. ·v . . THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE REPORT OF THE CONTROLLER AND AUDITOR GENERAL ON THE AUDIT OF FINANCIAL STATEMENTS OF THE REGIONAL COMMUNICATIONS INFRASTRUCTURE PROJECT (RCIP) CR.4614-TA) FOR THE FINANCIAL YEAR ENDED Controller and Auditor General, . National Audit Office, 16 Samora Machel Avenue, P.O. Box 9080, 11101 Dar es Salaam, Tanzania. Tel: 255 (022) 2115157/8, Fax: 255 (022) 2117527 E-mail: ocag@ nao.go.tz Website: www.nao.go.tz January , 2018 30TH JUNE, 2017 AR/RCIP/MWTC/2016/2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

. ·v

. .

THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE

REPORT OF THE CONTROLLER AND AUDITOR GENERAL ON THE AUDIT OF FINANCIAL STATEMENTS OF THE REGIONAL COMMUNICATIONS INFRASTRUCTURE PROJECT (RCIP)

CR.4614-TA) FOR THE FINANCIAL YEAR ENDED

Controller and Auditor General , . National Audit Office, 16 Samora Machel Avenue, P.O. Box 9080, 11101 Dar es Salaam, Tanzania. Tel: 255 (022) 2115157/8, Fax: 255 (022) 2117527 E-mail: [email protected] Website: www.nao.go.tz

January, 2018

30TH JUNE, 2017

AR/RCIP/MWTC/2016/2017

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

TABLE OF CONTENTS

Abbreviations ..................................................................................... iii

1.0

1 .1.

1.2.

1.3.

1.4.

1.5.

2.0

GENERAL INFORMATION .............................................................. .... 1

Mandate ..................................................................................... 1

Vision, Mission and Core Values .......................................................... 1

Audit Objectives ........................................................................... 2

Audit Scope ................................................................................. 2

Audit Methodology ......................................................................... 2

INDEPENDENT REPORT OF THE CONTROLLER AND AUDITOR GENERAL ......... 3

Office of the Controller and Auditor General AR/RCIP/MWTC /2016/2017 11

Page 3: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

Abbreviations CAG Controller and Auditor General ISSAls IPSAS PAA PAR PAC PFA PPA PPR RCIP

International Standard of Supreme Audit Institutions International Public Sector Accounting Standards Public Audit Act No.11 of 2008 Public Audit Regulation, 2009 Public Accounts Committee Public Finance Regulations, 2009 Public Procurement Act, 2011 Public Procurement Regulations, 2013 Regional Communications Infrastructure Project

Office of the Controller and Auditor General AR/RCIP/MWTC /2016/2017 lll

Page 4: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

1.0 GENERAL INFORMATION 1 . 1 . Mandate

The statutory duties and responsibilities of the Controller and Auditor General are given under Article 143 of the Constitution of the URT of 1977 (revised 2005) and in Sect. 10 (1) of the Public Audit Act No.11 of 2008.

1.2. Vision, Mission and Core Values

Vision To be a highly regarded Institution that excels in Public Sector Auditing.

Mission To provide high quality audit services that improves public sector performance, accountability and transparency in the management of public resources.

Core Values In providing quality services, NAO is guided by the following Core Values: ,/ Objectivity: We are an impartial public institution, offering audit services to our clients in

unbiased manner. ,/ Excellence: We are professionals providing high quality audit services based on standards

and best practices. ,/ Integrity: We observe and maintain high standards of ethical behavior, rule of law and a

strong sense of purpose. ,/ People focus: We value, respect and recognize interest of our stakeholders. ,/ Innovation: We are a learning and creative public institution that promotes value added

ideas within and outside the institution . ./ Results Oriented: We are an organization that focuses on achievement based on

performance targets. ,/ Team work Spirit: We work together as a team, interact professionally, share knowledge,

ideas and experiences.

We do this by:-• Contributing to better stewardship of public funds by ensuring that our clients are

accountable for the resources entrusted to them; • Helping to improve the quality of public services by supporting innovation on the use of

public resources; • Providing technical advice to our clients on operational gaps in their operating systems; • Systematically involve our clients in the audit process and audit cycles; and • Providing audit staff with appropriate training, adequate working tools and facilities that

promote their independence.

© This audit report is intended to be used by Government Authorities. However, upon receipt of the report by the Speaker and once tabled in Parliament, it becomes a public record and its distribution may not be limited.

Office of the Controller and Auditor General AR/RCIP/MWTC /2016/2017

Page 5: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

1 . 3. Audit Objectives To obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error and are prepared in accordance with an applicable financial reporting framework; and whether laws and regulations have been complied with.

1 .4. Audit Scope The audit was carried out in accordance with the, the International Standards of Supreme Audit Institutions (ISSAls) and other audit procedures as were deemed appropriate under the circumstances. This covered the evaluation of the effectiveness of the financial accounting system and internal control over various activities of the Regional Communication Infrastructure Project.

The audit was conducted on a sample basis; therefore, the findings are confined to the extent that records, documents and information requested for the purpose of the audit were made available to me. Audit findings and recommendations arising from the examination of the accounting records, appraisal of the activities as well as evaluation of the Internal Control System which requires management's attention and actions, are set out in the management letter issued separately to the Management of Regional Communication Infrastructure Project.

As auditor, I am not required to specifically search for fraud and therefore, my audit cannot be relied upon to disclose all such matters. However, my audit was planned in such a way that I would have reasonable expectations of detecting material errors and misstatement in the financial statements resulting from irregularities including fraud. The responsibility for detection, prevention of irregularities and the maintenance of an effective and adequate system of internal control rests with the management of the Regional Communication Infrastructure Project.

1.5. Audit Methodology My audit approach included tests of the accounting records and other procedures in order to satisfy the audit objectives. My audit procedures included the following: • Planning the audit to identify and assess risks of material misstatement, whether

due to fraud or error, based on an understanding of the entity and its environment, including the entity's internal controls.

• Obtain sufficient appropriate audit evidence about whether material misstatements exist, through designing and implementing appropriate responses to the assessed risks.

• Form an opinion on the financial statements based on conclusions drawn from the audit evidence obtained.

• Follow up on the implementation of the previous year's audit findings and recommendations.

2 Office of the Controller and Auditor General AR/RCIP/MWTC /2016/2017

Page 6: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

2.0 INDEPENDENT REPORT OF THE CONTROLLER AND AUDITOR GENERAL

Accounting Officer, Ministry of Works, Transport and Communication-Communication Sector 3 Moshi Street, P .0. Box 677, 40470 DODOMA.

REPORT ON THE AUDIT OF FINANCIAL STATEMENTS FOR THE FINANCIAL YEAR ENDED 30TH JUNE, 2017

Opinion I have audited the financial statements of the Regional Communications Infrastructure Project which comprises the statement of cash receipt and payments, cash flows statement for the year then ended, Statement of comparison of budget and actual amounts and a summary of significant accounting policies and other explanatory information set out to the audited financial statement to this audit report.

In my opinion, the accompanying financial statements of the Regional Communications Infrastructure Project present fairly in all material respects, Cash receipt and payments of the project for the year ended 30th june,2017 its Financial performance and its cash flow for the year then ended in accordance with International Public Sector Accounting Standards (IPSAS) Cash basis of accounting and in the manner required by the Public Finance Act, 2001 revised 2004.

Basis for Opinion I conducted my audit in accordance with International Standards of Supreme Audit Institutions (ISSAls). My responsibilities under those standards are further described in the Auditor's Responsibilities for the Audit of the financial Statements section of my report. I am independent of the Regional Communication Infrastructure Project in accordance with the International Ethics Standards Board for Accountants' Code of Ethics for Professional Accountants (IESBA Code) together with the ethical requirements that are relevant to my audit of the financial statements in Tanzania, and I have fulfilled my other ethical responsibilities in accordance with these requirements and the IESBA Code.

I believe that the audit evidence I have obtained is sufficient and appropriate to provide a basis for my opinion.

Key Audit Matters Key audit matters are those matters that, in my professional judgment, were of most significance in my audit of the financial statements of the current period. These matters were addressed in the context of my audit of the financial statements as a whole, and in forming my opinion thereon, and I do not provide a separate opinion on

3 Office of the Controller and Auditor General AR/RCIP/MWTC/2016/2017

Page 7: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

these matters. In addition to the matter described in the Basis for Opinion section I have determined that there are no key audit matters to communicate in my report.

Responsibilities of Management and Those Charged with Governance for the Financial Statements Management is responsible for the preparation and fair presentation of the financial statements in accordance with IPSASs, and for such internal control as management determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error.

In preparing the financial statements, management is responsible for assessing the entity's ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless management either intends to liquidate the entity or to cease operations, or has no realistic alternative but to do so.

Those charged with governance are responsible for overseeing the entity's financial reporting process.

Auditor's Responsibilities for the Audit of the Financial Statements My objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor's report that includes my opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISSAls will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these financial statements.

In addition, Sect. 10 (2) of the PM No.11 of 2008 requires me to satisfy myself that, the accounts have been prepared in accordance with the appropriate accounting standards.

Further, Sect. 48(3) of the Public Procurement Act No. 7 of 2011 requires me to state in my annual audit report whether or not the audited entity has complied with the provisions of the Law and its Regulations.

4 Office of the Controller and Auditor General AR/RCIP/MWTC/2016/2017

Page 8: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

..

Report on Other Legal and Regulatory Requirements Compliance with the Public Procurement Act, 2011 In view of my responsibility on the procurement legislation and taking into consideration the procurement transactions and processes I have reviewed as part of this audit, I state that, the Regional Communications Infrastructure Project procurement transactions and processes have generally complied with the requirements of the Public Procurement Act No. 7 of 2011 and its underlying Regulations of 2013 .

8th January, 2018

National Audit Office of Tanzania, P.O. Box 9080, 11101 Dar es Salaam, Tanzania. Tel: 255 (022) 2115157 /8 Fax: 255 (022) 2117527 Email: [email protected]

Office of the Controller and Auditor General 5

AR/RCIP/MWTC/2016/2017

Page 9: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

UNITED REPUBLIC OF TANZANIA

MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION

Tanzania Communications Infrastructure and eGovernment Project (Regional Communications

Infrastructure Program - RCIP Tanzania Project Cr. 4614-TA)

FINANCIAL STATEMENTS FOR THE YEAR ENDED 30TH JUNE 2017

Page 10: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

TH E UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMM NICATION RCIP PROJECT FINANCIAL STATEMENTS

CONTENTS

STATEMENT OF THE MANAGEMENT RESPONSIBILITY ...................................................... l

DECLARATION OF THE HEAD OF FINANCE/ACCOUNTING ON THE FINANCIAL

TH STATEMENTS FOR THE PERIOD ENDED 30 JUNE, 2017 ..................................................... 2

1. BACKGROUND INFORMA TION .............................................................................................. 3

2. PROJECT COMPONENTS ......................................................................................................... 5

3. INSTITUTIONAL COORDINATION OF THE PROJECT .................................................... 7

4. PROJECT IMPLEMENTATION STATUS ............................................................................. 10

5. COMMENTARY ON THE FINANCIAL STATEMENTS ..................................................... 52

6. PROJECT SUCCESS AND ACIDEVEMENTS ...................................................................... 57

7. PROJECT CHALLENGES ........................................................................................................ 59

8. CONCLUSION ............................................................................................................................. 60

STATEMENT OF CASH RECEIPTS AND PAYMENTS PER CATEGORIES ........................ 62

STATEMENT OF CASH FLOW ...................................................................................................... 63

DESIGNATED ACCOUNT ACTIVITY STATEMENT ................................................................ 66

NOTES TO THE FINANCIAL STATEMENTS ............................................................................. 67

Page 11: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE NITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

PROJECT GENERAL INFORMATION

I. IDA Credit Number

2 Project Number

3. Financier

4. Borrower

5. Project Title

6. Loan Amount

7. Execution Period

8. Implementing Entities

9. Loan Signing Date

10. Loan Effective Date

11. Loan Closing Date 12. Disbursement Deadline

13. First Repayment Date

14. Last Repayment Date

15 . Loan Term

16. Grace Period

17. Interest rates

18. Commitment fee

19. Service fee

20 Main Bankers

21. Auditors

4614-TA

Pl 11432

International Development Association (World Bank)

The United Republic of Tanzania (Ministry of Fi nance)

Tanzania Communications Infrastructure and eGovernment Project (Regional Communications In frastructure Program - RCIP Tanzania Project)

USO I 00 Million (SOR 67 Million)

8 years up to 31 December, 2017

i) Ministry of Works, Transport and Communication ii) President's Office-Public Service Management iii) Universal Communications Services Access Fund

22 July 2009

19 January 20 10

28 February, 20 15: Extended to 31 December, 20 17 30 April 20 17

15 September 20 19

15 March 2049

40 years

IO years

I%: between 15 September 2019 and 15 March 2029; 2%: between 15 September 2029 and 15 March 2049 0.5% per annum

0.75% per annum

i) Bank of Tanzania, ii) CRDB Bank Limited,

Controller and Auditor General , National Audit Office, P.O. Box 9080,Dar es Sa laam.

II

Page 12: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

.. T H E UN ITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRAN PORT AN D COMM UN ICATION RC IP PROJECT FINANC I AL ST AT EM ENTS

ABBREVIATIONS AND ACRONYMS AGC Attorney General Chambers CAG Controller and Auditor General CITCC China International Te lecommunication Construction Corporation DA Des ignated Account DCA Development Credit Agreement LJWLJM LJense Wavelength Division Multiplexing EALR Enhancing Access ibility of Land Records Project Eol Expression of Interest GoT Government of Tanzania GovNet HR ICT ICTC IDC ILMIS IP IP/MPLS IPSAS IDA IFR LGAs MCST MWTC MDAs MSD MNH MoFP MTB NAO NBAA NICTBB OFC PFA PKI PO-PSM PSRP RCIP RFP RlTA SOR SDH TBT TOR TZS UCSAF URT US D VAT WB

Government Communications Network Human Resources Info rmation and Communication Technology ICT Commission Internet Data Centre Integrated Land Management Info rmation System Internet Protocol lnte rnet Protoco ls - Multi protocol Label Switching International Public Sector Accounting Standards International Development Association Interim Financial Report Local Government Authorities Ministry of Communication, Sc ience and Technology Ministry of Works, Transport and Communication Ministries, Departments and Agencies Medical Stores Department Muhimbili National Hospital Ministry of Finance and Planning Ministerial Tender Board National Aud it Office National Board of Accountants and Auditors National !CT Broadband Backbone Optical Fibre Cable Public Finance Act Public Key Infrastructure President' s Office - Public Service Management Public Service Reform Programme Regional Communications Infrastructure Program Request for Proposal Registration, Insolvency and Trusteeship Agency Spec ial Drawing Ri ghts Synchronous Digital Hierarchy Tanzania Beyond Tomorrow Terms of Reference Tanzanian Shillings Universal Communications Access Fund United Republic of Tanzania United States Dollars Value Added Tax World Bank

Ill

Page 13: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINI TRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT OF THE MANAGEMENT RESPONSIBILITY

The Management is responsib le for preparing Financial Statements in accordance with the Public Finance Act no .6 of200 1 section 25(4) for each financial year. The Financing Agreement requires the implementing entities to prepare financial statements for each financial year that gives a true and fair view of receipts and payments of the reporting entity as at the end of the financial year. It a lso requ ires the implementing entiti es to ensure that the project keeps proper accounting records that di sclose, with reasonable accuracy, at any time the fin ancial position of the report ing entity. They are a lso responsible for safeguard ing the assets of the reporting entity.

The Management accepts responsibility for the annual financial statements, which have been prepared using appropriate accounting polic ies supported by reasonable and prudent judgments and estimates, in conformity with the Cash Basis international Public Sector Accounting Standard (IPSAS); or Financial Reporting under the Cash Basis of Accounting, and in the manner required by the Section 25(4) of the Public Finance Act 200 1 as amended in 2004. The RCIP Project financia l statements have a lso been prepared using special purpose framework to cater specia l needs of specific users of financial informati on.

The Management accepts respons ibility for the maintenance of accounting records that may be relied upon in the preparation of financial statements, as well as adequate systems of internal financial control. Management are respons ible for safeguarding the assets of the reporting entity and hence for taking reasonable steps for the prevention and detection of fraud , error and other irregularities.

To the best knowledge of the Management, the system of internal control has operated adequately throughout the reporting period and that the records and underlying accounts provide a reasonable basis fo r the preparation of the financ ial statement for the 20 16/2017 financial year.

The Management accepts responsibil ity for the integrity of the financial statement, the information it contains, and its compliance with the Public Finance Act 2001 and instructions from the Treasury. Procurement of goods, works, consultancy, and non-consultancy serv ices to the extent that they are reflected in these financial statements, have been done in accordance with the Public Procurement Act No. 4 of 2004 (as amended in 2011).

The Management accepts responsibi lity fo r the integrity of the financial statement, the information it contains, and its compliance with the Pub I ic Finance Act 200 I with amendment made in 2004, and instructions from the Treasury.

Procurement of goods, works, consultancy, and non-consultancy services to the extent that they are reflected in these financial statements, have been done in accordance with the Public Procurement Act No. 4 of 2004. Nothing has come to the attention of the Management to indicate that the Ministry will not remain a go ing concern for at least the next twelve months from the date of this statement.

Mrs. Maria Sasabo (PhD)

The Permanent Secretary (Communication) & Accounting Officer Ministry of Works, Transport and Communication 30 June, 2017

Page 14: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRAN PORT ANO COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

DECLARATION OF THE HEAD OF FINANCE/ACCOUNTING ON THE FINANCIAL STATEMENTS FOR THE PERIOD ENDED 30TH JUNE, 2017

The ationa l Board of Accountants and Auditors (NBAA) according to the power confe rred under the Auditors and Accountants (Registrati on) Act. No. 33 of 1972, as amended by Act No. 2 of 1995, requires financial statements to be accompanied with a dec laration issued by the Head of Finance/Accounting responsible for the preparation of financial statements of the entity concerned.

It is the duty of a Profess ional Accountant to ass ist the Governing Body/Management to discharge the responsibi lity of preparing financial statements of an entity showing true and fa ir view of the entity position and perfo rm ance in accordance with applicab le International Accounting Standards and statutory financial reporting requirements.

Full legal responsibility for the preparation of financial statements rests with the Management of the sector, as under Management Responsibility statement on an earlier page.

I, Seleman H. Z. Shedaffa being the Head of Finance/ Accounting of Communication Sector- Vote 68, hereby acknowledge my responsibility of ensuring that financial statements of RCIP Project for the year ended 301

h June, 20 17 have been prepared in compliance with applicable Accounting standards and statutory requirements.

I thus confirm that the financ ia l statements give a true and fair view position of RCIP Project, as on that date and that, they have been prepared Based on properly maintai ned financial records.

Signed by: Position: Ag. Chief Accountant NBAA Membership No. G. A. 1983 Date: 30 June, 2017

Page 15: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENTBYTHEPERMANENTSECRETARY

1. BACKGROUND INFORMATION

1.1 Introduction

The Permanent Secretary ("The Accounting Officer"), in the Ministry of Works, Transport and Communication, herein submits audited financial statements of the Tanzania Communications In frastructure and eGovernment Project (Regional Communications Infrastructure Program - RCIP Tanzania Project Cr. 4614-TA) for the year ended 30 June 2017.

1.2 Project Description

The RCIP Tanzania Project worth USO I 00 (SOR 67) million is financed by the World Bank under the International Development Assoc iation (IDA) Credit. The Development Credit Agreement (DCA) between the United Republic of Tanzania (URT) and the World Bank was signed on 22 July 2009 and the Credit became effective on 20 January 20 l 0. The project is being implemented jointly by the Ministry of Works, Transport and Communication (MWTC) and the President' s Office- Public Service Management (PO-PSM).

The original availability period of 40 years concessionary loan covers the timeframe of five (5) years with effect from January 2010 through February 2015. The principal amount plus interest shall be repaid in equal semi-annual instalments over a period of 30 years effective from 15 September 2019, upon expiry of the grace period of IO years. The interest component of the loan facility is calculated at the margin rates of l % and 2%, between 15 September 2019 and 15 March 2029; and between 15 September 2029 and 15 March 2049, respectively.

1.3 Project Disbursements

The RCIP Tanzania Project worth USO I 00 million is financed by the World Bank under the Internationa l Development Association (IDA) Credit. The Development Credit Agreement (DCA) between the United Republic of Tanzania (URT) and the World Bank was signed on 22 July 2009 and the Credit became effect ive on 20 January 2010. The project is being implemented jointly by the Mini stry of Works, Transport and Communication (MWTC) and the President 's Office- Public Service Management (PO-PSM).

A total of SOR 44.7 million (USO 64 million), approximately 64% of the proj ect funds on a cumulative basis, had been disbursed by 30 June 20 17. Notable improvements in project disbursements have been achieved due to implementation of major contracts for eGovernment application, GOVNET and Rural Connectivity. Similarly, project activities valued at US$93,2l l ,566 (93.2%) have been committed at the year-end date.

In addition, there is a significant reduction in loan amount by approximately USO 5 million due to exchange rate translation between SOR and USO. The implication to this reduction is that unallocated funds of USD 5 mill ion will be utilised to cover exchange loss.

3

Page 16: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

1.4 Objective of the Project

The objective of RCIP Tanzania Project is to support the Government of Tanzania initiatives including: (i) to lower prices for international capacity and extend the geographical reach of broadband networks; and (ii) to improve the Government ' s efficiency and transparency through eGovernment applications. The Project also complements and supplements initiatives of the National JCT Infrastructure Development Program.

The RCIP Tanzania Project provides funding for critical Government initiatives in the Information and Communications Technology (ICT) sector including:

a) The Universal Communications Access Fund (UCSAF) - critical for the provision of high quality and affordable communication services to rural and underserved areas of Tanzania,

b) e-Government Applications for enhanced efficiency in the provision of effective, transparent and affordable quality of service within the Government and to the General Public, and

c) The Government Communications Network (GovNet) for facilitating voice and data communication connectivity within the Public service sector.

The implementing agencies are geared to ensure that their respective project activities are carried out in accordance with agreed project objectives and as per performance targets.

