The Graciosa Project Adios supertankers, ahoy energy autonomy
Basel, 21 February 2012Martin Röder
Inhabitants: 4500
Area: 67 km2
Peak load: ~ 3 MW
Electricity consumption: ~14 GWh
Energy supply: Fossil fuels (85%)Wind power (15%)
Local Utility: EDA
Graciosa Island (Azores)Graciosa Island (Azores)
Graciosa’s current power system
Power station 4200 kW
(Fuel consumption ~ 4 Mio. l/a)
Adios supertankers, ahoy energy autonomy
Project Graciosa: 70-80% renewables
Island Test SiteTo address technical issues in island projects, we set up the Island Test Site to simulate up to 100% renewable energy systems. The grid based system can be configured to use wind, irradiation and load measurements from anywhere.
Potential for wind and solar Potential for wind and solar energyenergy
daily average 3.3 kWh/m2d
estim. yield 1.3 MWh/kW
Wind speed @ 15 m > 9 m/sestim. yield 3.0 MWh/kW
7
02468
101214
J F M A M J J A S O N D
Month
m/s
0
1
2
3
4
5
6
J F M A M J J A S O N D
Month
kW
h/m
2-d
ay Solar radiation
Wind
Expected Results: