SHIP PRODUCTION COMMITTEE FACILITIES AND ENVIRONMENTAL EFFECTS SURFACE PREPARATION AND COATINGS DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION AND TRAINING THE NATIONAL SHIPBUILDING RESEARCH PROGRAM June 1977 NSRP 0003 Proceedings of the REAPS Technical Symposium Paper No. 22: Recent Developments in Computer-Based Systems at Kockums U.S. DEPARTMENT OF THE NAVY CARDEROCK DIVISION, NAVAL SURFACE WARFARE CENTER
Transcript
Page 1: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

SHIP PRODUCTION COMMITTEEFACILITIES AND ENVIRONMENTAL EFFECTSSURFACE PREPARATION AND COATINGSDESIGN/PRODUCTION INTEGRATIONHUMAN RESOURCE INNOVATIONMARINE INDUSTRY STANDARDSWELDINGINDUSTRIAL ENGINEERINGEDUCATION AND TRAINING

THE NATIONALSHIPBUILDINGRESEARCHPROGRAM

June 1977NSRP 0003

Proceedings of the REAPS Technical Symposium

Paper No. 22:Recent Developments in Computer-Based Systems atKockums

U.S. DEPARTMENT OF THE NAVYCARDEROCK DIVISION,NAVAL SURFACE WARFARE CENTER

Page 2: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE JUN 1977

2. REPORT TYPE N/A

3. DATES COVERED -

4. TITLE AND SUBTITLE The National Shipbuilding Research Program: Proceedings of theREAPS Technical Symposium Paper No. 22: Recent Developments inComputer-Based Systems at Kockums

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Surface Warfare Center CD Code 2230 - Design Integration ToolsBuilding 192 Room 128 9500 MacArthur Blvd Bethesda, MD 20817-5700

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution unlimited

13. SUPPLEMENTARY NOTES

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT

SAR

18. NUMBEROF PAGES

39

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

DISCLAIMER

These reports were prepared as an account of government-sponsored work. Neither theUnited States, nor the United States Navy, nor any person acting on behalf of the UnitedStates Navy (A) makes any warranty or representation, expressed or implied, with respectto the accuracy, completeness or usefulness of the information contained in this report/manual, or that the use of any information, apparatus, method, or process disclosed in thisreport may not infringe privately owned rights; or (B) assumes any liabilities with respect tothe use of or for damages resulting from the use of any information, apparatus, method, orprocess disclosed in the report. As used in the above, “Persons acting on behalf of theUnited States Navy” includes any employee, contractor, or subcontractor to the contractorof the United States Navy to the extent that such employee, contractor, or subcontractor tothe contractor prepares, handles, or distributes, or provides access to any informationpursuant to his employment or contract or subcontract to the contractor with the UnitedStates Navy. ANY POSSIBLE IMPLIED WARRANTIES OF MERCHANTABILITY AND/ORFITNESS FOR PURPOSE ARE SPECIFICALLY DISCLAIMED.

Page 4: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION
Page 5: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

RECENT DEVELOPMENTS IN COMPUTER BASED SYSTEMS

AT KOCKUMS

Kai Holmgren

Kockums Computer Systems AB

Malmo, Sweden

As the Director of Kockums Computer Systems, Mr. Holmgren is respon-

sible for all its activity (development of systems, marketing, computer

production, etc.). He has been with Kockums in various positions since

1961. Before that time, he was in charge of technical systems development

at the Swedish Aeroengine Company.

365

Page 6: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

�✎✎�✎ .8.000Turnover 1976 .430 million dollars

Shipyard

@

Shipping

. ?

Industriesqf highwaj@qcAk4;. *rnp truckstiggin twhicles “and systemd~,

... f.,Sqwmi] equipment and systefi

Automation ~,

EnergySystems

Page 7: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

– 0— + —\ - ●

J \

\. ‘\*/ ‘\— :>- –“’’p!!,

/ #—+— +

Computer- based

Page 8: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Characteristics of Shipbuilding

● Tailor-made product

● Short series● All activities concentrated aroundone complicated and expensive product

● Different types of design activities(Hull, out-fitting machinery)

. Different types of production

. Heavy product requiring extensive areas,transportations and lifting

● Much work done out-doors. Steel is costwise almost 50 ‘%o of thetotal material

I

contract

● Large volumes of design and workpreparation information (short series)

● Material information and standardizationvery vital.

production delivery Timestart. The overall planning and follow-up is veryessential (a ship represents a big and

