The following 3 Alabama slides were lifted from Alabama’s Cyberinfrastructure presentation at EPSCOR meeting in KY in October. There was no one from Alabama at the meeting. The person who gave the presentation used to be, but now works at Clemson. Here is a link to the University of Alabama System Regional Optical Network (UAS-RON) that David forward in October. http://www.advaoptical.com/default.a spx?id=610&releaseID=589 Looks like The Huntsville and Birmingham campuses are already connected to each other and to I2 and NLR, and that there are plans to link in Tuscaloosa, too.
Transcript

The following 3 Alabama slides were lifted from Alabama’s Cyberinfrastructure presentation at EPSCOR meeting in KY in October. There was no one from Alabama at the meeting. The person who gave the presentation used to be, but now works at Clemson.

Here is a link to the University of Alabama System Regional Optical Network (UAS-RON) that David forward in October.

http://www.advaoptical.com/default.aspx?id=610&releaseID=589

Looks like The Huntsville and Birmingham campuses are already connected to each other and to I2 and NLR, and that there are plans to link in Tuscaloosa, too.

Auburn

Tuscaloosa

Huntsville

Birmingham

Mobile

150 Mbs10 Gbs

State Research Network

2

Alabama Research and Education Network (AREN)

AREN provides Internet access for Alabama state government, four-year universities, two-year colleges, K-12 schools, and libraries. Legislative appropriations from the Alabama Education Trust Fund provide this access at no cost to a limited number of public schools and colleges. Customers from private schools, 'general fund' state agencies and commercial customers continue to pay fully for services at standard rates.

3

Alabama Campus Networks

• UAB campus backbone is 10 Gbs– Internet2 is OC3 ATM (150Mbps)– Internet1 is 150Mbps

• UAH campus backbone is 10 Gbs– 10 Gb connection to National Lambda Rail– OC3 ATM to Internet2– 45Mb or 55Mb commodity Internet (through AREN

and ISPs)• Alabama Regional Optical Network (RON)

operated by Southern Light Rail expected live in 2007

• Auburn campus backbone is fiber optic– Internet2 is OC3 ATM

4

The following 4 Kentucky slides were lifted from Al Lind’s presentation at EPSCOR meeting in KY in October.

I’m sure Al would be glad to give you and update! On the timeline, etc.

KEN Current Network

KENKentucky Education Network

ATT Internet

KPENKIH-2 Dual Peering

176 K12 Districts – 10Mbps/100Mbps

75 Postsecondary Locations – 10mbps/1gbps

WIndstream Internet

KyRON Network

Internet2

Quilt InternetInternet

Commercial Peering

UofL

UK10 G

ig

Level3 OpticalSwitching Node

Combined NetworksKEN

Kentucky Education Network

ATT Internet

KPENKIH-2

Internet2

Windstream Internet

Quilt InternetInternet

Commercial Peering

UofL

UK

Dual Peering

176 K12 Districts – 10Mbps/100Mbps

75 Postsecondary Locations – 10mbps/1gbps

10 G

ig

Level3 Optical Switching Node

Future NetworkKEN

Kentucky Education Network

ATT Internet

KPENKIH-2

Internet2

Windstream Internet

Quilt InternetInternet

Commercial Peering

UofL

UK

Dual Peering

176 K12 Districts – 10Mbps/100Mbps

75 Postsecondary Locations – 10mbps/1gbps

10 G

ig

Level3POP

All Universities

The following South Carolina slides were lifted from SC’s presentation at EPSCOR meeting in KY in October.

Here is an article from March 07 about the SC House of Representatives providing 1.5 million to each of 3 universities in SC to pursue this. Not sureif that ended up being signed into law. – JHhttp://www.ciclt.net/clemson/main.asp?PT=n_detail&Client=clemson&N_ID=200080

From Tennessee’s presentation

• I am not sure exactly what hope springs eternal means in this next slide.I talked with the guy who gave this presentation (Tennesee’s EPSCOR officer), and asked him whether Tennesee’s research universities were already connected via fiber. He saidyes, but I don’t know. Not sure what “upon completion” means on the next slide.JGH.

•The second slide I pulled from a 2006 presentation I found by Doug Hurley. Not sure when the five year plan was to start and end, and what the status is. I got the idea from the UT guy I spoke with at EPSCOR that the plan had notgone so well. Thus, the Hope Springs Eternal comment. - JGH

Hope Springs Eternal

•The OneTenn network with storage depots directly attached.

•4 year sites will connect at 10Gbps; 2 year sites will connect at 2.4 Gbps.

•Total storage available in aggregate ~ 1PB. Approximately 550 TB's distributed among twelve 4-year schools, 140 TB's at 13 2-year campuses, and 340 TB's at the Tennessee Technology Centers and early adopter P-12 sites.

•While the Tech Centers and participating P-12 sites, are not connected to the backbone, and hence not shown on the map, the depots at their sites will facilitate their participation and increase their ability to benefit from OneTenn, especially in the area of multimedia content and video distribution.

The OneTenn infrastructure upon completion of the five year planThe OneTenn infrastructure upon completion of the five year plan

Q/A

Doug HurleyVP, Information Technology/CIO and Chairman,

FedEx Institute of Technology

University of Memphis

(901) 678.8324

[email protected]

Arkansas

• Arkansas Research and Optical Network (AERON)• Connected UA in Phase 1, 2006. More universities were to

be connected this year, after a bond issues was approved, once Phase 1 demonstrated success in an experiment linking UA with LSU. - JGH

• http://dailyheadlines.uark.edu/9773.htmThis is a press release from Dec 2006, which mentions Mike Huckabee’s having provided $6.4 million in state funding for the project.

http://www.gridtoday.com/grid/1189252.html

20

Fayetteville

Magnolia

RussellvilleFort Smith

Arkadelphia

Conway

Monticello

Pine Bluff

Jonesboro

Little Rock

TULSA

DALLAS

MEMPHIS

MONROE 25-July-2006

AREONAREONArkansas Research and Education Optical NetworkArkansas Research and Education Optical Network

We A

RE ON !

21

• The first bond issue (last fall) failed

• Governor Huckabee of Arkansas granted $6.4M (PI Zimmerman)

• MBO loop between Tulsa and Fayetteville fiber is in place, network hardware is being shipped

• The campus (last mile) connections are in progress

All is on target for a demo to the Governor on 12/5/06!

Fayetteville

Magnolia

RussellvilleFort Smith

Arkadelphia

Conway

Monticello

Pine Bluff

Jonesboro

Little Rock

TULSA

DALLAS

MEMPHIS

MONROE

AREONAREONArkansas Research and Education Optical NetworkArkansas Research and Education Optical Network

AREONAREONArkansas Research and Education Optical NetworkArkansas Research and Education Optical Network

• This fall, Uark will have connectivity to Internet2 and the National Lambda Rail

• The bond issue is on the ballot again this coming fall

• If it passes then the other research institutions will be connected to AREON

We hope this happens! (THIS DID HAPPEN- JGH)

• The timeframe for this is about a year and a half

AREON Backbone

UARK

SAU

ATUUAFS

HSU

UCA

UAM

UAPB

ASU

UALRUAMS

TULSA

DALLAS

MEMPHIS

MONROE

Oklahoma

http://www.onenet.net/technical/category4/research_corridor.htm

The Oklahoma Research corridor, which I (Jason) believe is complete, connects OU, OSU, University of Tulsa, and the OU Health Services center on optical fiber.