RFP CMc Services WPR Project - Addendum 1 190807
The Indianapolis Public Library 1
THE INDIANAPOLIS PUBLIC LIBRARY
REQUEST FOR PROPOSALS
CONSTRUCTION MANAGER AS CONSTRUCTOR
SERVICES FOR THE
WEST PERRY BRANCH LIBRARY PROJECT
ADDENDUM 1 Addendum
Issue Date: August 7, 2019
Contact: Michael Coghlan
Facilities Project Manager
The Indianapolis Public Library
2450 North Meridian Street
Indianapolis-Indiana 46208
Telephone: (317) 275-4830
E-mail: [email protected]
Web Site: http://www.indypl.org
RFQ Issue Date: July 24, 2019
RFP CMc Services WPR Project - Addendum 1 190807
The Indianapolis Public Library 2
1. Add the Draft Agreement as Attachment E.
The Draft Agreement AIA A133 Owner/Construction Manager as Constructor
Agreement 2009, as modified is included as Attachment E
Attachments:
AIA A133 Owner/Construction Manager as Constructor Agreement 2009, as modified.
August 2, 2019 Pre-Proposal Conference Memorandum (2 pages).
August 2, 2019 Pre-Proposal Conference Attendees Sign-in Sheet (2 pages).
End of Addendum 1.
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
RFP CMc Services WPR 190807 Attachement E Addendum 1 190807
Pre-Proposal Conference Memorandum
Indianapolis-Marion County Public Library 2450 North Meridian Street Indianapolis, Indiana 46208
Date: August 2, 2019
Time: 9:00 am
Location: Library Services Center, Room 226
Regarding: Pre-proposal Conference
RFP Construction Manager as Constructor Services for the
West Perry Branch Library
Attendees: Sign-in Sheet Attached
1. Welcome, Introductions and Overview:
.1 Introduced the IndyPL Evaluation Committee attendance:
Jackie Nytes, CEO, Sharon Smith, Director Facilities, Jessica Moore,
Diversity, Equity, and Inclusion Officer. Ron Fisher, Schmidt
Associates will serve as an advisor to the Evaluation Committee.
.2 Offerors are advised the received Proposals are considered Public
Records. Refer to the RFP for instructions on procedures to handle
confidential information.
.3 Questions and clarifications concerning the RFP are to be handled
in writing via e-mail.
2. Services Overview:
.1 Overall Project goals and intent is part of the Strategic Plan
Implementation Projects. The goal is to have the Project complete
are operating by the middle of May 2021 to be ready for the
Summer Reading Program.
.2 Scope of the Services – Attachment A, page 15. Ron Fisher stated
they have experience with the CMc process and there is the
potential for valuable input from the CMc on schedule,
constructability, and construction cost.
.3 Diversity and Inclusion in Employment, page 6. Jackie Nytes stated
the CMc delivery method is new for IndyPL and is a conscious
attempt to expand the XBE participation in our Projects. We have a
good track record in this area. We are looking for leadership from
the CMc in this effort.
.4 Iran Investments are described in the RFP.
.5 Insurance requirements are described in the RFP.
.6 E-Verify requirements are described in the RFP.
3. Proposal format requirements are described in the RFP:
.1 Cover letter.
.2 Offeror Proposal Sheet and Non-Collusion Affidavit.
.3 Offeror Profile, Experience, and Staff.
.4 Offeror’s history of contracting with XBEs is to be a detailed
tabulation and not just an overall report.
Pre-Proposal Conference Memorandum
Date: August 2, 2019
Regarding: Pre-proposal Conference
RFP Construction Manager as Constructor Services for the
West Perry Branch Library
2
.5 Offeror’s history of good faith efforts to fulfill client’s goals is to be a
detailed tabulation and not just an overall report.
.6 Approach, processes, and procedures to promote XBE contracting.
.7 Sample Work Plan.
.8 Offeror’s anticipated self-performed Work.
.9 Offeror’s approach to determine the GMP.
.10 Financial statements or other suitable documentation.
.11 Documentation on ability to meet insurance and bonding limits.
.12 Executed E-Verify Affidavit.
.13 Offeror’s exceptions to the Terms and Conditions.
4. Proposal Submittal Deadline – August 14, 2018, 2:00 pm Local Time.
.1 1 original, 5 copies, and 1 .pdf required.
.2 Page limit of 60 double-sided Sheets
5. Selection Process and Evaluation Criteria:
.1 IndyPL expects to request additional information from selected
Offerors on August 29, 2019.
.2 IndyPL expects to have discussions with Offerors reasonably
susceptible of being awarded the contract during the afternoon of
September 4, 2019.
.3 The evaluation criteria follows directly from the Offeror’s Statement
of Qualifications:
1) The satisfaction level of current and former clients, Architects/
Engineers, and First Tier Subcontractors of the Offeror under
contracts similar to the requirements of IndyPL.
2) Proposed fees.
3) XBE participation history.
4) Perceived effectiveness of the Work Plan.
5) Qualifications of the proposed Project Team.
6) Any other criteria deemed relevant by IndyPL.
6. Questions:
.1 Question: Will the Project design be available in Revit?
Answer: Yes.
.2 Question: When will the A133 be available for review?
Answer: The plan is to issue it as an addendum on August 5, 2019.
End of Memorandum.