Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES16175 INTERNATIONAL DEVELOPMENT ASSOCIATION RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE ECOSYSTEMS MANAGEMENT PROJECT FOR THREE PROPOSED CREDITS IN THE AMOUNT OF SDR 6 MILLION (US$9 MILLION EQUIVALENT) TO THE REPUBLIC OF BENIN SDR 11.9 MILLION (US$18 MILLION EQUIVALENT) TO THE REPUBLIC OF MALI SDR 88.6 MILLION (US$135 MILLION EQUIVALENT) TO THE REPUBLIC OF NIGERIA AND TWO GRANTS IN THE AMOUNT OF SDR 6 MILLION (US$9 MILLION EQUIVALENT) TO THE REPUBLIC OF GUINEA SDR 9.9 MILLION (US$15 MILLION EQUIVALENT) TO THE REPUBLIC OF NIGER BOARD APPROVAL DATE: JULY 3, 2007 DECEMBER 12, 2014 Water (GWADR) Regional Integration Department (AFCRI) Africa Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

Document of

The World Bank

FOR OFFICIAL USE ONLY

Report No: RES16175

INTERNATIONAL DEVELOPMENT ASSOCIATION

RESTRUCTURING PAPER

ON A

PROPOSED PROJECT RESTRUCTURING

OF THE

NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE

ECOSYSTEMS MANAGEMENT PROJECT

FOR THREE PROPOSED CREDITS IN THE AMOUNT OF

SDR 6 MILLION (US$9 MILLION EQUIVALENT)

TO THE REPUBLIC OF BENIN

SDR 11.9 MILLION (US$18 MILLION EQUIVALENT)

TO THE REPUBLIC OF MALI

SDR 88.6 MILLION (US$135 MILLION EQUIVALENT)

TO THE REPUBLIC OF NIGERIA

AND TWO GRANTS IN THE AMOUNT OF

SDR 6 MILLION (US$9 MILLION EQUIVALENT)

TO THE REPUBLIC OF GUINEA

SDR 9.9 MILLION (US$15 MILLION EQUIVALENT)

TO THE REPUBLIC OF NIGER

BOARD APPROVAL DATE: JULY 3, 2007

DECEMBER 12, 2014

Water (GWADR)

Regional Integration Department (AFCRI)

Africa Region

This document has a restricted distribution and may be used by recipients only in the performance of their

official duties. Its contents may not otherwise be disclosed without World Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

1

ABBREVIATIONS AND ACRONYMS

AGETIER Agence d’Exécution des Travaux d’Infrastructures et d’Equipements

Ruraux (Agency for the Implementation of Works, Infrastructure and

Rural Equipment)

APL Adaptable Program Lending

ASPEN Africa Safeguard Policies Enhancement

CeRPA Centre Régional pour la Promotion Agricole (Regional Centre for

Agriculture Promotion)

CIWA Cooperation in International Waters in Africa

CoM Council of Ministers

DNGR Direction Nationale du Génie Rural (National Rural Engineering

Department)

DO Development Objective

FY Fiscal Year

IDA International Development Association

IP Investment Program

NBA Niger Basin Authority

NEA National Executing Agency

OP Operational Policy

PAD Project Appraisal Document

PHCN Power Holding Company of Nigeria

PoE Panel of Experts

SDAP Sustainable Development Action Plan

WRD-SEM APL Water Resources Development and Sustainable Ecosystems Management

Program

WRD-SEM APL 1 First Phase APL Water Resources Development and Sustainable

Ecosystems Management Program

WRD-SEM APL 2A First Part of the Second Phase of the Water Resources Development and

Sustainable Ecosystems Management Program

Regional Vice President: Makhtar Diop

Country Director:

Senior Global Practice Director:

Colin Bruce

Junaid K. Ahmad

Practice Manager: Alexander E. Bakalian

Task Team Leader: Emmanuel Y. Nikiema

Page 3: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

2

AFRICA

NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE

ECOSYSTEMS MANAGEMENT PROJECT

CONTENTS

Page

DATA SHEET ............................................................................................................................... 3

A. SUMMARY OF PROPOSED CHANGES ............................................................................. 4

B. PROJECT STATUS ................................................................................................................. 5

C. PROPOSED CHANGES .......................................................................................................... 7

ANNEX 2: REALLOCATION OF PROCEEDS ...................................................................... 31

ANNEX 3A: EXTENSION OF CLOSING DATE - NIGER .................................................... 33

ANNEX 3B: EXTENSION OF CLOSING DATE - NIGERIA ............................................... 34

ANNEX 3C: EXTENSION OF CLOSING DATE - BENIN .................................................... 35

ANNEX 3D: EXTENSION OF CLOSING DATE - MALI ...................................................... 36

ANNEX 3E: EXTENSION OF CLOSING DATE - GUINEA ................................................. 37

Page 4: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development
Page 5: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

3

DATA SHEET

Africa

Niger Basin Water Resources Development and Sustainable Ecosystems Management Project

(P093806)

AFRICA

0000009087

Report No: RES16175

Basic Information

Project ID: P093806 Lending Instrument: Adaptable Program Loan

Regional Vice President: Makhtar Diop Original EA Category: Full Assessment (A)

Country Director: Colin Bruce Current EA Category: Full Assessment (A)

Senior Global Practice

Director: Junaid Kamal Ahmad Original Approval Date: 03-Jul-2007

Practice

Manager/Manager: Alexander E. Bakalian Current Closing Date: 31-Dec-2014

Team Leader: Emmanuel Y. Nikiema GEF Focal Area:

Borrower: Republic of Benin, Republic of Mali, Republic of Niger, Republic of Guinea and

Federal Republic of Nigeria

Responsible

Agency: Niger Basin Authority (NBA)

Restructuring Type

Form Type: Full Restructuring Paper Decision Authority: Board Approval

Restructuring

Level:

Level 1

Financing ( as of 09-Dec-2014 )

