The Joint Commission Update 2013 Dave Dagenais
Transcript
Page 1: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

The Joint Commission Update 2013

Dave Dagenais

Page 2: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Ranking Results: 11 out of 21 in 2012Top 20 Rank Standard

2012 RFIs 2011 RFIs Subject

2 LS.02.01.20 51% 56% Means of Egress

3 LS.02.01.10 46% 52% General LSC Requirements

5 EC.02.03.05 40% 40% Features of Fire Safety

6 LS.02.01.30 39% 45% Life Safety Protection

7 EC.02.06.01 35% 31% Built Environment

9 LS.02.01.35 34% 29% Fire Suppression Systems

10 EC.02.05.01 33% 23% Utility Systems (Ventilation)

11 EC.02.02.01 30% 25% Hazardous Materials & Waste

15 EC.02.05.09 23% 22% Medical Gases

17 EC.02.05.07 22% 26% Emergency Power

21 EC.02.03.01 19% 21% Fire Safety

Page 3: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#2: LS.02.01.20 51%• The hospital maintains the integrity of the means of

egress.• EP 1 Door locking• EP 13 Corridor Clutter• EPs 16 – 21 Suites issues

• Boundaries & Size defined• Sleeping Suite <5000 sq ft• Non-sleeping suite <10,000 sq ft

• EP 22: Patient sleeping room is not locked• EP 27-28: Lighting

Page 4: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Doors: Locking EP 1• Doors within a required means of egress shall not be locked

from the egress side• Exceptions

• Clinical needs of the patient for security measures – staff must be able to unlock at all times

• One (1) delayed-egress lock in any egress path• Access controlled in accordance with 7.2.1.6.2

• 3 types of locking arrangements found: • Clinical Needs Locking• Delayed Egress Locking• Access Control Locking

Page 5: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Corridor Storage• “If the corridor looks cluttered…it probably is”

• Carts Allowed:• Crash Carts• Isolation Carts• Chemo Carts

• Anything in the egress corridor more than 30 minutes is storage

• Dead end corridors may be used for storage • Less than or equal to 50sqft space

Page 6: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Suites • Not identified on drawings

• Boundaries• Dimensions• Exits

Page 7: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Egress Illumination EP 27• Means of egress are illuminated

• Corridors• Passageways• Stairways• Stairway Landings• Exit Doors• Exit Discharges

• Angles and Intersections of the above• Must be illuminated within 10 seconds

Page 8: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Egress Illumination EP 28• Failure of one bulb or fixture shall not result in total darkness

• Minimum illumination required is 0.2 foot-candle in any designated area

8

Page 9: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#3: LS.02.01.10 46%• Building and fire protection features are designed and

maintained to minimize the effects of fire, smoke, and heat.

• EP 9 Fire Barrier Penetrations• EPs 5 – 7 Door issues• EPs 1 & 2 Building Type issues• EP 8 Duct issues

Page 10: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#5: EC.02.03.05 40%• The hospital maintains fire safety equipment and fire safety

building features.

• Features of fire protection

Page 11: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Need for Inventory• EC.02.03.05 EP 1 – 20:

• Each device that is required to be tested must be documented in an inventory• If x devices were tested last year, and x-1 were tested this

year, which device was missed?• Each device must be on the inventory to identify which

device was missed• Total number of devices (quantity) is not adequate

• Lack of an inventory (written, electronic or other) results in a finding at each EP

Page 12: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

EC.02.03.05EPs 1 -20: • Missing documentation: scored at each EP as non-

compliant• Also write a finding at EP 25 for documentation not being

readily available to the AHJ

• LD.04.01.05 EP 4: Staff held accountable• If 3 or more findings at EC.02.03.05 EP 1 – 20

Page 13: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

EC.02.03.05 EP 25Name of the activityDate of the activityRequired frequency of the activityName and contact information, including

affiliation, of the person who performed the activity

NFPA standard(s) referenced for the activityResults of the activity

Page 14: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#6: LS.02.01.30 39%

• The hospital provides and maintains building features to protect individuals from the hazards of fire and smoke.• EPs 16 – 23 Smoke Barriers & Doors• EP2 Hazardous Areas

Page 15: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

LS.02.01.30 EP 1• Vertical Openings

• The following vertical openings must be enclosed with at least 1-hour fire rated construction:• Exit stairs (unless >4 stories, then 2-hour FRR)• Ramps• Elevator Shafts• Ventilation Shafts• Light Shafts• Trash or linen chutes• Utility chases