1.5 Project Closing Date

The RCIP Tanzania project became effective on 20th January 20 IO for a period of six years whereby the initial project closing date was set on 28 February, 2015. On ih January, 2015 the World Bank granted the extension of the proj ect c losing date for a period of 22 months to 31st December 20 16.

Delays in project implementation necessitated extending the closing date. Generally, the project progress has improved slightly as compared to last year. Delays in the critical steps in time­constrained project activities are likely to affect the proj ect's completion date as well as achievement of the Project Development Objectives (PDOs).

On 21 st July, 2016 the Government requested a second extension for 12 months thereby bringing the loan closing date to December 31 , 2017.

1.6 Project delays and constraints

The major risk in the course of implementation of the RCIP Project is the likelihood of delaying the completion of scheduled project activities because of project constraints in terms of resources, time and scope as follows:

• S low start to execute project activities during the first three years of implementation (i.e. 2009/2010, 2010/2011 and 20 11 /2012);

• Lengthy process for issuance of "No Objections" from World Bank. There is also a general concern from World Bank that important documents such as terms of reference, evaluation reports, concept notes, etc. were partially completed by implementing agencies when requesting for "No Objection" from the Bank;

• Limited project definition, scope desi gn, procurement activ ities and implementation timeframe .

.j

Page 17: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

• Lack of human capital to manage multi-stakeholder projects due to limited skills and expertise in managing integrated ICT projects;

• Low disbursement due to financial management issues; • All project activities need World Bank' s no objection as well as respective implementing

agencies ' Ministerial Tender Board (MTB) approvals. There were notable substantial delays in the approval process which had negative impact to the project lifecycle.

1.7 Disbursements after the Loan Closing Date

The RCIP project management team is trying every respect to ensure that a ll planned project act ivities are implemented within the extension period of 31 December 20 17. In order to complete disbursements for executed and delivered project activities prior to the loan closing date of 31 December 2017, all outstanding payments will be paid before the disbursement deadline date to 30 April 2018.

1.8 The Government of Tanzania Support

The Government of Tanzan ia recognizes that financing of ICT infrastructure in the country is a shared responsibility. The Government has been dedicating substantia l resources as counterpart funding for the implementation of RCIP Tanzania Project. For example, in the approved budget for the year 2016/17, TZS 2 billion was set aside to support development and implementation of ICT projects including RCIP and NICTBB infrastructure.

The Government, through the Ministry of Works, Transport and Communication (MWTC) continues to invest in ICT infrastructure in the country. Building the National JCT Broadband Backbone (NICTBB) infrastructure is among the efforts of the Government to enable easy access of JCT services to a ll citizens at affordable costs.

In order to achieve this goal, the MWTC is implementing a phased approach for developing the NICTBB through the National JCT Infrastructure Development program with the primary objective of providing broadband ICT connectiv ity to Tanzanians at al l levels including at the national, regional , district, community, village, and households levels.

2. PROJECT COMPONENTS

The RCIP Project comprises of four major components, namely:

Component l: Enab ling Environment (USO 14 milli on); Component 2: Connectivity (USO 60 million) ; Component 3: eGovernment Applications (USO 22 million); and Component 4: Project Management (USO 4 million) .

5

Page 18: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT ANO COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

2.1 Component 1 - Enabling Environment (US$14 million)

This component provides support for capacity building in order to strengthen the policy and regulatory environment and promote further sector reform in order to maximize benefits from access to international capacity including the following activities:

i.Strengthening of the ICT policy making capacity at Ministry of Works Transport and Communication (MWTC);

ii. Capacity building for the Tanzania ICT Board;

iii.Technical ass istance during implementation of the Universal Access strategy;

iv.Design of contracts for pre-purchase of international capacity;

v.Feasibility study, system design and preparation of bidding documents for the Government Communications Network;

vi.Capacity building and certification of trainers ("training the trainers") to enhance ICT use within the Government of Tanzania (GoT) through an ICT HR development program ;

vii.Capacity building to deal with changing environment and fast technology evolution in areas such as cost-mode lling, interconnection, regulatory tools to guarantee open access to national and international infrastructure, essential facility regulation, competition policy and regulation, spectrum and other scarce resource management;

viii.Capacity building and technical support for the development and implementation of the National ICT Infrastructure Development Program; and

ix.Airing of information, education, and communication messages.

2.2 Component 2 - Connectivity US$60 million

This component provides additional funding for the National ICT Infrastructure Development Program in Tanzania through the fol lowing subcomponents:

(a) Support for pre-purchase of international bandwidth for priority targeted user groups (US$ I 0 million) - Advance purchase of international bandwidth to boost the use of broadband capacity by priority grou ps;

(b) Financing for the Government Communications Network (Gov Net) (US$20 million) -Financing of optical fiber cab le connectivity and !CT equipment for Ministries and other MDAs in Dar es Salaam; and

(c) Support for the extension of coverage and access to ICT services in rural and underserved areas using PPP arrangements (US$30 million) - Competitive award of " least-cost" capital subsidies through an OBA tender process to private operators in order to achieve universal access targets by encouraging the private sector to invest in rural and underserved areas which are commercially not viable.

6

Page 19: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

TH E UN ITED REPUBLIC O F TANZAN IA MI NISTRY OF WORKS, TRANS PORT AN D COMM UN ICATION RC IP PROJ ECT FINANCI AL ST ATEM ENT S

STATEMENT BY THE PERMANENT SECRETARY (Continued)

2.3 Component 3 - eGovernment Applications US$22 million

This com ponent fi nances the imp lementati on of targeted eGovernment appl ications such as:

(a) Nati onal Business Porta l - Provision of a one-stop shop (i .e., website) for a ll business registration information needed by the public and business enti ties as we ll as downloadable licensing applications and links to the national business registrati on database;

(b) Te lemedicine System fo r the Muh imbili National Hospital (MNH) fo r improvement of health care and delivery of health services using e-referrals, e-radiology, and e-consultat ions amongst the major hospitals in Tanzania;

(c) Scaling up the National Vi tal Registration System - Extension of the coverage of an electronic vital records registration system fo r births, deaths, marriages, divorces, and wills ;

(d) Enhancing Accessibility of Land Records - Improvement of the quali ty of land records and associated cadastral map systems, topographic maps and images and making them accessible to the public through websites and mobile phone text messages. This proj ect was transferred to the PMO's office in year 201 4;

(e) e-Procurement Pilot fo r the Medical Stores Department (MSD) - Provision of an end-to-end electronic system fo r acquisition of medical suppl ies fo r se lection and purchase, to delivery at the MSD warehouse (linked to the warehouse system), and ultimate dissem ination to the medical fac ilities; and

(f) Additional applications that the Government of Tanzania will determine at a fu ture date -introduction of new technologies is occurring at a rapid rate in the fie ld of eGovernm ent and the Government needs the flexibility to respond to changing priorities and opportunities fo r deve lopment.

2.4 Component 4 - Project Management Support US$4 million

This component supports the proj ect management related issues inc luding project coordination, procurement, fi nancia l management, monitoring and evaluation, project communication, and environmenta l and socia l safeguards. T his component a lso prov ides support through office equipment, incremental operating costs, and audits.

3. INSTITUTIONAL COORDINATION OF THE PROJECT

The principal implementing agencies of the RCIP Tanzania Proj ect are the Min istry of Works, Transport and Communication (M WTC) in co llaboration with the Pres ident 's Office - Public Service Management (PO-PSM).

3.1 Ministry of Works, Transport and Communication (MWTC)

The MWTC is responsible for ensuring prompt and efficient overall coord ination, monitoring, reporting, evaluat ion and communication of RCIP Tanzania Proj ect activities a long with im plementation and management of the National ICT Broadband Backbone (NICTB B) Proj ect.

7

Page 20: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

[n particular, MWTC is responsible for the overall coordination of the RCIP Tanzania Project as well as implementation of: (i) Enabling Environment; and (ii) Part 2(a) of Connectivity components (pre­purchase of international bandwidth).

3.2 President's Office, Public Service Management (PO-PSM)

The PO-PSM is responsible for ensuring effective implementation of Connectivity component 2(b): Financing for the Government Communications Network, USD20 million and Component 3 -eGovernment Applications, USO 22 million. Component 3 is being implemented in collaboration with a number of beneficiaries including but not limited to:-

i) The Ministry of Land, Housing and Human Settlements; ii) Registration, Insolvency and Trusteeship Agency (RITA); iii) Muhimbili National Hospital (MNH); iv) Public Procurement Regulatory Authority (PPRA) v) Government Procurement Services Agency (GPSA) vi) Medical Store Department (MSD); vii) Ministry oflndustry, Trade and Investment (MITI); and viii) Records and Archives Management (RAM), a Division of PO-PSM.

3.3 Universal Communications Service Access Fund (UCSAF)

The Universal Communications Service Access Fund (UCSAF) is responsible for Connectivity component 2 (c), Supporting extension of coverage and access to JCT services in rural and underserved areas using public private partnership arrangements. The Fund is also responsible for enabling accessibility and participation by communication operators in the provision of communication services, with a view to promoting social, economic development of the rural and urhirn 11nclerservecl r1rer1s ; to prnvicle for ;:iv;:iilllhility of comm11nicr1tion services hy est;:ihlishine; ;:i leg;:il

framework for universal service providers to meet the communication needs of consumers.

3.4 The eGovernment Agency (eGA)/Beneficiary

The eGovernment Agency (eGA) is charged with the responsibility for the coordination, oversight and promotion of e-Government initiatives in the Ministries, Departments and Agencies (MD As.) and Local Government Authorities (LGAs). eGA is responsible for implementation of the eGovernment component in collaboration with PO-PSM.

3.5 Other Stakeholders and Beneficiaries

Other stakeholders of the project are the beneficiaries, namely: Medical Stores Department of the Ministry of Health, Community Development, Gender, Seniors and Children; Muhimbili National Hospital (MNH) ; Registration of Insolvency and Trustees Agency (RITA); Land Acquisition and Registration Department of the Ministry of Lands, Housing and Human Settlements; and Business Registration and Licensing Agency (BRELLA).

8

Page 21: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN PORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

3.6 The Project Steering Committee (SC)

In connection with the implementation of the National !CT Broadband Backbone (NICTBB) network, two bodies were formed for project implementation functions , these are: a Steering Comm ittee (SC) and a Technical Team.

According to the Financing Agreement, the Project Steering Committee shall be responsible for, inter alia:

(i) Policy guidance; (ii) Review of progress made towards achieving the Project's objectives, and making

recommendations for removal of any obstacles to the timely implementation of the Project; (iii) Review of consolidated Annual Work Plans and Budgets (A WPB}, and consolidated reports

on the implementation of the Project; and (iv) Review of documents submitted by the MWTC and PO-PSM.

According to requirements outlined in the RCIP Project Documents, SC should meet quarterly to

discuss progress of project implementation and make necessary decisions and approvals.

The SC comprises of Permanent Secretaries, Chief Executives or Directors from relevant sector

stakeholders as follows:

(i) President's Office - Public Service Management;

(ii) President's Office - Regional Administration and Local Government;

(iii) Ministry of Education, Science, Technology and Vocational Training;

(iv) Ministry of Finance and Planning;

(v) Ministry of Lands, Housing and Human Settlements Development;

(vi) Office of the Attorney General;

(vii) Ministry of Works, Transport and Communication (Works);

(viii) Ministry of Works, Transport and Communication (Transport);

(ix) Ministry of Finance and Economic Affairs - Zanzibar;

(x) Ministry of Communications and Transport - Zanzibar;

(xi) Ministry of Energy and Minerals;

(xii) Ministry of Works, Transport and Communication (Communication-Chair) ;

(xiii) ational Environment Management Council - NEMC;

(xiv) Universal Communication Service Access Fund (UCSAF); and

(xv) Tanzania Telecommunications Company Limited- TTCL.

From time-to-time the representatives of the following stakeholders might be co-opted into the

Steering Committee as resource persons:

(i) Ministry of Industry, Trade and Investment;

(ii) Tanzania Communications Regulatory Authority (TCRA);

(iii) Business Registration and Licensing Authority (BRELA);

(iv) Registrar and Insolvency Trustees Agency (RITA);

9

Page 22: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RC IP PROJECT FINANC I AL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

(v) Ministry of Health, Community Deve lopment, Gender, Seniors and Children;

(vi) Muhimbili National Hospital (MNH); and

(vii) Medical Stores Department (MSD)

3. 7 RCIP Project Technical Team (TT)

The Technical Team comprises of se lected technical staff from the Implementing Agencies. The beneficiaries did nom inate focal persons to jo in the Technical Team as needed . The Technical Team supports the Steering Committee. Technical Team meetings are held twice a month, amongst other issues to receive and discuss on progress reports of the whole project. The secretariat comprises of staff working under lCT Division in the MWTC.

4. PROJECT IMPLEMENTATION STATUS

Project disbursements of SDR 44.7 million (USO 64 million), approximate ly 64% of the total project fund s on a cumulative basis recorded a general increas ing trend as at 30th June 2017. Similarly, the undisbursed loan balance for the same period stood at USD 35,985,676. Disbursements have improved considerably due to payments of GovNet, Rural access and eGovernment applications contracts under implementations. The total di sbursed amount comprises of four maj or components as well as the designated account balance (Table l ):

Component l :- Enabling Envi ronment: US O 4,873,672; Component 2: - Connectivity: USO 43,464,979; Component 3:- eGovernment Applications: USO 9,809, 179; Component 4:- Project Management: USO 3,646,809 and Des ignated Account ba lance: USO 2,2 19,684

Tablel: Project Expenditures by Components

SIN Project Loan Disbursed Undisbursed Activity (USD) (USD) (USD)

l Enabling 14,000,000 4,873,672 9, 126,328 Env ironment

2 Connectivity 60,000,000 43 ,464,979 16,535,02 1

3 eGovernment 22,000,000 9,809,179 12, 190,821 App lications

4 Project 4,000,000 3,646,809 353, 191 Management Total 100,000,000 61,794,640 38,205,360

5 Designated - 2,219,684 (2,2 19,684) Account

Total 100,000,000 64,014,324 35,985,676 Expenditure

10

% Implementing Disbursed Agency

35% MWTC, POPSM and UCSAF

72% MWTC, POPSM and UCSAF

45% POPSM

9 1% MWTC and POPSM

62%

- MWTC and POPSM

64% MWTC, POPSM and UCSAF

Page 23: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA M INISTRY OF WORKS, TRAN SPORT AN D COMMUN ICATION RC IP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.1 Component 1 - Enabling Environment

The main objective was to provide support for capac ity building in order to strengthen the policy and regul atory environment, and promote further sector-reform in order to maximize benefits from access to international capacity. During the period, a disbursement rate of 35% per component budget (71 % per component project fund s) was recorded. In thi s area, low disbursement was recorded because the following activit ies were partia lly implemented using other resources as per Table 2 indicated below:

1. Strengthening of the ICT policy;

11. Technical assistance during implementation of the Universal Access strategy;

111. Design of contracts for pre-purchase of international capacity;

Table2: Expenditure by Components

SIN Project Activity Disbursed Planned Undisburse % Implementing (USD) (USD) d (USD) Disbursed Agency

I Rural Telecom 393,396 514,713 ( 12 I ,3 17) 76% UCSAF

2 GovNet 338,582 379,815 (41,233) 89% POPSM

3 Publicity and 265,990 325,976 (59,986) 82% MWTC awareness

4 NPKl 102,272 267,838 (165,566) 38% MWTC

5 eSchoo ls I, I 06,748 1,242, 105 ( 135,357) 89% MWTC Connectivity

6 ICT & VC 199,620 940,620 (74 I ,000) 2 1% MWTC equipment

7 Sc ience and 218, i67 218, i 67 - i00% MWTC Technology

8 Cyber Security 6 11 ,160 660,185 (49,025) 93% MWTC Laws

9 £CT 64,242 140, I 37 (75,895) 46% MWTC Commission

10 ICTBB and 277,243 480,513 (203 ,270) 58% MWTC Broadband

I I M & E Survey 308,647 468,050 (159,403) 66% MWTC

12 Environmental 12,350 65,000 (52,650) 19% MWTC Impact Assess

13 Training and 975,256 1,120,948 (145,692) 87% MWTC workshops

Sub Total 4,873,673 6,824,067 (1,950,395) 71%

14 Unallocated Funds 7, 175,933 (7, 175,933) -Total 4,873,672 14,000,000 (9,126,328) 35% Expenditure

11

Page 24: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRAN PORT AN D COMMUN ICATION RC IP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRET ARY (Continued)

4.1.1 National ICT Broadband Backbone (NICTBB)

The Government, through the Ministry of Works, Transport and Communication (MWTC) continues investing in ICT infrastructure in the country. Construction of the National ICT Broadband Backbone (NICTBB) infrastructure is among the efforts of the Government to enable easy access to ICT services to all citizens at affo rdable costs. In order to achieve thi s goal, the former Ministry of Communication, Science and Technology introduced a phased approach for developing the NICTBB through the National !CT Infrastructure Development program with the primary objective of providing broadband ICT connectivity to Tanzanians at all levels including at the national, regional, district, community, village, and households leve ls. The program has five phases with phases 1, rr, III (sub phase I) already completed. During implementation, the NICTBB project activities such as capacity building, project management, monitoring and evaluation are mainly faci litated through RCIP funding.

Detailed implementation of the NICTBB infrastructure is provided below: Phase I & II: Covered a total distance of 7,560 ki lometres of Optic Fibre Cable (OFC) backbone covering twenty four regions of Tanzania Mainland; connectiv ity to submarine cables (EASSy & SEACOM) and cross-border connectivity with neighbouring countries namely; Kenya, Uganda, Rwanda, Malawi, Burundi and Zambia. The total investment for these two phases amo unted to USO 170 million and TZS 17.72 billion (local component).

Phase III: Enhancing the national backbone infrastructure to have footpr int and a service point at each district headquarters; estahl ishi ng a fu ll-mesh IP layer (TP-MPT .S) to the existing DWDM and SDH layers; implementat ion of Data Centres for hosting IT services, implementation of the Public Key Infrastructure, and the implementation of common interest user networks such as health, educational and research. This Phase has four components as follows:

(a) Component 1: The construction of additional OFC links into the NICTBB network to achieve a mesh OFC transmission network topology;

(b) Component 2: The construction of regional and district OFC transmission networks; (c) Component 3: The construction of an IP-layer of the NICTBB and a national Internet Data

Centre (IOC) faci lity of high standard; and (d) Component 4: Implementation of additional Internet-based app lication systems for the

government to extend the ongoi ng eGovernment project to loca l governments: ERN ET, e­Schools etwork, e-HealthNet, Community Information Centres (C ICs), and Public Key Infrastructure (PKI).

The total investment required for Phase Ill of the NICTBB is estimated at USO 403 million (foreign component), TZS 2 billion (local component) and resources from RCIP funding of USO 300,000. Under Phase III , USO 93 .77 million (foreign component) was secured and disbursed fo r im plementation of the first sub phase (Sub Phase I) of Phase III. Implementation of phase III, sub phase II is currently under the planni ng stage.

Phase IV: A PPP arrangement among the MWTC and Telecommun ications Operators fo r rolling out of OFC Metro Ring Networks in urban areas and building missing links to complement the NICTBB initiatives. The total investment for this phase is approximate ly USO 80 million which is being sourced by telecommunication operators.

12

Page 25: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

TH E UN ITE D REPUBLIC O F TANZANIA MINIST RY OF WORKS, TRANSPORT AND COMM UN ICATION RC IP PROJ ECT FI NANC I AL STATEME NTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Phase V: Implementing last mile broadband connecti vity nationwide intended to provide access to the metro networks in urban areas and the NICTBB to gove rnment instituti ons, businesses and the general public. The investment outlay for Phase V will be determined after completion of Phase III and Phase IV .

Benefits of NICTBB Projects

T hrough deployment of the NICTBB and its connections to Submarine Cab les substantial and sustained ICT services has moved a country as a part of global community to adopt the fourth industria l revolution in di ffe rent aspects as follows:

1. Improved Communication Services: The increase of 56% fo r the mobile phone subscriptions from 17,642,408 users in 2009 to 40,173,783 users in 20 16; internet services increased for 97% from 520,000 users in 2009 to I 7,263,523 users in 20 15; communication service tariffs decreased fo r 54% from TSh. 147 in 2009 to TSh. 67 per minute in 201 5, etc;

11. Improved Technology in the Delivery of Financial Services: T his is attributed to the use of mobile phones in accessi ng financial services offered by te lecommunication com panies such as Vodacom, Airte l, T igo, Zantel and Ha lote l, and commercia l banks offering mobile banking (e-banking) services. As of June 2016, the use of mobile financial serv ices has increased to 17.3 milli on adults ' equivalent to more than 58% of adult population, which ranks Tanzania among the top countries in the world in the use of mobile financial services.

Us.e of mobile financial services has been deployed fo r micro-insurance, micro-secunt1es, micro-credit (M-Pawa and Wezesha) and micro-savings. It has a lso inc luded micro-pension, payment of bills, payment of tax, road licenses, salaries and other business transactions. These serv ices have been possible through partnerships between Mobile Network Operators (MNOs) with banks, insurance companies and the capi tal markets and regulatory authorities. The micro-credit product of M-Pawa has reached 2 miiiion subscribers with a totai transaction value of TZS 18.4 billion. Tanzani a has also become one of the first countries in the world to im plement interoperabil ity of mobile financial services a ims at making mobi le money services more cost effective and affordable.

11 1. Connecting Higher Learning and Research Institutions (HE R! s) with Last Mile Connectivity; where by a total of 28 HERis with 31 campuses have been covered by the proj ect;

1v. E-Schools Project: To date, 376 schoo ls and centres have rece ived ICT equipment and tra ining on the better use of these devices. In total 417 schoo ls a lready connected to the N ICTBB to enhance learning process.

v. Installation of Video Conference: The Government has completed the instal lation and the establ ishment of Video Confe rence fac ilities in several Government offices.

v1. Telemedicine: The Government th rough the Dar es Salaam Institu te of Technology (DIT) and in co llaboration with Universal Communication Services Access Fund (UCSAF) continued with the implementat ion of te lemedic ine projects . So fa r, ten hospitals are a lready connected to te lemedicine.

13

Page 26: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE N ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL TATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

v11. Establishing Housing Address and Zip Codes: Furthermore, the Government has continued with the implementation of the Settlement Plan Addresses and Zip Codes in Dar es Salaam, Arusha, Tanga and Zanzibar. etc.