Key Dates

Project Ln/Cr/TF Status Approval

Date Signing Date

Effectiveness

Date

Original

Closing Date

Revised

Closing Date

P093806 IDA-43420 Effective 03-Jul-2007 26-Jul-2007 30-Jan-2008 31-Jan-2013 31-Dec-2014

P093806 IDA-43430 Effective 03-Jul-2007 26-Jul-2007 08-Nov-2007 31-Jan-2013 31-Dec-2014

P093806 IDA-43480 Effective 03-Jul-2007 26-Jul-2007 08-Nov-2007 31-Jan-2013 31-Dec-2014

P093806 IDA-H3200 Effective 03-Jul-2007 26-Jul-2007 08-Nov-2007 31-Jan-2013 31-Dec-2014

P093806 IDA-H3210 Effective 03-Jul-2007 26-Jul-2007 29-Nov-2007 31-Jan-2013 31-Dec-2014

P111179 TF-10762 Effective 01-Dec-2011 01-Dec-2011 01-Dec-2011 31-Dec-2019 31-Dec-2019

Disbursements (in Millions)

Page 6: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

4

Project Ln/Cr/TF Status Currency Original Revised Cancelle

d

Disburse

d

Undisbur

sed

%

Disburse

d

P093806 IDA-43420 Effective USD 9.00 9.00 0.00 6.84 2.28 76

P093806 IDA-43430 Effective USD 18.00 18.00 0.00 11.66 6.39 65

P093806 IDA-43480 Effective USD 135.00 135.00 0.00 95.09 39.49 70

P093806 IDA-H3200 Effective USD 15.00 15.00 0.00 13.96 1.22 93

P093806 IDA-H3210 Effective USD 9.00 9.00 0.00 2.46 6.40 27

P111179 TF-10762 Effective USD 23.67 23.67 0.00 0.00 23.67

Policy Waivers

Does the project depart from the CAS in content or in other significant

respects? Yes [ ] No [ X ]

Does the project require any policy waiver(s)? Yes [ ] No [ X ]

A. Summary of Proposed Changes

This Restructuring Paper seeks the approval of the Executive Directors to restructure the first phase of the

Niger Basin Water Resources Development and Sustainable Ecosystems Management Program

(NB/WRDSEMP-APL 1). A Level 1 restructuring is requested to: (i) change the PDO to reduce the scope

of the project; (ii) allow formal triggering of the Pest Management Operational Policy 4.09 (OP 4.09); (iii)

reallocate available funds to activities that contribute directly to the achievement of the restructured PDO;

(iv) cancel activities under components 1, 2 and 3 that are no longer relevant or financed by other donors

and; (v) stagger closing dates up until 2017 to enable each of the five beneficiary countries (i.e., Benin,

Guinea, Mali, Niger and Nigeria) to complete remaining key activities.

Change in Implementing Agency Yes [ X ] No [ ]

Change in Project's Development Objectives Yes [ X ] No [ ]

Change in Results Framework Yes [ X ] No [ ]

Change in Safeguard Policies Triggered Yes [ X ] No [ ]

Change of EA category Yes [ ] No [ X ]

Other Changes to Safeguards Yes [ ] No [ X ]

Change in Legal Covenants Yes [ ] No [ X ]

Change in Loan Closing Date(s) Yes [ X ] No [ ]

Cancellations Proposed Yes [ ] No [ X ]

Change to Financing Plan Yes [ ] No [ X ]

Change in Disbursement Arrangements Yes [ ] No [ X ]

Reallocation between Disbursement Categories Yes [ X ] No [ ]

Change in Disbursement Estimates Yes [ ] No [ X ]

Change to Components and Cost Yes [ X ] No [ ]

Change in Institutional Arrangements Yes [ ] No [ X ]

Page 7: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

5

Change in Financial Management Yes [ ] No [ X ]

Change in Procurement Yes [ ] No [ X ]

Change in Implementation Schedule Yes [ X ] No [ ]

Other Change(s) Yes [ ] No [ X ]

Appraisal Summary Change in Economic and Financial Analysis Yes [ ] No [ X ]

Appraisal Summary Change in Technical Analysis Yes [ ] No [ X ]

Appraisal Summary Change in Social Analysis Yes [ ] No [ X ]

Appraisal Summary Change in Environmental Analysis Yes [ ] No [ X ]

Appraisal Summary Change in Risk Assessment Yes [ ] No [ X ]

B. Project Status

The project was approved on July 03, 2007, became effective on November 01, 2007 and started its

activities in December 2007 and faced a level 2 restructuring that extended the project closing date from

January 31, 2013 to December 31, 2014. During the period ending January 31, 2013, the disbursement rate

reached 26.10% and the project implementation was rated moderately unsatisfactory. This situation was

mainly due to: (i) poor quality of some studies conducted leading to lengthy revisions; (ii) contractual

delays combined with the need to establish adapted specifications and assemble major electromechanical

parts for the hydropower plants at Kainji and Jebba; (iii) two years after the commencement of the

Program, Environmental and Social Impacts Assessments including a social evaluation had to be

conducted for all Program activities in order to comply with World Bank operational policies; (iv) long

duration to provide no objections needed prior to commencement of some studies and works contracts and

addenda related to some contracts; and (v) long duration taken to issue some Letters of Credit and the

signing of contracts by some beneficiary countries where national procedures were applied with regard to

the approval of the financial agreements.

To date, all of these issues have been addressed and almost all major contracts have been signed and

implementation is ongoing, boosting the disbursement rate as presented below. In effect, since the last

Implementation Status Report (ISR) dated November 2014, the project rating is Moderately Satisfactory

and is on track towards achieving its objectives. The implementation of some contracts and remaining key

activities, however, cannot be completed before the targeted closing date of December 31, 2014 and the

balance to be paid for ongoing contracts is estimated at US$45 million.

Disbursement

The disbursement level, as of October 31, 2014, was 68.71 percent. The disbursement rate was 42.84

percent as of December 31, 2013, that is an increase of about 26 percentage points from January to

October 2014. This performance in disbursement is due to the delivery of the equipment for the major

contract (KR1A) which was signed in June 2011 for the rehabilitation of production units 5, 6 & 12 and

auxiliary equipment of Kainji Hydropower Plant representing about 68 percent of the total cost of WRD-

SEM APL 1.

