+ All Categories
Home > Documents > The Reliance Industries Limited (RIL)-Patalganga...

The Reliance Industries Limited (RIL)-Patalganga...

Date post: 27-Feb-2018
Category:
Upload: truongthien
View: 309 times
Download: 7 times
Share this document with a friend
19
The Reliance Industries Limited (RIL)-Patalganga Manufacturing Division (PMD) started its operation in 1983 before the Environment Impact Assessment notification came into existence. Hence, there is no Environment Clearance available for this project. However, No Objection Certificate (NOC)/Consents were duly obtained from Maharashtra Pollution Control Board (MPCB) and renewed from time to time. The latest Consents obtained from MPCB is appended.
Transcript
Page 1: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

The Reliance Industries Limited (RIL)-Patalganga Manufacturing Division

(PMD) started its operation in 1983 before the Environment Impact

Assessment notification came into existence. Hence, there is no

Environment Clearance available for this project. However, No Objection

Certificate (NOC)/Consents were duly obtained from Maharashtra

Pollution Control Board (MPCB) and renewed from time to time.

The latest Consents obtained from MPCB is appended.

Page 2: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

MAHARASHTRA POLLUTION CONTROL BOARDPhone •

Fax :

Email :Visit At :

Consent

4010437/4020781/4037124/403527324044532/4024068/[email protected]|ittp://mpcb.gov.in

order No: - Formatel} |O ) l y

Kalpataru Point, 3rd & 4th floor, Sion-_,.„.,„_„ Roari No R, Opp Cinp Planpt Cinema,

HAHARASHm* Sion fEl.

WHIM? Mumbai - 400 022

0/ BO/CAC-Cell/ EIC No RD-2652-14/6th CAO ^ tfjj

Matunga SchemeNear Sion Circle,

X

To,Reliance Industries Limited,(LAB Division),Plot Bl- B3, MIDC Industrial area,Patalganga, Dist: RaigadMaharashtra - 410220.

Subject: Renewal of Consent tO operate RED category.Ref: l.Earlier Consent granted vide no.BO/JD(PAMS)/EIC No.- RD-2044-11/R/203Dated: 03/11/2011.2. CAC meeting held on 12.06.2014

Your application: CR1311000200Dated: 22.11.2013.

For: Renewal of Consent to operateunder Section 26 of the Water (Prevention & Control of Pollution) Act, 1974 & underSection 21 of the Air (Prevention & Control of Pollution) Act, 1981 andAuthorization under Rule 5 of the Hazardous Wastes (M, H & T M) Rules 2008 isconsidered and the consent is hereby granted subject to the following terms andconditions and as detailed in the schedule I, II, III & IV annexed to this order:

1. The consent is granted for a period from 01.01.2014 up to 31.08.2015.2. The actual Capital Investment of the Industry is Rs. 550.51 Crs. (As per

C.A.Certificate submitted by industry)3. The Consent is valid for the manufacture of-

Sr. No. Product / By-Product Name Maximum Quantity inMT/M

1.2.3.4.

LABHeavy AlkylateLight EndsRaffinate & other by products( HNP/NP/Polymer)

83408401110

51598

4. Conditions under Water (P&CP), 1974 Act for discharge of effluent:Sr.no.

1.

2.

Description

Trade effluent

Domestic effluent

Permittedquantity ofdischarge(CMD)815

25

Standards tobe achieved

As perSchedule -IAs perSchedule -I

Disposal

To the ETP ofPolyesterdivision

M/s Reliance Industries Ltd PTA SRORaigadI/I/R/L/75111000 Page 1 of 8

Page 3: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

5. Ccmditions under Air (P& CP) Act, 1981 for air emissions:Sr.no.1.

2.

3.

Description of stack /sourceFront End Heater

Back End Heater

Flare

Number of Stack

1

11

Standards to beachievedAs per Schedule -II

As per Schedule -II

As per Schedule -II

6. Conditions about Non Hazardous Wastes:

Sr.no.

Type Of WasteQuantity&UoM

Treatment Disposal

N.A

7. Conditions under Hazardous Waste (MH & TM) Rules, 2008 for treatment anddisposal of hazardous waste:

Sr. Type Of Waste Categoi! Quant UOM Treatmer DisposalNo. 1 I y ! !l

2

34

5

6

Spent catalyst/ Fullersearth / spent clay

Slop oil

Oil containing sludge

Used Oil

Chemical Sludge fromwaste watertreatment

( Neutralization Cake)

Electronic Waste

1.7

1.8

3.1

5.1

34.3

E-Waste

200

1000

50

50

200

1.5

MT/A

MT/A

MT/A

MT/A

MT/A

MT/A

NA

NA

NA

NA

NA

NA

Sale to offsite recycle r/reprocessor having

valid consent of StatePollution Control

Board or to be sent toCHWTSDF

Sale to offsite recycler/reprocessor approvedKV MPPR

Sale to offsite recycler/reprocessor approvedby MPCB

Disposal toCHWTSDF for Land

filling

Disposal to ElectronicRecycler

8.

