+ All Categories
Home > Documents > The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a...

The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a...

Date post: 09-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
21
The Equestrian Order of the Holy Sepulchre of Jerusalem The Order‘s Projects in 2007
Transcript
Page 1: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

The Equestrian Order of the Holy Sepulchre of

Jerusalem

The Order‘s Projects in 2007

Page 2: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

The worldwide Order supports the Latin Patriarchate of Jerusalem every year. This money pays for the upkeep of priests, the running costs of the Patriarchate and several humanitarian projects –

as well as school fees

for Christian children in Catholic school

Page 3: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

In 2007 the Equestrian Order of the Holy Sepulchre of Jerusalem financed additionally 8 projects.

The majority consisted of the construction of parish and school centres, the school renovations and the refurbishment of parish halls and presbyteries.

(All Photos are courtesy of Dr. Christa von Siemens

Photo from Aboud

Latin Patriarchate)

Page 4: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Beit Jala (Palestine) School Extension

A new floor of around 1100 m2. has been built above the existing kindergarten. It will include 6

new

classrooms for 150 students in total, 2

laboratories, a library and a multipurpose hall. The Order is paying 50% of the total costs. The Project has been officially inaugurated on November 15.

Page 5: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Project sponsored by the Lieutenancies of

USA Northwest

Italy Adriatic Italy Tirrenic Italy Northern

France Ireland Belgium

Nederland

Page 6: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Beit Jala

New floor in construction

Page 7: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Rameh

( Israel) School

Construction of a security bunker for the children and two extra floors providing and additional 1010 m2

of space (8 new classrooms and a library) were completed by the end of September. This will allow children the opportunity of a full

education, from kindergarten to the end of junior high school.

Project sponsored by the Lieutenancies of

Italy Adriatic

Luxembourg Ireland

Canada Montreal

Page 8: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Rameh

Classroom

Page 9: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Fuheis

(Jordan) School 1st Phase

There is a constant increase of the Christian population in the area serviced by the school. The construction of a new 4-storey building is required. The first phase consists of the foundations and the ground floor.

Project sponsored by

the Lieutenancy of

England and Wales

Page 10: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Fuheis

Students

Page 11: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Jifna

(Palestine) Presbytery

The parish priest’s house has been completely renovated, including new fixtures and fittings in kitchen and bathrooms, new windows and renovation of the external facade.

Project sponsored by

the Lieutenancy of

Switzerland

Page 12: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Jifna

Kitchen

Page 13: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Rafidia

(Palestine) Church

The purpose of the Project is to strengthen the structure (cracks have developed in the walls owing to rainwater penetration beneath the foundations), building a new roof, rearranging the front access road and renovating the electrical system and part of the furnishings. So far, the start

of the Project has been delayed because additional technical appraisals are required.

Project sponsored by the Lieutenancies of

Germany Austria

Canada Toronto Nederland

Page 14: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Rafidia

Front Access

Page 15: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Beit Jala (Palestine) Furniture for the Parish Hall

The hall dedicated to Mme. Verreet has been furnished completely.

Project sponsored by the Lieutenancy of

USA Northwest

Page 16: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Beit Jala

Hall

Page 17: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Aboud

(Palestine) Furniture for the Parish Hall

The hall was completely furnished

Project sponsored by the Lieutenancy of

Italy Central/Sardinia

Page 18: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Aboud

Parish Hall

Page 19: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Patriarchate (Jerusalem) Headquarters

The purpose of the Project is to replace 3 large windows in the Cathedral and 15 other smaller windows on the first floor of the Patriarchate and to clean and re-point the stone walls of the relevant façades. So far, the start of the Project has been delayed because of the need to evaluate the most suitable way of executing the work.

Project sponsored by the Lieutenancy of

Germany

Page 20: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

Latin Patriarchate

Façade

Page 21: The Equestrian Order of the Holy Sepulchre of Jerusalem · Rameh ( Israel) School Construction of a security bunker for the children and two extra floors providing and additional

DEUS LO VULT

Mare di Galilea

Sea of Galilee


Recommended