Safeguards

The Program complies with all triggered safeguard policies; the rating is Satisfactory in the last ISR dated

November 2014. Since the project was approved, twenty seven (27) ESIAs and five (5) RAPs have been

prepared, consulted upon, cleared by the Bank and disclosed in-country and at the InfoShop. This

Page 8: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

6

demonstrates the strong capacities and skills on safeguards of both project coordination unit and the

implementing agencies in the five beneficiary countries. The mid-term review of the environmental and

social safeguards confirmed that environmental and social safeguards had been adequately addressed.

Given, however, that the project will rehabilitate 680 hectares of irrigation in Niger and will develop at

least 4250 hectares of new irrigation in Benin, Guinea and Mali, this restructuring proposes that the Pest

Management OP 4.09 be triggered, in addition to the existing safeguards policies that have already been

triggered. The initial 2007 ESMF refers explicitly to overall pest management framework in the borrowing

countries. Four (4) borrowing countries: Benin, Niger, Mali and Guinea have prepared national Pest

Management Plans (PMP) during project implementation that were audited, found satisfactory by the

Bank, and subsequently disclosed at the Infoshop and in the concerned countries in 2012. Since the PMPs

were already prepared, this triggering in the documentation is overdue and will bring it up-to-date with the

activities on the ground. There is no need for Nigeria to prepare a PMP.

Procurement and financial management

Procurement and financial management were rated Satisfactory in the last ISR dated November 2014,

since all issues raised above under this section (B) are addressed and almost all major contracts are signed

and implementation is ongoing on all components. In addition, a strengthening of the procurement staff

capacities, a close follow-up of National Implementing Agencies by the Project Management and

Coordination Unit (WRDSEM/PMCU) and the World Bank, combined with the celerity in no objection

issuance by the World Bank in 2014 enabled achievement of a good performance in procurement and

financial management.

However, despite all of this good progress in the current year, implementation of many activities will not

be completed before the current closing date of December 31, 2014.

Progress to date

Progress to date can be summarized as follows:

a. Under component 1 (NBA institutional strengthening and capacity building), there has been

significant progress in enacting the required legislation and institutional structure essential for regional

cooperation. Two out of four of the legal instruments have been obtained: the Water Charter has been

effective since July 2010 and the Council of Ministers (CoM) of the Niger Basin Authority (NBA)

approved the first Annex of the Charter in September 2011. The Panel of Experts (PoE) has been

operational since September 2011. The PoE for dam safety and for environmental and social aspects have

already initiated the review of the Kandadji Program, which includes the construction of the Kandadji dam

in Niger. Progress on the Water Charter in a basin with multiple riparians such as the Niger Basin

represents a breakthrough in terms of regional cooperation. The monthly and annual water resources

information database is operational; monthly reports are published on NBA website. The Permanent Water

Committee has been established and meetings planned for 2015 and 2016.

b. Under component 2 (Rehabilitation, optimization and development of regional infrastructure): in

Nigeria, the contract for the rehabilitation of the Kainji hydropower plant (which represents 68 percent of

the total cost of WRD-SEM APL 1) was signed in June 2011. Due to the aforementioned delays, full

rehabilitation of the hydropower plant is expected to be completed by mid-June, 2015. At Jebba the

production capacity has been reinforced by the rehabilitation of the main spillway discharge channel and

grouting of auxiliary dam No. 3; regarding the monitoring equipment for the dam, the procurement is

ongoing. A one year period is requested for the observance of the operation of the units during the

performance guarantee period. Preparatory studies for the Zungeru dam were funded by the Federal

Republic of Nigeria and have been completed. In its stead, the Government has requested the support for

Page 9: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

7

the preparation of a hydropower Master Plan of part of the Niger basin located in Nigeria which is about

to start and is expected to span a total of 16 months duration. The proposed plan will provide Nigeria with

an essential tool to rationally diversify energy generation and reduce carbon emissions.

The Kandadji studies were prepared earlier by other development partners. Under this component, the

updated safeguard documents have progressed more rapidly than expected and are completed. This

enabled the World Bank to fund the Kandadji Dam Program in Niger through the second phase of WRD-

SEM APL 2A, for an amount of US$255 million.

In Guinea, political problems that occurred after the transition interrupted the bidding process for the

Feasibility and Design studies of the Fomi multipurpose dam, which forced a rebidding of the contract.

More recently, Guinea and Mali officially decided to join forces on this important multipurpose project.

This culminated in a rethinking and broadening of key sections of the Terms of Reference (ToRs) to

enhance the regional dimension. The Fomi project, through the water regulation capacity it provides in the

upper Niger River, is one of the most critical infrastructures as established in the Sustainable Development

Action Plan developed by the Niger Basin Authority. It can unlock significant irrigation potential in Mali

(over 200,000 ha) and provide power to the West African regional power grid in addition to serving an

energy poor region of Guinea. It is yet a highly complex project that requires: high quality studies and an

exemplary inclusive decision making process, including on financing aspects. This is one of the main

objectives of the US$7.5 million TA financed by the CIWA trust fund that will be brought to the board in

January 2015.

