+ All Categories
Home > Documents > The Precast Concrete Industry

The Precast Concrete Industry

Date post: 05-Jan-2016
Category:
Upload: ivana
View: 34 times
Download: 2 times
Share this document with a friend
Description:
The Precast Concrete Industry. A proposal for the adoption of advanced Information Technologies. Introduction. Existing processes and business environment. Available and suitable information technologies. A framework target plan, including assessment of potential benefits. - PowerPoint PPT Presentation
37
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks The Precast Concrete Industry A proposal for the adoption of advanced Information Technologies
Transcript
Page 1: The Precast Concrete Industry

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

The Precast Concrete Industry

A proposal for the adoption of advanced Information Technologies

Page 2: The Precast Concrete Industry

2

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Introduction1. Existing processes and business environment.

2. Available and suitable information technologies.

3. A framework target plan, including assessment of potential benefits.

4. Assess the expected costs of achieving the plan.

5. Analysis of the readiness for implementation of the framework plan.

6. A detailed plan for the next incremental step.

Page 3: The Precast Concrete Industry

3

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - Scope

What is Precast Concrete Construction ? • Construction of buildings and other

facilities using precast concrete elements;

• Precast concrete elements are reinforced concrete elements produced in a dedicated plant. They are transported and erected after curing.

• For examples - Precast Concrete Institute

Page 4: The Precast Concrete Industry

4

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - Scope

What sub-sectors are there ? • Architectural Precast generally includes the

production and erection of precast panels for facades of buildings.

• Structural Precast generally includes production and erection of structural systems (assemblies of precast elements), and in certain instances of complete buildings.

Page 5: The Precast Concrete Industry

5

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - Scope

An economic review

• approximately 380 plants in Canada, the US and Mexico, operated by some 160 producer companies.

Page 6: The Precast Concrete Industry

6

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - Scope

Units $ '000 000 Precast Total New Construction Share

Public and Commercial Buildings 3,346$ 143,297$ 2.3%

Hotels, Motels and Housing 352$ 38,356$ 0.9%

Bridges 640$ 10,209$ 6.3%

Other 443$ 46,063$ 1.0%

Single Family Houses 13$ 175,296$ 0.0%

Total 4,794$ 413,221$ 1.2%

w/o houses 4,781$ 237,925$ 2.0%

Page 7: The Precast Concrete Industry

7

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - Scope

28%26%

20%18%

13%

6%

1%

56%

0%

10%

20%

30%

40%

50%

60%

Finland Germany UK Spain France Italy USA Turkey

Page 8: The Precast Concrete Industry

8

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - Scope

Who is involved ?

• Owners/Clients• Architects• Structural Engineers• Precast Concrete Producers and Erectors• General Contractors• Material Suppliers• Designers and providers of other building systems

Page 9: The Precast Concrete Industry

9

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - ProcessWhat activities are there ?

• Win contract and acquire project• Assembly design• Detailed design• Planning and Scheduling• Production• Handling - Storage and Shipping• Erection

Page 10: The Precast Concrete Industry

10

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 1: Environment - Process

What are the information dependencies ?

• Building design (geometry & systems)• Product design• Materials Procurement• Plan, Schedule and Production• Erection• Company Management information

Page 11: The Precast Concrete Industry

11

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acksPart 1: Environment

A High Level Process Model

Top-level External Activity

Top-level Internal Activity

complete project

abandon project

Acquire Project Do Detail Design Fabricate

Check Quality Assurance

Prepare Molds Check Quality No.2

Move to Yard

Schedule Engr. Staff

Material Cost Database

Labor Cost Database

Plant Scheduling

Prepare Project Schedule

Billing for Project

Deliver to Site Erect Structure

Yard Layout Planning

Prepare Reinf. & Hardware

Prepare/track bill of Material

Prepare Batch Instructions

LEGEND

Static Info Source

Page 12: The Precast Concrete Industry

12

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 2: Information Technologies

What is in use ?

• CAD – 2-D drafting e.g. Precast Drawings

• Structural Design applications e.g. LEAP

• ERP software (production planning, materials management, human resources, accounting, etc.)

• Scheduling software

Page 13: The Precast Concrete Industry

13

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 2: Computerization for Design

Use of CAD in Precast Concrete Companies

AutoCAD81%

Outsource4%

Other CAD15%

92% 8%

(PCI/CPCI Survey 2001) (Arditi et al. 2000, ASCE Journal of Architectural Engineering)

59%

41%

41% of producersreported encountering

problems in production due to ambiguities in

design “often” or “very often”.

Page 14: The Precast Concrete Industry

14

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 2: Information Technologies

What is the effectiveness of IT use ?

• Errors are commonplace.

• No integration – data is re-entered for each application.

• Examples…

Page 15: The Precast Concrete Industry

15

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Office Building

Page 16: The Precast Concrete Industry

16

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Parking Deck 1

Page 17: The Precast Concrete Industry

17

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Parking Deck 2

Page 18: The Precast Concrete Industry

18

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Parking Deck 2

Page 19: The Precast Concrete Industry

19

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Prison Complex

Page 20: The Precast Concrete Industry

20

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Arena

Page 21: The Precast Concrete Industry

21

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 2: Information Technologies

What else is available ?