4.1.2 Implementation of Rural Communications Project in Collaboration with VIETTEL Tanzania Ltd

In July, 20 14 the former Ministry of Communication, Science and Technology (MCST) signed a Memorandum of Agreement with VIETTEL to invest in the telecommunications infrastructure and services in the rural and underserved areas.. The project was initiated to support the Government initiatives for establishment of Universal Communication Services Access Fund (UCSAF) to provide the communication serv ices in rural and underserved areas. The implementation of the Rural Telecommunications project is being implemented under PPP arrangements whereby the Ministry is required to facilitate the right of ways, monitor and provide sustainable environment to fast track its implementation.

VIETTEL provides the investment for construction of 20,000 Km of the fiber network consisting of backbone, distribution, metro and last mile connections to cover 150 District Council s in the country. The Rural project will provide optic fiber terminations and internet services to 150 District councils, 150 District Hospitals, District Police stat ions and 65 Postal Offices. During the implementation phase, project management support, monitoring and evaluation were mainly facilitated through RClP funding as shown below:.

SIN Assortment Description Status

1. Infrastructure Completed 4,238 BTSs (2G and 3G); and provided Completed Deployment telecommunication services to Tanzanian people;

Compieted instaiiation or 80,649 wooden poles for overhead Completed optical cables; Completed deployment of 18, 192 km of optical cab le, among Completed which are 12,532 km of buried cable and 5,660 km of overhead cable.

2 . lmplementin Internet services for schools: 405/300 schools Completed g VlETTEL (the target of the second year deployment) commitments Optical fiber termination for District Council Office: 123/ 137 Completed to the offices by optical cable Government Optical fiber termination for District Hospital: 74/92 hospitals Completed

by optical cable Optical fiber termination for District Police: 111 /124 Stations Completed by optical cable Optical fiber termination for Department Post Office: 68/73 Completed Offices by optical cab le Optical fiber termination for Tribunal court: 26/27 Offices by Completed optical cable Covered communication for Villages: 2536/3000 Villages Completed (Target 3000 villages).

14

Page 27: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

TH E UN ITED REPUBLIC O F TANZA NI A MINISTRY OF WORKS, TRANS PORT AND COMM UNICATION RC IP PROJECT FINANC IAL ST AT EM ENT S

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.1.3 e-Schools Connectivity Project

The Government of the Uni ted Republic of Tanzania (URT) th rough the Ministry of Works, Transport and Communication (MWTC) is implementing among others, the form ulation of, coordinati on of, deve lopment and implementation of ICT polic ies, strategies, programmes and plans fo r enhanced national socio-economic growth. Thus, the Connect a School, Connect a Community (CSCC) Proj ect is in-line w ith the activities of the Ministry. The project is being im plemented under the col laboration of MWTC, the Internationa l Telecommunication Union (ITU) as project stimulators and the French Ministry of Foreign and European Affairs (MFAEE) and World Bank as the development partners (sponsors). At local level the project is coordinated by MWTC and implemented in collaboration with the Ministry of Education, Science, Techno logy and Vocational Training and the President's Office - Regional Administrati on and Local Government.

This initial arrangement which was coordinated by ITU at international level, successfu lly benefited forty nine centres among which fo rty two are secondary schools, one primary school, three health officer schoo ls as we ll as th ree Tanzania Posts Corporation centres. Following the addition of eighty secondary schoo ls (sponsored by the World Bank th rough RCIP Project) into thi s project, currently we have managed to equip a tota l of one hundred twenty nine schools (129) across the country covering 95% of a l I the regions in the country but yet very fa r from the goal if we count the coverage district-wise . Having reached a total of one hundred and twenty nine schoo ls across the country and for the country to register utmost results from this project, we found it essentia l to have a well qualified group of personnel with the right skills to manage and support the we ll be ing of the !CT equipment and a lso to train fe llow teachers and students.

In fulfi llment of this requ irement, in June, 20 15 the Min istry in co llaboration with the former Ministry of Education and Vocational Tra ining (MOEVT) and other representatives from the Nat ional Team of !CT tra iners fo r Second <1 ry Schools conclucted a workshop to develop a comprehensive and well customized content prior to a training program scheduled fo r two representatives fro m each schoo l among the one hundred twenty nine schoo ls a lready covered. The developed ICT content is accord ing to the syllabus of the ICT/ICS in secondary schoo ls issued by MO EVT in 2007.

Between September and October, 20 15 tra ining was conducted and it involved two representatives from all the benefic iary schoo ls. T he tra ining mainly covered issue on computer fundame nta ls, Word Processi ng, Spread Sheet (Exce l), Power Point presentation (PPT), Computer Networking and Internet and Preventive Maintenance. The trainees were examined afte r the training and the module inc luded both theory and practical knowledge though 80% was practical based.

So far the initiat ive has registered positive achievements and the targeted commun ities are benefit ing fro m the services at the same time the country is realizing the goals and objectives of the plan. Despite a ll the achievements still there are some challenges posed as such which inc lude necessity to scale up the project, fill missing links especia lly the most disadvantaged and more capacity building of trainers/administrators in those schools so as to enab le them to mainta in the !CT equipment and enhance the teaching and learning experience in the education sector.

15

Page 28: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COM MUNICATION RC IP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.1.4 Video Conference Systems

The project to install video conference systems to provide transmission of full motion video images and high quality audio between multiple locations among Government offices has two phases: • Phase I was for installation of Video Confe rence (VC) systems in the Revo lutionary Government

of Zanzibar (Zanzibar and Pemba regional offices). • Phase II is for supply and installation of equipment (Bridge) for linking Video Conference

stations for the Government of the United Republic of Tanzania.

The contract for supply and installation of video conferencing systems fo r Zanzibar and Pemba regional administrat ion offices and Zanzibar State House at contract price of USO 187,620 was s igned on 3 June 2014. Testing and commissioning of phase I was successfully completed in September 2014 and the systems are operational. Bidding documents fo r the tender for supply and installation uf Video Conference (VC) equipment for additional new Regions (i.e. Geita, Njombe, Simiyu and Songwe) is at the tendering stage. Phase 2 is for purchase and installation of Bridge equipment.

4.1.5 Science, Technology and Innovation (STI)

Project over view

The Government of the United Republic of Tanzania has been implementing a program of reviewing and revitalizing the National Innovation System since 2010. This review encompasses ICT as one of its key components.

Th is review employed the methodology developed and widely used by the Organisation fo r Economic Co-operation and Development (OECD) countries. This methodology consists of a self-assessment that culminates in a Background report, a review process done by external people that climaxed into the External Review and a Synthesis Report that conso lidated the observations from the two assessments forming the bas is on which the recommendations would be implemented. The rev iew exercise benefited immensely from the di scussions and a number of presentations which were made during the Smart- Partnership Dialogue which was he ld in Tanzania.

The resultant recommendations from the rev iew were presented to a number of stakeholders and finally, to the Inter-Ministerial Technical Committee (IMTC) which is a meeting of all Permanent Secretaries. I.t was the IMTC which directed the Ministry to use the Big Result Now (B RN) based methodo logy to deve lop a clear roadmap of implementing the recommendations which are contained in the rev iew documents. BRN methodology was preferred as it provides a platform fo r different stakeholders to partic ipate in setting priorities and having a buy-in for implementers from different sectors.

Involvement of Stakeholders

To achieve the above goal the former Ministry of Works, Transport and Communication organized a meeting (Lab) whi ch brought together a total of 120 participants from different sectors of the economy. During the Lab-meeting stakeholders jointly identified and agreed on targets and method of implementing the key review recommendations.

16

Page 29: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Outcome from the Lab

The participants reached a consensus of prioritizing four main areas for implementation namely: I . Strengthening Science Technology and Innovation Governance and Leadership; 2. Refocusing Research and Development Towards Business and Enterprises; 3. Linking teaching and learning towards innovation and entrepreneursh ip; 4. Strengthening business firms as producers and adopter of new innovations.

Syndication of the Lab report

The Lab report was presented to selected key stakeholders to enable them understand their role during the implementation of the roadmap. A total number of six stakeholders meetings were held as follows:

• Tanzania Academy of Sciences; • Permanent Secretaries from the Revolutionary Government of Zanzibar; • President ' s Office Planning Commission; • Members of the National Science and Technology Commission; • Medical Research Institute; and • The Working Council of the former Ministry of Communication, Science and Technology.

After syndication the report was finalized by incorporating inputs and recommendations from stakeholders.

Way Forward

The Ministry of Education, Science, Technology and Vocational Training in partnership with other stakeholders wi ll champion the implementation of the suggested solutions. The expected outcomes of the proposed change will result in the development of the STI-led socio-economic development that will help Tanzania accelerate the pace of development, to attain the middle income status as envisaged in the Vision 2025.

4.1.6 Capacity Building

PO-PSM capacity building plan with estimated cost of USD 2,387, I 00 was developed and approved by the World Bank for implementation with effect from February 2013. Activities earmarked for this plan were awareness creation programs, tailor made training, study visit programs, networking sessions through workshops and conferences, and annual e-Government events.

Implementation of capacity building for eGovernment is overseen by a training committee of ten people selected by PO-PSM from e-Government Agency (three), PO-PSM (three), PCCB (one), TRA (one), TGLA (one) and MLHSD (one). MLHSD is a representative of other beneficiaries implementing e-Government applications. Capacity Building (CB) is a cross cutting activity and will also involve MDAs and LGAs. The committee will ensure the relevance of identified CB activities and enable efficient implementation.

17

Page 30: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

Tl-IE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

CB activities conducted by PO-PSM up to 30 June 2016 are study visit to Bangladesh on birth registration by 15 people, study visit to Singapore on business portal by 15 people, study visit to Korea one-procurement by 15 people, attendance to a conference one-Government in Uganda by 5-people, conference one-Government in Korea by 5 people, conference one-Government in Kenya by 5 people, human resource training to 42 eGA staff, and participation at the 13th European Conference on eGovernment (ECEG 2013) in Italy by 5 staff. Planned conferences to France and Malaysia were not attended due to logistical problems during the period under review.

MWTC and UCSAF training plans were prepared and submitted to World Bank for review and approval in 2013. The World Bank recommended that instead of approving the plans, tailored capacity building activities which are viable and eligible under RCIP project financing can be requested through the ICT Directorate under MWTC for consideration and requesting no-objection from World Bank.

4.1.7 Cyber Security Laws

The rapid technological advances in telecommunications, information technology and broadcasting as well as the convergence of technologies, services and delivery platforms have made it necessary for countries in both the developed and developing countries to create and operate in an open, dynamic and responsive legal and regulatory framework to support the development of ICTs within the economy and society. On the other hand, [nformation and Communication Technologies (ICTs) have provided unprecedented opportunities to accelerate socio-economic development, while at the same time, the misuse of ICTs and their vulnerabilities create new and serious threats having the potential to harm the society.

In making sure that these cyber threats are dealt with, the Government of the United Republic of Tanzania enacted two very important legal instruments; the Cyber Crime Act, 2015 and the Electronic Transaction Act, 2015 on 15 Apri I 2015.

These legislations will help define the laws, create governing bodies for cyber operation on the identified cyber areas and/or add roles to the current controlling bodies to govern the new cyber issues. The legal framework will create a 'controlled environment' against virtual crimes that threaten national security and stability. Also, it will provide legal guidelines to bring to identify and charge crimes committed through or in electronic transactions and e-commerce that threaten business growth between companies, organisations, consumers, suppliers and other service providers.

The international frameworks that we abide to including East African Community (EAC) Legal Framework for Cyber Laws, 2008; Southern African Development Community (SADC) Model Laws and African Union Convention on the Confidence and Security in Cyberspace, 2012. All these legal framework, require each country to have a minimum of three fundamental cyber laws namely Cybercrimes Act, Electronic Transactions Act and Personal Data Protection Act. We already have the first two acts in place, now only remaining with the Personal Data Protection Act. In order to implement this legislation efficiently three activities were implemented during the year:

(i) Capacity building to law enforcers, Ministries and Agencies Lawyers and ICT staff;

(ii) Creating awareness to the public at large regarding enforcement of the Cyber Security laws;

18

Page 31: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT ANO COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

In addition, the Government through the Ministry of Works, Transport and Communication (Communication section) is now continuing with processes of enactment of the Personal Data Protection Act, 2017. For the enactment processes to be successfully implemented there are some activities that will need to be covered. First one is to gather stakeholders ' views which will be followed by a consolidation meeting to tinalize the cabinet paper and submit to the relevant authorities for consideration and further processes.

Secondly it is important to improve capacity of relevant officers on the necessary subject matter i.e. expertise in data protection as well as capacity building to law enforcers specifically police and prosecutors. After getting authorization from the Cabinet meeting, the Ministry will be required to draft the bill then submit it for enactment processes. Before and during legalization of the Act, MWTC need to create public awareness to the citizens to avoid legal cases due to ignorance and also make implementation of the Personal Data Protection (PDP) Act highly effective.

4.1.8 The Tanzania JCT Commission

The President of the United Republic of Tanzania issued a notice on establishment of the National ICT Commission (ICTC) vide Government Notice No. 532 of November 2015 to drive ICT development in the country. The ICTC's mandate is to provide advice, strategic planning, implementation and investment in JCT; monitor and coordinate National ICT initiatives and provide foresight in trend and opportunities for ICT uptake for the nation's socio-economic development. The ICT functions include:

• Fostering investment in ICT; • Build capacity and promote ICT profession and standards; • Advise and collaborate with other stakeholders on research, setting of standards and foresight; • Hosting and sustaining of national ICT Infrastructure and programs and any other functions.

The Ministry of Works, Transport and Communication in August 2016 allowed its six employees to work in the ICT Commission in the following positions: Business Support Services; procurement management; technical services; secretarial and reception services, driving and records management. For a period of July to September 2016, the project has also facilitated establishment of ICT Commission office premise at the Old Postal Building along Edward Sokoine.

Consultancy services for development of draft JCT Commission Bill commenced in August 2016 and completed in June 20 l 7after fulfilment of legal procurement requirements for engagement of the consultant. Secondly, the project facilitated the first workshop on ICT profession in August 2016 which gathered 76 ICT professionals countrywide to discuss and agree appropriate framework for profession recognition in the country.

The ICT Commission held its first ICT Profession workshop which focused on introducing ICT Professionals and stakeholders on the need for accreditation of ICT Professionals in Tanzania. This agenda arose from the fact that JCT Professionals practicing ICT in the industry are yet to have a legal accreditation body for their professional recognition and development. The workshop involved participation of industry ICT CEO's, professionals from within Tanzania and representative from the International Professional Practice Partnership (IP3) which is the world renowned ICT profession accreditation organization. The workshop was the first in a series of workshops that will be organized by the ICT Commission to afford a forum for topical national discussions on the JCT Profession.

19

Page 32: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Currently the ICT Commission is setting up registration and accreditation procedures expected to commence in the year 2017.

Furthermore as. part of its 2016/2017 work plan, the ICT Commission sets to have in place national JCT innovation guidelines and programs implementation together with establishment of Software Parks towards having in place [CT Smart Cities in Tanzania.

4.1.9 Production and Airing of TV and Radio Programs, and Production and Printing of Promotional Materials and insertion of articles in newspapers and journals

The objective for development of content is to produce 20 TV & 30 Radio Programs information and messages on RCIP-Tanzania, National ICT Broadband Backbone and development of the [CT Sector in Tanzania. All of the TV and radio programs will be aired in different TV and Radio Stations then be uploaded in the Ministry's website. The TV and Radio program will cover all information about the project including activities and objectives of the project put emphasis on the following aspect;

• Interview key project stakeho lders and develop video and radio content in English and Swahili to share RCIP-Tanzania activities, objectives and goals achieved;

• Documenting relevant video and audio production proposals with precise spot, theme, documentary outline and other video and audio needs analysis of the Ministry of Works, Transport and Communication & RC IP-Tanzania in accordance to the policies. and guidelines;

• Conducting relevant video component interviews as per the guidelines; • Carry out scripting, video shooting and supply of the equipment for the requirement; • Capture and edit video and audio as shot from the field; • Package the final product of video and audio to suit the MCST audience; • Translating the Video and audio; and

Provide reports with regards to the video and audio produced and sought

Production and airing of all 20 TV & 30 Radio Programs successfully completed during the year. Also production and printing of promotional materials successful ly completed. Preparations of Newsletters and insertion of articles in newspapers and journals have been completed.

4.1.10 Environmental Impact Assessment

In the course of implementing the project the World Bank Missions advised a compliance environmental audit to be conducted in order to assess compliance with safeguards policies of the bank as per requirements outlined in the Environmental and Social Management Framework (ESMF) and Resettlement Policy Framework (RPF) for the project; and also to identify constraints in implementation, document best practices, and suggest measures for effective implementation and monitoring of environment and social issues.

The audit was conducted from February 2017. The audit was carried out using standard internal guidelines for carrying out compliance environmental audits. This involved reviewing project documents especially the ESMF and RPF; national policies; World Bank Missions reports; and many others. An intensive stakeholders consultations was conducted in Dar es Salaam and project sites.

20

Page 33: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINI TRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRET ARY (Continued)

A total of 118 tower stations sites in 26 regions; 63 Govnet sites; and 24 LGA sites in 6 regions were vis ited. A check list developed during pre-audit stage was used in collecting information apart from direct observation. A simplified risk analysis tool was used to determine the significance of identified existing and potential impacts of non-compliance scenario.

The main conclusions from the environmental audit are; i) The project has increased communication connected to many parts in Tanzania. In remote areas,

communities are very happy of the project. Moreover, it has increased money transactions;

ii) The RCIP implementation in Tanzania adhered to environmental and social safeguards by following national policies and legislation on environment. ESIA was conducted for most communication towers and environmental certificates are in place. Since it was envisaged at the beginning that the implementation of the Govnet project would cause minor impacts from the fact that the optical fibre cable were laid along existing road reserves or telephone ducts, no ESIA was conducted;

iii) There was no Environmental Specialist in the implementation team of the client, which to a large extent affected follow up on adherence to ESIA related issues;

iv) Service providers or project operators were not acquainted with ESMF and RPF documents and their requirements. Neither, they had any contractual obligation to adhere to the ESMF and RPF. However, through ESIA the contractors committed themselves to sound environmental practices as condition of Environmental Certificates;

v) Major impacts that are common to many sites visited include: vegetation clearance; soil erosion; noise pollution; sanitary land and water pollution; land speculation; dominance within surroundings (visual intrusion); poor waste management; locational impacts;

vi) Land speculation was rampant to site implemented by MIC, VODACOM and Airtel. This is a serious observation that must be followed up;

vii) All but one service provider has a provision for constructing toilets for guards at the communication towers. A decent sanitary facility is essential to every person in modern times;

viii) Poor signal or connectivity is being experienced in many remotely located areas. This frustrates the users. Some complain of spending more air times due to poor signal reception .

4.1.11 Conducting Monitoring and Evaluation Survey

A consultancy firm has been hired to conduct a survey to get updated results indicators included in the RCIP Monitoring and Evaluation (M&E) framework, and also collect data in Phase I which will enable him to analyze outcomes of the RCIP in Phase 2.

The bidding process, tender evaluation, seeking approvals of MTB and WB including tender award and execution were conducted and completed during the year. The Consultant was expected to undertake the survey twice - immediately after the contract is awarded and at the end of 2016. This would allow providing primary data to be used to measure changes in outcomes and outputs of the project and thus facilitate effective monitoring and evaluation of the RCIP. Actual project progress and performance as per surveyed results, is provided under Table 3.

2 1

Page 34: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPU BLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RC IP PROJECT FINANCIAL STATEMENT S

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Table 3: Actual Project Progress and Performance

Item Expected Actual Performance% E- Schools2 80 80 62 Gov Net Net-MD A -connectivity 72 71 99 Rural Telecommunications- UCSAF 303 134 44 Video conferenci ng system 5 5 100 National Business Portal ( system) I Telemedicine system ( centers) 8 Nationa l Vital Registration System (centers) 60

e-Records/e-office ( system) EARL/IMMIS 1 e-Procurements( system) 1 Cyber Laws: Establishment of ACTs. 3 2 75 National Public Key infrastructure (system} I

Establishment of ICT Commission l I 100 Production of TV Broad casti ng 20 10 50 Production of Radio Broadcasting 30 10 33.3 Moni toring and Evaluation 2 phases 2 l 50

International Internet Bandwidth 176 176 100

4.1.12 National Public Key Infrastructure (NPKI)

The main object ive of the project (NPKI) is to provide verification of users' identity through certificate authority (CA) by bindings of publi c keys and certificate owner identi ty information, such as name, ID No, E-mail address and so on. Through the application of advanced encryption (cryptography) technologies, which will provide four security guarantees which are confidenti a lity, integrity, authenticity and non-repudiation to e lectronic information (transactions) during exchange through a chosen network.

With this objective users of selected network (trusted Network) w ill have a secure and re liable transactions has speculated in the e transacti on Act 2015 which establi shes NPKI. The table4 below summarizes the security services, threat and solutions that can be provided by PKI.

Table 4: Security services, threat and solutions

Security Services Threat Solution Confidentiality Data Leakage Encryption Integrity Data Forgery Digital Signature Authenticity Unauthorized User Digital Signature Non-repudiation Repudiation Digita l Signature

This project is estimated to cost a total of USO 8 million of which USO 150,000 has been allocated from the RClP project fo r the Feasi bili ty study and design of the system. The Contract with Individual consultant has been signed for implementation of this activity and work started in September 2016.