In Mali, the update of preparatory studies for Taoussa dam has been undertaken by other development

partners and, it no longer requires WRDSEMP-APL 1 funding.

c. Under component 3 (Sustainable management of selected degraded ecosystems and rehabilitation

of small water infrastructure), although all activities in Niger under this component are making good

progress, some activities remain: the remedial additional works for the Djamballa irrigated scheme; the

rehabilitation and development of twenty-two (22) nursery gardens; and the fish stocking of ponds. In

Mali, good results have been achieved especially on mechanical protection works in Sofara and

Gnimitongo, as well as in terms of the development of bourgou crops and the purchase of fishing

equipment. The remaining works to be completed in Mali are the development of 2,366 ha of the

Djambacourou plain for controlled immersion agriculture; the development of 5 ha of Djambacourou

women gardens; and the development of traditional fisheries. The results registered in Benin are related to

the development of agro forestry encompassing over 1,085 ha including Income Generating Activities

(IGA) and small irrigated schemes over 1,500 ha. The remaining activities include: the rehabilitation of

seven (7) small dams and the development of 700 ha of fragile zones upstream of the seven rehabilitated

dams. Civil works in Benin and Mali have been delayed due to the need to conduct Environment and

Social Impact Assessments (EISAs) and Social Evaluations (SEs). In Guinea, works, comprising the

development of 500 ha of agro forestry and 450 ha of lowlands at Faranah and Kissidougou, have started

and are ongoing. However, these works could be subject to delays due to the outbreak of the Ebola

epidemic.

Since some of the WRD-SEM APL 1 activities will not be completed by the December 2014 closing date,

beneficiary countries have expressed their desire to extend the current closing date and to reallocate

available funds; that to allow them to achieve key remaining activities after cancellation of some without

significant impact on the revised PDO.

C. Proposed Changes

Page 10: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

8

Change in Implementing Agency

Implementing Agency Name Type Action

Niger Basin Authority (NBA) Implementing Agency New

Development Objectives/Results

Project Development Objectives

Original PDO

The project development objective is to achieve a sustainable increase in the overall productivity of

existing water resources to foster economic development in selected countries of the Niger River Basin.

Change in Project's Development Objectives

Explanation

The rationale for the revision of the PDO is to respond to the need to reduce the scope of the project to

ensure a good link between the project target indicators, achievements and activities.

Proposed New PDO

The (new) WRD-SEM APL 1 Development Objective is: to enhance regional coordination and improve

water resources management in the Niger River Basin.

Change in Results Framework

Explanation:

A new Result Framework for WRD-SEM APL and a revised Results Framework for WRD-SEM APL1 are

presented in the Restructuring Paper.

Revision of the triggers for Phase 2 of the WRD-SEM APL. After four years of implementation of the

WRD-SEM APL, significant progress have been made to facilitate regional cooperation (for example,

implementation of the Water Charter) and the Kandadji Program in Niger has progressed rapidly and

therefore advancing the commencement of WRD-SEM APL 2A, which is related to the IDA contribution

to the Kandadji Program in Niger.

The rationale for adjusting the triggers as part of the restructuring is to ensure that they are relevant to the

overall program, including aligning the remaining triggers to restructuring proposals for phase 2 activities.

As originally designed, WRD-SEM APL has four institutional triggers and one technical trigger, which

must be met before moving from Phase 1 to Phase 2.

The four institutional triggers are: (i) the adoption of a Niger Basin regional environmental code by

riparian countries (Achieved); (ii) the finalization of the Niger Basin Water Charter (Achieved); (iii) the

creation of a Permanent Water Commission (Achieved); and (iv) the development and adoption of the

legal instruments for the joint management and optimization of large infrastructure, dispute resolution and

arbitrage enforcement by riparian countries (On-going).

The technical trigger is that the Power Holding Company of Nigeria (PHCN) has met the expected output

in terms of availability of the rehabilitated units 5, 6, and 12 of Kainji power plant (Expected to be

achieved by April 2015).

For the WRD-SEM APL 2A, only the first three institutional triggers are relevant and they have been met.

The last institutional trigger will be required only when the three envisaged dams in the Niger Basin -

Kandadji, Niger; Taoussa, Mali; and Fomi, Guinea and related infrastructure are operational. The technical

Page 11: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

9

trigger relates only to Nigeria and so is not relevant for the WRD-SEM APL 2A under preparation.

Compliance

Change in Safeguard Policies Triggered

Explanation:

The project remains classified as Category A (full assessment). The supervision mission in May 2012

confirmed that WRD-SEM APL 1 is compliant with all triggered safeguards policies. However, based on

activities to be conducted in irrigation and agriculture, the Pest Management safeguard (OP 4.09) is

triggered for the remainder of the WRD-SEM APL 1. Pest Management Plans were prepared and disclosed

in 2012: in Guinea (29/08/2012), Mali (23/08/2012), Niger (16/01/2012) and Benin (28/08/2012).

The PAD under Annex 10 on safeguards mentions respectively in Paragraphs 16 & 23 that “a Strategic

Regional Environment Assessment (SREA) and preliminary Resettlement Action Plans (RAPs) will be

prepared as part of the Energy Option Assessment to be undertaken under Component 2 during Project

implementation” & “The Project will finance a Strategic Regional Environment Assessment (SREA) and

preliminary RAPs for the Niger River Basin to identify a priority investment plan acceptable by all major

stakeholders. This priority ranking will be based on technical, economic, social, and environment

screening and ranking criteria. In this first phase Project, there will be no environmental and social impacts

from this option assessment and planning process.

Meanwhile, this scope of work was conducted before under the SDAP and the Investment Program of the

Niger Basin Authority by other donors and these studies have been planned in the PAD (WRD-SEM APL

1) to be updated in order to meet international standards to enable the funding of WRD-SEM APL 2 by the

Partners (i.e. when the IDA contribution to an investment is confirmed and the Bank procedures applies).

Current and Proposed Safeguards Policies Triggered: Current Proposed

Environmental Assessment (OP) (BP 4.01) Yes Yes

Natural Habitats (OP) (BP 4.04) Yes Yes

Forests (OP) (BP 4.36) Yes Yes

Pest Management (OP 4.09) No Yes

Physical Cultural Resources (OP) (BP 4.11) Yes Yes

Indigenous Peoples (OP) (BP 4.10) No No

Involuntary Resettlement (OP) (BP 4.12) Yes Yes

Safety of Dams (OP) (BP 4.37) Yes Yes

Projects on International Waterways (OP) (BP 7.50) Yes Yes

Projects in Disputed Areas (OP) (BP 7.60) No No

Financing

Change in Loan Closing Date(s)

Explanation:

Given the delays in commencement of civil works in Nigeria, Guinea, Niger and Benin the countries have

requested an extension of the closing date from 31 December 2014 to December 31, 2017.