• CAD: 3-D Modeling

• Rendering, Animation and Virtual Reality,

• CAM and Robotics,

• B2B, collaboration portals,

• Product Model based integration,

• Automated data collection and monitoring

Page 22: The Precast Concrete Industry

22

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 3: A Framework Target Plan

• What are the long-term IT goals ?

• What are the short-term IT goals ?

• Potential local benefits – activities and cost-centers

• Potential system benefits in the supply chain

• A future process model

Page 23: The Precast Concrete Industry

23

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acksPart 3:Long-term IT goal

Integration

Process planningapplication

Design application

Analysis application

Shop drawingApplication

IntegratedPrecast/

PrestressedData model

Rebar bending application

Design Stage

Architect or contractor

Mold design application

Production Stage

Robotics applications

Logistics and production app.

Scheduling and workflow app.

Materials order/ tracking app.

EnterpriseApplications

Material suppliers

“B2B”exchanges

Formwork fabricator

Outside

Exchanges

Internal

Exchanges

(Eastman & Augenbroe, 2000, presentation to PCI)

Page 24: The Precast Concrete Industry

24

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acksPart 3:Short-term IT goal

3-D Modeling

Process planningapplication

Design application

Analysis application

Shop drawingApplication

3D Modeling

of Precast

Buildings

Rebar bending application

Design Stage

Mold design application

Production Stage

Robotics applications

Logistics and production app.

Scheduling and workflow app.

Materials order/ tracking app.

EnterpriseApplications

Internal

Exchanges

(Eastman & Augenbroe, 2000, presentation to PCI)

Page 25: The Precast Concrete Industry

25

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 3: Local benefits

• Reduced drafting hours/salaries

• Reduced drafting and production errors

• Shortened sales response time

• Shortened time to erection

• Improved management information flows

All of the above = Increased Market Share.

Page 26: The Precast Concrete Industry

26

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 3: Supply chain benefits

• Improved coordination with and support for project architects and engineers.

• Shorter activity times for GC.

• Lower overall cost for Owner.

• Shorter overall duration – benefits all.

Page 27: The Precast Concrete Industry

27

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 3: A future process model

Precast Process Model

Page 28: The Precast Concrete Industry

28

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 4: Expected Costs

• What are the ‘hard’ costs ?– Initial investment in hardware and software– Annual maintenance fees– Training fees and salaries– Equipment

Page 29: The Precast Concrete Industry

29

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 4: Expected Costs

What are the ‘soft’ costs ?– Business re-organization and adaptation– Decreased productivity during ‘learning-curve’

period.– Management time (salaries)– Opportunity cost

Page 30: The Precast Concrete Industry

30

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 5: Industry Readiness

• What are the conditions that must exist ?

• Which conditions are presently satisfied ?

• Which conditions can be satisfied in the short-term?

• Which conditions can be satisfied in the long-term?

Page 31: The Precast Concrete Industry

31

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 5: What conditions must exist ?

1) Significant value-added portion

2) Perceived economic benefits

3) Available production automation technology

4) Computerization in the business environment

5) IT integration in external environment

6) Modeling software

7) Product model integration

Preconditions

Conditions

Necessary Developments

Page 32: The Precast Concrete Industry

32

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 5: Industry Readiness• Which conditions are currently satisfied ?1) Significant value-added portion

2) Perceived economic benefits

3) Available production automation technology

4) Computerization in the business environment

5) IT integration in external environment6) Modeling software7) Product model integration

Materials are 15-20% of product cost

Yes; especially schedule, error reduction and market share

Yes; rebar, mold, casting and finish automation is available

Yes; enterprise management systems are common

Page 33: The Precast Concrete Industry

33

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 5: Industry Readiness• Which conditions can be satisfied in the

short-term?1) Significant value-added portion

2) Perceived economic benefits3) Available production automation technology4) Computerization in the business environment5) IT integration in external environment

6) Modeling software

7) Product model integration

Yes; development is now under way by Tekla. For example…

Yes; development is now under way by Georgia Tech

Page 34: The Precast Concrete Industry

34

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 5: Industry Readiness• Which conditions can be satisfied in the

long-term?1) Significant value-added portion

2) Perceived economic benefits3) Available production automation technology4) Computerization in the business environment

5) IT integration in external environment

6) Modeling software7) Product model integration

Through the IAI ?

Page 35: The Precast Concrete Industry

35

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Part 6: The Next Step• What technologies and resources are

required ?– 3-D Modeling Software and Product Model– software and model development teams– industry technical working teams– financing

• What short term benefits are expected ?– reduced errors,– reduced lead times,– reduced engineering costs.

Page 36: The Precast Concrete Industry

36

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Summary

1. Existing processes and business environment.

2. Available and suitable information technologies.

3. A framework target plan, including assessment of potential benefits.

4. Assess the expected costs of achieving the plan.

5. Analysis of the readiness for implementation of the framework plan.

6. A detailed plan for the next incremental step.

Page 37: The Precast Concrete Industry

37

Str

ateg

ies

for

IT A

dopt

ion

in th

e B

uild

ing

Indu

stry

© 2

002

Pro

f. C

.M. E

astm

an &

Dr.

R. S

acks

Precast Concrete Industry - Role 1

Welcome.

As you listen to this presentation, try to consider the issues from the point of view of an imaginary interested party. Try to protect your interests by asking questions and asserting your views ! To help you prepare, here is a description of your role:

You are the CEO and president of a medium sized precast concrete production company. The company specializes


Recommended