9.

The Board reserves the right to review, amend, suspend, revoke etc. this consentand the same shall be binding on the industry.This consent should not be construed as exemption from obtaining necessaryNOC/permission from any other Government authorities.

10. Industry shall carry out water audit from reknowed institutes like IIT, NEERI etcwithin 3 months and submit BG of Rs 2 lakhs for the compliance of the same.

11. Industry shall carry out vigorous monitoring for VOC once in 15 days and submitBG of Rs 5 lakhs for the compliance of the same.

M/s Reliance Industries Ltd PTA SRORaigadl/I/R/L/75111000 Page 2 of 8

Page 4: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

12. M/s REL LAB shall sign bi-lateral agreement with M/s REL-Polyester for jointresponsibility of the treatment of their trade and domestic effluent. If M/s M/s REL-Polyester fails to treat their domestic effluent, they should make their ownarrangement for the treatment of effluent. In case of the non-compliance of properO&M, discharging pollutants, both of them will be jointly & severally liable for thesame & any legal obligation, action etc.

For and on behalf of theMaharashtra Pollution jKontrol Board

( Rajeev KuMembe

Received Consent fee of-Sr. Amount(Rs.) DD. No. Date Drawn OnNo.1.2.3.

3300000/-100/-3060/-

0001740001700478

25/9/201325/9/201311/8/2014

HDFC BankHDFC BankHDFC Bank

The balance fees Rs 14,68,027, with the Board will be considered at the timeof next renewal of consent.

Copy to:1. Regional Officer -MPCB, Belapur, Navi Mumbai and Sub-Regional Officer-

MPCB, Belapur, Navi Mumbai, They are directed to ensure the complianceof the consent conditions.

2. Chief Accounts Officer, MPCB, Mumbai.3. CC/CAC desk- for record & website updation purposes.

M/s Reliance Industries Ltd PTA SRORaigadl/I/R/L/75111000 Page 3 of 8

Page 5: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-ITerms & conditions for compliance of Water Pollution Control:

1) A] As per your application, you shall send the trade effluent and domesticeffluent for treatment in the ETP of M/s REL Polyesters, Patalganga.

2) The Board reserves its rights to review plans, specifications or other datarelating to plant setup for the treatment of waterworks for the purificationthereof & the system for the disposal of sewage or trade effluent or inconnection with the grant of any consent conditions. The Applicant shallobtain prior consent of the Board to take steps to establish the unit or establishany treatment and disposal system or extension or addition thereto.

3) The industry shall ensure replacement of pollution control system or its partsafter expiry of its expected life as defined by manufacturer so as to ensure thecompliance of standards and safety of the operation thereof.

4) The Applicant shall comply with the provisions of the Water (Prevention &Control of Pollution) Cess Act, 1977 and as amended, by installing watermeters, filing water cess returns in Form-I and other provisions as containedin the said act.

Sr.no.1.

2.3.

4.

Purpose for water consumed

Industrial Cooling, spraying in mine pits orboiler feedDomestic purposeProcessing whereby water gets polluted &pollutants are easily biodegradableProcessing whereby water gets polluted &pollutants are not easily biodegradable andare toxic

Water consumptionquantity (CMD)1520

25455

0

5) The Applicant shall provide Specific Water Pollution control system as perthe conditions of EP Act,1986 and rule made there under from time to time/Environmental Clearance / CREP guidelines.

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75111000 Page 4 of 8

Page 6: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-II

Terms & conditions for compliance of Air Pollution Control:

1. As per your application, you have provided the Air pollution control(APC)system and erected following stack (s) and to observe the followingfuel pattern-

Sr. Stack APC Height Type of Fuel Quantit S % S02

No. Attached Syste in Mtrs. y & Kg/DayTo m UoM

1

2

3

Heater(XIII)

Heater(XIV)

Flare (XV)

NA

NA

NA

60

65

80

NG + Process (*)off gas#/ FO+

Process (*) off gas

NG + Process (*)offgas#/FO+

Process (*) off gas

NG/LPG(Standby)(+) / LPG(Standby)

0.11+2.2MMSCMD/ 1.4+2.2 TPH

0.13+1.25

MMSCMD / 1.92+ 1.25TPH

-

0.01/4

0.01/4

NA

ForNG,see

point3

/2688ForNG,see

point3

/3686NA

FO & LPG shall be used as stand-by fuel.