Page 35: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RC IP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRET ARY (Continued)

The system design and study were completed in May 2017 whereby the consultant submitted a ll contractual deliverables as per the ToRs as per table 5 below. Due to limited funds under RCIP project, MWTC wi ll so licit funds from other sources/projects for implementation of NPKI based on the feasibility study and system design. Potential sources funds to implement the PKI system include:

(i) The Government internally generated resources; (ii) NICTBB proceeds; (iii) Digital Tanzania project under WB funding and (iv) Other internat ional financ iers

Table 5: Feasibility Study and Design of PKI

SIN Deliverable

a) ToR for Consultant to conduct Feasibility Study For NPKI submitted to WB and approved

b) Consultant Procured

c) Inception Report For Feasibi lity Study Submitted

d) Draft Document Submitted; I. Business, Functional, Non-Functional

Requirements, System Design Specification and Legal Framework and Policy, Legislative and Regulation Requirements/Framework

2. Tender Document for deployment of NP Kl

3. Business Operational Modell document for NPK I

e) Final Document Submitted; 1. Business, Functional, Non-Functional

Requirements, System Design Specification and Legal Framework and Policy, Legis lative and Regulation Requirements/Framework

2. Tender Document for deployment of NP Kl

3. Business Operational Model document for NPKl

Status Completion date

Completed June 2016

Completed October 2016

Completed November 2016

December Completed 2016

Completed May 2017

Page 36: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE NITED REPUBLIC OF TANZAN IA M INISTRY OF WORKS, TRAN SPORT AND COMMUNICATION RC I P PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.2 Component 2 - Connectivity

The main objecti ve of this component for implementation of the national JCT infrastructure development program in Tanzania through pre-purchase of the government internationat bandwidth; financing of government communications Network (GovNet) and provide support for the extension of coverage and access to JCT services in rural areas using PPP arrangement is being implemented successfully. Funds disbursements stood at 72% as per Table 6 below:

Table6: Expenditures under Connectivity component

SIN Project Disbursed Planned Undisbursed O/o Implementing Activity (USO) (USD) (USD) Disbursed Agency

l Internet l 1,645 ,479 11 ,778,64 1 ( 133, 162) 99% MWTC bandwidth

2 GovNet 16,703,283 2 1,966,029 (5 ,262,746) 76% POPSM

3 Rural Telcom 15, l 16,2 18 27,711 ,446 (12,595,228) 55% UCSAF

Sub-Total 43,464,979 61,456,116 (17,991,137) 71%

Savings from - 1,456,116 (1,456,116) -Component 3

Total 43,464,979 60,000,000 (16,535,021) 72% Expenditure

4.2.1 Pre-purchase of international bandwidth

This sub-component has been a llocated a tota l of US$ 11.4 million for advance purchase of international bandwidth to be allocated to selected priority groups such as MDAs, schoo ls, univers ities and hospitals. The objective is to lower the cost of accessing international bandwidth in order to boost the use of broadband capacity for these users.

On 5 June 2012, the former Ministry of Communication, Sc ience and Technology (MCST) and Tanzania Te lecommunications Company Limited (TTCL) signed a contract for procurement of internet bandwidth worth USD 9,263 ,000 out of which USO 8,850,000 is financed through IDA funding. The contract is for the supply of a IO year !RU of 1.55 Gbps (10 STM-1) internet bandwidth . In add ition, the contract worth USO 2,572,814.18 for the supply, installation and commissioning of in ternet termination equipment between MCST and Copycat Tanzania Limited was signed on 5 June 20 12.

lnstallation of equipment, commissioning and creation of Aggregation Point of Presence (A-POP) was completed in October 2012. Similarly, the international bandwidth with capacity of 1550 Mbps was delivered in February 2013. The project was commissioned in March 2014 after successfu l utilization of the bandwidth capacity. The bandwidth provides subsidised internet services to target user groups such as MDAs, Schools and Hospitals. By June 2016, utilization based on capacity assignment reached l 00% of the entire bandwidth of l 550Mbps with over 206 Government institutions utiliz ing the service. Connection of additional users was temporarily stopped till installation of Spam Filter. Purchase and delivery of Spam Filter was done in December 2016 and installation was completed in January 20 17.

Page 37: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.2.2 Government Communications Network (GovNet)

The purpose of the project is to bui,ld a private government network that will facilitate not only telecommunication service but also spearhead efficiency in the government by sharing of resources ancl recl11ction of expenses ;::irisine; from 11n-coorclinMe.cl con ne.ctiv ity initi ;:i tive:s within the government such as:

i) Centralizing and share some common Government Applications ii) Keeping privacy and integrity and sharing of government ICT applications and related data

between relevant Institutions iii) Establish and providing reliable and high capacity voice inter·communications between

institutions; iv) Establish video conferencing between institutions · v) Optimal and efficient use of the existing public infrastructure

The project extends and scale up the already installed Optical Fiber Network which currently links seven government institutions to reach and connect a total of 72 MDA's. The feasibility study was completed during the year 2013 which resulted in network design and development of three major project phases:

a) Supply, Installation and Commissioning of Network Equipment, Optic Fibre Cable (OFC) and Related Services and Accessories for Government of Tanzania Communication Network.

b) Supply, Installation and Commissioning of Structured Local Area Network, Computer Equipment, IP PBX and related services and accessories for Government of Tanzania communication network.

c) Supply, Installation and Commissioning of Structured Local Area Network, Computer Equ ipment, IP PBX and related services and accessories for Local Government Authority.

(i) Last-mile fiber optic connectivity to 72 MDAs

This phase is divided into two assortments as tabulated below:

Table 7: Last-mile fiber optic connectivity to 72 MDAs

SIN Assortment Description Contract Status

3. Assortment I Supply, Installation and Contractor: Softnet Completed Commissioning of Network Technologies Ltd Equipment for 72 MDAs in Contract value: USD Dar es Salaam, Dodoma and 5,819,808.21 Pwani based on MPLS technology

4. Assortment Supply, installation of last Contractor: TTCL Completed II mile connectivity (Optical Contract value:

Fibre Cables, Accessories USO 1,964,055.43 ancl Re l;::iterl C:ivil Works) for 72 MDAs in Dar es Salaam, Dodoma and Pwani

25

Page 38: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

This phase covered 72 MD As, among them, 68 are located in Dar es Salaam; 2 are located in Dodoma and 2 in Bagamoyo, Pwani . The detailed list is tabulated under Table 8 below:

Table 8: List of MDAs under GovNet

S/No Site name Region l President's Office, State House Dar es Salaam 2 Vice President's Office Dar es Salaam 3 Prime Minister' s Office Dar es Salaam 4 Prime Minister' s Office, TAMISEMI Dodoma 5 Ministry of Labour and Employment Dar es Salaam 6 Ministry of Industry and Trade Dar es Salaam 7 Ministry of Livestock Fisheries and Development Dar es Salaam 8 Ministry of Water Dar es Salaam 9 Ministry of Defense and National Service Dar es Salaam 10 Ministry of Lands, Housing and Human Settlements Dar es Salaam 11 Ministry of Community Development, Gender and Children Dar es Salaam 12 Ministry of Agriculture, Food Security and Co-operatives Dar es Salaam 13 Ministry of Education and Vocational Training Dar es Salaam 14 Ministry of Communication, Science and Technology Dar es Salaam 15 Ministry of Works Dar es Salaam 16 Ministry of Justice and Constitutional Affairs Dar es Salaam 17 Ministry of bast African Co-operation Dar es Salaam 18 Ministry of Natural Resources and Tourism Dar es Salaam 19 Ministry of Home Affairs Dar es Salaam 20 Ministry of Energy and Minerals Dar es Salaam 21 Ministry of Information, Culture and Sports Dar es Salaam 22 Ministry of Transport Dar es Salaam 23 President' s Office, Public Service Management Dar es Salaam 24 Ministry of Health and Social Welfare Dar es Salaam 25 Ministry of Finance Dar es Salaam 26 Ministry of Foreign Affairs and International Relations Dar es Salaam 27 Controller and Auditor General, National Audit Office Dar es Salaam 28 Human Rights & Good Governance Commission Dar es Salaam 29 Public Service Commission Dar es Salaam 30 Law Reform Commission Dar es Salaam 31 Judicial Service Commission Dar es Salaam 32 TACAIDS Dar es Salaam 33 PCCB Dar es Salaam 34 National Electro! Commission Dar es Salaam 35 Registrar Court of Appeal Dar es Salaam 36 Drug Control Commission Dar es Salaam 37 President's Office Planning Commission Dar es Salaam 38 Attorney General Dar es Salaam 39 President ' s Office, Ethics Secretariat Dar es Salaam 40 Registrar of Political Parties Dar es Salaam

:?.6

Page 39: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REP BLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

S/No Site name 41 National Assembly Office (Dar) 42 National Assembly Office (Dodoma) 43 National Archive Office (Dar) 44 Tanzania Building Agency (TBA) 45 Business Registration and Licensing Agency (BRELA) 46 Drilling and Dam Construction Agency (DDCA) 47 Eastern Africa Statistical Training Centre (EASTC) 48 Government Chemist Laboratory Agency (GCLA) 49 National Bureau of Statistics (NBS) 50 National College of Tourism (NCT) 51 Occupational Safety and Healthy Agency (OSHA) 52 Tanzania Electrical, Mechanical Electronics Services Agency (TEMESA) 53 Registration Insolvency and Trusteeship Agency (RITA) 54 Tanzania Airport Ai port (T AA) 55 Tanzania Institute of Accountancy (TIA) 56 Tanzania Food and Drug Agency (TFDA) 57 Tanzania Meteoro logical Agency (TMA) 58 Tanzania National Road Agency (TANROADS) 59 Tanzania Public Service College (TPSC) 60 Tanzania Government Flight Agency (TGFA) 61 Weights and Measures Agency (WMA) 62 National Food Reserve Agency (NFRA) 63 Tanzania Employment Services (TAESA) 64 Government Procurement Services Agency (GPSA) 65 Taasisi ya Sanaa na Utamaduni Bagamoyo (TaSuba) 66 Dar es Salaam Rapid Trans (DART) 67 Water Development and Management Institute 68 Agency for Education Management (ADEM) 69 National Housing and Building Research Agency (NHBRA) 70 Electronic Government Agency (EGA) 71 National ID Authority 72 National Archive Dodoma

(ii) Installation of LAN, IP PBX and supply of computer hardware to 72 MD As.

Re2ion Dar es Salaam Dodoma Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Oar es Salaam Dar es Salaam Oar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Dar es Salaam Oar es Salaam Dar es Salaam Dar es Salaam Pwani Dar es Salaam Dar es Salaam Pwani Dar es Salaam Dar es Salaam Dar es Salaam Dodoma

Phase II aims to improve the structured LAN of 19 Ministries, IP PBX with IP Phones for 72 MDAs, procurement of 55 servers and 500 computers to be used to enhance government efficiency through improved infrastructure. Seven contracts worth USO 5 million were signed on 161

h Januarys 2015 to implement this phase with the firms indicated in Table 9 below:

'27

Page 40: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Table 9 GOVNET Phase II Contracts and Progress SIN Assortment Description Contract Status

l.

2.

3.

4.

5.

6.

7.

Assortment l

Assortment II

Assortment III

Assortment IV

Assortment V

Assortment VI

Assortment VII

Supply, installation, testing and commissioning of 500 desktops, 4 work

Contractor: Computer Completed

station computers, 3 heavy duty printers, 15 medium duty printers, and 55 servers to MDAs and LGAs

Centre (T) Limited Contract value: USO 1,700,199.01

Supply, Installation and Commissioning of Local Area Network Structured Cabling for 5 Ministries (MSCT, MJCA, MOHA, MODANS and PMO)

Contractor: Techno Image Completed

Contract value: USO 555,3 78.80 and TZS 198,619,004

Supply, Installation and Contractor: Computech Completed Commissioning of Local Area ICS (T) Limited Network Structured Cabling for 4 Ministries (MIST, MEAC, Contract value: MID and PMO - RALG) USD361 ,260.61

Supply, Installation and Contractor: Techno Image Commissioning of Local Area Limited Network Structured Cabling for 5 Ministries (MNRT, MAFSC, MLEYD, MLDF and MoHSW)

Contract value: USO 569,361.80 and TZS 144,601,330

Completed

Supply, Installation and Contractor: Computech Completed Commissioning of Local Area ICS (T) Limited Network Structured Cabling for 5 Ministries (MEM, MICS, Contract value: MLHHS, POPSM and Mo VET) USO 499,642.26

Supply, Installation and Contractor: Inventions Completed Commissioning of IP PBX and Technologies Limited IP Phones for 72 MDAs in Dar Es Salaam, Dodoma and Pwani Contract value: Regions USO 964,272.40

Supply, Installation and Contractor: Techno Image Completed Commissioning of CCTV, Limited Video Conferencing and Access Control Systems for e- Contract value: Government Agency and USO 216,102 .88 and TZS POPSM 39,176,000

28

Page 41: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRAN PORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

iii) LGAs Connectivity.

GOVNET Phase Ill implementation involves the extension of Gov Net to additional 77 LGA sites as well as connecting the current LGA/PMO-RALG network to GovNet. GovNet phase fII was initiated as a result of savings from Gov et I and II. It was decided that funds be directed towards connecting number of institutions collectively termed as LG As to Gov Net. Three contracts indicated in Tab le I 0 were signed:

T bl 10 GOVNET Ph a e : ase III C ontracts an dP rogress SIN Assortment Description Contract Status

I. Assortment Supply, installation of last Contractor: Kotes Completed. Final I mile connectivity (Optic (T) Ltd Acceptance Test

Fibre Cables, Contract Value: (FAT) is due by Accessories and related civil USD 1,668,127.70 December 2017 works) for 77 LGAs.

2. Assortment Supply, Installation and Contractor: Delivery and II Commissioning of COMPUTECH JCS installation of

Structured LAN and IP (T) LTD, equipment to 77 is PBX with Accessories for Contract Value: complete. 77 LGAs as grouped below: USO 6,124,189.30 Provisional

Acceptance Test (PAT) is due by October 20 17

,., Assortment Supply, Insta llation and Contractor: SCI Completed. Final .) .

III Commiss ioning of Power Tanzania Ltd Acceptance Test Backup, Air conditioning, (FAT) is due by CCTV, Access Contro l and Contract Value: December 2017 Fire Detection systems for USO 700,695.49. LGAs Computer App lications Systems Center at Utumishi Building, Dar es Salaam.

The connected regions and associated beneficiaries are as indicated below:

SN Region NICTBB LGAs TOTAL Points LGAs

1 Dodoma Dodoma Dodoma RS, Dodoma MC, Dodoma 4 DC, Regional Hosp ital

2 Arusha Arusha Arusha Rs, Arusha CC, Arusha DC, 4 Regional hospital

3 Kil imanjaro Moshi Ki limanj aro RS, Moshi MC, Moshi 4 DC, Mawenzi Hospital

4 Tanga Tanga Tanga Rs, Tanga CC, Tanga DC, 4 Bomba Hospital

5 Morogoro Morogoro Morogoro RS, Morogoro MC, 4 Morogoro DC, Morogoro Regional Hospital

29

Page 42: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

SN Region NICTBB LGAs Points

6 Pwani DSM Dar es Salaam RS 7 Lindi Lindi Lindi Rs, Lindi MC, Lindi DC,

Sokoine Hospital

8 Mtwara Mtwara- Mtwara Rs, Mtwara MC, Mtwara DC, Mikandani Ligula Hospital

9 Ruvuma Songea Songea Rs, Songea MC, Songea DC, Tunduru DC, Ruvuma Regiona l Hospita l

10 Iringa lringa lringa RS, lringa MC, Iringa DC, Iringa Regional Hospital

11 Mbeya Mbeya Mbeya RS, Mbeya CC, Mbeya DC, Mbeya Regional Hospital

12 Singida Singida Singida Rs, Singida MC, Singida DC, Singida Regional Hospital

13 Tabora Tabora Tabora RS, Tabora MC, Tabora DC, Kitete Regiona l Hospital

14 Rukwa Sumbawanga Rukwa RS, Sumbawanga MC, Sumbawanga DC, Rukwa Regional Hospital

15 Kigoma Kigoma-Ujiji Kigoma Rs, Kigoma MC, Kigoma DC, Maweni Regional Hospital

16 Shinyanga Shinyanga Shinyanga RS, Shinyanga MC, Shinyanga DC, Shinyanga Regiona l Hospita l

17 Kagera Bukoba Kagera RS, Bukoba MC, Bukoba DC, Biharamulo , Kagera Regiona l Hospital

18 Mwanza Mwanza Mwanza Rs, Mwanza CC, Ilemela MC, Sekoutoure Regional Hospital

19 Mara Musoma Mara RS, Musoma MC, Musoma DC, Mara Regional Hospital

20 Manyara Babat i Manyara RS, Babati TC, Babati DC, Manyara Regional Hospital

Total

TOTAL LGAs

1 4

4

4

4

4

4

4

4

4

4

4

4

4

4

77

Execution of phase Ill at a total cost of USO 8.5 million will started in December 2015. It is expected that implementation of the Gov et project fo.r all three phases wi ll be completed in December 2017.

30

Page 43: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.2.3 Extension of Coverage and Access to ICT Services in Rural Areas

Under this sub-component, a total of US$ 30 million was allocated for the extension of coverage and access to JCT serv ices in rural areas using Public-Private Partnership (PPP) arrangements. USO 27,711 ,447. The objective is to enab le achi vement~ of univcr3al access targets by providing incentives to the private sector to invest in rural areas through provision of subsidies.

In its efforts to extend communication services to rural and urban underserved areas, the Government of United Republic of Tanzania, through the Universal Communications Services Access Fund floated and signed contracts with four major licensed telecommunications operators. This project is being implemented in collaboration with telecommunications operators; namely Tanzania Telecommunications Company Lim ited, Airtel Tanzania Limited, Vodacom Tanzania Limited and MIC Tanzania Limited that upon its implementation, 347 wards will gain communication services as analyzed under Table 11 below:

No Service Wards Wards on Subsidy USO Disbursed Disbursed provider Contracted Air USO O/o

1 Phase " l " 52 52 5,827,978 5,401,838 93% 2 Phase " 1 A" 77 77 6,026,464 3,041,238 50% 3 Phase " 2A" 102 99 7,675,479 3,400,532 44% 4 Phase "2B" 116 113 8, 181 ,526 3,272,610 40%

Total 347 341 27,711,447 15,116,218 55%

The kasibili ly sludy and design of the Rural Telecommunication Access project was performed under the contract worth USO 348,870.30 between the Universal Commun ications Service Access Fund (UCSAF) and the project consultant, Mr Andrew Dymond . The design resulted into four phases (" 1 ", "IA", "2A", "2B" and "3") as follows:

Phase 1

In October 2012, the Fund invited sealed subsidy bid from eligible and qualified bidders for the provision of basic voice telecommunications services (contract UCSAF- 2012-1) in a set of currently un-served or under-served wards within the United Republic of Tanzania based on the financial feasibility criteria. The project is financed by World Bank through RCIP.

The tender comprised of 152 wards having 869 villages with a total population of 1,617,310 without communication serv ices. The maximum allowable subsidy was set to USO l 0,990,000. After bids evaluation, 4 service providers emerged winner to extend communication service in 52 wards, having a total of316 villages with a population of737,378. The 52 wards were awarded to service providers at a contract subsidy of USO 5,827,978. Table 12 below indicates a number of wards awarded to each operator along with a contract subsidy amount provided.

J I

Page 44: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPU BLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Table 12: Total Subsidy per each Operator

No. Operator Wards On Air Subsidy Disbursed Disbursed

USD USD %

1 Airtel 12 11 2, 192,230 2,192,230 100%

2 MIC (Tigo) 19 19 1,402,150 1,402,150 100%

3 TICL 20 20 2, 130,698 1,704,558 80%

4 Vodacom 1 1 102,900 102,900 100%

TOTAL 52 51 5,827,978 5,401,838 93%

Currently, all 52 wards have been connected and gained access to communication services.

Phase lA

After finaliz ing WB Phase l project bidding process, the Fund continued with preparation of the second bidding document for WB Phase 1 A. WB Phase I A bidding document comprised a total of 168 wards, having 968 villages with an est imated population of 1,322,753 people having no communication services. The maximum allowable subsidy was set to USO 14,336,000. The tender was floated on 3 1 July, 2013 and accord ing to the bidding document, the deadline to submit bidding document was set on 4th November, 2013.

On 4 November, 201 3, only one service provider, TTCL returned the ir bid. After bid evaluation, 33 wards were successfu l awarded to TICL at a contract sum of USO 6,026,464.10. The contract signing ceremony took place on 21 February, 20 14 at UCSAF Boardroom. On 15 November, 2013, the former Minister for Communication, Science and Technology, Hon Makame M. Mbarawa (MP), called for a meeting between Service Providers and the Ministry to discuss a way forward for WB Phase I A since there was a poor response from almost all the service providers with exception of TICL. It was agreed that Service Providers shou ld extend communication services to 44 wards left out from the WB Phase IA bidding document at their own cost, Vodacom henceforth took 36 wards, Airtel took 4 wards and T igo took 4 wards.

Therefore, a total of 77 wards from WB Phase I A se lected sites have rece ived communication service after successful implementation of the respective projects.

Table 13: Total Subsidy per each Operator

No. Operator Wards On Air Subsidy Disbursed Disbursed

USD USD % 1 TICL 33 33 6,026,464 3,04 1,238 50% 2 Vodacom 36 36 - - -

3 Airtel 4 4 - - -4 MIC 4 4 - - -

TOTAL 77 77 6,026,464 3,041 ,238 50%

32

Page 45: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Phase 2A

After successfu l initial process for the first Phase of rural telecommunication project, the Fund engaged itself with implementation of WB Phase 2, which comprises ofWB Phase 2A and WB Phase 28 project. WB Phase 2A project is a rural telecommunication project to extend communication service to rural and urban underserved wards financed by WB through RCIP project.

The tender for Phase 2A was floated on 28 November, 2014, with a maximum allocated subsidy value of USO 14,213,000. In total , there were 158 wards with a total of 757 villages, with estimated uncovered population of 756,212 people. After bids evaluation, 102 wards were successfu l allocated to bidders [Operators] at a total contract subsidy value of USO 7,675,479 as indicated in the Table 14 below:

Table 14: Total Subsidy per each Operator for Phase 2A Project

No. Operator Wards On Air Subsidy Disbursed Disbursed

USO USO % 1 Airtel 5 5 306,000 208,400 68%

2 MIC (Tigo) 41 40 1,629,278 842,492 52%

3 TTCL 20 18 2,315,60 l 979,800 42%

4 Vodacom 36 36 3,424,600 1,369,840 40%

TOTAL 102 99 7,675,479 3,400,532 44%

During the year, 99 out of 102 wards from Phase 2A project were connected to communication services. Service providers expect to finalize site construction for the remaining wards before end of December, 2017. Phase 2B

WB Phase 2B project was designed hand in hand with WB Phase 2A. WB Phase 28 document was developed as a specific response to the fact that a large number of villages remain unserved despite mobile service coverage having reached other close-by areas, including in the same ward and, according to coverage maps made available to the Fund, to the same village. The lack of service may be due to terrain or other factors hindering the receipt of useful mobile signals. WB Phase 2B project provided subsidies for the expansion of basic voice services to a subset of those villages.

