Test Automation of SCON
- Project Proposal
Anantara Solutions Private Limited
Table of contents
1. About Anantara
2. The Business Landscape
3. Business Problem
4. Proposed Solution
5. Project Requirements
6. Similar Accomplishments
7. Our Approach
8. Proposed Schedule
9. Assumptions and Risks
10. Deliverables Summary
11. Deliverables from Siemens
12. Proposed Team for Phase-1
2Copyright Anantara Solutions Private Limited 2007. All rights reserved.
About Anantara
<>
3Copyright Anantara Solutions Private Limited 2007. All rights reserved.
The Business Landscape
SAP 41(Main Manufacturing)
M.C.M.
SHARE(Oracle Siebel)
SCON
Configure
VB App
E-Commerce
Country Specific Instances of SAP
SAP 40 - USA
SAP 45 – Germany
SCON: Quotation Generation application uses complex algorithm for various product types; details fetched from SHARE
The Business Landscape
SAP system maintains all
details of products and prices
Diagrams & Literature are maintained in MCM, which provides the data to e-commerce website
& the SHARE Siebel system
Siebel system manages
quotations through SCON, a VB application
SCON is driven by complex and detailed logic for quotations, which has validation
requirements
The Business Problem
Logic is complex in SCON quotation module
60-70% of the changes impact SCON
Around 200 test cases in SCON, low test coverage per release cycle
60-75% effort of new releases goes into validation of quotations
Long cycle time for Manual Test Runs of highly business-critical system
Complete manual regression testing of SCON not achieved usually
6Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Proposed Solution
Phased approach towards automation of SCON regression testing
Phase1 Pre-POC
Understand the requirements in detail
and develop automation plan
Phase2 POC
Develop a proof-of-concept
demonstrating the identified test cases
Phase3 Project
Develop the test automation framework
and deliver the complete solution for regression testing of
SCON
7Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Project Requirements
•Understand the ecosystem involving SAP-MCM-Share-SCON
•Develop understanding of quotation logic using onsite interactions and documentation
•Identify complete list of test scenarios with priorities
•Validate existing order management system
•Design automation solution for regression tests of SCON
•Deploy data generation for quotation module, which is complex and has extensive testing cycles
•Handover of automation solution to Siemens with detailed training artefacts
Our Approach: Pre-POC to Project Initiation
Pre-POC (2-3 consultants working onsite for 3 weeks)
• Study the requirements, environment and identify tests to be automated
• Will cover requirement analysis and designing the approach for POC
• Deliverable: Proposal presented for the POC phase
Proof Of Concept (offshore team over approx. 10 weeks)
• Automation solution development of identified POC tests
• Test automation environment set up, and automation approach finalized
• Deliverable: Demonstration of identified paths for automation
Project (offshore team with onsite coordinator)
• Implementation of automation for complete set of test cases
• Cost of consulting plus expenses• Deliverable: complete solution with extensive training
videos
Our Approach: Pre-POC to Project Initiation
10Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Proposed Pre-POC phase schedule
11Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Assumptions and Risks
Assumptions
•Current state of defects to be provided along with the system•Parallel development will be minimum during automation development•Availability of SMEs, documentation and stage data for automation development
Risks•Variations in planned scope of POC or project can impact timelines•Access to Siemens environment for offshore team•Availability of Siemens team for regular review of progress
12Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Deliverables Summary
Pre-Phase
Complete requirement analysis
Identification of apt automation tool
Identification of automation methodology
Identification of test cases for POC
Definition of POC objectives and scope
13Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Deliverables from Siemens
Training/ demonstration on:
• SCON functionalities
• Logic of quotation-generation
• Integration with SHARE and other systems
Availability of:
• Subject Matter
Experts• Documentation• Source code
Top management buy-in for:
• Automation tool to be used
• Automation approach
14Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Case Study
15Copyright Anantara Solutions Private Limited 2007. All rights reserved.
SIMILAR BUSINESS CHALLENGE
Configuration driven AUT
- 3 million test flows- New flows with every new customer/study- Manual testing causing business loss
- Complete coverage through manual testing impossible
- Long regression test cycles
TEST AUTOMATION DESIGNED FOR AUT
Reduced testing cycle from 6 weeks to 5 days per release
Saves 3 person years of test effort per year
Total savings in testing costs USD 1.2 million at current rate
Solution adapts to customizations (Self-navigation feature)
Executes test-flows automatically for all regression/study tests
Generates test data on the fly
Covers both positive and negative tests
Executes comprehensive workflow branches and conditional tests
Creates XML based reports – compatible with web/MS
* References available on request
Our Team for Pre-POC
Deepak Mehta
• Principal Consultant
• 16+ years experience in test strategy design, planning and execution
• PMP Certified, rich experience in Consulting, project planning and execution
• Hands-on with multiple technologies with specific expertise in systems integration, test automation, & system design
16Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Deepak Mehta
Our Team for Pre-POC
Amit Kulshrestha
• Senior Consultant
• 11+ years experience in test strategy design, planning and execution
• Adept in requirement analysis and solution designing
• Expertise in functional test automation, database testing, manual testing
• Development experience with VB 6.0
• Hands-on with QTP, WinRunner, Test Complete
• Exposure to performance testing of web applications
17Copyright Anantara Solutions Private Limited 2007. All rights reserved.
Amit Kulshrestha
18
Thank you
Helping You Compete Better !
www.anantsol.com
Copyright Anantara Solutions Private Limited 2009. All rights reserved.