2. The Applicant shall provide Specific Air Pollution control equipments as perthe conditions of EP Act, 1986 and rule made there under from time to time /Environmental Clearance / CREP guidelines.

3. The applicant shall operate and maintain above mentioned air pollutioncontrol system, so as to achieve the level of pollutants to the followingstandards:

ParticulatematterSC-2 Boiler(Natural gasas fuel)

Not to exceed

Not to exceed

150 mg/Nm3.

4130 Kg/D

4. The Applicant shall obtain necessary prior permission for providingadditional control equipment with necessary specifications and operationthereof or alteration or replacemenalteration well before its life come to anend or erection of new pollution control equipment.

5. The Board reserves its rights to vary all or any of the condition in theconsent, if due to any technological improvement or otherwise suchvariation (including the change of any control equipment, other in whole orin part is necessary).

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75111000 Page 5 of 8

Page 7: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-IllDetails of Bank Guarantees

Sr.No.

1

2

3

Consent(Cto

E/O/R)C toR

CtoR

CtoR

AmtofBG

Imposed5 lakhs

5 lakhs

5 lakhs

SubmissionPeriod

Within 15days from thedate of issueof consentWithin 15days from thedate of issueof consent

Within 15days from thedate of issueof consent

Purpose of BG

O & M of PCS

Industry shallcarry outwater auditfrom reknowedinstitutes likeIIT, NEERIIndustry shallcarry outvigorousmonitoring forVOC once in 15days

Compliance Period

31.08.2015

30.11.2014

31.08.2015

ValidityDate

31.12.2015

28.02.2015

31.12.2015

The existing BG of Rs 5 lakh submitted aga|nst the ID issued vide no 708dated 19.10.2011 shall be returned back as BG of Rs 5 lakhs for O & M of PCShas been imposed in this consent.

M/s Reliance Industries Ltd LAB SRORaigadl/I/R/L/75111000 Page 6 of 8

Page 8: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-IVGeneral Conditions:1) The applicant shall provide facility for collection of environmental samples and

samples of trade and sewage effluents, air emissions and hazardous waste to theBoard staff at the terminal or designated points and shall pay to the Board for theservices rendered in this behalf.

2) If the MIDC pipeline is broken/ overflowing chamber, in such cases industry shall notdischarge their treated effluent into MIDC drain, it shall be sent to CETP by tanker.

3) Industry should monitor effluent quality, stack emissions and ambient air qualitymonthly/quarterly.

4) The applicant shall provide ports in the chimney/(s) and facilities such as ladder,platform etc. for monitoring the air emissions and the same shall be open forinspection to/and for use of the Board's Staff. The chimney(s) vents attached tovarious sources of emission shall be designated by numbers such as S-l, S-2, etc. andthese shall be painted/ displayed to facilitate identification.

5) Whenever due to any accident or other unforeseen act or even, such emissions occuror is apprehended to occur in excess of standards laid down, such information shall beforthwith Reported to Board, concerned Police Station, office of Directorate of HealthServices, Department of Explosives, Inspectorate of Factories and Local Body. In caseof failure of pollution control equipments, the production process connected to it shallbe stopped.

6) The applicant shall provide an alternate electric power source sufficient to operate allpollution control facilities installed to maintain compliance with the terms andconditions of the consent. In the absence, the applicant shall stop, reduce orotherwise, control production to abide by terms and conditions of this consent.

7) The firm shall submit to this office, the 30th day of September every year , theEnvironmental Statement Report for the financial year ending 31st March in theprescribed Form-V as per the provisions of rule 14 of the Environment (Protection)(Second Amendment) Rules, 1992.

8) The industry shall recycle/reprocess/reuse/recover Hazardous Waste as per theprovision contain in the HW(MH&TM) Rules 2008, which can berecycled/processed/reused/recovered and only waste which has to be incinerated shallgo to incineration and waste which can be used for land filling and cannot berecycled/reprocessed etc should go for that purpose, in order to reduce load onincineration and landfill site/environment.

9) The industry should comply with the Hazardous Waste (M,H & TM) Rules, 2008 andsubmit the Annual Returns as per Rule 5(6) & 22(2) of Hazarsous Waste (M,H & TM)Rules, 2008 for the preceding year April to March in Form-IV by 30th June of everyyear.

10) An inspection book shall be opened and made available to the Board's officers duringtheir visit to the applicant.

ll)The applicant shall make an application for renewal of the consent at least60 days before the date of the expiry of the consent.

