+ All Categories
Home > Documents > The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Date post: 27-Mar-2015
Category:
Upload: hayden-duncan
View: 219 times
Download: 2 times
Share this document with a friend
Popular Tags:
11
The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager
Transcript
Page 1: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

The RIPE NCC UpdateIngrid Wijte

Registration Services Assistant Manager

Page 2: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Operations: Registration Services

• Allocations now for three months only, as of July• One wait queue for new and ongoing requests…• Steady ticket load, although…• Pronounced

summer hole• Membership growth

significantly above budget

http://www.ripe.net/internet-coordination/ipv4-exhaustion/ipv4-available-pool-graph

Page 3: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Registration Services: Ticket load

Page 4: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

IPv6 Ripeness: 7765 LIRs

1 star: have IPv62 stars: + visible in RIS3 stars: + route6 object4 stars: + rDNShttp://ripeness.ripe.net/

Page 5: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Policy Development

Concluding Phase:•Global Policy for post exhaustion IPv4 allocation mechanisms by the IANA•Removal of multihomed requirement for IPv6 PI •Post-depletion IPv4 address recycling•PI Assignment Size

Recently accepted:•Temporary Internet Number Assignment Policies

Page 6: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Certification – The Discussion

• Early attempts in Lisbon, October 2009- Focus on business impact, policies

• Deployment 2011- Ca. 600 members requested certificates

• Discussion of Principles and Dangers in May 2011- Clear concerns about “Red Button” and related impact

on routing system- Retraction of Certification Policy Proposal

• Way forward- More presentations & discussion at next RIPE Meeting- General Meeting

Page 7: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Preserving Financial Stability

• A New Charging Scheme is needed- Current scheme based on (mostly IPv4-) allocations

• Propose to set Fee proportional to Benefit- How to measure “benefit from RIPE NCC services”?

• Proposal published• Feedback from members-discuss mailinglist

- Smaller jumps - Sliding scale- …

• To be formally adopted during General Meeting

Page 8: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Member & Stakeholder Survey

• Previous surveys in 2002, 2005, 2008• Goals

- Find out views of members on RIPE NCC services

- Hear about members’ needs- Gather input for strategic development

• Focus group meetings throughout region- Desiree Miloshevic, John Earls

• Analysis by Oxford Internet Institute- Awaited for September

Page 9: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Membership & Community Development• Working with regional communities since 2003

- Moscow, Middle East- Next week: Balkans

• Great success- Encouraged setup of MENOG / ENOG

• Intensifying membership development- Deploying Paul Rendek- Hiring Serge Radovcic

• Regional Meetings:- Dubrovnik, 6 – 9 Sep, Muskat, 3 – 4 Oct,

Moscow, 28 – 30 Nov

Page 10: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Come: RIPE 63

10

Page 11: The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.

Questions?


Recommended