The tender document comprised a total of 240 villages located in 175 different wards, in 23 regions, treated as 17S. Bidding Lots. The maximum allocated subsidy was USO 11 , 722,705-. Each Lot was for the provision of services in one village or several villages, in one individual ward.

The subsid ies were offered at an individually estimated maximum, targeted to increase coverage to a ll the targeted villages at a specified level of service provision. The subsidies were estimated using cost estimates that assume low-cost, limited signal range base stations using solar power generation focusing only on the main population concentrations, but also assumed very low subscriber Average Revenue per User (ARPU), reflecting latest information received by the Fund from the operators. The villages selected for this competition were primarily those within the list of unserved villages which have total populations above 1,500.

33

Page 46: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AN D COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

The Fund received a "No Objection" from World Bank, and the tender was floated on 21st January, 2015 while deadline to submi t proposals was set on 23 rd March, 2015. After bids evaluation, 116 wards were awarded to service providers as indicated in the table 15 be low at a total contract subsidy value of USD 8,181 ,526. Currently, 113 out of I 16 wards are connected w ith communication services under Phase 2A.

Table 15: Total Subsidy per each Operator for Phase 2B

Subsidy Disbursed Disbursed No. Operator Wards On Air

USO USO %

1 MIC (Tigo) 19 19 1,407,9 18 563,167 40%

2 TTCL 41 38 3,365,535 1,346,214 40%

3 Vodacom 56 56 3,408,073 1,363,229 40%

TOTAL 116 113 8,181 ,526 3,272,610 40%

Phase 3

The final phase which comprised of all the wards that were left out in previous four phases was cancelled during the year 2016 in order to cover exchange losses. The maximum available subsidy was approximately USD 2.2 million.

4.3 Component 3 - eGovernment Applications

The project implementation plan of e-Government component was re leased in May 2013 . The project component is mostly constrained by the involvement of many players in the project.

Origina lly, the RCIP program w::is pl::inneci to nm for five consecutive years starting from 2010-2015. By the time the implementation plan for thee-Government component was approved, three years had a lready elapsed and only two years had remained to end-up the project which resulted into low disbursement rate of 45%. According to eGovernment plan, a ll projects under e-Government application had to be implemented in two consecutive phases, namely:

i. Feasibility Study and Design; ii . System Implementation as well as System Testing and Handing-over.

eGovernment applications apply the judicious use of JCT to enable governments to improve their internal systems, de liver services more efficiently and effectively, and make information more accessible to citizens. This component will support se lected major government serv ices which would be cand idates for transition to eGovernment through the use of technology, business process re­engineering to streamline processes, and change management to ensure acceptance of the new methods of working as per Table 16 below:

34

Page 47: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANS PORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRET ARY (Continued)

Table 16: Expenditure by Components

SIN Project Disbursed Planned Undisbursed O/o Activity (USD) (USD) (USD) Disbursed

l Business 1,178,775 1,913,310 (734,534) 62% Portal

2 Telemedic ine 821 ,954 4,476,063 (3 ,654, 110) 18%

3 Nationa l Reg. 3,494,870 5,594, 180 (2,099,3 10) 62% System

4 EALRS 380,422 380,422 - 100% /ILMIS

5 eProcurement 396,712 2,47 1,299 (2,074,587) 16%

6 eRecords 766,495 1,447,2 19 (680,724) 53%

7 Designing 60,600 60,600 - 100% Server cluster

8 eMob ile 47,510 838,838 (791 ,328) 6%

applications 9 eGovernment 355,735 447,017 (9 1,282) 80%

Policies 10 Publicity and 248,956 335, 190 (86,234) 74%

awareness 11 Training 2,057, 150 2,543, 135 (485 ,985) 81%

POPSM/ eGA

Sub Total 9,809,179 20,507,272 (10,698,093) 48% 12 Unallocated - 1,492,728 (1 ,492,728) -

funds

Total 9,809,179 22,000,000 (12 ,190,821) 45% Expenditure

4.3.1 National Business Portal

Implementing Agency

MITI

MNH

RITA

MLHHSD

PPRA

POPSM

POPSM

POPSM

POPSM

POPSM

POPSM

POPSM

POPSM

The Nationa l Business Portal (NBP) will build bridges between the Government and businesses by offering integrated access to information that will increase efficiency in bus iness sector as well as improved coverage of public service delivery.

The project is expected to support governm ent efforts to faci litate strategic marketing of products while ensuring fair returns to all stakeholders based on a competitive, efficient and an equitable marketing system. It will also provide all business information needed by the public and business entities as well as downloadable reg istration and licensing application forms and eventually allow for the provision of on line regi stration and licensing services. The beneficiary of the project is the Ministry of Industry and Trade (MIT) and as of I 51 Ju ly 2017 the management of the project wi ll be shifted to Business Registration and Licensing Agency (BRELA) whereby the implementati on is staged in two phases namely; feas ibility study & system design stage and Implementation stage. Phase I has been completed whereas Phase II is in progress of implementation.

35

Page 48: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN SPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Phase I: Feasibility Study and System Design

The contract to perform the first phase was s igned on 18th February 20 13 for the total cost of USO

55,490.59 and final report submitted on 30 December, 20 13. The fo llowing were the key deliverables

attained during execution of phase I:

a) Inception report;

b} Feasibility study. report that include portal architecture. Implementation plan and bidding

documents;

c) Final report

Phase II: Implementation

Based on bid document developed In Phase I, the contract for the system design, development, configuration, supply, installation, and commissioning of system and hardware for the NBP was signed on l September, 2015 fo r the total cost of USO 1,643,800. Implementation of Phase II started in October 20 15 by which 65% of contractual amount will be disbursed as of 30th September 20 17. In this phase, the supplier has delivered the Implementation plan, Functional requirement document and the Use Case document. In addition, the installation of hardware have been finalized and tested. End user training started from 5th December 2016 to 30th December 2016. The system has been migrated from test to live Environment and know accessible at http:/www.business.go.tz. Preparations are underway to launch the system. The system will be launched after completion of the following remaining activities and as indicated in Table 17:-

(i) Integration with BRELA System (ii) Integration with Government payment gateway (ii i) Additional content uploading and launching the system:

Table 17: Business Portal implementation plan

SIN Deliverables Status Completion date

1. Advance Payment Completed June 2016 2. Proj ect implementation Plan Completed July 2016 3. Detailed System Architecture and Completed November 20 16

System Prototype 4. Supply and installation of Completed April 201 7

Hardware Equipment 5. Provisional Acceptable Portal Completed June 2017

System Implementation Report. 6. Execution of Trai ning program Completed January 2017 7. Complete System Integration In Progress November 20 17

(Discussions are underway to increase scope by integrating with Government Payment gateway)

8. PGP and system commissioning In progress December 201 7

36

Page 49: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN SPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRET ARY (Continued)

The main challenge is integrat ion with Government Payment gateway which is an added scope of work. Discussions are underway to ensure the scope of work is agreed and necessary changes are done for the work to be completed by November 20 L 7. In addition, contract worth USD 87, IO L for providing advisory services during implementation of the project was signed in June 2015. It is envisaged that the supply, delivery, installation, nelwork.i11g, ln1i11i11g a11J commissioning of the NDP will be completed in December 20 17.

4.3.2 Telemedicine System

The Te lemedicine Project aims to improve health care and health services by using Information and Communication Technologies (! CT). The project will be implemented at Muhimbili National Hospital-MNH (a referral hospital) and linked to three regional hospita ls with concentration on e­referral, e-radiology and e-consultation.

The scope of the project covers stages starting from the feasib ility study, acquisitions oftelemedicine system and equipment, improving necessary ICT infrastructure for the system to operate, capacity building and review of busi ness operations. The beneficiary of the project is the Ministry of Health and Social welfare (MOHSW) as well as Muhimbili National Hospital (MNH) whereby the implementation is staged in two phases namely; feas ibility study & system design stage (Phase I) and Implementation stage (Phase II).

Phase I: Feasibility Study & System Design The contract to perform the first phase was signed on 16th July 2013 with Swiss Tropical and Public Health Institute (Switzerland) for the total cost of CHF 692,705 .88 and TZS 128,473 ,042.40. Sixty Per cent (60%) payment was made fo r all de liverab les indicated in Table 18. The remaining 40% was undisbursed as the consultancy was not extended to perform supervisory services in Phase IL

Table 18: key deliverables of Telemedicine project under Phase I:

SIN Deliverable Status Remarks Payment a The inception report performing Report Completed 10% paid

feasi bility study and design the system submitted b National Te lemedicine Framework and Document Completed 15% Paid

Master Plan submitted C Report on Feasibility Study and System Document Completed 15% Paid

design Subm itted d Report on Implementation Plan for the Document Completed 10% Paid

Pilot Project Submitted e Bidding documents for all procurements Document Completed 10% Paid

identified in the Procurement Plan Submitted

Phase II: Implementation

Phase lI started in June 2016, immediately after signing the implementation contract wi th Samsung C&T Corporation Limited worth US$ 3,798,707.00. The implementation Phase involves eight sites (Indicated in Table 19) whereby several activ ities that include detailed system design, system development and customization, system insta llat ion and testing, hardware procurement and installation, and trainings have been completed.

37

Page 50: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Table 19: Telemedicine sites

SNO Hospital District

1 Nyangao District Hosp ita l Nyangao

2 Nachingwea District Hospital Nachingwea

3 Kilosa District Hospital Kilosa

4 Turiani District Hospital Mvomero

5 Mafi a District Hospital Mafia

6 Morogoro Regiona l Hospital Morogoro

7 Lindi Regional Hospital Lindi

8 Muhimbili Nationa l Hospital Ilala

On the other hand, several activities have been completed that includes:

Region

Lindi

Lindi

Morogoro

Morogoro

Pwani

Morogoro

Lindi

Dar Es Salaam

(a) Construction of Local Area Network (LAN) and Wide Area Network (WAN) to all eight project sites.

(b) Installation of hardware and software. (c) End User trainings (d) User Acceptance Test (UAT), the system is operational and be ing used in pifot basis

The completion status of project deliverab les is as indicated in the Table 20 below:

Table 20: Telemedicine implementation plan

SIN Deliverables Status Completion date

1. Advance Payment: Completed August 2016

2 . Acceptance of de livered materia ls: Completed December 2016

3. Provisional Acceptance Test ing, PAT In progress September 20 17

4. Execution of Training program Completed May 2017

5. Snags C learance (PAT outstanding items): In progress November 20 17

6. Final Acceptance Testing In progress December 2017

38

Page 51: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

The contractor is rectifying the snags observed during User Acceptance Test (UA T) whereby it is expected that by 15th November 2017 all snags will be cleared. The telemedic ine system is operational and being used in pilot basis. Processes are underway to train more doctors. The challenges for omission of recurrent costs to this contract due to the guidance received during the WB Mission.

4.3.3 Birth and Death Registration System (BRS)

The overall objective of BRS system is to enhance birth and death regi stration through improved systems and business processes. The beneficiary of the project is The Registration, Insolvency and Trusteeship Agency (RITA) where the implementation is staged in two phases namely feasibility study & system design stage (Phase I) and Implementation stage (Phase II).

Phase I: Feasibility Study & System Design

The contract to perform the Phase I was signed on 21 st January 2014 with Compliance Alliance Ltd for the total cost of USO 690,873 and TZS. 90,940,000. Hundred Per cent (100%) payment was made fo r all de liverables indicated in Table 21.

Table 21: key project competent deliverables of Phase I

SIN Deliverable Status Remarks Payment a) The Inception report which will include Report submitted Completed 20% paid

work plan and methodology be submitted 2 weeks after signing the contract.

b) ICT policy paper for RTTA Document Completed 15% paid submitted

c) Birth registration automation strategy Document Completed that shall include birth registration Submitted process re-engineering study

d) Birth Registration System design and Document Completed 10% paid architecture including technical Submitted specifications and functions

e) Registration data collection system Document Completed 15% paid desi gn including technical Submitted specifications

f) Detailed implementation and Document Completed 10% paid procurement plan including time Submitted schedules and associated cost estimates

g) Bidding documents for all Document Completed 10% paid procurements identified m the Submitted Procurement Plan

h) Final report that documents the Document Completed 20% - paid procurement process for selecting the Submitted implementing contractors/vendors and the introduction of vendors to the proj ect

39

Page 52: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RC IP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Phase II: Implementation

Phase II started in June 2016, immediately after s igning the implementation contract with Infotech Private Limited worth US$ 4,753,330.28. The implementation Phase involves 60 sites (Indicated in Table 22) whereby several activities need to be performed that indudes detaited system design, system development and customization, system installation and testing, hardware procurement and installation, data migration and ski lls transfer.

Table 22: BRS-4G sites

N Region District Wards Hospital Health TOTAL 0 s s Centers

- - - - - ------- --·-- - - - ~ - - - - -1 Geita 5 2 2 11 20 2 Shinyanga 5 2 2 10 19 3 Dar es Salaam 3 2 16 0 21

TOTAL SITES 13 6 20 21 60

The fo llowing deliverables w ill be attained by 30th September 2017 • The Inception report su bmitted. • System Design/System Requirement Document approved • Architecture and system prototype approved, • Documented change management procedures, • approach to legacy digital data migration prepared and approved, • Monitoring and evaluation guidelines and !EC plans prepared and approved.

In addition, Insta llation of hardware and software of the systems have been finalized. End user and Technical Trainings have been conducted whereby the current status is such that Contractor is rectifying snags observed during User Acceptance Test (UAT). The system wil l be launched after completion of Snags c learance processes as indicated in Table 23 .

SIN Deliverables Status Completion date l. Inception Report Completed July2016 2. Acceptable Detai led System Completed November 2016

Architecture and system prototype 3. Supply and installation of hardware Completed April 2017

equipment 4. Provisional Birth and Death Registration In progress November 2017

Systems acceptance

5. Execution of user training program Completed June2017 6. Final acceptance Birth and Death In Progress December 2017

Registration Systems

40

Page 53: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLI C OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RC IP PRO.JECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Currently the contractors are clearing snags whose major ones are on replication and inter-site redundancy. It is expected that the system will be operation in November 2017 once the snags are cleared.

In addi tion, another consultant has been engaged to perform support supervision serv ices during the implementation phase.

4.3.4 Enhancing Accessibility of Land Records Project (EALR)/ILMIS

The objective of the project is to integrate all land systems and improve the qua li ty of land records and associated cadastral map systems, topographic maps and images and making them accessible to the public through websites. and mobile phone text messages . The proj ect is under implantation by the Ministry of Land, Housing and Human Settlements (MLHHSD).

The contract for designing and implementation of Integrated Land Management Information System (ILMIS) and Enhancing Accessibility of Land Records Project (EALR) between the Ministry of Land, Housing and Human Settlements and COWi (Denmark) & Orgut Consulting (Sweden) was signed in July 201 2. The feasibi lity study, system design and bidding documents were completed during the year by which the bidding documents were finalized and approved by the World Bank.

After the system design, the cost to implement the system was approximated at USO 15 million which is far and above the RCIP budget of USO 3 million. Therefore, the Government decided to solicit funds for implementation of the ILMIS project using proceeds of "add itional financing" under the Private Sector Coi11pelitiveness Project-Additional Finance (PSCP-AF) which is being implemented under the Prime Minister's Office. RCIP Tanzania funding of USO 3 million have been re-allocated to finance other eGovernment app lications. On completion of the consultancy services, an amount of USO 323,358 (equivalent to 80% of the contract sum) was disbursed.

4.3.5 Unified National e-Procurement System: Public Procurement Authority(PPRA) The original purpose of the project is to improve the effectiveness of procurement of drugs and medical supplies by acquisitions of e-procurement and online ordering system, improving necessary ICT infrastructure for the system to operate, capacity build ing and review of business operations. Specifically the project aims to provide end-to-end electronic system fo r acqui sition of medical suppl ies from se lection and purchase, to delivery at the Medical stores Department (MSD) warehouse (linked to the warehouse system), and ultimate dissemination to the medical facilities. The beneficiary of the project was MSD where the implementation was staged in two phases namely feas ibility study & system design stage (hereby referred as Phase I) and Implementation stage (hereby referred as Phase II).

Phase I: Feasibility Study & System Design

The original contract of USD 500,235 .30 fo r implementation plan for feasib ility study, implementation plan, and procurement and implementation support consultancy for the unified national e-procurement system in Tanzania was signed on 21 January 20 14. The addendu m to origina l contract amounting to USO 264,830.45 was signed in March, 2015 after changes in the project scope to incorporate GPSA and PPRA requirements. Thus the revised contract amount is USO 765,065.75 by which 80% payment has been made. Key project deliverables relating to system design and bidding document generation reports were completed:

4 1

Page 54: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS~ TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

T bl 24 K d r a e . ey e 1vera bl Ph es ase I SIN Deliverable Status Remarks

a) The inception report performing Report subm itted Com pleted feas ibility study and des ign the system

b) Report on Feasibility Study and Document Completed System design Submitted

c) Report on Implementation Plan and Document Completed Procurement Plan Submitted

d) Rev ised feasibility study and Document Completed des ign report based on the added Submitted scope as per amended TOR

e) Rev ised the implementation plan to Document Completed include activities based on the Submitted added scope as per amended TOR

f) Bidding documents for all Document Completed procurements identified in the Submitted Procuremeii.t Plan

Phase II: Implementation

Payment l 0% pa id of the Original Contract sum 15% Paid of the Original Contract sum 15% Paid of the Original Contract sum 20% Paid of the Remaining Contract sum 20% Paid of the Remaining Contract sum 20% Paid of the Remaining Contract sum

Phase II started in June 2016, immediate ly afte r signing the implementation contract with EUROPEAN DYNAMICS S.A worth USO 1,706,232.80. The envisaged Unified National eProcurement system will be accessed via an online portal and will inc lude features such as Registration, tender adverts, e-Purchasing, e-Auction, e-Tendering, e-Contract, e-Payment, e­Disputes, PMIS, security logs and help desk .. In add ition, the portal will have linkages with Certification Authority, tenderers, Procuring entities and other stakeholders. Under Phase II , the supplier will perform the following activities. a) Analyse, des ign, deve lop, customi ze, supply and insta ll a Unified National e-procurement system

to be used GPSA, MSD and PPRA as we ll as l 00 Procuring entities (PEs) for CU IS in Phase l . The Implementation will depend on implementation modalities as to be proposed by bidder and agreed upon by the client.

b) Prepare standard operating procedures fo r Unified National e-Procurement system .

c) Develop and implement capacity building plan and associated manuals inc luding trainings and knowledge transfer

d) Establish coding system for goods and services fo r procuring entities which are in line with United Nations Standard Products and Services code (UNSPSC)

e) Develop system monitoring and evaluation plan.

f) Integrate existing systems name ly ERP at MSD and PMIS at PPRA.

Implementation of the project is expected to be commissioned before December 201 7 where as the key targets are as indicated in Tab le 26.

-1 2

Page 55: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN SPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

SIN Deliverables Status Completion date 1. Report detailing eProcurement business Completed July 2016

process operating procedures 2. Detailed System Architecture and Completed August 20 16

System Prototype 3. Supply and insta llation of Hardware Completed April 20 17

Equipment 4. Provisional Acceptable report for In Progress November 20 17

Unified National eProcurement System Implementation

5. Execution of Training program NIA December 20 17 6. System Commissioning NIA December 20 17

The challenge remains on integration with other systems such as IFMS due to dependency with the external systems on availabili ty of APis. Discussions are underway between PPRA and the contractor to examine what can be done to address the challenge.

4.3.6 eRecords

The purpose of this project is to build and reinforce Records and Archive Management (RAM's) ability to ensure the management and preservation of digital records for government needs and business, and citizen access. The project will create a digital repository based on the available information capable of ensuring on-go ing access to di gita l records and enabling online access to non­sensitive government information contained in the repository. The project is being implemented in two Phases as described underneath.

Phase I: Feasibility Study & System Design The consultancy contract fo r Phase I was s igned on 8 June 2015 at a cost of GBP 67,71 2. The consultancy activities were finalized by which l 00% payment was made as indicated in Table 27.

Table 27: Key deliverables Phase I

SIN Deliverable Status Remarks Payment a) Inception report . Report submitted Completed 10% payment

made b) System design and requirements for Document Completed 15% payment

establishing Trusted Digita l Submitted made Repository

c) Re-engineered processes fo r Document Completed 15% payment archives management and Submitted made preservation of di gita l records Report as well as Records Management Framework on existing records keeping practices.

d) Capacity Building requirements for Document Completed 15% payment digita l records management and Submitted made preservation, Detailed Procurement and implementation plan.

43

Page 56: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN SPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

SIN Deliverable Status e) Stakeholders ' engagement and Document

Final report. Submitted t) TORs, functional requirements and Document

technical specifications Submitted g) Bid Document Document

Submitted

Phase II: Implementation

Remarks Payment Completed 15% payment

made Completed 15% payment

made Completed 15% payment

made

Phase II started in September 20 16, immediate ly after signing the implementation contract with MF[ Document Limited worth USO 1,352,280. The contractor has already submitted the inception report, Project Implementation plan as well as deta iled System Architecture and System Prototype as indicated below.

Table 28: eRecords project implementation

SIN Deliverables Status Completion date I. Project Implementation Plan Completed October 2016 2. Detailed System Architecture and Completed December 20 16

System Prototype ,.,

Supply and installation of Hardware Completed July 2017 .) . Equipment

4. Provisional acceptable eRecords System In progress September 20 17 5. Execution of Training program In progress Septem her 20 17 6. System Integration In progress November 2017 7. PGP and system commissioning NIA December 20 17

The system will be launched once scanning and ingestion of I 00,000 records will be completed. The task is expected to be finalized by 30th November 2017.

4.3.7 eOffice System enhancement

The e-Office sys.te rn is geared at automating Government daily routine business operations. The use of the system will improve efficiency, consistency and effectiveness of government responses; reduce turnaround time to meet the demands of their client service charters. In addition, the system wi ll provide for effective resource management to improve the quality of ad ministration as well as establ ish transparency and accountab ility.

