A Guide to Generating
Banners Requisition for a Purchase Order
The Requisition Process
7/27/2019 The Requisition Process -Ban7
2/77
Welcome to the Requisition ProcessVirtual Seminar!
The lesson is self-paced. So sit back,relax, and enjoy the show with every
click of the mouse!
This training presentation is a step bystep guide through the requisition
form (FPAREQN).
For starters, heres an overview of
the purchasing process
7/27/2019 The Requisition Process -Ban7
3/77
The Purchasing Process
PurchaseOrder
InvoiceBid
Check
PurchasingDepartment
Vendor
ReceivingDepartment
AccountsPayable
1
23
4
5
6
7
8
9
Requisition
Files
10
7/27/2019 The Requisition Process -Ban7
4/77
lets begin
Now that you understand whatposition the requisition plays inthe purchasing process,
7/27/2019 The Requisition Process -Ban7
5/77
Once you sign-on, this is themain screen that you will see
7/27/2019 The Requisition Process -Ban7
6/77
Type the name of the form,FPAREQN, in the directaccess field. Then enter
from the keyboard.
7/27/2019 The Requisition Process -Ban7
7/77
DO NOT CLICK ON THESEARCH BUTTON ON
THE RIGHT.
Note: Technically, this button is called the LOV button.
It stands for list of values. When you click on it, a new
window will open, and you can choose from a list of
items that are available. You can also perform a search,which we will show you later in the presentation.
7/27/2019 The Requisition Process -Ban7
8/77
Type in the word NEXT (with
no quotes or spaces before orafter) to command Banner toassign a requisition number.
7/27/2019 The Requisition Process -Ban7
9/77
Then click on next block.
7/27/2019 The Requisition Process -Ban7
10/77
Order date and transactiondate will have defaulted inwith the current date, as wellas your contact information.
Enter a future date for thedelivery date.
The latestversion hasreplaced the
options menuon the left sidewith tabs
7/27/2019 The Requisition Process -Ban7
11/77
The comment field isoptional.
7/27/2019 The Requisition Process -Ban7
12/77
Click on the LOVbutton to choose adelivery address.
7/27/2019 The Requisition Process -Ban7
13/77
Choose RECV
then press OK.
7/27/2019 The Requisition Process -Ban7
14/77
Type in the name of theperson to whom thisorder is going. Include
building and room #, oran ext. #.
7/27/2019 The Requisition Process -Ban7
15/77
Click the Options MenuButton, then onDocument Text.
7/27/2019 The Requisition Process -Ban7
16/77
Use this area to put messages for the vendor,
state a quote #, specify special requests, etc.There are 99 lines available. When text isentered on a line and is full, use the down arrowto advance to the next line.
7/27/2019 The Requisition Process -Ban7
17/77
Save when finished.
7/27/2019 The Requisition Process -Ban7
18/77
Note: This message bar isBanners line of
communication to the user.(Here it says that the textentered has been saved)
Exit.
7/27/2019 The Requisition Process -Ban7
19/77
1. Banner takes youback to the
requisition form.Notice a requisitionnumber is assigned.
2. ClickNext block
to continue.
7/27/2019 The Requisition Process -Ban7
20/77
Enter the vendor ID numberif you know it. If not, click onthe LOV button to search forthe vendor.
7/27/2019 The Requisition Process -Ban7
21/77
Choose Entity Name/ID Search.
7/27/2019 The Requisition Process -Ban7
22/77
7/27/2019 The Requisition Process -Ban7
23/77
Banners search
engine is casesensitive, so try all
caps first.
7/27/2019 The Requisition Process -Ban7
24/77
Scroll down to see if the vendoryoure looking for is listed here.
7/27/2019 The Requisition Process -Ban7
25/77
If not, do another search.This time, try upper andlower case.
7/27/2019 The Requisition Process -Ban7
26/77
Scroll down to findyour vendor.
7/27/2019 The Requisition Process -Ban7
27/77
Double click on the vendor name tobring it back to the requisition.
Or click on the
vendor name onceto hi-light, then clickon the select
button.
7/27/2019 The Requisition Process -Ban7
28/77
Check the vendors address tomake sure thats the right address
to send a purchase order to.If it is not, click on theLOV button next to Seq#to pick another address.
