Open HouseFebruary 26, 2020
THE
PTH 1 and PTH 1AWest Interchange Study
PTH 1 and PTH 1A West Interchange Study
2
WELCOME & PURPOSE
The intent of today’s open house is to:
• Provide information on the purpose and scope of the PTH 1 and PTH 1A Interchange Study;
• Present the interchange alternatives, as well as the advantages and disadvantages associated with each alternative; and
• Offer the public an opportunity to review the interchange alternatives, provide feedback, and ask questions of the project team.
Completing a comment sheet here today or online at: https://www.gov.mb.ca/mit/wms/structures/design.html
Members of the project team are here to discuss the study and answer any questions you may have. Look for a person wearing a WSP or Manitoba Infrastructure nametag.
Provide your input by: Have a question?
PTH 1 and PTH 1A West Interchange Study
3
The existing overpass structure (bridge) at PTH 1 and
PTH 1A was constructed in 1968 as part of the Trans-Canada
Highway (PTH 1) by-pass around Portage la Prairie (Portage).
The bridge is located west of Portage and was designed to
convey 3 lanes of PTH 1A traffic (2 northbound lanes into
Portage and 1 southbound lane out of Portage) over 4 lanes
of PTH 1 traffic (2 eastbound lanes and 2 westbound lanes).
Over the years, the bridge has been damaged by several
vehicle impacts, and many bridge elements are exhibiting
significant deterioration. As a result, the bridge is
currently restricted to a single lane.
Manitoba Infrastructure (MI) has determined that it is
not cost effective to rehabilitate the bridge and a new
structure is required at this location. As part of this
study, MI is also looking to improve the interchange.
BACKGROUND
Top of New Deck SurfaceHighway 1A
Top of Road SurfaceHighway 1
Min
imum
Ex
isti
ng C
lear
ance
4.9
m
Min
imum
Pr
opos
ed C
lear
ance
5.4
m
Old Bridge to be Removed
New Bridge
PTH 1 and PTH 1A West Interchange Study
4
Study Area LimitStudy Area Limit
RailRail
LEGENDLEGEND
Roa
d 40
WR
oad
40W
Roa
d 39
WR
oad
39W
CN Rivers SubdivisonCN Rivers Subdivison
Trans-Canada Highway
Trans-Canada Highway
PTH 1 (Portage Bypass)
PTH 1 (Portage Bypass)
Service Road SWService Road SW
Port
age
Div
ersi
onPo
rtag
e D
iver
sion
PTH 1PTH 1
CP Carberry SubdivisionCP Carberry Subdivision
NExisting Bridge to be
Replaced
To BrandonTo Brandon
To Winnipeg
To Winnipeg
To Portage la PrairieTo Portage la Prairie
Can Oat D
riveCan O
at Drive
PTH 1A (City route)
PTH 1A (City route)
STUDY AREA
PTH 1 and PTH 1A West Interchange Study
5
1. Replace the bridge;
2. Improve traffic operations and safety by bringing the interchange to current design standards; and
3. Accommodate the access needs of the public and established industry in Portage.
Manitoba Infrastructure has engaged WSP (an engineering and planning service provider) to complete a functional design study for the future reconstruction of all roadways and the bridge structure within the PTH 1 and PTH 1A interchange to:
A functional design study is an early phase of the design process in which the road and bridge designs are established based on projected travel patterns, design standards, site conditions, environmental regulations, user demands, and project constraints.
project constraints,
including funding
design standards
environmental regulations
user demands
projected travel
patterns
site conditions
A Functional
Design Study
SCOPE
Note: Due to funding constraints Manitoba Infrastructure may need to complete this project in phases with the initial phase including the replacement of the overpass.
PTH 1 and PTH 1A West Interchange Study
6
The public engagement process for the study involves local governments, landowners, business owners, other stakeholders, and the public.
The objectives of the public engagement process are to convey clear information about the project, including its scope and timing, while also gathering input regarding the proposed interchange alternatives and preferred interchange alternative.
Public engagement techniques will include:
- Group stakeholder meetings;
- Two public open houses;
- Project webpage; and
- Online survey.
PUBLIC ENGAGEMENT PROCESS
PTH 1 and PTH 1A West Interchange Study
7
The public engagement process has been divided into three phases:
1 2 3Phase 1:
Introduce the project and gather initial feedback.
Phase 2:
Present two interchange alternatives and gather feedback.
Phase 3:
Present the preferred interchange alternative.