The initial Focus fo r e-Office Development was to acquire the software from National Informatics Centre (NIC) of Department of Electron ics & Information Technology - Government of India whereby a budget set forth for this is USO 300,000 for capacity building. Software Demonstrations were done and it was observed that the system required minimal effort to customize as it met over 80% of GoT requirements. Several discussions were made with NIC on modalities to acquire the software. NIC were not ready to release the source code which was the the Major requirement of GoT to avo id dependency. In view of the above, a decision was made to develop the system internally.

Page 57: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COM M UN ICATION RCIP PROJECT FINANCIAL STATEM ENT S

STATEMENT BY THE PERMANENT SECRETARY (Continued)

The first module of the system that manages electronic file transfers have been developed and dep loyed by which 18 Public Inst itutions are using the system. Currently, the No Objection have been granted to improve the system by addi ng other functio nality such as Claims and applications management; Personnel informatio n management; Collaboration and messaging (communication); Training Management as well as integration with ERP system. These enhancement act ivities are in progress and to be completed December 2017 Furthermore, it has been observed that more storage devices are required hence the same was approved and included in the Tender o No.: ME/OOS/RCIP/2016/2017/G/22 (Procurement of Storage and server for Mobile Payment Gateway, USSD and SMS Gateway) whose contract was signed in May 20 17. It is expected that by November 2017 a ll the hardware will be delivered to enhance storage and computing of the Infrastructure to enable more Institutions to sue the system.

4.3.8 Designing Server Clusters

Thee-Government Agency (eGA) has started its operations and has now embarked on establi shment of the necessary infrastructures as one of the important requirements to enable the Agency to carry out its operations. It is expected that the server clusters will solve existing ICT Infrastructure problems pertaining to:

a) The Government e-resources and infrastructure are highly unconso~idated and fragmented across various MDAs/LGAs;

b) Unreliable e-Government services; c) Unsecure e-Government serv ices; d) Unshared Government Data; e) Unenforceable standards wi thin the Government.

In the current situation it is difficult to enforce or control various standards which e-government ICT platforms and serv ices have to meet. Thi s includes security standards, accessibi lity standards, platform standards, and other technology-based standards. In this regards, the consultant was engaged to analyze, design, and determine the actual requirements and costs. necessary to establish three server clusters to support subsequent management decision.

The assignment was performed at a total cost of USO 60,600 covering the period of six months from November 201 2 to April 2013 and completed successfully. The following were the key deliverable for the ass ignment.

a) Feasibility study report determining the actual requirements; b) Server cluster design report System proposing fully redundant cluster configuration model,

architecture and modes of deploying to suit the eGA requirements with possib le scalability in future;

c) Draft Service Level Agreement (SLA) with the service provider to host the server clusters based on the final design to be determined by the Consu ltant;

d) A matrix of all costs and other requirements that are needed to implement three server clusters at different locations in Tanzania in the fo llowing manner:

• High-end so lution: USO 25, 172,850 • Medium solution : USO 13,600,850 • Low-end so lution: USO 8,795-,900

-15

Page 58: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Based on this report, eGA so licited other sources of fund s to implement the c lusters. During the year, implementation of this project was completed .

4.3.9 Government Mobile e-Services

The overa ll objectives of this project are to improve livelihood of Tanzanians through delivery of quality public services through application of mobile solutions; and to improve efficiency and effectiveness of Government operations. The specific and immediate objecti-ves include the fo llowing:

(a} To facilitate public institutions and private sector firms to leverage and exploit mobile

technology and associated opportunities for providing quality, efficient, effective and timely

services to citizens as well as improving interaction between the governm ent and c itizens.

(b) To improve accessibility of public services to the general public in terms of number of

services~ delivery channels and reach, through improv ing mobile platform for the purpose of

accommodating more services offered through mobile channel.

(c) To assess services offered via mobile channels and develop more effecti-ve integrated service

ddivery through mobile so lutions with greater transparency and Government's visibility.

The beneficiary of the project is eGovememnt Agency (eGA) where the implementation is. staged in two phases namely feas ibility study & system design stage (hereby referred as Phase I} and System Enhancement stage (hereby referred as Phase II).

Phase I: Feasibility Study & System Design

In September, 201 3 the e-Government Agency engaged an individual consultant to identify and prioritize Government Services which can be delivered through mobile channels especially using mobile phones. The objectives of this consultancy was to prioritize at least 20 government services that can be delivered as e-service, including identification of a minimum of 5 quick wi ns that can be developed by leveraging mobi le technologies within a timeframe of 12 months. The consultancy assignment was completed successfu lly whereby five priority mobile services were identified. In addition, based on the output of this consultancy assignment the eGovernment Agency (eGA) has initiated efforts fo r ensuring that more mobile based e-serv ices are deployed to be accessed by more ci tizens in a coordinated manner and in holi st ic approach.

Nine mobile based e-Services identified through a government wide pnont1zation exercise were launched in July 2014. The services include mobile based access to school test results and university admission decisions, mobile and Internet based employment/ recruitment application for Government jobs opportunities [The service is running and the number of request made s ince 2014 is 105,237) , identification of voting stations [The service is running and the Number of unique subscribers during the voting period October 2015 was 1,632,971 J and related information, and a service to deliver timdy and accurate weather information via mobile. Based on these report the Government through eGA have been able to implement mobile platform which support SMS gateway, USSD (menu based service) gateway and IVR payment gateway and have secured short code for Government serv ices (i.e.* 152*00#).

Page 59: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

Phase II: System Enhancement The Phase II of the Project has three major components: Mobile Infrastructure, Capacity Building,

and Mobile Application Development. The details of the components and their associated status are

as follows:

(a} Component 1 - Government Mobile Infrastructure. This component will provide

equipment for improvement of the current Government Mobile Infrastructure. Specifically, in

this component the following activities will be supported: (i) Procurement of Servers for

Payment Gateway; (ii) Procurement of Servers for USSD and SMS Gateway;

(iii) Procurement of Storage facility. The contract was signed in March 2017 and it is expected

that by July 2017 the mobile Platform hardware infrastructure will be improved.

(b) Component 2 - Capacity Building. This component will provide support for training,

knowledge and experience sharing between staff from Indian Government's eGA equivalent,

DeitY and eGA staff for the purpose of making the mobile solutions locally developed and

maintained by local experts to ensure sustainability of the mobile solution services. eGA

intends to invite two mobile solution experts from DeitY to come to Tanzania and work with

eGA's technical experts. DietY is chosen by eGA for two main reasons, first, DeitY manages

India Government's mobile platform which has over 1,500 services, therefore it has rich

experience in development and management of mobile so lutions; and second, eGA and DietY

have Memorandum of Understanding (MOU) for cooperation. The first training was

conducted for 21 days in October 2016 by GoT Development team was trained by 4 experts

from India.

(c) Component 3 - Applications Development. This component supports all activities related

to the applications development; this will include engaging Government employees from

various institutions to work together with eGA staff in developing the applicat ions. The

development is mainly in two categories: (i) Development of Payment Gateway application;

and (ii} Development of USSD and SMS Gateway Application. This will also include

mobilization of Government experts to form development teams. The development started

November 2016 whereby Public Institution SMS Portal (http://www.mgov.ega.go.tz) and

Citizen Portal (http://mportal.ega.go.tti) was developed. These improvements have given

Public Institutions more flexibi lity of deploying more services ..

Notably, the Mobile Platform that enables government mobile based services to be hosted and accessed using short code (i.e. *152*00#) has been developed and operational. This provides one window for all government mobile services whose dashboard is accessible via http: //mportal.ega.go.tz/. As a result, a total of 79 Public Institutions are using the platform whereby 11.5 million push and pull transactions will be registered by 151

h August, 2017. The leading transactions include 36% water bill notifications (36%), National Health Insurance Card Verification, Card Status Query & Claim Status Query (29%) as well as Pension notifications (20%).

Page 60: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.3.10 eGovernment Legal Framework

During the year, other remaining sub-projects under eGovernment applications were at different stages of implementation as shown below:

a) e-Government Associated Standards and Guidelines

Creation of eGovernment Standards and Guidelines to ensure all eGovernment initiatives are implemented using same guidelines hence enhancing systems interoperability, integration as well as easy data sharing. The Guidelines have been finalized.

b) eGovernment Policies

Development of eGovernment Policy whose objective is to ensure quality and sustainable public service delivery by adopting and using Information and Communication Technologies. The use of this policy will eventually strengthen management and control of e-Government initiatives. The eGovernment Policy is under approval process.

c) ICT Units Management Framework

Review of ICT Governance Framework that would ensure ICT is wdl managed and government within the public service. It covers Development of ICT Units Management Framework to be customized in MDA's/LGA's. The Final report is under management review.

4.3.11 Capacity Building

PO-PSM capacity building plan with estimated cost of USO 2,387, 100 was. developed and approved by the World Bank for implementation with effect from February 2013. Activities earmarked for this plan were awareness creation programs, tailor made training, study visit programs, networking sessions through workshops and conferences, and annual e-Government events.

Implementation of capacity building for eGovernment is overseen by a training committee of ten people selected by PO-PSM from e-Government Agency (three), PO-PSM (three), PCCB (one), TRA (one), TGLA (one) and MLHSD (one). MLHSD is a representative of other beneficiaries implementing e-Government applications. Capacity Building (CB) is a cross cutting activity and will also involve MDAs and LGAs. The committee will ensure the relevance of identified CB activities and enable efficient implementation.

CB activities conducted by PO-PSM up to 30 June 2016 are study visit to Bangladesh on birth registration by 15 people, study visit to Singapore on business portal by 15 people, study visit to Korea one-procurement by 15 people, attendance to a conference one-Government in Uganda by 5 people, conference on e-Government in Korea by 5 people, conference on e-Government in Kenya by 5 people, human resource training to 42 eGA staff, and participation at the 13th European Conference on eGovernment (ECEG 2013) in Italy by 5 staff. Planned conferences to France and Malaysia were not attended due to logistical problems during the period under review.

MWTC and UCSAF training plans were prepared and submitted to World Bank for review and approval in 2013. The World Bank recommended that instead of approving the plans, tailored capacity building activities which are viable and eligible under RCIP project financing can be

48

Page 61: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

requested through the ICT Directorate under MWTC for consideration and requesting no-objection from World Bank. Several capacity building programmes have been conducted in form of normal trainings, seminars, conferences, study vis its, short trainings etc. The objectives of capac ity building are :-

a) Build necessary technical capacity to ICT staff within MDAs/LGAs for proper management

of existing ICT systems and any other that may arise due to the impact of RCIP on

procurement of bandwidth and Connecting MD As/LG As.

b) Enhance the capacity of MD As and LGAs to implement e-Government policies, strategies

and other eGovernment initiatives.

c) Develop the high-level awareness and commitment that will carry forward e-governance for

soc io-economic development.

d) Sharing experiences and provide linkages with several national and international e­

eGovernment players.

e) Enhance capacity to eGA staff from effective central coordination, control and management

of eGovernment initiatives.

Total number of 2,232 Government employees benefits and attended various trainings and awareness programmes.as indicated in the Tab le 29.

Table 29: Trainings and awareness conducted

SIN Category Number of Staff

a) ICT Policies, Laws and regulation related trainings 49

b) Infrastructure and Connectivity Trainings 259

c) Applications related trainings 266

d) Awareness and sensitization programmes 610

e) I st Annual eGovernment Component 770

f) Project and Financial Management 26

g) Leadership and Managerial skill s 16

h) ICT Management Trainings 150

i) Technical hard-core Trainings 12

j) Regional and International Meetings and Conference 74

Total 2,232

Page 62: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJ ECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.3.12 Publicity -eGovernment Component

Through the programme a five year communication action plan for effective and effic ient eGA comm unications was developed with a view to fac ilitate and foste r the delivery of its mandate of tac1l1tatmg d1scuss1ons, resource mobilization, policy advice, and access ing global knowledge. tlased on the plan, several programmes have been initiated that include Production and a iring e-government contents through TV . The Contract fo r production and airi ng 52 TV programmes was signed in September 20 16. The Scripts have been produced and production of TV programmes has been finalized. Airing of produced programmes have started in National TV every Tuesday from 6pm -7pm since ih March 2017 whereby 28 TV programmes w ill be ai red in September 20 17. ln addition, the Creation of documentary to ascertain RCIP achievements attained so far is in progress.

4.4 Component 4 - Project Management Support

Project management related issues such Project Co-ordination; Procurement of project support activities; Finance Management; Monitoring and Evaluation ; Communication and Environment; Social Safeguards; Support fo r office equipment; incremental operating costs and audits have achi eved 91 % of the component funds as per Table 30:

Table 30: Project Management Support

SIN Project Disbursed Planned Undisbursed % Implementing Activity (USD} (CJSD) (USD) Disbursed Agency

I Project 1,450,325 1,71 1,775 (26 1,450) 85% MWTCand consultants POPSM

2 Motor 148,85 l 148,851 - 100% MWTC and Vehic le POPSM

3 ICT and other 375,505 463,505 (88,000) 8 1% MWTCand assets POPSM

4 Coding of - 37,000 (37,000) - MWTCand RCIP asset POPSM

5 Opex MWTC 862,474 1, 103,378 (240,905) 78% MWTC

6 Opex PO- 809,655 959,602 ( 149,947) 84% POPSM PSM

Sub- 3,646,809 4,424,111 (777,302) 82% Expenditure Saving from - (424,111) 424,111 -Component I

Total 3,646,809 4,000,000 (353,191) 91% Expenditure

50

Page 63: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLI C OF TANZAN IA MINI T RY OF WORKS, TRANSPORT AN O COMMUNICATION RC IP PROJECT FINANCIAL STATEMENTS

STATEMENT BY THE PERMANENT SECRETARY (Continued)

4.4.1 Project Consultants coordination

The Procurement Specialist and Financial Management Specialist were engaged with effect from 14 November 20 11 . The eGovernment Coordinator responsible for coord ination of the eGovernment component was engaged on 25 October 2011. Likewise, the Project Advisor who was engaged effective from 1 July 20 12 resigned in February 2014. Recru itment process to hire another Project Advisor was terminated during the year. The Monitoring and Evaluation Specialist was recruited in April 2013.

Appointments of project consu ltants are on contract terms of one year, renewable subj ect to satisfactory perfo rmance. The main objective of the assignment is to ensure effective and flexible planning, coordination, successful implementation, monitoring and evaluation of the RCIP Tanzania project.

4.4.2 Project Support Activities

Programme support activities consist of costs for management and coord ination of the project activities including procurement of ICT equipment, motor vehicles as well as operational and maintenance costs to faci litate implementation of core activities of the project components.

Mrs. Maria Sasabo (PhD) The Permanent Secretary (Communication) & Accounting Officer Ministry of Works, Transport and Communication

51

30 June, 2017

Page 64: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE NITED REPUBL IC OF TANZAN IA M INISTRY OF WORKS, TRANSPO RT AND COMMUN ICATION RC IP PROJ ECT FINANCIAL STATEMENTS

5. COMMENTARY ON THE FINANCIAL STATEMENTS

5.1 Loan Disbursement Status

Cumu lative di sbursements for the period ended "O June 2017 amounted to USD 64 mil lion, which is approximately 64% of the project funds (Plan 93%). Disbursements comprise of cumulative project expend itures of USD 6 1.8 mill ion and di sbursed project funds held in the Designated Account of USD 2.2 mi llion. Sim ilarly, the undisbursed loan balance for the same period stood at USD 36 mitlion .

Low disbursements of funds was mainly caused by ddays in the public procurement process as we ll as lengthy approval of procurement project activities between the implementing agencies, beneficiaries and the World Bank. Table 31 below provides a breakdown of sources and uses of funds on a cum ulative basis to 30 June 2017.

Table 31: Summary of movements in source and use of funds.

Cumulative to date 30 June 2017 Particulars Actual Planned Variance Analysis

USD USD USD O/o

Loan Facility (SDR 67 mill ion) 100,000,000 l 00,000,000 - -Withdrawals to date Project expenditures 6 1,794,640 93 ,2 11 ,566 (31 ,416,926) 66% De£ignated Account balance 2,2 19,684 - (2,293, 110) -Total disbursements 64,014,324 93,211,566 (29,353,726} 69% Undisbursed loan balance (35,985,676) (6,63 1,950) (29,353,726} % of disbursements 36.0% 6.6 % -

5.2 Project Expenditures by Components

The total expenditure for the year amounted to USD 17 million against the planned budget of USD 32 .8 million, leading to a negative variance of 48%. Notable delays, extended procurement and approval processes attributed to the unfavourable performance during the year. The fo llowing activities were executed subsequent to the year end :

(i) Provisional Acceptable of the National Business Portal, eProcurement system, Birth and Death Registration System, Telemedicine system, and eRecords.

(ii) Provisional Acceptance Testing (PAT) of LG As connectivity in 77 sites (iii ) Commiss ioning and technica l audit of Ru ral Telecomm unications Access project

Table 32 presents a breakdown of annual and cumulative expenditures by project components comparing total expenditure and planned budget as at 30 June 2017.

52

Page 65: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RC IP PROJECT FINANCIAL STATEMENTS

Table 32: Expenditure by Components

Expenditure Year to Date June 2017 Cumulative to Date June 2017 by Actual Planned Variance Actual Planned Variance Components USO 000 USO 000 USO 000 O/o USO 000 USO 000 USO 000 O/o

1- Enab ling 1,314.7 2,044.9 (730.2) (40) 4,873.7 6,824.1 (1 ,950.4) (49) Environment 2- Connectivity 9,502.9 22,054.9 (12,552) (47) 43,465 61 ,4561.t (17,99 1.6) (45) 3 -e 5,833.1 8,23 7.3 (2,404.2) (65) 9,809.1 20,507.2 (10,698. 1) (81) Government Applications 4- Project 442 546.5 (103 .5) (14) 3,646.8 4,424.1 (777.3) (22) Management Total 17,093.7 32,883.7 (15,790) (48) 61,794,6 93,211.6 (31,416.9) (52) Expenditure

5.3 Analysis of funds as per stages of implementation

During the period under review, projects under implementat ion and close-out phases focusing on project delivery stood at 50% and 41 % respectively. Similarly, total projected expenditures at the procurement phase amounted to USO 2.4 million equivalent to 2% of the project funds. The project implementation team is in the process of identifying and engaging suppliers who will provide the best value for money. Similarly, USO 7.1 million equivalent to 7% of the loan amount constitutes unallocated funds. These activities will be reallocated to cover exchange loss between USO and SOR currencies. None the less, it is notable that only USO 93 million of the total project funds will be utilised.

Chart I and Table 33 provides analysis of funds utilisation as per the project cycle in terms of completion, execution, procurement and reallocation as at 30 June 2017.

Chartl: Analysis of funds per the project implementation cycle:

Project funds USD %

• Exch ange Loss • Closed

anal sis '000 Under 5% / Contracts

C losed 41,057 41 41%

Contracts 0 en Contracts 50,848 51 • Closed Contracts

Procurement 3,288 3 • Open Contracts

stage Under Procurement

Exchange Loss 4,807 5 Total Funds 100,000 100 • Excha nge Loss

53

Page 66: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT ANO COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

Table 33: Analysis of funds per the project implementation cycle

i) Closed Contracts

Activity Feasibility study, design and implementation of the Rural Telecommunication Access Proiect Design and implementation of the Government Communications Network Government internet bandwidth Feasibility study and designing of eGovernment applications

eGovernment Standards, Guidelines and Frameworks Training and Development (ICT)

eGovernment Training and Development

Project Consultants ICT, motor vehicle and other assets Procurement of Video Conferencing Systems for Zanzibar Government Auditing Environmental Impact Assessment Publicity and awareness on ICT and eGovernment

Key ICT Stakeholders participation in the Lab (STI) Support for implementation of the NICTBB Development Program Cyber security laws: Cybercrimes Act, and £-Transactions Act, 2015

Purchase of computers and IT devices for 80 schools PKI system design and capacity building activities Project Opex MWTC/POPSM Development of the National Information and Communications Technology (ICT) Commission Act RCIP Project Monitoring & Evaluation

Other project activities

Total USD

ii) Projects under Implementation Stage

Activity Implementation of the Rural Telecommunication Access Project Implementation of the Government Communications Network

eGovernment Standards, Guidelines and Frameworks Training and Development Project Consultants National Business Portal Telemedicine System for MNH National Vital Registration System for R[T A e-Procurement Pilot for PPRA

54

Entity USD UCSAF 4,090,676

PO-PSM 13,076,003

MWTC 11 ,729,366 PO-PSM 1,858,014 PO-PSM 531 ,978 MWTC 1,064,730 PO-PSM 2,149,494

All 974,075 All 470,880

MWTC 199,620

UCSAF 65,000 All 372,106 MWTC 218,167 MWTC 263,917 MWTC 611, 160

MWTC 1, 115,946 MWTC 178,506

All 1,686,379 MWTC 92,611

MWTC 308,647

All

41,057,275

Entity USD UCSAF 24,055,269

PO-PSM 9,296,217

PO-PSM 68,276 All 242,290 All 657,700

PO-PSM 1,857,819 PO-PSM 3,932, 169 PO-PSM 4,848,448 PO-PSM 2,471 ,299

Page 67: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

Activity eRecords Management and Preservation project Mobile Payment Gateway, USSD and SMS Gateway

Publicity and awareness on ICT and eGovernment Deve loping e-Legislation and its regulatory fram ework

Purchase of computers and IT devices for 80 schoo ls PKI system design and capacity building activities Project Opex MWTC/POPSM ICT Commission capacity building activities and support

RCIP Project Monitoring & Evaluation

Support for implementation of the NICTBB Development Program

Total USD

iii) Projects under Procurement Stage

Activity Implementation of the Government Communications Network

Government internet bandwidth Procurement of Equipment (Bridge) and Video Conferencing Systems

Des ign ing and implementation of eGovernment applications Trnining and Developn1t;11l (ICT)

Procurement of Baggage/Parcel Scanner

Project Consultants ICT, motor vehicle and other assets

Asset Coding

Total USD

iv) Exchange Loss

Activity Exchangelosscover: June , 2017

Reserved for exchange loss and unallocated

Total USD

5.4 Project Commitments

Entity USD PO-PSM 1,352,280 PO-PSM 900,389 All 298,026 MWTC 49,025

MWTC 126, 159 MWTC 89,332

All 376,601 MWTC 47,526 MWTC 159,403

All 19,770

50,847,998

Entity USD PO-PSM 561 ,000 MWTC 450,000

MWTC 741 ,000 PO-PSM 430,000

All 550,000 MWTC 350,000

All 48,000 All 88,000

MWTC 70,000

3,288,000

Entity USD MWTC 4,403 ,859

MWTC 402,868

4,806,727

Committed expenditures which include projects approved and activities under implementation stages as at 30th June 2017, amounted to USO 93 .2 million (93%) as indicated in Table 34 as per approved "Procurement Plan", "Training Plan" and "Operational Expendi ture Plan".

