2
Goal of Single Market
- The goal is to deliver single competitive markets for gas and
electricity- Teamwork is required to achieve the
goal- Players will need to work together
- to achieve the desired result- where energy traded across internal
EU borders is much the same as if it is traded within each Member State.
“The internal market should be completed by 2014 so as to allow gas and electricity to
flow freely.” (EU Council conclusions, 4 February 2011)
The goal of the internal market is achievable with stakeholder participation
3
Third Package instruments
Regulatory
approach
• New institutional framework• Framework Guidelines in
priority areas defined by the Commission on the basis of which the ENTSOs develop Network Codes
i.e. Capacity Allocation, Balancing, Interoperability and Tariffs
“Voluntary”
implementation
• Pilot projects to be implemented before legally required through the Regional Initiatives
• Guidelines of Good Practice (e.g. storage, LNG)
• EaseeGas Common Business Practices
4
ENTSOG ACER CEER ENTSOE
Co-operation & Co-ordination
Each of the representative bodies works together to deliver common goals
Working Together
5
ACER is an Essential part of the Mix
ACER
EuropeanCommission
NRAsRegulatoryAuthorities
ENTSOG/TSOs
OtherStakeholders
6
ACER Current Mission
“The purpose of the Agency shall be to assist the [NRAs] in exercising, at Community level, the regulatory tasks performed in the Member States and, where necessary, to coordinate their action”.
Article 1(2), Regulation (EC) No. 713/2009
Therefore, ACER.is NOT a European Energy Regulator.… but plays a CENTRAL ROLE in the new institutional framework introduced by the 3rd Legislative Package on Energy
7
NRA Co-operation
TSO Co-operation
Market Monitoring
Framework Guidelines
and Network Codes
ACER’s Departmental Structure
The Regional Initiatives are relevant to our 4 key areas of delivery
8
Key Stakeholder Groups
Competitive Market
ArrangementsENTSO
Eurelectric
ACER
CEER
Eurogas
IFIECDSO asoc.
EFET
OGP
European Commission
Energy Community
Each stakeholder group has the opportunity to provide feedback on the proposals
9
National
Markets
Cross
Border
Arrangements
Regional
Application
How Far Do We Need to Go?
Delivering the Internal Energy Market requires Regional progress
10
Why is the Regional Approach so Important?
Regional
Projects
Regional
Plans
Regional Hubs
Regional
Similarities
11
Framework Guidelines and Network Codes
Network Codes
(a) network security and reliability rules(b) network connection rules(c) third-party access rules(d) data exchange and settlement rules(e) interoperability rules(f) operational procedures in an emergency(g) capacity-allocation and congestion-management rules(h) rules for trading related to technical and operational provision of network access services and system balancing(i) transparency rules(j) balancing rules(k) rules regarding harmonised transmission tariff structures(l) energy efficiency regarding electricity networks.
Framework Guidelines
entso
12
Making Proposals Work
Is/was a change in direction required to meet our goals?
Harmonisation
Milestones Objectives
Regional AchievementsImplementation Issues Timing Issues
Concrete Proposals NecessaryChange in management Change in direction
13
ACER Role in Regional Initiatives
SUPPORT
ASSISTANCE
COORDINATION
COOPERATION
MONITORINGAND
REPORTING
NRAMarket
TSO
14
ACER 2011 and 2012 Work Programmes
Development of Framework Guidelines
Opinions on ENTSO Statutes
Monitoring of the Internal Energy Market
Inter-TSO Compensation Mechanism
Opinion/recommendationson ENTSO WP and TYNDP
Monitoring of the Regional Initiatives
Reasoned Opinions on Network Codes
REMIT Implementation
Development of Framework Guidelines
Opinion/recommendationson ENTSO WP and TYNDP
Monitoring of the Regional Initiatives
Co-ordination of the Regional Initiatives
Monitoring of the Internal Energy Market
EIP - Projects of Common Interest
TSOCertification
2011 2012
TSOMonitoring
15
Thank you for your attention