Page 16: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

LS.02.01.30 EP 2• Hazardous areas defined, include, but not limited to:

• Laboratories that use flammable or combustibles in quantities less than those considered severe hazard

• Laboratories that are determined severe hazard• Areas used for general storage >50ft2 • Central / bulk laundries >100ft2 • Boiler or furnace room• Soiled Linen & Trash Collection Rooms• Fuel storage• Janitor closets and • Maintenance & Paint shops

Page 17: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

LS.02.01.30 EP 4 & 5• Interior Wall, Floor, and Ceiling Finishes

• In existing buildings, interior finishes are required to be rated Class A or B

• When newly installed, finishes must be Class A

Page 18: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

LS.02.01.30 EP 6 & 7• Corridor Partitions

• Partitions that separate corridors in unsprinklered areas must be:• ½-hour Fire rating, continuous from floor slab to

underside of the floor or roof above, through any concealed spaces, such as those above suspended ceilings and including interstitial spaces

• Constructed to limit the transfer of smoke with all penetrations properly sealed

• NOTE: If sprinklered, ceiling is allowed to be the smoke barrier

• In new buildings, unrated walls are smoke tight

Page 19: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

LS.02.01.30 EP 9 – 11• Corridor Doors

• Doors must be substantial, made of >1¾ inch solid bonded wood core or equivalent (without louvers unless wet locations)

• Free of protective plates >48” above the bottom of the door

• Doors must be fitted with positive latching hardware and able to restrict the movement of smoke

• All corridor doors must swing. Pocket or sliding doors are not acceptable

Page 20: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#7: EC.02.06.01 35%• EP 1 Interior spaces meet the needs of the patient population

and are safe and suitable to the care, treatment and services provided

• The organization must provide a safe environment• Unsecured oxygen cylinders• Child safe plugs

Page 21: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

EC.02.06.01• EP 13 The organization maintains ventilation, temperature

and humidity levels suitable for the care, treatment and services provided

• Ventilation: • i.e. doors held open by air pressure; odors

• Temperature: • Hot / Cold calls

• Humidity• Primary concern is for areas >60%RH

• Mold growth is possible• EP 20: Patient care areas are clean and free of offensive

odors

Page 22: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#9: LS.02.01.35 34%

EP 1: monitor authorized automatic sprinkler systemEP 2: water flow alarm

• There are 18” or more of open space maintained below the sprinkler deflector to the top of storage.

NOTE: Perimeter wall and stack shelving may NFPA 13-1999, 5-6.6

Page 23: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

18” rule18”18”

OK OK OKWrong

Wall Wall

Ceiling

Perimeter Shelving Perimeter

Shelving

Page 24: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#10: EC.02.05.01 33%• EC.02.05.01 EP 1: Improper system design

• Inability of the mechanical system to achieve required results

• EC.02.05.01 EP 4: Lack of written inspection, testing & maintaining frequencies

• Continuous monitoring by a building automation system (BAS) is acceptable

Page 25: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

EC.02.05.01• EC.02.05.01 EP 6: Ventilation system is unable to provide

appropriate pressure relationships, air-exchange rates and filtration efficiencies• Specific areas lack

• negative or positive pressures in relationship to adjacent areas • i.e. Endoscopy Processing Room should be negative to

the egress corridor• the correct number of air changes per hour • Improper filtration

Page 26: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

EC.02.05.01 EP 6

In areas designed to control airborne contaminants (such as biological agents, gases, fumes, dust), the ventilation system provides appropriate pressure relationships, air-exchange rates, and filtration efficiencies.

Page 27: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Air Pressure Relationship Testing

Electronic Monitoring

Smoke Testing

Flutter Strip Testing

Page 28: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#11: EC.02.02.01 30%Hazardous Materials and Waste• EP 1: Inventory• EP’s 3 – 5: Personal Protective Equipment and the process to

manage hazardous materials and waste handling and exposures

• EP’s 6 – 7: Hazardous energy sources• Escorts to Hot Lab based on organization policy

• Perspectives, July 2012

Page 29: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Personal Protective Equipment Testing

LEAD APRONS

DOSIMETRY BADGES

Self -Contained Breathing Apparatus

• Accurate inventory• Testing frequencies (based on policy)