55

Page 68: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINI TRY OF WORKS, TRAN PORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

However, it is indicated in the World Bank system that there has been a reduction in loan amount by approximately USO 4.6 million due to variations in conversion of SOR to USO. The implication to this reduction is that some project activities will not be implemented. This has resulted in an available balance of US$ 3.2 million that have been be committed to other project activities still in the ptanning stage as per Table 34.

Table 35 presents a breakdown of cumulative project commitments under implementation by project components; comparing total planned project funds against commitments as at 30 June 2017.

Table 34: Projects in the planning stage

SIN Description Amount The active equipment that will allow 11 MDAs to be connected to the

60,000 l GOVNET

GOVNET License: License renewal for Cisco and Cyberoam/Sophos 471,000

2 equipment for three years eOffice: Enhancement will cover additional features, integrations with

300,000 3 other systems, technical and end user trainings 4 Technical and Financial Trainings at POPSM, eGA 200,000

e-Records Ingestion of records: The installation and commissioning of the Digital Records management and preservation system will be 40,000

5 completed by end of September 2017. NPB Integrations: NBP need to be integrated with : Online Registration

50,000 6 System: Government payment gateway

Video Conference (VC) Trainings: Focus will be to train and sensitize high level officers to use the Video Conference in order to reduce 50,000

7 assoc iated travel costs and risks 8 Activities of enhancing BRS System 40,000

Supply and Installation of Equipment (Bridge) for linking 85 Video 541,000

9 Conferencing Stations

10 Procurement of [CT Equipment for MWTC and ICT Commission 68,000

11 Video Conferences for 4 Regions 200,000

12 Furniture for [CT Commission 20,000

13 Provision of Asset Coding Services 30,000

14 Assistant Financial Management specialist 48,000

15 Procurement of Baggage/Parcel Scanner 350,000

16 SmartNet for A-POP: SLA fo r bandwidth manager 50,000

17 Procurement of additional international bandwidth 350,000

Asset Coding: To ensure that procured and registered project asset are properly identified, tracked and controlled using unique and uniform 70,000

18 asset tags

19 Shifting of systems and !CT equipment to Dodoma 30,000

20 Capac ity Building activities at MWTC, ICTC, UCSAF 300,000 TOTAL-USD 3,268,000

56

Page 69: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AN D COMMUNICATION RCIP PROJECT FINANCIAL STATEM ENT S

Table 35: Project commitments

Expenditure by Project Funds Committed Uncommitted Performance Components

USD USD USD % 1- Enabling 14,000,000 6,824,067 7,175,933 49% Envi ronment 2- Connectivity 60,000,000 61 ,456, 116 (1 ,456,116) 102% 3 -eGovernment 22,000,000 20,507,272 1,492,728 93% Applications 4- Project 4,000,000 4,424,111 (424,111) 111 % Management Total 100,000,000 93,211,566 6,788,434 93% Expenditure

6. PROJECT SUCCESS AND ACHIEVEMENTS

Major achievements during the period comprise but not limited to the fo llowing project activities:

6.1 Legal and Regulatory Environment

i) The Government of the United Republic of Tanzania enacted the Cyber Crime Act, 2015 and the Electronic Transaction Act, 2015 on 15 April 2015. This has created an environment to foste r implementation of electronic systems as e lectronic transactions are now recug11izeJ a11J prutecteJ by law.

ii) Creation of eGovernment Standards and Guidelines to ensure all eGovernment initiatives are implemented using same guidelines hence enhancing systems interoperabili ty, integration as well as easy data sharing.

iii) Development of eGovernment Policy whose objective is to ensure quality and sustainable public service delivery by adopting and using Information and Communication Technologies. The policy is in the final stages of approval. The use of this policy will eventually strengthen management and control of e-Government initiatives.

iv) Review of ICT Governance Framework that would ensure ICT is we ll managed and government within the public service.

v) In November 2015, the Government estab lished the National ICT Commiss ion (ICTC) vide the Government Notice No. 532 to drive ICT development in the country. The ICTC's mandate is to provide advice, strategic planning, implementation and investment in ICT; monitor and coordinate National ICT initiatives and provide foresight in trend and opportunities for ICT uptake fo r the nation ' s soc io-economic development.

6.2 Improving and lowering the cost of internet connectivity

i) Procured bulk international Internet bandwidth for IO years which is being distributed to Government institutions. These institutions are now utilizing centrally procured and

57

Page 70: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE NITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

managed Internet access at low cost. T his has made sign ificant sav ing between 50% -90% to institutions using the servi ce whose number has reached 206 institutions.

6.3 Extending Communication Services in Rural areas

i) The implementation of the universal access program financed through the RClP project has resulted in over 34 1 unserved or under-served wards in rural areas have gaining access to mobile communication services inc luding Mobile Money Transfer services (Financial Inclusion) such as Mpes.a, Tigo Pesa, Airtel Money etc. The geographical coverage includes more than 2.6 million people from 1,393 villages countrywide.

6.4 Improving government efficiency

i) Launched implementation of the Government Communication Network (GovNet) a iming at providing inter-MDAs communications services like data exchanges, sharing network resources, IP Telephony, Video Conferencing etc. Total of 72 MDAs have been connected to the GOVNET using high-speed data connection. This has brought big positive impact in terms of reduction on internal communication, easy of sharing of data and other resources as well as easy of managing internal informat ion resources.

ii) In co llaboration with the Government, Des igned Government mini data centre which has been implemented for the Government institutions to host or co-allocate their systems. RCIP did the design and the Government through other sources did the implementation. The use of this facility has improved availability and reliability of Government systems.

6.5 Improving service delivery

i) JCT Infrastructure in place, which have been deployed by the government includes the National ICT Broadband Backbone (NICTBB) that enable easy access of ICT services to all citizens at affordable costs. Through NJCTBB number of services are possible, i.e. Electronic banking services through banks (CRDB, NMB, NBC, etc.); mobile banking servi ces i.e. M-Pesa, T igo-Pesa, Z-Pesa and Airtel Money; online bills payments i.e. TA ESCO services (Luku), DAW ASCO for water services, TAX payments, Set Top Box (STB) fo r television services, tickets online buying; and other online services like video conference, e-schools and e-Government services.

ii) In collaboration with the Government, designed mobile platform that is now hosting various mobile applications. Some of the services developed by the Government and are ava il able included the voter's mobile application that was used during national election 2015 for voters to veri fy their ID cards and check their polling stations. A number of voters used the application during the national elections. Another hosted application in this platform is the job applications by which a number of seekers have used the system to apply job within the Government. Plans are underway through RClP to build capacity to Government staff in order to expand the mobile platform so as to accommodate additional mobile delivery channels as we ll as increasing ten additional mobile based e-services.

58

Page 71: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINI TRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

7. PROJECT CHALLENGES

7.1 Project Closure

The RCIP project management team is trying every respect to ensure that all planned project activities are implemented within the extension period of 31 December 2017. In order to complete di sbursements for executed and delivered project activities prior to the loan closing date of 31 December 2017, all outstanding payments will be paid before the disbursement deadline date to 30 April 2018.

The RClP Tanzania project became effective on 20th January 2010 for a period of five years whereby the project closing date was set on 28th February 2015.

On ?1h January, 2015 the World Bank granted the extension of the project closing date for a period of 22 months to 31st December 2016 due to delays in project implementation. Generally, the project progress has. improved slightly as compared to last year.

Delays in the critical steps in time-constrained project activities are likely to affect the project's completion date as well as achievement of the Project Development Objectives (PDOs). On 21 st July, 2016 the Government requested a second extension by 12 months thereby bringing the closing date to December 31, 2017.

7.2 Project delays and constraints

The major impact in the course of implementation of the RCf P Project is the likelihood of delaying the completion of scheduled project activities because of project conslrainls i11 lerms of rcsourcc3, time and scope as follows:

• Slow start to execute project activities during the first three years (i.e. 2009/20 I 0, 2010/2011 and 2011/2012);

• Lengthy process for issuance of "No Objections" from World Bank. There is also a general concern from World Bank that important documents such as terms of reference, evaluation reports, concept notes, etc. were partially completed by implementing agencies when requesting for "No Objection" from the Bank;

• Limited project definition, scope design, procurement activities and implementation timeframe. • Lack of human capital to manage multi-stakeholder projects due to limited skills and expertise in

managing integrated ICT projects; • Low disbursement due to financial management issues; • All project activities need World Bank 's no objection as well as respective implementing

agencies' Ministerial Tender Board (MTB) approvals. There were notable substantial delays in the approval process which had negative impact to the project lifecycle.

7.3 Disbursements after the Loan Closing Date

The RCIP project management team is trying every respect to ensure that all planned project activities are implemented within the extension period of 31 December 2017. In order to complete disbursements for executed and delivered project activities prior to the loan clos ing date of 31 December 2017, all outstanding payments will be paid before the disbursement deadline date to 30 April 2018.

59

Page 72: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN SPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

Final payment for retention money (I 0%-20%) for GovNet Ill , eGovernment applications and rural telecommunications access projects should be extended for payment by March, 2018. Thi s will give room for finalizing few remaining activities and giving a minimum of 6 months grace period of successfuL service provisioning.

7.4 Foreign Exchange Risk

There is a significant foreign exchange risk that exists because project financial transactions are denominated in USD while the base currency of the loan is nominated in SDR. Subsequent to the year end, transactional exposure arising from exchange rate movement is approximately USO 5 mittion.

7.5 Project Sustainability Plan

Organisational and financial sustainability issues of several projects. are critical to ensure the results obtained are maintained upon completion and closure of RCIP. Some of the sustainability parameters where sought and implemented on course of implementing the projects that includes capac ity building and ski lls transfer to staff who will manage the systems, housing the applications in centralized managed data centre to min imize cost of managing isolated systems, acquisition of source codes etc. some of these need to be further analysed spec ifically for each project. A team have been formed towards this endeavour to ascertai n sustainability issues inc luding asset management[ asset cod ing] that will be performed before c losure of the project.

7.6 Lack of insufficient financial resources

Inadequate allocation of financial resources for infrastructure development and maintenance support as well as fast-changing telecommunication sector pose a significant cha llenge of managing RCIP telecommunication and ICT assets go ing foward .

8. CONCLUSION

The Project implementing agenc ies and beneficiaries are committed to ensure that the project 1s delivered as planned notwithstanding the above constraints and challenges.

The Governm ent and World Bank are c lose ly managing the on-go ing project act1v1t1es through monitoring and controlling the project variables such as time, resources, scope, technology and processes against the plan to ensure the project attains its goals and objectives effectively.

Mrs. Maria Sasabo (PhD) The Permanent Secretary (Communication) & Accounting Officer Ministry of Works, Transport and Communication

60

30 June, 2017

Page 73: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT OF CASH RECEIPTS AND PAYMENTS PER COMPONENTS For the year ended 30 June 2017

RECEIPTS IDA Proceeds Counterpart Funds Government of Tanzania Total Receipts

PAYMENTS Component 1 - Enabling Environment Component 2 - Connectivity

Component 3 - eGovernment application

Component 4 - Project management Total Payments

Increase/(Decrease) in cash Cash at the beginning of the year Cash at the end of the period

Mrs. Maria Sasabo (PhD) Accounting Officer

Note

4 5

6

7 8

9

IO

2017 USD

18,842,095

18,842,095

1,314,721 9,502,867 5,833,091

442,996

17,093,675

1,748,420 471,264

2,219,684

6 1

2016 USD

15,878,923

15,878,923

1,425,859 13,052,694

1,573,240

848,007

16,899,800

(1 ,020,877) 1,492, 141

471 ,264

30 June, 2017 Date

Page 74: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN SPORT AND COMMUNICATION RCIP PROJECT FINANC IAL STATEM ENTS

STATEMENT OF CASH RECEIPTS AND PAYMENTS PER CATEGORIES For the year ended 30 J une 2017

RECEIPTS IDA Proceeds

Counterpart Funds

Government of Tanzania Total Receipts

PAYMENTS

Category 1: works, goods, consultants' services, training, operating costs and non-consu lting serv ices

Category 2: capital subsidies

PPF Refinancing Unallocated Total Payments

Increase/(Decrease) in cash Cash at the beginning of the year Cash at the end of the period

Mrs. Maria Sasabo (PhD) Accounting Officer

Note

4 5

6

11

12

62

2017 USD

18,842,095

18,842,095

12,960,340

4,133,335

17,093,675

1,748,420 471 ,264

2,219,684

2016 USD

15,878,923

15,878,923

10,076,000

6,823,800

16,899,800

(1,020,877) 1,492,141

471 ,264

30 June, 2017 Date

Page 75: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT OF CASH FLOW For the year ended 30 June 2017

Cash flow from operating activities RECEIPTS IDA Proceeds

Counterpart Funds

Government of Tanzania Total Receipts

PAYMENTS Enabling Environment Connectivi ty eGovernment applications Project Management Total Payments

Net cash flow from operating activities

Cash flow from investing activities Purchases of property, planl amJ e4uipmenL Purchases of intangible assets Rural access capital subsidies Net cash flow from investing activities

Cash flow from financing activities IDA proceeds Interest payment Repayment of borrowings Net cash flow from financing activities

Net (decrease)/increase in cash Cash at the beginning of the year Cash at the end of the period

Mrs. Maria Sasabo (PhD) Accounting Officer

Note

4 5

6

7 8 9 10

13 14 12

4

63

2017 2016 USD USD

970, 165 1, 11 4,817 49,275 54,567

889,372 839,190 4 10,264 776,553

2,319,076 2,785,127

2,319,076 2,785,127

5,697,545 6,556,823 4,943 ,719 734,050

4,133,335 6,823,800 14,774,599 14,114,673

18,842,095 15,878,923

18,842,095 15,878,923

1,748,420 (1,020,877) 471,264 1,492, 14 l

2,219,684 471 ,264

30 June, 2017 Date

Page 76: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

-

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT OF COMPARISON OF BUDGET AND ACTUAL AMOUNT For the year ended 30 June 2017

Sources of Funds Note Year to Date June 2017 Cumulative to Date June 2017 Actual Planned Variance Actual Planned Variance

USD USD USD USD USD USD Opening Cash Balances Project Account -MWTC 2 2,787 41,758 (8,971) Project Account- POPSM 2 204,422 65,937 138,485 IDA Designated Account 3 234,055 4,405,099 (4 ,171 ,044)

Total 471,264 4,512,794 (4,041,530)

Add: Receipts

IDA 4 18,842,095 30,883,719 (12,041 ,624) 64,014,324 95 ,368,050 (31 ,710,036)

Counterpart 5

Government of Tanzania 6

Total Financing 18,842,095 30,883,719 (12,041,624) 64,014,324 95,368,050 (31,710,036)

Less: Expenditures Enabling Environment 15 1,314,721 2,044,867 (730, 146) 4,873,673 6,824,067 (1,950,394)

Connectivity 16 9,502,867 22,054,973 (12,552,106) 43 ,464,979 61 ,456,116 (17,99 }, 137)

eGovemment application 17 5,833,091 8,237,327 (2 ,404,236) 9,809,179 20,507,272 (10,698,093)

Project Management 18 442,996 546,552 (103 ,556) 3,646,809 4,424, 111 (777,302)

Total Expenditure 17,093,675 32,883,719 (15,790,044) 61,794,640 93,211,566 (31,416,926)

Closing Cash Balances Project Account -MWTC 2 33,022 41,758 (8,736) 33,022 41,758 (8,736) Project Account- POPSM 2 123,461 65,937 57,524 123,461 65 ,937 57,524 IDA Designated Account

,.., 2,063,201 2,405,099 (341,898) 2,063 ,201 2,405,099 (341 ,898) .)

Total 2,219,684 2,512,794 (293,110) 2,219,684 2,512,794 (293,110)

SAscJsol Mrs. Maria Sasabo (PhD) 30 June, 2017 Accounting Officer Date

64

Page 77: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

STATEMENT OF DISBURSEMENTS PER CATEGORIES For the year ended 30 June 2017

Type of Disbursement Year to Date June 2017

Disbursement per category Category l Category 2 PPF Refinancing Unallocated Designated Account Total

Category l Category 2 PPF Refinancing Unallocated Designated Account Total Expenditure

Mrs. Maria Sasabo (PhD) Accounting Officer

Allocated snR

41 ,500,000 20,000,000

500,000 5,000,000

67,000,000

USD 62,000,000 30,000,000

700,000 7,3 00,000

100,000,000

Disbursed Undisbursed SDR SDR

32,606,740 8,893,260 10,532,089 9,467,911

250 499,750 5,000,000

1,574,836 (1,574,836)

44,713,915 22,286,085

USD USD 46,678,030 15,321 ,970 15,116,2 18 14,883,782

392 699,608 7,300,000

2,219,684 (2,219,684)

64,014,324 35,985,676

65

Disbursed O/o

79% 53%

0% 0%

67%

O/o

75% 50%

0% 0%

64%

30 June, 2017 Date

Page 78: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

TH E UN ITED REPUBLIC O F TAN ZANI A MINISTRY OF WORKS, TRANS PORT AN D COMM UN ICATION RC IP PROJ ECT FI NANC IAL ST AT EMENTS

DESIGNATED ACCOUNT ACTIVITY STATEMENT For the year ended 30 JUNE 2017

Opening Cash Balances

Add: Receipts Initial Deposit

IDA Replenishments

Interest Earnings Total Financing

Less: Expenditures Enabling Environment Connectivity eGovernment Applications Project Management Total Expenditure

Note

Closing cash balances in the Designated Account

Represented by:

Project Account -MWTC Project Account- POPSM IDA Designated Account Closing cash balances in the D.A. (A)

Total advances accounted for:

MCST/1 10 MCST/109 MCST/105

2 2 3

Applications not yet credited in the D.A. (B)

Amount recovered by World Bank (C)

Total advances by World Bank (A+B+C)

Mrs. Maria Sasabo (PhD) Accounting Officer

66

Year to Date

471 ,264

7,190,149

7,190,149

1,314,72 1 92 1,388

2,762,624 442,996

2,219,684

33,022 123,46 1

2,063,201 2,219,684

108,572 592,522 971 ,994

1,673,087

1,107,229

5,000,000

Cumulative to Date

5,000,000 14,764,350

19,764,350

4,873,672 2,838,090 6,186,486 3,646,418

17,544,666

2,219,684

33,022 123,461

2,063,201 2,219,684

108,572 592,522 971 ,994

1,673,087

1,107,229

5,000,000

30 June, 2017 Date

Page 79: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REP BLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS

1. Significant Accounting Policies

The princlpal accounting policies adopted in the preparation of these financial statements are set out as below. These policies have been consistently applied throughout the reporting period.

1.1 Basis of Preparation

The financia l statements have been prepared under the historical cost conversion inc luding the application of the IPSAs cash basis of financial reporting. The cash basis of accounting recognises transactions and events only when cash is received or paid by the implementing entities. The RCIP Project financial statements have also been prepared using special purpose framework to cater special needs of specific users of financial information. These financia l statements provide users (including lenders} with information about the sources of cash raised during the period, the purposes for which cash was used and the cash balances at the reporting date. The measurement focus in the financial statements is balances of cash and changes therein. Notes to the financial statements provide additional disclosures about liabilities and inventories in line with accrual basis IPSASs.

1.2 Statement of Compliance

The financial statements have been prepared in accordance with International Public Sector Accounting Standards (IPSASs) issued by the Public Sector Committee of the International Federation. The financial statements also comply with the Public Finance Act of 2001 as amended in 2004.

1.3 Accounting period

The project prepares. its financial statements for the period of twelve months ending on 30th June each year.

1.4 Accounting Convention

The financial statements have been prepared using the hi storical cost convention.

1.5 The Statement of Budget and Actual Expenditure

The IPSASs require a comparison of the approved budget amounts and the actual amounts arising from execution of the budget to be included in the financial statements. The IPSASs a lso require disclosure of an exp lanation of the reasons for material differences between the budget and actual amounts. This statement has been incorporated in the financial statements appropriately.

1.6 Foreign Currency Translation

The financ ial statements are presented in United States Dollars (USD) which is the functional and presentation currency of the term loan. All foreign currency transactions are translated into USD using the exchange rates prevailing at the dates of the transactions. Monetary items denominated in foreign currenc ies are re-measured at the rates of exchange ruling at a settlement date or the reporting date.

67

Page 80: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF' TANZANIA MINI TRY OF' WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

1.7 Cash and Cash Equivalents

Cash and cash equivalents comprise of cash in hand, deposits held at call with commercial banks and the Bank of Tanzania (BoT).

1.8 Taxes

RCIP Tanzania Project is not exempted from taxes. Expenditures are inclusive of all taxes including Value Added Tax (VAT).

1.9 The Budget

The budget and the financial statements are prepared and presented on the same basis.

2. Project Bank Accounts

MWTC and PO-PSM operate separate project accounts at the CRDB Bank Limited, Azikiwe Branch. Funds from the Designated Account are transferred regularly into these accounts to meet operational and other costs of the RCIP Project. Cash and cash equivalents comprise of the following :

Name of Account TZS Exchange Rate USD

Project Account (MWTC) 71 ,417,227 2,162.72 33,022 Project Account (PO-PSM) 273,670,370 2,216.65 123,461 Total 345,087,597 237,209

3. Designated Account

MWTC maintains the Designated Account at the Bank of Tanzania as required by the World Bank regulations. As at 30 June 2017, the projects had fund balances amounting to USO 2.2 million, comprising of funds in the Designated Account and local project accounts as tabulated below:

Opening cash balance Add: Project receipts from World Bank Less: Project expenditures Closing cash balances in the Designated Account

Represented by: Project Account -MWTC Project Account- POPSM IDA Designated Account Closing cash balances in the Designated Account

68

Year to Date

471,264 7,190, 149 5,441 ,729 2,219,684

33,022 123,461

2,063 ,201 2,219,684

Cumulative to Date

19,764,350 17,544,666 2,219,684

33 ,022 123,461

2,063,20 l 2,219,684

Page 81: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

Cumulative disbursements through the designated account for the entire project period up to 30 June 2017 amounted to USD 19, 764,3S.O, which is approximately 19.8% of the project fu nds. Low disbursement of funds was ma inly caused by lengthy delays in effectiveness includ ing complicated legal processes fo r approval of procurement project activities among the implementing agencies and World Bank.