12) Industry shall strictly comply with the Water (P&CP) Act, 1974, Air (P&CP) Act,1981 and Environmental Protection Act, 1986 and industry specific standard underEP Rules 1986 which are available on MPCB website (www.mpcb.gov.in).

13) The industry shall constitute an Environmental cell with qualifiedstaff/personnel/agency to see the day to day compliance of consent condition towardsEnvironment Protection.

14) Separate drainage system shall be provided for collection of trade and sewageeffluents. Terminal manholes shall be provided at the end of the collection systemwith arrangement for measuring the flow. No effluent shall be admitted in thepipes/sewers downstream of the terminal manholes. No effluent shall find its wayother than in designed and provided collection system.

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75111000 [\ Page7of8

Page 9: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

15) Neither storm water nor discharge from other premises shall be allowed to mix withthe effluents from the factory.

16) The applicant shall install a separate meter showing the consumption of energy foroperation of domestic and industrial effluent treatment plants and air pollutioncontrol system. A register showing consumption of chemicals used for treatment shallbe maintained.

17) Conditions for D.G. Seta) Noise from the D.G. Set should be controlled by providing an acoustic enclosure or

by treating the room acoustically.b) Industry should provide acoustic enclosure for control of noise. The acoustic

enclosure/ acoustic treatment of the room should be designed for minimum 25 dB(A) insertion loss or for meeting the ambient noise standards, whichever is onhigher side. A suitable exhaust muffler with insertion loss of 25 dB (A) shall alsobe provided. The measurement of insertion loss will be done at different points at0.5 meters from acoustic enclosure/room and then average.

c) Industry should make efforts to bring down noise level due to DG set, outsideindustrial premises, within ambient noise requirements by proper sitting andcontrol measures.

d) Installation of DG Set must be strictly in compliance with recommendations of DGSet manufacturer.

e) A proper routine and preventive maintenance procedure for DG set should be setand followed in consultation with the DG manufacturer which would help toprevent noise levels of DG set from deteriorating with use

f) D.G. Set shall be operated only in case of power failure.g) The applicant should not cause any nuisance in the surrounding area due to

operation of D.G. Set.h) The applicant shall comply with the notification of MoEF dated 17.05.2002

regarding noise limit for generator sets run with diesel18) The industry should not cause any nuisance in surrounding area.19) The industry shall take adequate measures for control of noise levels from its own

sources within the premises so as to maintain ambient air quality standard in respectof noise to less than 75 dB (A) during day time and 70 dB (A) during night time. Daytime is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between10 p.m. and 6 a.m.

20) The applicant shall maintain good housekeeping.21) The applicant shall bring minimum 33% of the available open land under green

coverage/ plantation. The applicant shall submit a statement on available open plotarea, number of trees surviving as on 31st March of the year and number of treesplanted by September end, with the Environment Statement.

22) The non-hazardous solid waste arising in the factory premises, sweepings, etc. bedisposed of scientifically so as not to cause any nuisance / pollution. The applicantshall take necessary permissions from civic authorities for disposal of solid waste.

23) The applicant shall not change or alter the quantity, quality, the rate of discharge,temperature or the mode of the effluent/emissions or hazardous wastes or controlequipments provided for without previous written permission of the Board. Theindustry will not carry out any activity, for which this consent has not beengranted/without prior consent of the Board.

24) The industry shall ensure that fugitive emissions from the activity are controlled soas to maintain clean and safe environment in and around the factory premises.

25) The industry shall submit official e-mail address and any change will be dulyinformed to the MPCB.

26) The industry shall achieve the National Ambient Air Quality standards prescribedvide Government of India, Notification dt. 16.11.2009 as amended.

-0-0-0-

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/7511 WOO \

Page 10: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Phone :

Fax :

Email :Visit At :

MAHARASHTRA POLLUTION CONTROL BOARD4010437/4020781 __ Kalpataru Point, 3rd & 4th floor, Sion-Matunga Scheme/4037124/4035273 __ Road No. 8, Opp. Cine Planet Cinema, Near Sion Circle,24044532/4024068 MAHARASHTRA Sion (E),/[email protected] ^HMHHHF Mumbai - 400 022http://mDcb.gov.in

Consent order No: - Formate l.O/ BO/CAC-Cell/ EIC No RD-2651-14/6th CAC

To,Reliance Industries Limited,(PTA Division),B- 4, MIDC Industrial area,Fatalganga, Dist: RaigadMaharashtra - 410220.

