+ All Categories
Home > Documents > The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey #...

The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey #...

Date post: 12-Jul-2020
Category:
Upload: others
View: 7 times
Download: 0 times
Share this document with a friend
15
The Project for Improving Public Bus Service in Yangon 3 nd Traffic Engineering Training Traffic Survey 28th February 2020
Transcript
Page 1: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

The Project for Improving Public Bus Service in Yangon

3nd Traffic Engineering Training

Traffic Survey

28th February 2020

Page 2: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

1. Bus Related Survey

1.1. Number of Operated Buses Count

1.2. Bus Stopping Time Record

1.3. Number of Boarding and Alighting Bus Passengers Count

1.4. Parking, Vendor, Pedestrian Survey

2

Contents

Type of Bus Stop/Service and Location of Bus Stop definition

How to Conduct Survey

Page 3: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

3

There are 3 main types of Bus Stop1) Scheduled Stop

2) Request Stop

3) Hail and Ride Stop

The other types of Bus Stop

1) Only Boarding/Alighting Stop

2) Timing Point Stop

3) Skip-Stop

4) Sunday Stop, etc…………..

Type of Bus Stop/Service Location of Bus Stop

1) Near Side

2) Mid-Block

3) Far Side

Bus StopBus Stop Bus Stop

Type of Bus Stop/Service and Location of Bus Stop

Traffic Direction

Traffic Direction

Page 4: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

4

1. Bus Related Survey

Causes of Traffic Congestion at the Bus Stops

QuestionWhy buses cannot stop at the bus stop correctly?

The space for other vehicles is secured.

Traffic congestion occurs because buses cannot stop at the bus stop correctly.

< Ideal Situation >

< Current Situation >

Right Position

Bu

s stop

Bu

s stop

Page 5: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

5

1. Bus Related Survey

Causes of Traffic Congestion at the Bus Stops< Current Situation >

Page 6: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

Bu

s stop

6

1. Bus Related Survey

What is needed to stop the bus at the bus stop correctly?

Bu

s stop

Something occupying the bus stop

Need to remove

• Location (taxi, vender)• Number (taxi, vender)

Taxi / Vender

It is necessary to secure the number of bus stops and passenger waiting space according to the demand.

Survey is needed to understand the current situation

Bus / Passenger

• Number (bus, boarding/alighting passenger)

• Stopping time (bus)

Page 7: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

7

1. Bus Related Survey

Bu

s stop

Bu

s stop

Route 1

Route 1

Route 1

Bu

s stop

• Number of Boarding / Alighting Passengers

• Arrival Time

< Record Contents >

• Bus route

• Departure Time

7:00

7:02

When bus comes

When bus stops

When bus leaves

Page 8: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

8

1. Bus Related Survey

Sample Survey Sheet for Bus Survey

#Route

No.

Plate

No.

Arrival

TimeNo. of

Alighting

Passengers

Departure

TimeNo. of

Boarding

Passengers

hh mm hh mm

1 21 3N/7558 7 10 8 7 12 3

2 61 7N/7733 7 12 3 7 14 2

3 21 9M/8157 7 17 8 7 18 1

4 21 9N/5619 7 21 12 7 22 3

Page 9: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

9

1.1. Number of Operated Buses Count

Number of operated buses

Bus

Route

To count the number of operated buses by bus route and time zone using survey sheet.

Page 10: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

Morning Time

Evening Time

7:00-8:00 : 86 bus, 8:00-9:00 : 98 bus 7:00-8:00 : 186 bus, 8:00-9:00 : 172 bus

17:00-18:00 : 116 bus, 18:00-19:00 : 143 bus 17:00-18:00 : 186 bus, 18:00-19:00 : 154 bus

Bus

RouteBus

Route

Bus

Route

Bus

Route

10

1.1. Number of Operated Buses Count

Page 11: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

11

1.2. Bus Stopping Time Record

To calculate the bus stopping time (maximum, average) by bus route and time zone using survey sheet.

Stopping Time = Departure Time – Arrival Time

Maximum bus stopping time

Page 12: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

121.3. Number of Boarding and Alighting Bus Passengers Count

To count the number of bus passengers (boarding, alighting) by bus route and time zone using survey sheet.

Number of Boarding and Alighting

Bus Passengers

Page 13: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

131.3. Number of Boarding and Alighting Bus Passengers Count

Number of Boarding Passegners

Lay Daung Kan Road

Direction to Inbound

7:00-7:30 7:30-8:00 8:00-8:30 8:30-9:00

1 8 13 4 1

3 7 10 15 17

7 171 238 238 141

18 9 7 14 5

24 30 52 62 23

62 43 71 45 61

71 2 25 10 2

84 10 5 42 8

92 3 1 2 2

96 16 24 21 15

Total 299 446 453 275

Route Max Boarding

Passengers/Bus/Route

1 5

3 14

7 25

18 10

24 20

62 18

71 25

84 10

92 7

96 14

Total 148

5

14

25

10

20

18 2

5

10

7

14

148

1 3 7 1 8 2 4 6 2 7 1 8 4 9 2 9 6 T O T A L

MAX BOARDING PASSENGERS/BUS/ROUTE

Page 14: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

14

1.4. Parking, Vendor, Pedestrian Survey

Zone 1 Zone 2 Zone 3

Zone 4 Zone 5 Zone 6

I. Set in several zones for survey II. Count the number of parking vehicles, vendors and pedestrian in each zone

Page 15: The Project for Improving Public Bus Service in Yangon · Sample Survey Sheet for Bus Survey # Route No. Plate No. Arrival Time No. of Alighting Passengers Departure No. of Boarding

15

The number of Parking, Vendor, Pedestrian

119 147 577 638 249 129

12

2

11

9

62

88

10

7

98

47

43

309

179

10

9 18 13

14 77 11 26

373

36

15

10

16

25

17

10

6

8

14

25

7

7

6

3

119

10

7

The maximum number of parking vehicle per hour (vehicle / day)

(Taxi, Private Car, Delivery Truck)

The maximum number of vendor per hour (vendor / day)

The maximum number of pedestrian per hour (people / day)

306

164

10

7 71

There are few people

using pedestrian bridge.

There are many pedestrian

near the bus stop.

Taxis occupied parking lot.

1.4. Parking, Vendor, Pedestrian Survey


Recommended