Measure twice, cut once
• In most projects, the first system is barely usable.
• Should you built a throw a way system?
Building a throw away system
• The new version will include lessons learned.
• Produce a better product
• Better chance of success
Not building a throw away system
▪ Able to meet time deadlines
▪ Agony for the user
▪ Bad reputation
First built
This is a picture of the Tacoma Narrows Bridge. At the time, the third longest suspension bridge in the world.
General ConsensusSystems need more
management control.
Changes are inevitable.
• J. Cosgrove author of the article
“Needed: a new planning framework”
Treat all plans, milestones and schedules as tentative, so as to facilitate changes.
Changes continue
• Level of expertise
• Capitalize on capabilities
• Fixing problems create more problems