The Ultimate Turnaround: Managing a 24-Hour Project

Date post: 22-May-2015
Category:
Upload: kps3-marketing
View: 611 times
Download: 1 times
Share this document with a friend
Description:
Most projects we do demand quick turnaround times, however, 24 hours is more than quick, it is insane. In this discussion we will talk about the process, skills required, and project management techniques that went into building the Alpha version of GoOutside.com for the Hack4Reno event. Using a team of 3 developers, a designer and a project manager (me), we were able to produce an engaging, feature rich and award winning web application in just under 24 hours. Presentation Take-a-ways: 1. If you are ever asked to manage a project that seems impossible, mandate that you get to pick the team. This project would have never happened without all of the players on the team. 2. Be sure to have a team meeting prior to the start and define the end goal... for us, it was to win the event! 3. When time is tight... be sure you shoot for the stars, but understand that is not what the final product will be. 4. Share the load... this comes back to the discussion about the team, a good team will pick up when others are slacking. 5. Meet and check progress often. 6. Don't be afraid to crush some pipe dreams... as long as the team knows the end goal isn't jeopardized... they will no care. 7. Though not my favorite job... ensuring that you are a cheerleader for the project is a mandatory job duty for any project manager. 8. When the end is in sight but the team is producing poor quality work, make them all focus on one task and work together to complete it. This will re-energize the team and make them come back together.  9. Celebrate! A good team wants to keep working together... so celebrate.
Popular Tags:
41
Transcript
Page 1: The Ultimate Turnaround: Managing a 24-Hour Project
Page 2: The Ultimate Turnaround: Managing a 24-Hour Project

The Ultimate Turnaround:

Managing a 24-Hour Project

Page 3: The Ultimate Turnaround: Managing a 24-Hour Project

ROB GAEDTKEProject Manager (some times)Creative Director (other times)

Page 4: The Ultimate Turnaround: Managing a 24-Hour Project

Develop an app for the City of Reno in 24-Hours

BACKGROUND

Page 5: The Ultimate Turnaround: Managing a 24-Hour Project
Page 6: The Ultimate Turnaround: Managing a 24-Hour Project

Team GoOutside: 3 developers a designer and me

BACKGROUND

Page 7: The Ultimate Turnaround: Managing a 24-Hour Project

To win the entire thing.

GOAL

Page 8: The Ultimate Turnaround: Managing a 24-Hour Project

THE END PRODUCT

Page 9: The Ultimate Turnaround: Managing a 24-Hour Project
Page 10: The Ultimate Turnaround: Managing a 24-Hour Project

Search, Add, Rate and Share your favorite go.cations.(That’s our fancy way of saying the spots in Reno you love)

Page 11: The Ultimate Turnaround: Managing a 24-Hour Project

Authenticate, Check-in and Like via Facebook open graph.

Page 12: The Ultimate Turnaround: Managing a 24-Hour Project
Page 13: The Ultimate Turnaround: Managing a 24-Hour Project

Built for Mobile.

Page 14: The Ultimate Turnaround: Managing a 24-Hour Project
Page 15: The Ultimate Turnaround: Managing a 24-Hour Project

GPS Detection.

Page 16: The Ultimate Turnaround: Managing a 24-Hour Project
Page 17: The Ultimate Turnaround: Managing a 24-Hour Project

Completely user moderated.

Page 18: The Ultimate Turnaround: Managing a 24-Hour Project

And finally… user management.

Page 19: The Ultimate Turnaround: Managing a 24-Hour Project
Page 20: The Ultimate Turnaround: Managing a 24-Hour Project

HOW WE GOT THERE

Page 21: The Ultimate Turnaround: Managing a 24-Hour Project

PRE-GAME

Page 22: The Ultimate Turnaround: Managing a 24-Hour Project

PRE-GAME:

The team.

Page 23: The Ultimate Turnaround: Managing a 24-Hour Project

PRE-GAME:

Clearly defined roles.

Page 24: The Ultimate Turnaround: Managing a 24-Hour Project

PRE-GAME:

A solid game plan.

Page 25: The Ultimate Turnaround: Managing a 24-Hour Project

PRE-GAME:

An end goal in mind.

Page 26: The Ultimate Turnaround: Managing a 24-Hour Project

GO TIME

Page 27: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (1 hour)

The kick-off… what are we building and more importantly, who are we building it for?

Page 28: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (2 hour)

Put the masterpiece up… but know that a solid B- performance would win the event.

Page 29: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (3 hours)

Divide and concur!

Page 30: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (9 hours)

Regroup… Reenergize… then back to it.

Page 31: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (10 hours)

Share the load… I did some HTML, uploaded locations… programmers did some content writing… what ever was needed.

Page 32: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (12 hours)

Crush some dreams in hopes of finishing.

Page 33: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (13 hours)

Continue to kill functionality that took too long or simply wasn’t working out.

Page 34: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (15 hours)

75% done… right on target.

Page 35: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (17 hours)

Playing the role of cheerleader and realist.

Page 36: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (18 hours)

Finished deliverables only. All hands finish a task before the next is begun.

Page 37: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (20 hours)

Stop new production… time for testing and polish only.

Page 38: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (23 hours)

Final push and getting ready for the big presentation.

Page 39: The Ultimate Turnaround: Managing a 24-Hour Project

IN-GAME (24 hours)

GoOutside for the win.

Page 40: The Ultimate Turnaround: Managing a 24-Hour Project
Page 41: The Ultimate Turnaround: Managing a 24-Hour Project

QUESTIONS?