Ln/Cr/T Status Original Closing Current Closing Proposed Closing Previous Closing

Page 12: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

10

F Date Date Date Date(s)

IDA-

43420 Effective 31-Jan-2013 31-Dec-2014 30-Jun-2016 31-Jan-2013

IDA-

43430 Effective 31-Jan-2013 31-Dec-2014 30-Jun-2016 31-Jan-2013

IDA-

43480 Effective 31-Jan-2013 31-Dec-2014 30-Jun-2016 31-Jan-2013

IDA-

H3200 Effective 31-Jan-2013 31-Dec-2014 31-Dec-2015 31-Jan-2013

IDA-

H3210 Effective 31-Jan-2013 31-Dec-2014 31-Dec-2017 31-Jan-2013

TF-

10762 Effective 31-Dec-2019 31-Dec-2019 31-Dec-2019 31-Dec-2019

Reallocations

Explanation:

Please refer to the table on page 13 of the Restructuring Paper.

Ln/Cr/TF Currency Current Category of

Expenditure Allocation

Disbursement % (Type

Total)

Current Proposed Current Proposed

TF-10762 EUR ER PAYMENT 18,357,373.

00

18,357,373.

00 100.00 100.00

FEE 0.00 0.00 100.00 100.00

OPTION PREMIUM 0.00 0.00 100.00 100.00

Total: 18,357,373.

00

18,357,373.

00

IDA-43420 XDR IDA43420 PT1

GDS,CS,TR,OP,AUD 700,000.00 767,000.00 100.00 100.00

IDA43420 PT3

GDS,WKS,CS,TR,OP

5,300,000.0

0 5,233,000.0

0 100.00 100.00

Designated Account 0.00 0.00 0.00 0.00

Designated Account 0.00 0.00 0.00 0.00

Total: 6,000,000.0

0

6,000,000.0

0

IDA-43430 XDR IDA43430 PT1

GDS,CS,TR,OP,AUD

1,250,000.0

0 1,730,000.0

0 100.00 100.00

IDA43430 PTS 2,3

GDS,WKS,CS

10,650,000.

00 10,170,000.

00 100.00 100.00

Designated Account 0.00 0.00 0.00 0.00

Designated Account 0.00 0.00 0.00 0.00

Page 13: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

11

Total: 11,900,000.

00

11,900,000.

00

IDA-43480 XDR IDA43480 PT 1

GDS,CONS,TR,AUD

1,800,000.0

0 3,133,000.0

0 100.00 100.00

IDA43480 PT 2

GDS,WKS,CS,OP

86,800,000.

00 85,467,000.

00 100.00 100.00

Designated Account 0.00 0.00 0.00 0.00

Designated Account 0.00 0.00 0.00 0.00

Total: 88,600,000.

00

88,600,000.

00

IDA-H3200 XDR IDAH3200 PT1

GDS,CS,TR,OP,AUD 225,000.00 258,000.00 100.00 100.00

IDAH3200 PTS 2,3

GDS,WKS,CS

9,025,000.0

0 8,992,000.0

0 100.00 100.00

IDAH3200 REFUND OF

PPF 650,000.00 650,000.00 0.00 0.00

Designated Account 0.00 0.00 0.00 0.00

Designated Account 0.00 0.00 0.00 0.00

Designated Account 0.00 0.00 0.00 0.00

Total: 9,900,000.0

0

9,900,000.0

0

IDA-H3210 XDR IDAH3210 PT1

GD,CS,TR,OP,AUD 700,000.00 767,000.00 100.00 100.00

IDAH3210 PTS 2,3

GD,WKS,CS

5,300,000.0

0 5,233,000.0

0 100.00 100.00

Designated Account 0.00 0.00 0.00 0.00

Designated Account 0.00 0.00 0.00 0.00

Total: 6,000,000.0

0

6,000,000.0

0

Components

Change to Components and Cost

Explanation:

The following activities have been cancelled or modified under components 1, 2 and 3:

Component 1: NBA Institutional Strengthening and Capacity Building

Sub Component 1.C: Institutional Strengthening of Regional Water Resources Management and Planning

Establishment of a Regional Consultative Group (RCG) for building a consensus on infrastructure

development and management in the Niger Basin (Cancelled).

Page 14: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

12

Establish permanent sub-basin commission (Cancelled).

Developing legal instruments package to support the Sustainable Development Action Plan (SDAP)

implementation (Cancelled).

Component 2: Rehabilitation, Optimization, and Development of Regional Infrastructure

Sub Component 2.A: Rehabilitation of Kainji hydropower dam

Rehabilitation of the navigation lock (Cancelled).

Sub Component 2.B: Rehabilitation of Jebba hydropower dam

Rehabilitation of selected electro-mechanical equipment. (Modified): (i) Major spare parts: Six break

pressure control valves, six mechanical over speed valves, three guide vane control valves; (Cancelled) (ii)

transformer parts: six bushing seals, six oils and winding temperature meters, three heat exchangers, six oil

tanks diaphragms membrane and (iii) Penstocks and Scroll cases: sand-blasting and normal coating

(Cancelled).

Civil works on the tailrace spillway channel, grouting of auxiliary Dam No. 3 and rehabilitation of the

navigation lock. (Modified): Civil works on the spillway discharge channel and grouting of auxiliary Dam

No. 3 rehabilitation of the navigation lock (Cancelled).

Prevention of tree invasion (Modified). Study of bed load accumulation up to 1,600m from the axis of the

dam is completed. The removal of submerged tree logs and debris around turbines and spillway intakes

(200 m upstream from dam axis); and (ii) removal of dead trees in the reservoir (Cancelled).

Sub component 2.C: Supporting Option Assessment for Regional Water Infrastructure Development

Feasibility and detailed engineering studies for Zungeru dam site in Nigeria (Cancelled). The above

activities have been cancelled and replaced by the study entitled “”Screening of potential hydropower sites

in the Niger Basin within Nigeria and preparation of a master plan of Benue sub-basin in Nigeria” .

