The Evolution of HVAC SoftwareThe Evolution of HVAC Softwareand the Revolution of BIM!and the Revolution of BIM!
Presented by Joseph V. Simmons, P.E.
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIMWhat …
• What has been!• What is!• And what will---be the role of software in
the HVAC industry?FOR
•Consultants•Contractors•Manufacturer’s Representatives•Building Owners
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Building Loads
• Hand Calculate• TI 59 Calculator
• Spreadsheets• Carrier• CHVAC ELITE• Trane
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Manufacturers’ Equipment Selection
• Pump Manufacturers– Heat Exchanger– Expansion Tanks
• Selections of COILS• Fan Manufacturers• Major Manufacturers: Trane, York,
Carrier, and McQuay
W WO
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Energy Analysis
• DOE2 / eQuest• Blast• Energy Pro• Visual DOE• Green Building Studio !• Carrier HAP• Trane
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
What is
BIM ?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Terminology from ASHRAE
• BIM
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Terminology from ASHRAE
• BIM• 3-D BIM
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Terminology from ASHRAE
• BIM• 3-D BIM• 4-D BIM
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Terminology from ASHRAE
• BIM• 3-D BIM• 4-D BIM• 5-D BIM
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Definition from ASHRAE
BIM: Human activity of using BIM software and technologies to model the building.
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Definition from ASHRAE
3D BIM: A model that includes 3-D shapes.
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Definition from ASHRAE
4D BIM: A 3D BIM that has cost information.
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
BIM Definition from ASHRAE
5D BIM: A 4D BIM that has a schedule and time constraints.
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
WHYis BIM
so important to usNOW and in the FUTURE?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
It’s All About POWER
The rate at which work is performed.
LoadsEnergy Analysis
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
It’s All About POWER
• To our projects and clients in making better decisions and choices, and about getting projects built RIGHT and in less time!
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
What is the Power ofBuilding Information Modeling (BIM)?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
ASHRAE Definition
Building Information Modeling:
The ability to allow the whole building or system to be optimized in lieu of optimizing individual components.
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
What Software Modelsthe Whole Building
and all of it’s Systems?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM Not any that I
know of!
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
IPD
• Integrated Project Delivery– Using powerful programs to optimize
our buildings and systems!
– Procedure– Cost and Schedule
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Powerful Programs/Platforms
• Autodesk and Bentley Products– Revit, Micro-station
• gbXML• Loads Software• Energy Analysis• HVAC Solution• Manufacturer’s Programs
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
General Office
• Accounting– QuickBooks, Sage, Timberline
• Project Management– Microsoft Project, Newforma, Primavera,
Excel• Cost Estimation
– RS Means, QuickPen, Quotesoft• Marketing
– PowerPoint, InDesign, Photoshop, ACT!• Specification
– MasterSpec, e-Specs, SpecLink– General, Word, ???
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
WHAT is the 1,000 Pound Gorilla?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Autodesk
• Revit Gorilla’s Appetite – Training Costs– Software Costs– Computer Costs– Two Big Monitors– Slow and Hard to work
with! 9,10, 11
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Our Clients are Typically Architects!
• Traditional Design, Bid and Build• Mechanical Engineer is Prime• Design Build We Work for Contractors• Design Build Contractors Work for Us• ????
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Deliverable Phases
– Schematic Design– Design Development– Construction Documents– Construction Administration– As-Built Drawings
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Be a Flexible Team Player
• Understand the Client and Project• Who are we working for?• Deliverable phases
• How can we be cost effective to meet the budget and schedule using powerful programs and IPD?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
3 Methods of Integrated Project Delivery
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Integrated Project DeliveryMethod #1
• Autodesk Revit– Run Loads Inside of Revit– Size and Optimize System?
• Duct sizing in Revit• Other systems as you currently do!• Hand calculations, Excel?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Integrated Project DeliveryMethod #1
• Final Deliverables, BIM and 3D BIM– Detailed Calculations– Ductwork and Piping Layout 3D Revit,
Rfa Files– Equipment Schedules– Schematics, Air Flow, Hydronic, and
Steam– Details of Equipment– Bills of Materials/Cost Estimation– Specifications
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Integrated Project DeliveryMethod #2
• Autodesk Revit• Export gbXML file from Revit• Import gbXML file, run loads
– Carrier– Elite CHVAC– TRANE
• Size and optimize system?– Duct sizing in Revit– Other systems as you currently do– Hand calculations, Excel?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Integrated Project DeliveryMethod #2
• Final Deliverables, BIM and 3D BIM– Detailed Calculations– Ductwork and Piping Layout 3D Revit,
Rfa Files– Equipment Schedules– Schematics, Air Flow, Hydronic, and
Steam– Details of Equipment– Bills of Materials/Cost Estimation– Specifications
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Integrated Project DeliveryMethod #3
• Autodesk Revit• Export gbXML file from Revit• Import gbXML file, run loads
– Carrier– Elite CHVAC– Trane
• Import gbXML file into HVAC Solution, then size and optimize systems
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Integrated Project DeliveryMethod #3
• HVAC Solution Output– Equipment Schedules– Equipment Selection– Detailed Calculations– Air Flow, Hydronic and Steam Schematics– Details of Equipment– Bills of Materials/Cost Estimation– Electrical Coordination Schedule– Control Points– Revit Files, RFA
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Integrated Project DeliveryMethod #3
• Final Deliverables, BIM and 3D BIM– Detailed Calculations– Ductwork and Piping Layout 3D Revit– Revit RFA File– Equipment Schedules– Schematics, Air Flow, Hydronic and
Steam– Details of Equipment– Bill of Materials/Cost Estimation– Specifications
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Back to the BIM Terminologyfrom ASHRAE
• BIM Optimize the System• 3-D BIM 3-D Model
Something to think about!
• 4-D BIM Cost• 5-D BIM Time/Schedule
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
What BIM or 3D BIM DeliverablesWill You Share With Others?
Share with the Contractor?
Share with the Owner?
Share with Other Consultants?
Share with the Reps?Share with the Facilities People?
YOU
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Two Simple Examples
• Floor plan from Architect 30 years ago
• How many of us currently run or review loads?
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
Shifting of Work!
• Optimize the Mechanical Systems• Controls • Energy Analysis• LEED• Construction Administration• Building Commissioning• What are we going to share? 4D, 5D
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIM
As
• Consultants• Representatives• Contractors• Building Owners
We have to stay on top of our game!
Th
e E
vo
luti
on
of
HV
AC
So
ftw
are
a
nd
th
e R
evo
luti
on
of
BIMQ & A