13
The Paris area EHV grid Return to Session
Transcript
Page 1: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

The Paris area EHV grid

Return to Session

Page 2: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 2

EHV underground network in France

The UGC network (> 50 kV) represents 3260 km

RTE EHV grid : 3rd in the world and 1st in Europe with 906 km

All big cities are supplied with 225 kV

0

200

400

600

800

1 000

Leng

th o

f un

derg

roun

d lin

es

> 22

0 kV

(km

)

Denmark France Germany Italy Netherlands Spain UnitedKingdom

Source CIGRE WG B1.07

Return to Session

Page 3: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 3

Evolution of RTE’s UGC length

YEAR EHV (km) HV (km) TOTAL (km)1969 233 910 1 1431979 380 937 1 3171995 661 1 549 2 2102007 906 2 354 3 260

0

500

1 000

1 500

2 000

2 500

3 000

3 50019

65

1970

1975

1980

1985

1990

1995

2000

2005

Leng

ht (

km)

HV

EHV

Return to Session

Page 4: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 4

St OuenAmpère

Romainvile

Malassis

Charenton

Arrighi

Cretaine

Moulineaux

Harcourt

Chevilly

Puteaux

Perret

NovionFallou

Plaisance

St Maur Sonnettes

Cormeilles

Nanterre

Avenir

Courneuve

Colonie

Menus

Argenteuil

TerrierPlessis-Gassot

Sausset

Villevaudé

Morbras

Le Chesnoy

Cirolliers

Villejust

Mézerolles

Cergy

Alouettes

Paris area grid in 2007

400/225 kV substation

225 kV transit substation

400 kV OHL ring225 kV UGC

Return to Session

Page 5: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 5

Paris area Data

Oil filled cables Synthetic cables Total225 kV UGC length (km) 195,8 442,2 638

First 225 kV cable in 1936, and some parts still in use

Average age of the grid : 20 years

19691957

1920 1950 1980 2000

Impregnatedpaper HV

Oil filledEHV

1920 1936

HPOFTHT

1962

Polymeric PEHV

Polymeric PEEHV

1989

Polymeric XLPEHV

2000

Polymeric XLPE - EHV

2002

Now : Polymeric XLPE - sheath AlHV et EHV-

Now : Polymeric XLPE - Al sheathHV - EHV

Return to Session

Page 6: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 6

Paris area grid in 1969

Plessis-Gassot

Villevaudé

Le Chesnoy

Villejust

Cergy

Mézerolles

St OuenAmpère

Romainvile

Charenton

Arrighi

Harcourt

Chevilly

Puteaux

NovionFallou

Plaisance

St Maur

Cormeilles

400/225 kV substation

225 kV transit substation

400 kV OHL ring225 kV UGC

Return to Session

Page 7: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 7

Paris area grid in 1979

Plessis-Gassot

Le Chesnoy

Villejust

Cergy

St OuenAmpère

Romainvile

Charenton

Arrighi

CretaineHarcourt

Chevilly

Puteaux

Perret

NovionFallou

Plaisance

St Maur

Cormeilles

Nanterre

VillevaudéMézerolles

400/225 kV substation

225 kV transit substation

400 kV OHL ring225 kV UGC

Return to Session

Page 8: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 8

Paris area grid in 1995

TerrierPlessis-Gassot

Le Chesnoy

Cirolliers

Villejust

Cergy

St OuenAmpère

Romainvile

Malassis

Charenton

Arrighi

Cretaine

Moulineaux

Harcourt

Chevilly

Puteaux

Perret

NovionFallou

Plaisance

St Maur Sonnettes

Cormeilles

Nanterre

Courneuve Villevaudé

Morbras

Mézerolles

400/225 kV substation

225 kV transit substation

400 kV OHL ring225 kV UGC

Return to Session

Page 9: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 9

St OuenAmpère

Romainvile

Malassis

Charenton

Arrighi

Cretaine

Moulineaux

Harcourt

Chevilly

Puteaux

Perret

NovionFallou

Plaisance

St Maur Sonnettes

Cormeilles

Nanterre

Avenir

Courneuve

Colonie

Menus

Argenteuil

TerrierPlessis-Gassot

Sausset

Villevaudé

Morbras

Le Chesnoy

Cirolliers

Villejust

Mézerolles

Cergy

Alouettes

Paris area grid in 2007

400/225 kV substation

225 kV transit substation

400 kV OHL ring225 kV UGC

Return to Session

Page 10: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 10

St OuenAmpère

Romainvile

Malassis

Charenton

Arrighi

Cretaine

Moulineaux

Harcourt

Chevilly

Puteaux

Perret

NovionFallou

Plaisance

St Maur Sonnettes

Cormeilles

Nanterre

Avenir

Courneuve

Colonie

Menus

Argenteuil

TerrierPlessis-Gassot

Sausset

Villevaudé

Morbras

Le Chesnoy

Cirolliers

Villejust

Mézerolles

Cergy

Alouettes

AVENIR – SAUSSET 225 kVReturn to Session

Page 11: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 11

Characteristics of one recent lineAvenir – Sausset 225 kV

18 km1 200 mm² Cu, XLPECommissioning in august 2002Laying techniques : PVC ducts in concrete3 great depth drilling installations

2 steered drillings 75 and 85 m1 micro-tunnel 135 m

Cost : 22 M€

Return to Session

Page 12: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 12

AVENIR – SAUSSET 225 kVReturn to Session

Page 13: The Paris area EHV grid - Jicable · The Paris area EHV grid ... > 220 kV (km) Denmark France ... 400/225 kV substation 225 kV transit substation 400 kV OHL ring 225 kV UGC. Return

JICABLE 2007 13

Perspectives of development

Operating policy

R&D actions : transition joints, optimisation of laying methods,lifespan of cables on the network

Grid modifications for new clients connections and consumption increase