Click on next block. This willmove page selection to theCommodity/Accounting tab
7/27/2019 The Requisition Process -Ban7
29/77
Tab over to Desc to describe the item you want to purchase.
Be as precise as possible. Bear in mind that this descriptionhas to be clear to the people who are approving this purchaserequest as well as the vendor. Therefore, it is important toinclude item # where appropriate.
7/27/2019 The Requisition Process -Ban7
30/77
The description field haslimited space.
When the description is toolong, keep typing till you runout of space. Then click onitem text in the Options
menu, to continue thedescription.
7/27/2019 The Requisition Process -Ban7
31/77
Notice the description from theprevious page resurfaced here.
Click on nextblock.
7/27/2019 The Requisition Process -Ban7
32/77
7/27/2019 The Requisition Process -Ban7
33/77
Notice the confirmation message.
Click the Exit button.
7/27/2019 The Requisition Process -Ban7
34/77
Notice Item Text is checked.
Its an indication that thedescription for this item iscontinued in Item Text.
Tab to U/M (Unit of Measure).Type in the measurement, or
click on the LOV button toselect from a list.
Fill in thequantity.
7/27/2019 The Requisition Process -Ban7
35/77
How much for each?
7/27/2019 The Requisition Process -Ban7
36/77
Tab through the ext cost,
and Banner will do thecalculations for you.
7/27/2019 The Requisition Process -Ban7
37/77
7/27/2019 The Requisition Process -Ban7
38/77
Go through the same processas with the first item.
7/27/2019 The Requisition Process -Ban7
39/77
Theres no restriction to the
amount of commodity youwant to order. Just continueusing each row for each item.
Notice the description to the
second item is short. It doesnot need to continue in itemtext. Therefore, the item textbox is not checked.
7/27/2019 The Requisition Process -Ban7
40/77
For training purposes, well orderthree items. This third itemrequires a continuation. So clickon item text tab of the Options
menu item.
7/27/2019 The Requisition Process -Ban7
41/77
7/27/2019 The Requisition Process -Ban7
42/77
Choose either yes tosave, or no to erase
what youd just put in.
Then exit.
7/27/2019 The Requisition Process -Ban7
43/77
Click on next block to
enter the accountingcodes to be charged.
7/27/2019 The Requisition Process -Ban7
44/77
Unchangeable default: C (chartof accounts),
Yr (fiscal year) Should be
current year (July 1, - June 30).
Changeable defaults:Orgn (organization code),Prog (program code)
Skip Index code. Enter the fund code.
Make changes to Orgn code onlyif needed. Otherwise, tab to Acct
and enter in the Acct code.
7/27/2019 The Requisition Process -Ban7
45/77
Consider the amount to becharged to this acct. You can
choose to charge by % or by $.
To charge by %: Click on thebox right below the % sign.
7/27/2019 The Requisition Process -Ban7
46/77
Tab over to USD and putin the percentage.
7/27/2019 The Requisition Process -Ban7
47/77
Tab through the USDsection, and Banner will fillin the $ amount based on
your percentage.
Notice the check
mark is no longerthere after Bannerdid the calculations.
7/27/2019 The Requisition Process -Ban7
48/77
To charge by $:Tab over to USDand type in the$ amount.
7/27/2019 The Requisition Process -Ban7
49/77
Tab through this sectionso that Banner cancalculate your line total.
7/27/2019 The Requisition Process -Ban7
50/77
To share the cost betweentwo grants or cost centers
(or between a grant and acost center), you can specifyby percentage like this
7/27/2019 The Requisition Process -Ban7
51/77
Ex.: First cost center topick up 75% of the cost.
7/27/2019 The Requisition Process -Ban7
52/77
Tab through to see the $ amount that is75% of your commodity total.
Keep tabbing until the cursor gets tothe second row of the FOAPALaccounting strings.
Press the down arrow key on yourkeyboard to go to the second row.
7/27/2019 The Requisition Process -Ban7
53/77
Tab again to have theC and Yr filled in.
Notice the remainingcommodity amount isspecified here.