Complementary studies for Fomi dam site in Guinea (Modified). The complementary studies will be

limited to technical assistance to develop the design for the construction of the dam.

Complementary studies for Taoussa dam site in Mali (Cancelled). These studies have been cancelled since

they were conducted by other development partners and therefore, no longer needed.

Complementary studies for Kandadji dam site in Niger (Modified and Cancelled). Updating the

Resettlement Action Plan to international standard (Modified for only the first wave of displacement out of

two waves); and the detailed engineering design for Kandadji dam were conducted by other development

partners and therefore, no longer needed.

Component 3: Sustainable management of selected degraded ecosystems and rehabilitation of small water

infrastructure

Sub Component 3.A: Rehabilitation and diversification of small dams

Rehabilitation and diversification of twelve small dams in Benin and diversification of agricultural

activities (Modified) This activity was reduced to seven dams. The activity related to the diversification of

agricultural activities has been cancelled.

Rehabilitation of two small dams in Niger including development of horticulture and irrigated vegetables,

livestock and their market (Modified and Cancelled). (a) Rehabilitation and protection of Aboka dam

(Cancelled). Technical, environmental and social studies have been completed for Aboka dam. However,

Page 15: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

13

works under the activity were not completed due to insufficient budget; (b) Rehabilitation of Theim dam

was undertaken.

Sub Component 3.B: Rehabilitation and Extension of small irrigation schemes

Rehabilitation of three irrigation schemes in Niger: (a) Rehabilitation of the irrigation scheme of Kourani

(Cancelled); (b) Rehabilitation of the irrigation scheme of Son-Lossa Kokomani (Cancelled). Technical,

environmental and social studies were conducted under the project while civil works for these activities

were finalized by the Emergency Program for Food Security funded by the World Bank due to lack of

funding available under the project.

Development of small irrigation schemes in Benin (Modified). This activity increased to 1 500 hectares

from 250 hectares.

Sub Component 3.C: Support the development of traditional fisheries

Promote sustainable fishing practices and fish production processing (Modified). (a) The number of fish

pools and fish-farming ponds in Mali were reduced to 120 pools and 20 fish farming ponds due to limited

funding available.

Sub Component 3. D: Watershed Restoration and Agro Forestry

River bank stabilization and erosion control (Modified). (a) This activity in Mali was modified from 6 km

of dykes and 9 km of vegetation in Mali to 2 km of mechanical protection and 9.3 km of biological

protection. This activity has already been completed. (b) Stabilization of 200 km of Koris' embankments

in Niger was modified to stabilization of six km of Koris' embankments; Forestry protection and

development of agro- forestry (Modified). (a) Reforestation and re vegetation in Niger was modified from

6 million plants produced and planted to 32 plant nurseries.

Current Component

Name

Proposed Component

Name

Current Cost

(US$M)

Proposed

Cost (US$M) Action

Component 1:

Institutional

Strengthening and

Capacity Building

Component 1: NBA

Institutional

Strengthening and

Capacity Building

7.77 10.73 Revised

Component 2:

Rehabilitation,

Optimization and

Development of Regional

Infrastructure

138.45 134.62 Revised

Sustainable Management

of selected degraded

ecosystems and

rehabilitation of small

water infrastructure.

39.78 40.65 Revised

Total: 186.00 186.00

Other Change(s)

Change in Implementation Schedule

Page 16: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

14

Explanation:

In Niger, additional twelve (12) months are required to achieve the remaining activities comprising:

remedial additional works for the Djamballa 689 hectares irrigated scheme; rehabilitation and development

of twenty-one (21) nursery gardens; and stock fish in 15 ponds to produce 80 tons of fish.

In Benin, additional eighteen (18) months are required to complete remaining activities including the

rehabilitation of seven (7) small dams for which the environmental and social impact assessments were

just completed; the development of 700 hectares of small irrigated schemes (in addition to the 800 hectares

already completed to reach the target of 1,500 ha; the restoration of watersheds; the development of 415 ha

of agro forestry in addition to the 700 ha completed to reach the target of 1,115 ha) and of 700 ha of

fragile zones upstream of the seven small dams to be rehabilitated .

In Mali, additional eighteen (18) months are required to launch and ensure completion of development of:

2,366 ha of the Djambacourou plain for controlled immersion agriculture; 5 ha of the Djambacourou

women gardens; and traditional fisheries.

In Nigeria, additional eighteen (18) months are also required to complete the following key activities:

rehabilitation and testing of units 5, 6 & 12 and auxiliaries at the Kainji Hydropower Plant to increase its

production capacity to 340 MW as planned in the PAD; completion of additional remedial works at Jebba

dam to secure a capacity production of 578 MW already under production and develop the screening of

potential hydropower sites in the Niger Basin within Nigeria; and preparation of the Benue sub-basin

master plan in Nigeria.

In Guinea, additional time of 3 years is required to complete technical studies (update of feasibility,

detailed engineering design and bidding documents) and safeguard studies (update of Environmental and

Social Impact Assessment (ESIA); update of the Resettlement Action Plan – (RAP) for the large

multipurpose Fomi dam in Upper Guinea to meet international quality standards). The Fomi dam enjoys

high levels of support, especially from Mali and Guinea, and could be a major pillar of the Bank’s strategic

engagement in the Sahel, with potential to scale up irrigation by over 200,000 ha in addition to

hydropower. It is also an inherently complex case that few other organizations than the Bank can tackle

through exemplary multidisciplinary work. To this effect, a US$7.5 million Niger River Basin

Management Project (NRBMP) grant from the multi-donor Cooperation in International Waters in Africa

(CIWA) trust fund is currently under preparation. This grant will support studies designed largely to ensure

quality and sound decision making, as well as workshops, Donors round tables and other studies related to

Fomi Dam. The Guinea Financing Agreement is proposed to be extended until December 31, 2017. This

extension of thirty-six (36) months will also enable completion of the remaining ongoing activities

consisting of the development of 500 ha of agro forestry and 450 ha of lowlands at Faranah and

Kissidougou where works were launched on November 2014.

