4
CREF 2016 BARDOT’s OTEC SYSTEM "a modular capacity of Production for everyone"
Transcript
Page 1: The offshore session (guerin)

CREF 2016 BARDOT’s OTEC

SYSTEM "a modular capacity

of Production for everyone"

Page 2: The offshore session (guerin)

2

ONSHORE SOLUTION OFFSHORE SOLUTION

• Power installed (up to 1MW)• Off-grid or connected

• Power installed 2 to 50++ MW• Off-grid or connected

TURNKEY SOLUTIONS

Page 3: The offshore session (guerin)

3

1st OTEC in a Few dates

• 2016 / Q2 Resort & OTEC Conceptual study

• July 2016 Award • 2016 Q2 / Q4 Detailed engineering• 2017 Procurement • 2018 / Q1 Offshore installation

Lights on !• 2018 / Q2 Resort Grand Opening