Subject: Renewal of consent to operate RED category.Ref: 1. Earlier Consent granted vide no. BO/BO/JD(PAMS)/EIC No. RD-2023-11/R/201dated 03/11/2011.2. CAC meeting held on 12.06.2014

Your application :CR1311000177Dated: 22.11.2013.For: Renewal of consent to operateunder Section 26 of the Water (Prevention & Control of Pollution) Act, 1974 & underSection 21 of the Air (Prevention & Control of Pollution) Act, 1981 and Authorizationvoider Rule 5 of the Hazardous Wastes (M, H & T M) Rules 2008 is considered and theconsent is hereby granted subject to the following terms and conditions and as detailedin the schedule I, II ,111 & IV annexed to this order:

1. The consent is granted for a period from 01.01.2014 to 31.08.2015.2. The actual capital investment of the industry is Rs. 751.32 Crs.

C.A. Certificate submitted by industry)3. The Consent is valid for the manufacture of-

4.

(As per

Sr. Product / By-Product Maximum Quantity in MT/MNo. ! Name '. . ,1.2.

3.4.5.6.7.

PTARaffinate & other byproducts ( IG Benzene,Remax, Renine)ElectricitySteamLPGPentene (N and iso)P - Xylene ( By- Product )

2500050509

48 MW250

22501042

20840Conditions under Water (P&CP), 1974 Act for discharge of effluent:Sr.no.

1.

2.

Description

Trade effluent

Domestic effluent

Permittedquantity ofdischarge(CMD)5077.40

100.90

Standards to beachieved

As per Schedule-IAs per Schedule-I

Disposal

CETP

CETP

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75110000 of10

Page 11: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

5. Conditions under Air (P& CP) Act, 1981 for air emissions:I Sr.no.

Description of stack /sourceBoiler ( I to III )Heater (IV to X )

i FlareHRSG - I & IIIncinerator

Number of Stack Standards to beachievedCj^Lii^ V Ct-t

As per Schedule -IIX JLJJ JJ^J. k-Jl^-Xl-^ V* i .1. J.J.

As per Schedule -IIJ. M.J M V/ M. k_7 «_^ A M. V* H.-H-- —A-l

As per Schedule -IIAs per Schedule -IIAs per Schedule -II

6. Conditions about Non Hazardous Wastes:Sr.no.

1

Type Of Waste

Biological ETP

Quantity &UoM

1000 MT/A

Treatment

Disposal

Used as manure

Conditions under Hazardous Waste (MH & TM) Rules, 2008 for treatment anddisposal of hazardous waste:

Sr. Type Of Waste Categc Quantil UOM Treatr DisposalNo. y ent1

2

34

56

7

8

9

Spent catalyst/ Fullersearth / spent clay

Slop oil

Oil containing sludgeUsed Oil

Discarded AsbestosOil soaked cotton rags/hand glovesProcess Ash

Purge Steam

Electronic Waste

1.7

1.8

J.I5.1

15.255.1

56.2

E-Waste

300

200

50125

300100

250

12000

1.5

MT/A

MT/A

MT/AMT/A

MT/AMT/A

MT/A

MT/A

MT/A

NA

NA

NANA

NANA

NA

NA

NA

Sell to offsite recycler/reprocessor having validconsent of State PollutionControl Board or to besent to CHWTSDFSell to offsite recycler/reprocessor approved by(registered with) MOEF/CPCB having validconsent of State pollutionControl BoardSell to offsite recycler/reprocessor approved by(registered with) MOEF/CPCB having validconsent of State pollutionControl BoardCHWTSDFCHWTSDF

Sell to offsite recycler/reprocessor having validconsent of State PollutionControl Boardsale to offsite reprocessorhaving valid consent ofState Pollution ControlBoardDisposal to ElectrorRecycler.

The Board reserves the right to review, amend, suspend, revoke etc. this consent andthe same shall be binding on the industry.

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75110000 Page 2 of 10

Page 12: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

9. This consent should not be construed as exemption from obtaining necessaryNOC/permission from any other Government authorities.

10. Industry shall carry out treatability study of ETP from IIT/NEERI and submit thereport by 30.11.2014. Also submit BG of Rs 2 lakhs for the compliance of the same.

11. Industry shall provide CAAQMS by 28.02.2015 and submit BG of Rs 10 lakhs for thecompliance of the same.

For and on behalf of theMaharashtra Pollution Control Board

( RajeevMem'

Received Consent fee of-

ir mxfal, IAS )kretary

Sr. Amount(Rs.) DD. No. Date 1 Drawn OnNo. • I1.

2.

3.

45,04,500

100

3420

000172

000169

0479

25.09.2013

25.09.2013

11.08.2014

HDFCBankHDFCBankHDFCBank

The balance fees Rs.20,03,5207- with the Board will be considered at the time ofnext renewal of consent.