Page 17: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

15

ANNEX 1: New Results Framework and Monitoring

Project

Name: Niger Basin Water Resources Development and Sustainable

Ecosystems Management Project (P093806)

Project

Stage: Restructuring Status: DRAFT

Team

Leader: Emmanuel Y. Nikiema

Requesting

Unit: AFCRI Created by: Lucson Pierre-Charles on 08-Sep-2014

Product

Line: IBRD/IDA

Responsible

Unit: GWADR Modified by: Emmanuel Y. Nikiema on 09-Dec-2014

Country: Africa Approval FY: 2008

Region: AFRICA Lending

Instrument: Adaptable Program Loan

Project Development Objectives

Original Project Development Objective:

The project development objective is to achieve a sustainable increase in the overall productivity of existing water resources to foster economic

development in selected countries of the Niger River Basin.

Proposed Project Development Objective (from Restructuring Paper):

The (new) WRD-SEM APL 1 Development Objective is: to enhance regional coordination and improve water resources management in the Niger

River Basin.

Results

Core sector indicators are considered: Yes Results reporting level: Project Level

Project Development Objective Indicators

Status Indicator Name Core Unit of Measure Baseline Actual(Current) End Target

New Percentage of activities

implemented according to the

Percentage Value 0.00 75.00 100.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Page 18: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

16

Niger Basin Sustainable

Development Action Plan Comment - Development

of irrigated

schemes

- Sustainable

watershed

management

- Silting and

erosion control

- Rehabilitation

of dams

New Number of legal instruments

adopted by riparian integrated

water countries for integrated

water resources management at

regional level.

Number Value 0.00 2.00 4.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment The Niger Basin

Water Charter

entered in force

in 2011.

The last of the 9

member States

has ratified the

NB Water

Charter in 2014

Annex 1 of NB

Water Charter

(Environment)

adopted in 2012

Annex 2 of NB

Water Charter

(Coordinated

Management of

Large Dams)

Annex 3 of

Water Charter

(Prior

Notification of

Planned

Page 19: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

17

Measures)

Date 29-Nov-2012 19-Nov-2014 31-Dec-2017

Comment

New Generation Capacity of

Hydropower rehabilitated

under the project

Megawatt Value 0.00 120.00 340.00

Sub Type Date 29-Dec-2007 19-Nov-2014 31-Dec-2017

Breakdown Comment Kainji: 120

Jebba: 500

Generation

capacity of

hydropower

capacity

rehabilitated at

Kainji: 340

Generation

capacity

reinforced at

Jebba

hydropower

station: 578

New Land area where sustainable

land mgt. practices were

adopted as a result of project

Hectare (Ha) Value 0.00 12739.00 13439.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment The initial area

of land to

restore including

watershed

protection and

dune

stabilization:

7500 Ha in

Niger

Agroforestry

areas: 525 Ha

(pure

Page 20: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

18

plantation), 590

Ha

(rehabilitation

old plantations),

700 Ha

(upstream dams)

in Benin; 500

Ha in Guinea

New Direct project beneficiaries

Number Value 0.00 3.75 55.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment 50 million from

Electricity

5 million from

other activities

New Female beneficiaries

Percentage Value 0.00 2.06 31.90

Sub Type

Supplemental

Marked for

Deletion

Percentage of activities

implemented according to the

Niger Basin Sustainable

Development Action Plan

(SDAP).

Text Value The SDAP has

been finalized

and approved

by riparian

countries of

the Niger

Basin.

About 15 % of

the SDAP

activities are

implemented

At least 50% of

the SDAP's

activities are

implemented.

Date 29-Nov-2007 14-Mar-2014 31-Dec-2014

Comment A survey by

country will be

done before the

closing date.

Marked for

Deletion

Percentage of watershed areas

in Faranah (Guinea), Mopti

Text Value Watershed

sites have been 2250 Ha of

watershed

Page 21: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

19

region (Mali), Dosso and

Tilaberi (Niger) and Alibori

(Benin) using agroforestry,

river bank stabilization and

sedimentation control.

identified

during project

preparation.

managed against

erosion and

siltation.

Date 16-May-2007 14-Apr-2014 31-Dec-2014

Comment Target exceeded.

Marked for

Deletion

Hectares of rehabilitated or

additional irrigated surface in

Mopti Region (Mali), Tilaberi

(Niger) and Karimaman

(Benin).

Text Value All sites have

been identified

and approved

during project

preparation.

690 Ha

management

completed in

Niger. Works

ongoing in Mali

and Benin

At least 1,000

Ha of irrigated

surface

rehabilitated in

the basin.

Date 29-Nov-2007 14-Mar-2014 31-Dec-2014

Comment By the end of the

Project it is

expected that the

1 000 Ha target

will be exceeded

(estimated

number at least

2,600 Ha)

Marked for

Deletion

Hydropower capacity (MW)

rehabilitated at Kainji and

Jebba hydropower plants.

Text Value Only units 6, 9

and 10 out of

the 8 units of

Kainji HEP are

still operating.

This represents

280 MW

available for a

total capacity

of 760 MW

New turbines and

parts will be on

place the coming

months.

At least units 5,

6 and 12 of

Kainji HEP are

fully

rehabilitated and

operational.

This will

represent

additional

320MW.

Date 29-Nov-2007 14-Mar-2014 31-Dec-2014

Comment The end target

Page 22: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

20

needs to be

updated during

the restructuring

of the Project.

Intermediate Results Indicators

Status Indicator Name Core Unit of Measure Baseline Actual(Current) End Target

Revised Component 1: Percentage of

monthly and/or annual water

resources information database

publicly available on NBA

website.

Percentage Value 0.00 100.00 100.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment Hydrological

monthly forecast

report published

on NBA website

and transmitted

to NBA member

States and

Partners

Percentage of monthly and/or

annual water resources

information database publicly

available on NBA website.