)complicated project

Page 9: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

x

Page 10: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Material status

Work status

Resource planning

Plate and profile administration

Work preparation

Financial accounting

I

Page 11: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

I Central planning

I Detailed planning – design IDrawing offices

P

,

F w

,Hull Electrical Outfitting MachineryF

] Detailed planning – ProductionWorkshops

H u l l 4 ! + % H u l l w 1 0 u t f i t t i n g ~ M a c h i n e r y ~components assembly I

Planning levels for production

Planning units 1,000

Workshop orders 8,000

Jobs 80,000

371

Page 12: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

_

B. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BB. BE. BB. BB. BB. BB. BB. BB. B

% :B. B

E.:B. BB, B

nA. A332

. -

E.E.’E.E.E.E.E.E.E.E.E.E.E.E.D.A.A.A.A.A.A-A.A.A.342

E. F.‘E.E.E.E.E.E.E.E.E.E.E.E.E.D.B.B.B.B.B.B.

::

kA.~

A:A.A.338

E.E.E .E.E.E.E.E.E.D.D.D.D.D.D.

2A.A.A.A.A.A.A.A.A.

iA.A.A.346

I

15;

:I1

SCALE 3 I

A.A.A.350

A.

x K O C K U M S

Conversion of a networkinto a building programme

1 F“” ‘RODucTTYPE NO ICSELLAY FLOAT OIJTDOCK DE$WXVEXRY

TFITTIMiiRT D SECTIOX

s o

I l - n ’ . . 4 U . ” & ” . . = ,48024 D796BB READY-hL4DE FOR SEC OLTF --- 515

D02 FOREBODY OLTF. IN HULL DEPT03 El 391 SEC OUT04 B 991 READY-h2ADE FOR SEC OUTF

446 504501 509--- 513446 504--- 506

Deckhouses71302 H702 SEC OUTF71304 H702 READY-MADE FOR SEC OuTFF71503 H703SB SEC OUTF71504 H’i03SB READY-MADE FOR SEC OUTF

503 511--- 513502 510--- 510

372

Page 13: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

50,000 kinds of materials

\,,

,--

10,000 (stock materials)

Ordered bythe computer

K O C K U M S

“.%

40,000 (direct materials)

Ordered bythe designer

Computer — control of delivery timesagainst building programme

373

Page 14: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

b.a.nc’. o :C, c...titw.wPAMINNEME OM U7EEUV TN LEWRANE

K O C K U M S REMINOER OP NON-OEUVERY,.. - k . . — 0 . .

— — — - 73-09-07 T AHLM- - - 0 -. . .. . ... .

371000 39 1972. ..- .-

BEEVARAS OMGAENDE

Data bank for piece list information

Basic

information

“~

Piece lists- draught

Completedpiece listinformatlon

\

374

Page 15: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

KOCKUMS

— ----

>. .!,,

K O C K U M S,

375

Page 16: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Order-set–material requisitionNo.

● Planned quantity● Required quantity

with check digit (filled in manually)

R R RR KKK KKKKRR RR RR RRRRR/R RRR1

k

-. .—53 1660 100 [ 001100083112

AM*, Ild lb Iklb*i&!; q lb i v l h f u l r l m d h w i K . . M i l M a - . f 4 * K . + f i l l b , w + g

3] 2106 156 I L 12001273 I 1200.00 mmIh’m’11 1 1 1 , , 14% ; % R. BAR 15 COMPR. TOL. 1S0 H 10 VT

5 L = 600~ L=.% MATRL. GRP. 1231 LOCATION 700000% ~7 *

8 I,dl.!l-

9( v-;,-) [?.AI -Ydl Cm, I,* =1~ .!- - m-) (w C“ ,e) m:-,-.+,) (m...a”$)-) w = + . )

8 K O C K U M S

Central planning

i ;

u- 1 .‘w” ‘ w v

Detailed planning – production

workshomH u l l w ! H u l l ~ : O u t f i t t i n g # # ~ M a c h i n e r y ~

/ components / assembly I ‘1.

IF , I I I

Page 17: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

K O C K U M S

plan for Workshops. .