Copy to:1. Regional Officer -Raigad MPCB and Sub-Regional Officer- Raigad -1 MPCB,

They are directed to ensure the compliance of the consent conditions. The BG ofRs 5 lakh towards O & M of PCS shall be forfeited as JVS results of treatedeffluent dated 18.03.2014, 25.02.2014, 04.01.2014 are exceeding the consented thenorms.

2. Chief Accounts Officer, MPCB, Mumbai.3. CC/CAC desk- for record & website updation purposes.

M/s Reliance Industries Ltd PTA SRORaigadI/l/R/L/75110000 Page 3 of 10

Page 13: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-I

Terms & conditions for compliance of Water Pollution Control:

1) Aj As per your application, you have provided the combined Effluent TreatmentPlant (ETP) for treatment of trade and domestic effluent with the designcapacity of 5500 CMD.

B] The Applicant shall operate the effluent treatment plant (ETP) to treat the tradeeffluent so as to achieve the following standards prescribed by the Board orunder EP Act, 1986 and Rules made there under from time to time, whichever isstringent

SrNo.

010203

04050607

08

Parameters

pHOil & GreaseBOD (3 days 27oC )

Total Dissolved SolidsSuspended SolidsCODChloride

Sulphate

Standards prescribed byBoard (If any)Limiting Concentration inmg/1, except for pH5.5-9.010 mg/1100 mg/1

2100 mg/1100 mg/1250 mg/1600 mg/1

1000 mg/1

C) The treated effluent shall be discharged to CETP.

2) A.] As per your consent application, the domestic effluent shall be treated in ETP.

3) In case the treatment system is combined for trade effluent and sewage then thestandards and disposal path prescribed at sr. no.l B & C of schedule I shall beapplicable.

4) The Board reserves its rights to review plans, specifications or other data relatingto plant setup for the treatment of waterworks for the purification thereof & thesystem for the disposal of sewage or trade effluent or in connection with the grantof any consent conditions. The Applicant shall obtain prior consent of the Board totake steps to establish the unit or establish any treatment and disposal system orextension or addition thereto.

5) The industry shall ensure replacement of pollution control system or its parts afterexpiry of its expected life as defined by manufacturer so as to ensure thecompliance of standards and safety of the operation thereof.

M/s Reliance Industries Ltd PTA SRORaigadI/l/R/L/75110000 Page 4 of 10

Page 14: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

6) The Applicant shall comply with the provisions of the Water (Prevention & Controlof Pollution) Cess Act, 1977 and as amended, by installing water meters, filingwater cess returns in Form-I and other provisions as contained in the said act.Sr. I Purpose for water consumedno.

i

1.

23.

4.

Industrial Cooling, spraying in mine pits orboiler feedDomestic purposeProcessing whereby water gets polluted &pollutants are easily biodegradableProcessing whereby water gets polluted &pollutants are not easily biodegradable andare toxic

Waterconsumptionquantity (CMD)12923

1213916

0

7) The Applicant shall provide Specific Water Pollution control system as per theconditions of EP Act,1986 and rule made there under from time to time/Environmental Clearance / CREP guidelines.

I M/s Reliance Industries Ltd PTA SRORaigadl/I/R/L/75110000 Page 5 of 10

Page 15: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-II

Terms & conditions for compliance of Air Pollution Control:

As per your application, you have provided the Air pollution control(APC)system and also erected following stack (s) and to observe the followingfuel pattern-

Sr. j Stack APC Height Type of | Quantity & S % | SO2No. Attached To System in Fuel UoM Kg/Day

i Mtrs. ! !1

2

3

4

5

Boilerd to III)

Heaters (IV toX)

Flare ( XI)

Incinerator(XII)

HRSG ( I & II )

Stack

Stack

Stack

Stack

Stack

30 each

30 each.

100

30

60 each

LSHS+ ByProducts/NG

Process offgas / NG

LPG(Standby)/NGC9/FO/LSHS/NG

Naphtha/Kerosene**/NG

3.1 TPHeach * / 0.29MMSCMD

4.613 TPH/0.25MMSCMD

---

0.075 TPH/0.0024MMSCMD

29.2 TPH** /0.55MMSCMD

0.2*/0.01

0.00910.01

-

-10.01

0.5

297.6/ ForNG,seepoint320/ForNG,seepoint3-

ForNG,seepoint37008/ ForNG,seepoint3

Natural gas should be used as a fuel. Due non-availability of NATURAL GASONLY, LSHS/FO shall be used and accordingly SO2 standard shall bemaintained.