7/27/2019 The Requisition Process -Ban7
54/77
Fill in the Fund
code.
Change Orgn to reflect thesecond cost center thatwill pick up the other 25%of the cost.
Continue to Acct code.
7/27/2019 The Requisition Process -Ban7
55/77
Again, check the % box.
7/27/2019 The Requisition Process -Ban7
56/77
7/27/2019 The Requisition Process -Ban7
57/77
Tab through to see the$ amount of 25% ofyour commodity total.
7/27/2019 The Requisition Process -Ban7
58/77
7/27/2019 The Requisition Process -Ban7
59/77
Heres a summarization of the requisition.
It is good practice to jot down the reqnumber for future references.
When everything is inbalance, click on theComplete button.
7/27/2019 The Requisition Process -Ban7
60/77
7/27/2019 The Requisition Process -Ban7
61/77
7/27/2019 The Requisition Process -Ban7
62/77
Enter the req # here to go backinto the req and make changes.
NOTE: The req # starts with anR, followed by 7 digits (numbers,
not letters as in the letter O).
Click on next block untilyou get to the place thatneeds corrections andmake the changes.Dont forget to click on
complete once you are
done.
7/27/2019 The Requisition Process -Ban7
63/77
IMPORTANT NOTES
Commodity descriptions
should be as detailed and explain exactly what the itemsare.
should contain the vendors item number (if applicable).
can be as long as you want it to be. Just click on item
text (a new window will open) to continue where you gotcut off on the main screen.
This will help the approvers to understand what it is thatsbeing requested to order.
The same description will be copied over to the P.O. and
then to the invoice. If there is a quote number, state that number on document
text.
Check the system often to follow-up on the requisition until itis assigned a P.O.
7/27/2019 The Requisition Process -Ban7
64/77
If you want to have a hard copyof the requisition for yourrecords while waiting for the
purchase order (P.O.), go toform FOICOMM and print out acopy. The following slides will
guide you through it.
7/27/2019 The Requisition Process -Ban7
65/77
From General Menu,type in the form nameFOICOMM. Then enter.
7/27/2019 The Requisition Process -Ban7
66/77
Enter the requisition number.
For Document Type,
choose REQ.
7/27/2019 The Requisition Process -Ban7
67/77
Click on next block.
7/27/2019 The Requisition Process -Ban7
68/77
All the important information from thereq is presented on this page.
Print this out for your records.To view the accountinginformation, click theOpt ions menu, then
Account ingInformat ion.
7/27/2019 The Requisition Process -Ban7
69/77
This shows you where the itemsrequested are to be charged,plus the amount on each.
When youre done
reviewing, just exit.
7/27/2019 The Requisition Process -Ban7
70/77
To check the status
of a requisition
(or any document),
go to the
document history form
FOIDOCH
7/27/2019 The Requisition Process -Ban7
71/77
Type in FOIDOCH.
Then enter.
7/27/2019 The Requisition Process -Ban7
72/77
1. For DocType, putREQ.
2. Enter the req #(R_ _ _ _ _ _ _ )
3. Click on Next block to seethe requisition and all otherdocuments attached to it inthe purchasing process.
7/27/2019 The Requisition Process -Ban7
73/77
An empty field next to
the req # indicates thatthe req is incomplete.The C means
complete and awaitingapprovals.
An A indicates that the
req has been approvedby all approvers and isnow waiting for a P.O. tobe issued. The P.O. number will appear when
assigned. First the completed, thenthe Approvedindicators will appearas the P.O. changes status.
When the P.O. is approvedit is sent to the vendor. A
copy is then sent to therequestor.
7/27/2019 The Requisition Process -Ban7
74/77
This is how the
Purchase Order
looks when printed
VENDOR
7/27/2019 The Requisition Process -Ban7
75/77
Receiving address andATTN line.
VENDORCOPY
Information fromDocument Text.
Commoditydescription
Item Text
REQUESTOR
7/27/2019 The Requisition Process -Ban7
76/77
REQUESTORCOPY
The only difference
between this copy andthe previous one is theinformation at the bottom.
7/27/2019 The Requisition Process -Ban7
77/77
Brenda RobinsonPhone: 520-5236
Email: [email protected]