I REMAINING HOURS WEEK 7308 289

[510539 55410 62703 140- 150 7946510539

16.0 1.156960 38603 30- 70 7046___~~%_~~--

5 1 n w o- - - - - - - = _ . . _ ” - - - - - - L - - - - - - - — -

73061 73085 8P

I

ou’rD3CNt.73081 73084 P G 402 PLAC73 08] 73084 P ~ \;2&Yh;R73082 7309573082 73105 P H-702 OUt

ACCUMULATED = 1408

73091 73094 8903 DIDT- - -- =.=-L____ ----- --—

K O C K U M s

0 . -7

I

377

Page 18: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

378

Page 19: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION
Page 20: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

I M E T R Y I ‘ \—

4

Unique name

Data type; type of geometry;other classifying information

Transformation vector

References to other descriptions

Technical information:plate thickness, steel quality

Other auxiliary information

2- or 3-dimensional geometry

c 305

Reference between KOCK descriptionsin the data bank

! I II I

k e t

d Geometryof a web I I v

380

Page 21: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Cut surface with plane

CALL T32

Result

Curve ‘C’generatedand stored

c 501

Some typicalapplication subroutines

Hydromechanicalcalculations

Nesting

Generation ofhull pieces(micro design standards)

381

Page 22: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Principle

C 401

flow – design and productionI

Preliminary design general arrangements, specifications II Principle design class. drawings, specifications

Detail design working drawings, material spec.1 J

,

i

K O C K U M SSTEERBEAR HULL

FAIRING

SHELL EXPANSION

LONGITUDINAL GENERATION

STRUCTURE GENERATION

PARTS GENERATION

NESTING

OTHER PRODUCTION INFO

INTERACTIVE DESIGN SVSTEM

PARTS GENERATION

NESTING

CHECK DRAWINGS

I

382

STEERBEAR CONTROL

CNC-CONTROLLEDMANUFACTURINGOF PANELSInCLUDING VARIABLEBEVEL ANGLE CUTTINGCbiTING,MARKETING ETC

Page 23: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

C 304

Hierarchy in data bank

Hull reference

Building blocks

Panels

Hull pieces

C 506

Hull structure generation

Generationof panels

. . . can bedone by

. . . based on

Example

AA HULL 546

AA 121

AA 121–7

AA 121–7–S250P

. Brackets

383

Page 24: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Simple KOCK program

. . .

K O C K U M S

o0

0

u

m&a $

2

/ 1da400mI n

INPUT:\ BOUNDARY, FR148/V=5200/’AG162-3’/

Page 25: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Tripping bracket

Result:

Special bracket

RESULT:

The bracket generated and stored.

.

385

Page 26: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION
Page 27: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

I

II

‘v‘—

–+-i-l

387

Page 28: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Check drawing

INPUT:

PANEL, ‘B’, ‘C’, EQUAL, ‘A’, X = FR252, FR255;

388

Page 29: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

-—

IJ

1

389

Page 30: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

.

3 9 0

Page 31: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

C519

Longitudinal bending table

AVST HUJO AVST

o 4 5 9 2 5O O

5 0 0 4 b 2 3 0 0 0

1 0 0 0 4 b 4 S 5 0 0

1 5 0 0 4 b 5 4 0 0 0

2 0 0 0 4 b S 4 5 0 0

HUJO

4 6 5

4 b 5

4 6 4

4 6 4

4 6 3

AVST

5 0 0 0

5 5 0 0

6 0 0 0

b9Q0

7 0 0 0

UUJO

4 6 3

4 6 2

4 6 2

4 6 1

461l

1

AVST

7 5 0 0

8 0 0 0

8 5 0 0

0 7 9 7

B O C K N I N O S T A B E L L 2

HUJO A V S T H O J O A V S T H U J O A v S T H U J D AVST HUJO

4bQ

4 6 0

4 5 9

4 5 9

I

I

,

Page 32: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION
Page 33: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION
Page 34: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION
Page 35: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

x

395

Page 36: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION
Page 37: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

UHN1- HN1Position numbers

Component codes

F18 K43 F18 F18 F18.HNV17 VNR ,233-348733

F18 F18

397

Page 38: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

398

Page 39: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

8:

Page 40: THE NATIONAL SHIPBUILDING RESEARCH PROGRAM · 2011-05-14 · DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION

Additional copies of this report can be obtained from theNational Shipbuilding Research and Documentation Center:

http://www.nsnet.com/docctr/

Documentation CenterThe University of MichiganTransportation Research InstituteMarine Systems Division2901 Baxter RoadAnn Arbor, MI 48109-2150

Phone: 734-763-2465Fax: 734-763-4862E-mail: [email protected]


Recommended