+ All Categories
Home > Documents > THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

Date post: 19-Jan-2016
Category:
Upload: donald-thompson
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
10
THE FINANCIALS The loan for TPF campus
Transcript
Page 1: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

THE FINANCIALS

The loan for TPF campus

Page 2: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

Update

Page 3: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

THE FINANCIALS

For the building project

Page 4: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

The built up area

First Floor: 2123 sq ft

Ground Floor: 2128 sq ft

Basement Floor: 1641 sq ft

Page 5: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

Cost per floor

First Floor: 21 Lacs/ about 48,000 CHF

Ground Floor: 21 Lacs / about 48,000 CHF

Basement Floor: 16 Lacs/ about 36,000 CHF

Page 6: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

Constructing the Shishukendra

The activity spaces

A slide for the little ones!

Steps for the oldies!

Page 7: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

Ground Floor: Resource Center for Youth and Development

A training hall and space for print and net-based materials and resources

Page 8: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

The North side: Staff space

Office rooms

Workstations to seat up to 18 staff members

Page 9: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

The East side: the utility corner

The kitchen and store

The washrooms

Sit out and relaxation point!

Page 10: THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.

First Floor: Library and Training Hall

Training Hall for 20 – 25 participants

Library and Resource Center


Recommended