(*): Liquid by products from manufacturing process are blended with LSHS. FOused for start up only @ 4.0 tph

(**): HSD is used @ 10.2 tpd only during start up / shut down.

The emission from various sources in the factory shall be restricted as to limitthe ambient level of non-methane hydrocarbon in the factory premises to 0.24ppm on 24 hours average basis.

2. The Applicant shall provide Specific Air Pollution control equipments as per theconditions of EP Act, 1986 and rule made there under from time to time /Environmental Clearance / CREP guidelines.

3. The applicant shall operate and maintain above mentioned air pollution controlsystem, so as to achieve the level of pollutants to the following standards:

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75110000 PagejfoflO

Page 16: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

ParticulatematterNOx fromcapctivepower plantSO2 Boiler(Natural gasas fuel)

Not to exceed

Not to exceed

Not to exceed

150 mg/Nm3.

150 ppm

498 Kg/D

4. The Applicant shall obtain necessary prior permission for providing additionalcontrol equipment with necessary specifications and operation thereof oralteration or replacemenalteration well before its life come to an end or erectionof new pollution control equipment.

5. The Board reserves its rights to vary all or any of the condition in the consent, ifdue to any technological improvement or otherwise such variation (includingthe change of any control equipment, other in whole or in part is necessary).

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75110000 Page 7 of 10

Page 17: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-IIIDetails of Bank Guarantees

History of BG:Sr.No,

1

Consent(Cto

E/O/R)CtoR

Amt ofBG

ImposedRs 5 lakh

Submission Period

To beforfeited

Purpose of BG

JVS results of treatedeffluent dated 18.03.2014,

25.02.2014, 04.01.2014are exceeding the

consented the norms.

Compliance Period

To beforfeited

ValidityDate

To beforfeited

Proposed BG:r T1

No.

1

2

2

Consent(Cto

E/O/R)C t o R

CtoR

C t o R

Amt ofBG

ImposedRs 10lakhs

Rs 2lakhs

Rs 10lakhs

Submission Period

Within 15days fromthe date ofissue ofconsentWithin 15days fromthe date ofissue ofconsentWithin 15days fromthe date ofissue ofconsent

Purpose of BG

O & M o f P C S

Towards treatabilitystudy of ETP

Towards providingCAAQMS

Compliance Period

31.08.2015

30.11.2014

28.02.2015

ValidityDate

31.12.2015

30.03.2015

30.06.2015

M/s Reliance Industries Ltd PTA SRORaigadl/l/R/L/75110000

Page 18: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

Schedule-IVGeneral Conditions:1) The applicant shall provide facility for collection of environmental samples and samples of

trade and sewage effluents, air emissions and hazardous waste to the Board staff at theterminal or designated points and shall pay to the Board for the services rendered in thisbehalf.

2) If the MIDC pipeline is broken/ overflowing chamber, in such cases industry shall notdischarge their treated effluent into MIDC drain, it shall be sent to CETP by tanker.

3) Industry should monitor effluent quality, stack emissions and ambient air qualitymonthly/quarterly.

4) The applicant shall provide ports in the chimney/(s) and facilities such as ladder, platformetc. for monitoring the air emissions and the same shall be open for inspection to/and foruse of the Board's Staff. The chimney(s) vents attached to various sources of emission shallbe designated by numbers such as S-l, S-2, etc. and these shall be painted/ displayed tofacilitate identification.

5) Whenever due to any accident or other unforeseen act or even, such emissions occur or isapprehended to occur in excess of standards laid down, such information shall be forthwithReported to Board, concerned Police Station, office of Directorate of Health Services,Department of Explosives, Inspectorate of Factories and Local Body. In case of failure ofpollution control equipments, the production process connected to it shall be stopped.

6) The applicant shall provide an alternate electric power source sufficient to operate allpollution control facilities installed to maintain compliance with the terms and conditionsof the consent. In the absence, the applicant shall stop, reduce or otherwise, controlproduction to abide by terms and conditions of this consent.

7) The firm shall submit to this office, the 30th day of September every year , theEnvironmental Statement Report for the financial year ending 31st March in theprescribed Form-V as per the provisions of rule 14 of the Environment (Protection) (SecondAmendment) Rules, 1992.

8) The industry shall recycle/reprocess/reuse/recover Hazardous Waste as per the provisioncontain in the HW(MH&TM) Rules 2008, which can berecycled/processed/reused/recovered and only waste which has to be incinerated shall go toincineration and waste which can be used for land filling and cannot berecycled/reprocessed etc should go for that purpose, in order to reduce load on incinerationand landfill site/environment.

