The Hidden Power of Sewage. St. Paul’s Co-educational College. Lo Ka Shun, Parco Tsang Tin Ki, Angela Wong Ho Gan, Albert Poon Wing Yiu, Sarah. How much sewage we Hong Kong people produce each day?. X 1400. 2.6 million cubic metres!!. Working Principle. - PowerPoint PPT Presentation
Popular Tags:
14
The Hidden Power of Sewage St. Paul’s Co-educational College Lo Ka Shun, Parc o Tsang Tin Ki, An gela Wong Ho Gan, Alb ert Poon Wing Yiu, S arah
Transcript
Page 1: The Hidden Power of Sewage

The Hidden Power of Sewage

St. Paul’s Co-educational College Lo Ka Shun, Parco

Tsang Tin Ki, AngelaWong Ho Gan, Albert

Poon Wing Yiu, Sarah

Page 2: The Hidden Power of Sewage

How much sewage we Hong Kong people produce each

day?

Page 3: The Hidden Power of Sewage

2.6 million cubic metres!!

X 1400

Page 4: The Hidden Power of Sewage

Working Principle

.• Utilize kinetic energy of running sewage

Sewage rushes down along the pipes outside buildings

Large kinetic energy spin a watermill

A dynamo changes kinetic energy to electricity

Page 5: The Hidden Power of Sewage

Preliminary Model

1.5 metres long plastic PVC water pipe

plastic box with a watermill

Page 6: The Hidden Power of Sewage

Preliminary Model

Drawbacks• Some water escapes

without spinning watermill

• Some water rebounds back onto the watermill– hinder the rotation.

Page 7: The Hidden Power of Sewage

Advanced Model

1.top and bottom each have a hole for the entry and exit of water

2.Slightly tilted plane

3.An arc is craved for the watermill to tuck in

4.space below the watermill is enlarged

Page 8: The Hidden Power of Sewage

Advanced Model

Page 9: The Hidden Power of Sewage

Output Power• Measuring Setup:

– An electronic water pump – Amount of water pumped

to our model is kept at a constant

• Water velocity

=0.4516 m/s²

– AC-DC transformer in our advanced model

Page 10: The Hidden Power of Sewage

• Procedures:– Substituted the resistor and

– re-measure the current and voltages

– calculate output power

• Output voltage is very stable

• ~5 batteriesX 5

Output Power

Page 11: The Hidden Power of Sewage

Applications

• Widely used, especially in big cities like Hong Kong

• modified and installed in underground pipes to generate electricity

Page 12: The Hidden Power of Sewage

Further Improvement

• Further Investigation on – How many of our device is to be installed in a

pipe outside a building– What interval between devices can achieve

the maximum electrical output

• Further develop:– Use lighter material to make the watermill– Use a more corrosion resistance material

Page 13: The Hidden Power of Sewage

Conclusion• clean, inexpensive energy resource.

• easy to build

• applying this alternative energy resource in a large scale,

• the reliance on burning fossil fuels for energy

• environmental damage, e.g. global warming

Page 14: The Hidden Power of Sewage

Thank You!