+ All Categories
Home > Documents > The Trussed Rafter Association Voice of the Trussed Rafter ... · The Trussed Rafter Association...

The Trussed Rafter Association Voice of the Trussed Rafter ... · The Trussed Rafter Association...

Date post: 06-Jun-2020
Category:
Upload: others
View: 22 times
Download: 0 times
Share this document with a friend
2
The Trussed Rafter Association Voice of the Trussed Rafter Industry OPEN WEB DESIGN The product delivers ease of access for services, allowing wiring, plumbing, and ducting to be accommodated under the floor without the need to be cut or drill holes in the joist. LONG TERM STABILITY The reduced section of timber used in the manufacture of the metalweb joists combined with the metalweb means less shrinkage is experienced leading to quieter and longer lasting floors. SPEED OF ERECTION REDUCED COSTS Increased spans, simpler installation of utilities and services, flexibility of design and faster erection results in significantly reduced build costs. The Trussed Rafter Association Voice of the Trussed Rafter Industry Constructed of kiln dried stress graded timber and plated together with high strength steel webs, metalweb floor systems have a number of benefits compared with other floor and joist systems. BENEFITS OF METALWEB FLOOR SYSTEMS CONTACT US The Trussed Rafter Association, The Building Centre, 26 Store Street London WC1E 7BT www.tra.org.uk t: 020 3205 0032 f: 020 7291 5379 e: [email protected] Wide timber chords allow for easy fixings for both the floor decking and ceiling finish without the need for herringbone strutting throughout the floor.
Transcript
Page 1: The Trussed Rafter Association Voice of the Trussed Rafter ... · The Trussed Rafter Association Voice of the Trussed Rafter Industry OPEN WEB DESIGN The product delivers ease of

The Trussed Rafter Association

Voice of the Trussed Rafter Industry

OPEN WEB DESIGN

The product delivers ease of access for services,

allowing wiring, plumbing, and ducting to be

accommodated under the �oor without the needto be cut or drill holes in the joist.

LONG TERM STABILITY

The reduced section of timber used in the manufacture

of the metalweb joists combined with the metalweb

means less shrinkage is experienced leading to quieter

and longer lasting �oors.

SPEED OF ERECTION

REDUCED COSTS

Increased spans, simpler installation of utilities and

services, �exibility of design and faster erection results

in signi!cantly reduced build costs.

The Trussed Rafter Association

Voice of the Trussed Rafter Industry

Constructed of kiln dried stress graded timber and plated together with high strength

steel webs, metalweb �oor systems have a number of bene!ts compared with other

�oor and joist systems.

BENEFITS OF METALWEB

FLOOR SYSTEMS

CONTACT US

The Trussed Rafter Association,

The Building Centre,

26 Store Street London WC1E 7BT

www.tra.org.uk

t: 020 3205 0032

f: 020 7291 5379

e: [email protected]

Wide timber chords allow for easy !xings for both the

�oor decking and ceiling !nish without the need for

herringbone strutting throughout the �oor.

Page 2: The Trussed Rafter Association Voice of the Trussed Rafter ... · The Trussed Rafter Association Voice of the Trussed Rafter Industry OPEN WEB DESIGN The product delivers ease of

SOUND AND FIRE PERFORMANCE

MADE TO MEASURE

Joints are designed and supplied to site for the speci�c

scheme virtually eliminating site wastage.

LIGHTWEIGHT

The open web structure means metalweb joists

are lighter to handle than timber equivalents.

USEFUL LINKS

View our metal web joist video at:

The Trussed Rafter Association

Voice of the Trussed Rafter Industry

CONTACT US

The Trussed Rafter Association,

The Building Centre,

26 Store Street London WC1E 7BT

www.tra.org.uk

t: 020 3205 0032

f: 020 7291 5379

e: [email protected]

Joist Depth Opening Diameter

From 202mm From 105mm

To 421mm To 275mm

www.tra.org.uk

Metalweb !oors meet all of the requirements for sound

and �re performance as detailed in the Building Regulations.

Please refer to technical data sheet for further information.

Member Information:

T: 01227 712322

F: 01227 712852

E: [email protected]

Units 2a & 2c, Canterbury Ind Park, Hersden, Canterbury, Kent CT3 4HQ


Recommended