4. IDA Proceeds

Disbursements made by World Bank during the year 2017/20 16

Application Name of Payee Currency Amount Category Date Paid MCST/ 101 In fotech Private Ltd USD 1,208,474 l 20-Jun-l 7 MCST/100 MFI Ltd USD 265,872 l 24-May- 17 MCST/99 TTCL USD 193,077 l 26-Apr-l 7 MCST/99 TTCL USO 53,560 2 26-Apr-l 7 MCST/99 TTCL USD 143,957 2 26-Apr-l 7 MCST/94 MIC Tanzania Ltd USD 397,858 2 l 7-Mar- 17 MCST/93 Infotech Private Ltd USD 402,824 l 15-Mar-l 7 MCST/92 SCI Tanzania Ltd USO 278,280 l l 7-Feb- 17 MCST/91 Computech ICS (T) Ltd USD 2,408, 156 l 26-Jan-l 7 MCST/90 TTCL USD 486,695 2 7-Dec-16 MCST/84 MFI Ltd USO 265,872 1 28-Nov-16 MCST/83 Computer Centre Ltd USO 614,845 l 3 l-Oct-16 MCST/57 MIC Tanzania Ltd l JSO 444,634 2 31-0ct-16 MCST/82 Infotech Private Ltd USO 604,237 l l 9-0ct-16 MCST/78 AIRTEL Tanzania Ltd USO 1,2 14,790 2 9-Sep- 16 MCST76 MFI Ltd USD 323,188 1 2-Sep- 16 MCST/75 Softnet Technologies Ltd USD 572,117 l 2-Sep-16 MCST77 Techno Image Ltd USO 264,833 I 2-Sep- 16 MCST/73 TTCL USO 303,385 1 17-Aug-l 6 MCST/72 TTCL USO 1,205,293 2 17-Aug-16 Sub Total payment to Suppliers

11,651,947

MCST/98 MWTC USD 1,2 13, 107 30-Mar-l 7 MCST/97 MWTC USO 1,838,497 30-Mar-l 7 MCST/88 MWTC USD 427, 169 30-Nov-1 6 MCST/89 MWTC USO 1, 171 ,947 30-Nov-16 MCST/85 MWTC USO 43 1,043 28-Nov- 16 MCST/81 MWTC USO 772,276 29-Sep-16 MCST/79 MWTC USO 210,448 28-Sep-16 MCST/74 MWTC US O 1, 125,661 l 8-Aug- 16

Sub advances to the designated account 7,190,148

Grand Total 18,842,095

69

Page 82: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRAN PORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

The above applications were effected to suppliers as well as advances to the designated account using the direct payment method for the cost of proj ect expenditures .

5. Counterpart Funds

The RCIP Tanzania Project is mostly financed by the World Bank.

6. Government of Tanzania

The RCIP Tanzania project is the Loan Agreement of 40 years between United Republic of Tanzania and World Bank through its financier Internationa l Deve lopment Association (IDA)

7. Component! -Enabling Environment: USD 14 million

This component provides support fo r capacity building in order to strengthen the policy and regulatory environment and promote further sector reform in order to maximize benefits from access to international capacity inc luding supporting the capacity of MWTC and other key agencies involved in I CT sector.

eSchuub ICT e4uiµ111e11l Video conference equipm ent Property, plant and equipment Rural Telecom Services GovNet Implementation Publici ty and awareness NPKI

eSchools training and supervision Science and Technology Cyber Security Laws ICT Commission NICTBB and Broadband Strategy Monitoring & Evaluation Survey Environmental Impact Assessment Training and Development

Operating activities

Total Payments

8. Component 2 - Connectivity: USD 60 million

2017

USD 344,556

344,556 4,263

61,446 198,758 68,078 16,839

57,656 53,939 57,774

24 1,498 12,35 0

197,564 970,165

1,314,721

2016

USD 303, 156

7,886 311,042

70,889 84,488 34,407

344,488 48,195

29 l 443

59,398

181 ,509 1,114,817

1,425,859

This component provides add itiona l funding fo r the National ICT Infrastructure Development Program in Tanzania through the fo llowing subcomponents:

70

Page 83: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UN ITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RC IP PROJ ECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

(i) Pre-purchase of international bandwidth for priority targeted user groups; (ii) Government Communications Network - fiber connectivity and eq uipment for Ministries,

Departments, and Agencies (MDAs) ; and (iii) Extension of coverage and access to ICT services in rural areas using public-private

partnership arrangements.

2017 2016 USD USD

Internationa l internet bandwidth Bandwidth management system 83,887 34,936 License renewal 49,275 54,567 Government communication network 5,236,370 6,139,391 Rural access cap ita l subsidies - UCSAF 4, 133,335 6,823,800

Total Payments 9,502,867 13,052,694

9. Component 3 - eGovernment Applications: USD 22 million

This component funds the implementation of targeted e-Government app lications and capac ity building activities as follows :

2017 2016 USD USD

ational Business Portal 796,198 327,087 Telemedicine for Muhimbili Hospita l 329,359 160,299 National Registrati on System 3,043,458 174,035 eProcurement system for PPRA 9 1,793 eRecords for National Archive 682,9 1 L 72,629 Sub-total Intangible assets 4,943,719 734,050 eGovernment Policies 45 ,353 259,736 Publicity and awareness 95,480

Traini ng PO-PSM and eGA 748,539 579,454 Sub- total operating activities 889,372 839,190

Total Payments 5,833,091 1,573,240

10. Component 4 - Project Management: USD 4 million

This component consists of support the MWTC and PO-PSM capacity for management and coord ination of the Project activities induding, procurement, financial management, monitoring and evaluation, communication of Project activities, and environmental and soc ia l safeguards.

71

Page 84: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

Project consultants Coding of RCIP asset Opex MWTC Opex PO-PSM

Subtotal operating activities Motor Vehicle ICT and office equipment Total Payments

11. Category 1

Category one comprise of the following project activities:

2017 USD

232,895

101,233 76,136

410,264

32,732 442,996

2016 USD

292,340

175, 179 309,034

776,553

71,454 848,007

(i) Goods, consultants' services, training and operating costs for all components (ii) Works for Connectivity and e-Government Applications. (iii) Non-consulting services for all components.

Enabling Environment Connectivity eGovernment Applications Project Management Total Payments

12. Category 2

2017 USD

1,314,721 5,369,532 5,833,091

442,996

12,960,340

2016 USD

1,425,85-9 6,228,894 1,573,240

848,007

10,076,000

Project activities for capital subsidies to support extension of coverage and access to ICT services in rural areas using public private partnership arrangements. This project activity is being implemented in collaboration with telecommunications operators; namely Tanzania Telecommunications Company Limited, Airtel Tanzania Limited, Vodacom Tanzania Limited and MIC Tanzania Limited.

MIC Tanzania Ltd Airtel Tanzania Ltd TTCL Vodacom Tanzania Ltd Total Payments

72

2017 USD

842,492 1,401 ,338 1,889,505

4,133,335

2016 USD

843,597 122,400

3,124,734 2,733,069

6,823,800

Page 85: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE NITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUN ICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

13. Property, plant and equipment

Internet bandwidth equipment Government commun ication network eSchools !CT equipment Video Conference equipment ICT and office equipment

Total Payments

14. Intangible Assets

National Business Portal Telemedicine System National Registrat ion System eProcurement system eRecords

Total Payments

15. Component I - Enabling Environment

2017 USD

83,887 5,236,370

344,556

32,732

5,697,545

2017 USD

796,198 329,359

3,043,458 91,793

682,9 11

4,943,719

2016 USD

34,936 6, 139,39-l

303, 156 7,886

71 ,454

6,556,823

2016 USD

327,087 160,299 174,035

72,629

734,050

Activity Year to Date June 2017 Cumulative to Date June 2017 Actual Planned Variance Actual Planned Variance

USD USD USD USD USD USD Rura l Telecom Services 4,263 41 ,102 (36,839) 393,396 514,713 (121,317) GovNet Implementation 61 ,446 72,765 (11 ,319) 33 8,582 379,815 (41 ,233) Publicity and awareness 198,758 254,589 (55,831) 265,990 325,976 (59,986) NPKT 68,078 233,644 (165 ,566) 102,272 267,838 (165,566) eSchools Connectivity 361 ,395 467,119 (105 ,724) 1,106,748 1,242, 105 (1 35,357) JCT & VC equipment 199,620 940,620 (74 1,000) Science and Technology 2 18,167 218, 167 Cyber Security Laws 57,656 67,194 (9,538) 611 ,160 660,185 (49,025) JCT Commission 53,939 87,096 (33 , 157) 64,242 140,137 (75 ,895) NICTBB and Broadband 57,774 212,012 ( 154,238) 277,243 480,513 (203,270) M&E 241 ,498 297,918 (56,420) 308,647 468,050 (159,403) Environmental Impact 12,350 65,000 (52,650) 12,350 65,000 (52,650) Training and workshops 197,564 246,428 (48,864) 975,256 I, 120,948 (145 ,692)

Total expenditure 1,314,721 2,044,867 (730,146) 4,873,673 6,824,067 (1,950,394)

73

Page 86: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

J

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

The unfavourable variance of USO 1,95.0,394 between actual expenditures and the budget is mainly attributabte to:

Activity Variance analysis as at 30 June 2017 Variance USD

Rural Supervision; monitoring and evaluation; technical audit 121 ,317 Telecommunications and asset management activities are on going Access Project

Government Supervision; monitoring and evaluation; acceptance 41 ,234 Communications Network testing and asset management activities are on going (GovNet)

Publicity and awareness Implementation of airing TV and Radio programs are stilt 59,986 in progress. The variance is due to delays in implementation of contracts and approval of content for newsletters and insertion of articles in newspapers and journals

National Public Key The system feasibility study and design were completed in 165,566 Infrastructure (NPK[) May 2017 and payment to the consultant was effected

subsequent to the year-end eSchools Connectivity Delivery of eSchools power equipment was completed 135,35-7 Project subsequent to the year end

ICT equipment & Video Re-tendering process for bridge equipment is in progress 741 ,000 Conference Systems and Tender documents for new VC equipment are in the

process of approval Cyber Security Laws Present Cabinet paper to Cabinet Secretariat. 49,025

Continue with capacity building of law enforcement officers.

Tanzania ICT 60% payment for Provision of Consultancy Services for 75 ,895 Commission the Development of the National Information and

Communication Technology ([CT) Commission Bill will be completed in August 2017

National ICT Broadband The tender for consultancy service for preparation of 203,270 Backbone (NICTBB) Broadband Strategy was cancelled during the year

Monitoring & Evaluation Implementation of phase one was completed in June 159,403 December 2016.Implementation of phase two Has not yet been conducted which recorded the variance

Environmental Impact 80% payment of the contract price upon acceptance of 52,650 Assessment the final report for Provision of Consultancy Services for

carrying out an environmental and social compliances audit will be completed in September 2017

Training and workshops Training activities will be conducted before 31 145,691 December, 2017

Total variance 1,950,395

74

Page 87: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

16. Component 2 - Connectivity

Activity Year to Date June 2017 Cumulative to Date June 2017 Actual Planned Variance Actual Planned Variance

USD USD USD USD USD USD Internet Bandwidth 133,162 217,049 (83 ,887) 11,645,479 I I ,778,64 I (133,162} GovNet 5,236,370 8,232,858 (2,996,488) 16,703,282 21,966,029 (5,262,747) Rural access 4,133,335 13,605,066 (9,471 ,73 1) 15,116,218 27,711 ,446 (12,595,228) Total Expenditure 9,502,867 22,054,973 (12,552,106) 43,464,979 61,456,116 (17,991,137)

The difference between actual expenditure and budgeted project act1v1t1es under category two recorded a negative variance of USD 17,991,137. Predominantly, the difference related to the Government communications network and Provision of Rural Telecommunications Services project activities as follows:

Activity Variance analysis as at 30 June 2017 Variance USD

Pre-purchase of international Final payment against completion of supply, 113,162 bandwidth installation, testing and acceptance of spam

protection system in the "Government International Bandwidth Management System" will be completed in July 2017.

Government Communications • Delays in getting permission to use NICTBB 5,262,746 Network (GovNet) and TTCL facilities in order to integrate 77 sites

to the GovNet (discussion between NICTBB, TTCL, TAMISEMI and eGA have been finalized and construction work is in progress).

• 10% retention money will be paid in March 2018

Rural Telecommunications • Phase one completed all 52 wards, 20% final 12,595,228 Access Program payment will be paid subsequent to the year end

• Phase lA - All 77 wards completed and final payment will be paid before the disbursement deadline .

• Phase 2A: 83 wards out of l 02 completed .

• TTCL still has 18 wards incomplete while MIC has one site pending

• Phase 2B: 77 wards out of 116 are completed, TTCL still have 39 wards incomplete

• Retention money covering 20% of the contract will be in year 2018

Total Variance 17,991,136

75

Page 88: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS (Continued)

17. Component 3 - eGovernment Applications

Activity Year to Date June 2017 Cumulative to Date June 2017 Actual Planned Variance Actual Planned Variance

USD USD USD USD USD USD National Business Portal 796,198 813,746 (17,548) 1, 178,775 1,913,309 (734,534) Telemedicine for MNH 329,359 1,229,778 (900,419) 821 ,954 4,476,063 (3,654,109) National Reg. System 3,043 ,458 2,989,070 54,388 3,494,870 5,594,180 (2,099,31 O} EALRS /ILMIS 380,422 380,422 eProcurement for MSD 91 ,793 904,253 (812,460) 396,712 2,471 ,299 (2,074,587) eRecords 682,911 822,723 (139,812) 766,495 1,447,219 (680,724) Designing Server cluster 60,600 60,600 eMobile applications 47,510 838,838 (791,328) eGovernment Policies 45,353 133,066 (87,713) 355,735 447,017 (91,282) Publicity and awareness 95 ,480 216,159 (120,679) 248,956 335,190 (86,234) Training POPSM/ eGA 748,539 1,128,532 (379,993) 2,057,150 2,543,135 (485 ,985)

Total Expenditure 5,833,091 8,237,327 (2,404,236) 9,809,179 20,507,272 (10,698,093)

Unfavourable vari·ance of USD l 0,698,093 reported during the year. Substantial delays were noted with reference to the anticipated time in implementation of the eGovernment Applications projects due to lengthy procurement procedures for hiring of consultants as well as lack of resources in terms of time, costs and human capital as described below:

Activity Variance analysis as at 30 June 2017 Variance USD

National Business Portal Integration with Online Registration System (ORS) 734,534 managed by BRELA and Government payment Gateway will be completed during the year

Telemedicine for MNH Clearance of snags is in progress. The contractor 3,654,110 has not raised invoices per project milestones

National Registration System The Contractor is clearing the snags. The system 2,099,310 will be launched once two main snags are cleared (I.e Addition of RAM, Inter-site Switching) that are estimated to be completed in November 2017

eProcurement for PPRA Finalization of the system was affected by changes 2,074,587 in procurement regulations. The contractor has estimated re-customization to be completed October 2017.

eRecords System testing, Trainings and User Acceptance Test 680,724 are planned to be conducted from 201

h August 2017 Procurement of Storage and server for Mobile 791,328

eMobile applications Payment Gateway, USSD and SMS Gateway P-Government Policies 10% of the contract price is pending. The policy is 91 ,282

in the final stage of approval Publicity and awareness • Production of TV programmes finalized 86,234

• Production of Graphical signature tune and 8

76

Page 89: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

Activity Variance analysis as at 30 June 2017

Video clips for advertis ing finalized

• Aring of TV progarmmes in progress (20Programmes will be Aired by 3 1st July 2017)

Training POPSM/ eGA Training for technical ICT staff from MDAs and LG As was. not conducted as planned due to delays in procurement process. In addition, study visits in overseas countries were cancelled .

Variance USD

485,985

Total Variance 10,698,093

18. Component 4 - Project Management

Activity Year to Date June 2017 Cumulative to Date June 2017 Actual Planned Variance Actual Planned Variance

USD USD USD USD USD USD Project consultants 232,895 247,535 (14,640) 1,450,325 1,711 ,775 (261 ,450) Motor Vehicle 148,851 148,851 ICT and other assets 32,732 33,408 (676) 375,5 05 463,505 (88,000) Coding of RCIP asset 37,000 (37,000) OpexMWTC 101 ,23-3 145,5 12 (44,279) 862,473 1,103,378 (240,905} Opex PO-PSM 76, 136 120,097 (43 ,961) 809,655 959,602 (149,947)

Total Expenditure 442,996 546,552 (103 ,556) 3,646,809 4,424,111 (777,302)

The eGovernment coordinator, GovNet Consultant, Procurement Specia li sts and M&E Specia list are on board. Contracts for the Project Adv isor and Financial Management Specia li st were closed during the year. Project operating costs (Opex) incurred by the MWTC and PO-PSM in the course of the implementation of the proj ect; include operation and maintenance costs, office supplies communications serv ices, consumables, travel costs, per diems and accom modation. The variance of USD 777,302 was mainly attributed by delays in procurement of office equipment and furniture as well as operations expenditures for the Project.

Activity Variance analysis as at 30 June 2017 Variance USD

Project consultants Contracts fo r the Project Advisor, Financial 26 1,450 Specialist, Procurement Specia lists and M&E Specialist have been closed.

ICT and other assets Procurement of ICT Equipment for MWTC and ICT 88,000 Commi ssion are still in the procurement process

Coding of RCIP ass.et Approval by World Bank is required for the task to 37,000 be implemented by internal staff using RCIP funds.

Opex MWTC Costs cover the peri od from July 2017 to December 240,905 20 17

77

Page 90: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RC IP PROJECT FINANCIAL STATEMENTS

Opex PO-PSM

Total Variance

Costs cover the period from Ju ly 2017 to December 2017

19. Expenditure by Categories

149,947

777,302

(i) Category 1 comprise of: Works, Goods, Consu ltants ' services, Trai ning and Operating Costs for Components 1 through 4 of the Project; and Non-consu lting Services for Components " 1 ","2"and "3-" of the Project.

(ii) Category 2 covers Capital Subsid ies under Component 2 (iii) of the Project that include extension of coverage and access to ICT serv ices in rural areas using PPP arrangements.

20. Project Risk Management

The RCIP Tanzania Project is exposed to a number of risks that might have significant impact on the overaH project management during planning and execution phases. The Wodd Bank, MWTC and PO­PSM are conducting a comprehensive risk management containment covering risk planning, identification, analysis, responses, monitoring and control to ensure that all significant risks are mitigated for eventual successful implementation of the project within the agreed timeframe and resources. This is being undertaken through regular mission visits, technical audit by TCRA, internal and external audits as well as conducting Steering Committee and Techn ical Team project meetings.

21. Account Payables

Account payables are contractual obligations to pay for goods or services that have been received or supplied, and have been invoiced or formally agreed with the supplier (and include payments in respect of capital subsidies owed to mobile operators). At the year end, the following liabilities were outstanding:

2017 2016 USD USD

Property, plant and equipment 850,780 1,9n,s93 fntangible assets 26S.,699 401,120 Capital subsidies 4,978,263 2,420,082

Training 78,381 272,104

eGovernment appl ications 1,958,749 1,586,332 Project consultants 159,134 67,351 Project Opex 132,024 68,756

Total Payments 8,423,030 6,814,638

22. Inventories

Consumable supplies are expensed in the period in which they are paid for. However, a memorandum record is maintained in the inventory register at cost and disclosed in the statement of stores and other assets.

78

Page 91: THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT …documents.worldbank.org/curated/en/625841515651602382/pdf/P111432-RCIP-Audit-Report...Compliance with the Public Procurement Act,

THE UNITED REPUBLIC OF TANZAN IA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION RCIP PROJECT FINANCIAL STATEMENTS

23. Lease of Internet Bandwidth

Finance lease is one in which risk and rewards incidental to the ownership of the leased asset are transferred to lessee but not the actual ownership .

In February 2012, the former Ministry of Communication, Science and Technology (MCST) and Tanzania Telecommunications Company Limited (TICL) commissioned a finance lease for procurement of internet bandwidth worth USO 9,26},000 out of which USO 8,850,000 is financed through IDA funding. The contract is for the supp ly of a l O year IRU of 1.55 Gbps (10 STM-l) internet bandwidth.

The bandwidth w·ill provide subsidised internet services to target user groups such as. MDAs, Schools and Hospitals . By June 2017, utilization based on capacity assignment reached 100% approximately 1S.00Mbps out of 1550Mbps with over 206 Government institutions utilizing the service .

Under this lease, risk and rewards incidental to the ownership of the leased asset have been transferred to lessee but not the actual ownership.

24. Project Commitments

Project commitments as at 30 June 20 l 7 amounted to USO 93 million out of which USO 61.8 million; equivalents to 66% of the committed funds have been disbursed as shown below:

Type of Component Committed Disbursed Performance

USD USO %

Component 1- Enabling Environment 6,824,067 4,873,672 71% Component 2- Connectivity 61,456,116 43,464,979 71%

Component 3- eGovernment applicat ions 20,507,272 9,809, 179 48%

Component 4- Project Management 4,424, l 11 3,646,809 82%

Total 93,211,566 61,794,640 66%

The Project Plan Team Members are working hard to ensure that these planned project activities are carried out in an effective and efficient way whi le ensuring that measurements against project plans, specifications, and the original project feasibilities are on truck.

25. Principal Place of Business

3 Moshi Street, P.O. BOX 677, 40470 DODOMA

Mrs. Maria Sasabo (PhD) Accounting Officer

79

30 June, 2017 Date


Recommended