9) The industry should comply with the Hazardous Waste (M,H & TM) Rules, 2008 andsubmit the Annual Returns as per Rule 5(6) & 22(2) of Hazardous Waste (M,H & TM)Rules, 2008 for the preceding year April to March in Form-IV by 30th June of every year.

10) An inspection book shall be opened and made available to the Board's officers during theirvisit to the applicant.

11) The applicant shall make an application for renewal of the consent at least 60days before the date of the expiry of the consent

12) Industry shall strictly comply with the Water (P&CP) Act, 1974, Air (P&CP) Act, 1981 andEnvironmental Protection Act, 1986 and industry specific standard under EP Rules 1986which are available on MPCB website (www.mpcb.gov.in).

13) The industry shall constitute an Environmental cell with qualified staff/personnel/agencyto see the day to day compliance of consent condition towards Environment Protection.

14) Separate drainage system shall be provided for collection of trade and sewage effluents.Terminal manholes shall be provided at the end of the collection system with arrangementfor measuring the flow. No effluent shall be admitted in the pipes/sewers downstream ofthe terminal manholes. No effluent shall find its way other than in designed and providedcollection system.

15) Neither storm water nor discharge from other premises shall be allowed to mix with theeffluents from the factory.

16) The applicant shall install a separate meter showing the consumption of energy foroperation of domestic and industrial effluent treatment plants and air pollution control

M/s Reliance Industries Ltd PTA SRORaigadI/l/R/L/75110000 \9e 9 °l^

Page 19: The Reliance Industries Limited (RIL)-Patalganga ...environmentclearance.nic.in/writereaddata/Form-1A/EC/10_Jun_2015... · The Reliance Industries Limited (RIL)-Patalganga Manufacturing

system. A register showing consumption of chemicals used for treatment shall bemaintained.

17) Conditions for D.G. Seta) Noise from the D.G. Set should be controlled by providing an acoustic enclosure or by

treating the room acoustically.b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/

acoustic treatment of the room should be designed for minimum 25 dB (A) insertionloss or for meeting the ambient noise standards, whichever is on higher side. Asuitable exhaust muffler with insertion loss of 25 dB (A) shall also be provided. Themeasurement of insertion loss will be done at different points at 0.5 meters fromacoustic enclosure/room and then average.

c) Industry should make efforts to bring down noise level due to DG set, outsideindustrial premises, within ambient noise requirements by proper sitting and controlmeasures.

d) Installation of DG Set must be strictly in compliance with recommendations of DG Setmanufacturer.

e) A proper routine and preventive maintenance procedure for DG set should be set andfollowed in consultation with the DG manufacturer which would help to prevent noiselevels of DG set from deteriorating with use

f) D.G. Set shall be operated only in case of power failure.g) The applicant should not cause any nuisance in the surrounding area due to operation

of D.G. Set.h) The applicant shall comply with the notification of MoEF dated 17.05.2002 regarding

noise limit for generator sets run with diesel18) The industry should not cause any nuisance in surrounding area.19) The industry shall take adequate measures for control of noise levels from its own sources

within the premises so as to maintain ambient air quality standard in respect of noise toless than 75 dB (A) during day time and 70 dB (A) during night time. Day time is reckonedin between 6 a.m. and 10 p.m. and night time is reckoned between 10 p.m. and 6 a.m.

20) The applicant shall maintain good housekeeping.21) The applicant shall bring minimum 33% of the available open land under green coverage/

plantation. The applicant shall submit a statement on available open plot area, number oftrees surviving as on 31st March of the year and number of trees planted by Septemberend, with the Environment Statement.

22) The non-hazardous solid waste arising in the factory premises, sweepings, etc. be disposedof scientifically so as not to cause any nuisance / pollution. The applicant shall takenecessary permissions from civic authorities for disposal of solid waste.

23) The applicant shall not change or alter the quantity, quality, the rate of discharge,temperature or the mode of the effluent/emissions or hazardous wastes or controlequipments provided for without previous written permission of the Board. The industrywill not carry out any activity, for which this consent has not been granted/without priorconsent of the Board.

24) The industry shall ensure that fugitive emissions from the activity are controlled so as tomaintain clean and safe environment in and around the factory premises.

25) The industry shall submit official e-mail address and any change will be duly informed tothe MPCB.

26) The industry shall achieve the National Ambient Air Quality standards prescribed videGovernment of India, Notification dtd. 16.11.2009 as amended.

27) The applicant shall install three continuous automatic ambient air andmicrometeorological monitoring station at location indicated by State Board to be set upand operate at its own cost measure SO2, NOx and particulate matter. These CAAQMSshall also have necessary provision of networking to the Air Quality Monitoring networkof MPCB.