WE ARE HERE
PUBLIC ENGAGEMENT PROCESS
PTH 1 and PTH 1A West Interchange Study
8
PTH 1
CA
N-O
AT
DR
IVE
RO
AD
39
W
PTH 1
To Brandon
To Portage la PrairieTo W
innipeg
New Two-Lane Undivided Bridge
with Increased Clearance
Improved Ramp
Geometry
Proposed Right-of-Way South Limit
New Right-in and Right-out
Access
Extended Acceleration
Lane
NLegend
Proposed Alignment
Access to PTH 1 Closed, Median to be
Removed
RO
AD
40
W
Truck
Turnaround
Advantages: • Improved interchange geometry
Disadvantages: • Requires additional land
• Access to property south of interchange is limited
INTERCHANGE ALTERNATIVE 1: IMPROVED EXISTING
Increased Roadway Width
Under Bridge Will Accomodate
Agricultural Vehicles
PTH 1 and PTH 1A West Interchange Study
9
PTH 1 PTH 1A
CA
N-O
AT
DR
IVE
RO
AD
39
W
PTH 1
To Brandon
To Portage la PrairieTo W
innipeg
New Two-Lane Undivided Bridge
with Increased Clearance
New All Directional
Access
Extended
Acceleration
Lane
NLegend
Proposed Alignment R
OA
D 4
0W
New
Roundabouts Will Accommodate
Agricultural Vehicles
Truck
Turnaround
INTERCHANGE ALTERNATIVE 2: ROUNDABOUTS
Increased Roadway Width
Under Bridge Will Accomodate
Agricultural Vehicles
Advantages: • Improved interchange geometry
• No additional land requirement
• Improved driver safety
• Access to property south of interchange is improved
Disadvantages: • Roundabouts unfamiliar to some drivers
Access to PTH 1 Closed, Median to be
Removed
PTH 1 and PTH 1A West Interchange Study
10
Alternative 2 roundabouts would be similar to the recently constructed PTH 2 and PTH 3 roundabout
INTERCHANGE ALTERNATIVE 2: ROUNDABOUTS
PTH 1 and PTH 1A West Interchange Study
11
PTH 1A
CA
N-O
AT
DR
IVE
RO
AD
39
W
PTH 1
To Brandon To Portage la Prairie
To Winnipeg
N
Legend
PTH 1 and PTH 1A Eastbound Traffic
PTH 1 and PTH 1A Westbound Traffic
RO
AD
40
W
POTENTIAL CONSTRUCTION DETOUR
Temporary Intersection
Treatment to be DeterminedAccess Right
In/Right Out
No Left Turns In or Out During Construction
Bridge
Replacement
Local Access Eastbound Traffic
Local Access Westbound Traffic
PTH 1 and PTH 1A West Interchange Study
12
PTH 1PTH 1PTH 1A (City route)
PTH 1A (City route)
Roa
d 40
WR
oad
40W
PTH 1PTH 1
Due to safety concerns, the intersection at PTH 1 and Road 40 W will be closed in both of the proposed interchange alternatives.
This will impact access to and from the lands to the south of the interchange.
Alternative access and routes will be provided for both of the proposed designs, as illustrated on the Interchange Alternative #1 and #2 drawings. The intersection will not be permanently closed until alternate access is provided via the interchange.
CLOSURE OF ROAD 40 W ACCESS TO PTH 1
Access to PTH 1 Closed, Median to be
Removed
PTH 1 and PTH 1A West Interchange Study
13
DEC 2019
JAN2020
FEB2020
MAR2020
APR2020
Gain an Understanding of Existing Conditions
Develop Draft Interchange Alternatives
Open House #1 to Review Interchange
Alternatives
Evaluate and Select Preferred Interchange
Alternative
Open House #2 to Present Preferred
Interchange Alternative
END OF APRIL
Preliminary Design Complete
2020We Are Here
STUDY TIMELINE
PTH 1 and PTH 1A West Interchange Study
14
OCT 2019
JUN2020
Preliminary Design
MAR2021
APR2020
Detailed Design
JUN 2021
Replacement of Bridge and
Associated Roadworks
Construction
NOV2022
We Are Here
OVERALL PROJECT TIMELINE
Future Phases
Highway and Intersection
Works
PTH 1 and PTH 1A West Interchange Study
15
Chat with a member of the project team and ask any questions you may
have.
Complete a comment sheet and leave it with us
today or email it to [email protected]
Complete the comment sheet as part of the
project’s online survey at: https://www.gov.mb.ca/
mit/wms/structures/design.html
Join us at Open House #2
in early April 2020 to learn more about the preferred interchange
alternative.
Stay up-to-date on the project by visiting the project webpage at:
https://www.gov.mb.ca/mit/wms/structures/
design.html
NEXT STEPS
PTH 1 and PTH 1A West Interchange Study
16
Thank you for attending tonight’s open house.