• Training for PPE users

Page 30: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Gases & Vapors • EP 10: Gases and vapors that are monitored include, but are

not limited to• Formaldehyde• Ethylene Oxide (EtO)• Glutaraldehyde• Waste anesthetic gases• Acetic Acid• Methyl/Ethyl Alcohol

Page 31: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#15: EC.02.05.09 23%

• Medical Gas Systems• EP 1: Inspection Testing and Maintaining• EP 2: Test when modified, installed or repaired • EP 3: Obstructions• EP 3: Labeling

• Contents of piping• Areas served

• Accuracy

Page 32: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#17: EC.02.05.07 22%EPs 4 – 7 • Missed Generator & Automatic Transfer Switch (ATS) Tests

• 12 times per year between 20 & 40 days• Each emergency generator must be tested

with a load of at least 30% of nameplate• Each ATS must be tested

• Missed triennial 4 hour test

Page 33: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

#21: EC.02.03.01 19% • Fire Safety (EP 1)

• Open junction boxes• More than 300cuft of nonflammable medical gases (i.e.

oxygen) per smoke compartment, open to the egress corridor

• Fire Plan (EP 9 & 10)• Lack of fire safety training as per fire plan

• Surgical site fires

Page 34: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Categorical Waivers

Page 35: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

S&C 13-58• Issued August 30th, 2013

• Covers several “categorical waivers”

Page 36: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Medical Gas Master Alarms

• Allows substitution of a centralized computer system for (one) Category 1 medical gas master alarm.

Page 37: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Openings in Exit Enclosures

• Permits existing openings in exit enclosures to mechanical equipment spaces if they are protected by fire-rated door assemblies.

Page 38: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Emergency Generators and Standby Power Systems

• Reduces the annual diesel-powered generator exercising requirement from two (2) continuous hours to one hour and 30 minutes.

Page 39: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Doors

Allows more than one delayed-egress lock in the egress path where the clinical needs require specialized security measures or when a patient requires specialized protective measures for safety.

Page 40: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Suites

Accommodates the use of suites by allowing: (1) one of the required means of egress from sleeping and non-sleeping suites to be through another suite, provided adequate separation exists between suites; (2) one of the two required exit access doors from sleeping and non-sleeping suites to be into an exit stair, exit passageway, or exit door to the exterior; and (3) an increase in sleeping room suite size up to 10,000 ft2.

Page 41: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Extinguishing Requirements

Allows for the reduction in the testing frequencies for sprinkler system vane-type and pressure switch type waterflow alarm devices to semiannual, and electric motor-driven pump assemblies to monthly.

Page 42: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Clean Waste & Patient Record Recycling Containers

Allows the increase in size of containers used solely for recycling clean waste or for patient records awaiting destruction outside of a hazardous storage area to be a maximum of 96-gallons

Page 43: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

S&C 12-21

• Corridor Width• New “Effective” Corridor width

• Fixed furniture allowed• Rolling carts, equipment and

movement aids allowed

Bench c.c.

5’-0

8’-0

Page 44: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Decorations• Increases the amount of wall space that may be covered by

combustible decorations• 20% Not Sprinklered• 30% Sprinklered• 50% Sprinklered in patient room (less than 4)

Page 45: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Kitchens• Allows certain types of alternative type kitchen cooking

arrangements including kitchens, serving less than 30 residents, to be open to corridors as long as they are contained within smoke compartments

Page 46: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Fireplaces• Allows the installation of direct vent gas fireplaces in smoke

compartments containing patient sleeping rooms and the installation of

• solid fuel burning fireplaces in areas other than patient sleeping areas

Page 47: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

S&C 13-25• OR Relative Humidity• lowering the humidity requirement for operating rooms and

other anesthetizing locations from at least 35percent to at least 20 percent.

Page 48: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

How to request a categorical waiver• Document your desire and that you comply with the waiver

provisions in your policy and procedures manual.• Verbally announce that you are requesting the waivers at

each entrance interview of a survey• Check with your State Agency and verify the waivers will be

accepted for licensing• Indicate Life Safety waiver requests in your BBI• Indicate Environment of Care waiver requests in your

management plan

Page 49: The Joint Commission Update 2013 Dave Dagenais. Ranking Results: 11 out of 21 in 2012 Top 20 RankStandard 2012 RFIs2011 RFIsSubject 2LS.02.01.2051%56%Means.

Questions