Percentage Value 0.00 100.00 100.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment this indicator will

be dropped as it is

not well defined

Revised Component 1: Number of

water management meetings

held per year by the Permanent

Water Commission (PWC).

Number Value 0.00 0.00 3.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment PWC created

but not yet

operational

Number of water management

meetings held per year by the

Number Value 0.00 1.00 2.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Page 23: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

21

Permanent Water Commission

(PWC). Comment

New Component 2: Number of

Kainji hydropower units

rehabilitated and Jebban units

reinforced

Number Value 0.00 1.00 3.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment Kainji: 0

Jebba: 0

Kainji: 1

Jebba: 5

Kainji: 3

Jebba: 6

In Kainji, Units

5, 6 & 12 are to

be rehabilitated.

In Jebba, no unit

was to be

rehabilitated.

Activities were

only to reinforce

the production

capacity of the

dam.

New Component 2: Kainji dam

monitoring and instrumentation

equipment updated in Kainji

and Jebba

Text Value Faulty

instrumentatio

n and

monitoring

equipment at

Kainji and

Jebba

Study (dam safety

and

epidemiological

survey) started on

September 2013

for 16 months.

Some equipment

will be purchased

and installed

before the end of

the study

Full replacement

or repair of

recording

instrumentation

and monitoring

equipment at

Kainji and

Jebba.

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment

Revised Component 2: Number of dam

Number Value 0.00 1.00 3.00

Page 24: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

22

sites with completed feasibility

studies. Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment Preliminary

studies on two

dam sites

(Fomi,

Kandadji).

2010: Zungeru

dam studies

done under

beneficiary

country funds.

IDA funds for

Zungeru will

support

Hydropower

master plan

study for

Nigeria (with

development

options in

Benue

catchment);

Taoussa (Mali):

studies funded

by another

partner; IDA

fund for

Taoussa dam

has been

reallocated to

support

component 3 in

Mali

Number of dam sites with

completed feasibility studies.

Number Value 2.00 1.00 4.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment The end target

will be updated

during the

restructuring.

Page 25: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

23

Revised Component 3: Hectares

afforested for ecological or

income generation purposes.

Hectare(Ha) Value 0.00 1705.00 2205.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment Detailed revised

target per

country Benin:

525 Ha (pure

plantation); 590

Ha (old

plantation);

Guinea: 500 Ha

agroforestry;

Mali: 590 Ha

(Bourgou)

Hectares afforested for

ecological or income

generation purposes.

Hectare (Ha) Value 0.00 0.00 1000.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment The Bank

provided its no

objection for

rehabilitation of

forestry in Benin

and Guinea

(2,000 Ha in

Guinea). It is

expected that by

the end of the

Project, the end

target will be

exceeded.

Revised Component 3: Hectares of

irrigation schemes

rehabilitated.

Hectare(Ha) Value 0.00 1489.00 5005.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment Detailed revised

target per

Page 26: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

24

country: Benin:

1,500 Ha;

Guinea: 450 Ha;

Mali: 2,366

Niger: 689 Ha

Hectares of irrigation schemes

rehabilitated.

Hectare(Ha) Value 0.00 690.00 1200.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment The rehabilitation

of 690 Ha is

completed since

September 2013.

The end target

will be adjusted

during the

restructuring.

Revised Number of small dams

rehabilitated in Niger and

Benin.

Number Value 0.00 1.00 8.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment Initial targets:

Benin 12;

Niger 2

Revised target:

Benin 7; Niger 1

Number of small dams

rehabilitated in Niger and

Benin.

Number Value 0.00 1.00 14.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment One dam is

rehabilitated in

Niger and 7 dam

contracts will be

signed soon in

Benin.

Page 27: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

25

Revised Component 3: Hectares of

areas stabilized against erosion.

Hectare(Ha) Value 0.00 11624.00 2250.00

Date 29-Nov-2007 19-Nov-2014 31-Dec-2017

Comment

Hectares of areas stabilized

against erosion.

Hectare(Ha) Value 0.00 3500.00 2250.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment 3500 Ha of land

restored and 450

Ha of dunes

fixed.

Target exceeded.

Marked for

Deletion

Number of Kainji & Jebba

hydropower units rehabilitated.

Number Value 0.00 0.00 6.00

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment Parts for Units 5

and 6 mostly

bought and

brought to Dam

sites and the

rehabilitation of

Unit 12 is on-

going.

Only 3 units will

be rehabilitated

in this project,

the target will be

corrected.

Marked for

Deletion

Kainji dam monitoring and

instrumentation equipment

updated in Kainji & Jebba.

Text Value Faulty

instrumentatio

n and

monitoring

equipments at

Kainji and

Jebba.

Full replacement

or repair of

recording

instrumentation

and monitoring

equipment at

Kainji and

Jebba.

Date 20-Nov-2007 14-Apr-2014 31-Dec-2014

Page 28: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

26

Comment The indicator will

be dropped during

the restructuring

as it is not well

defined.

Marked for

Deletion

The Donor Round table is

successfully organized and

funding is mobilized to support

its implementation.

Text Value The

Sustainable

Development

Action Plan

has been

finalized and

its draft

investment

plan prepared.

Completed At least 50% of

the funding of

Investment Plan

for the first five

years is

available to start

activities on the

ground.

Date 31-Jan-2008 14-Mar-2014 31-Dec-2014

Comment

Marked for

Deletion

Bidding documents for Kainji

HEP finalized with successful

prequalification of firms.

Text Value The bidding

document of

Kainji and

Jebba dams

including

tender

documents for

supervision

and work,

supply and

installation are

finalized.

Contract

implementation is

ongoing

At least Units 5,

6 and 12 of

Kainji HEP are

fully

rehabilitated and

additional two

units are

included based

on available

funding. The

instrumentation

equipment of

Kainji and Jebba

are rehabilitated.

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment Only Units 5, 6

and 12 will be

Page 29: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

27

rehabilitated

Marked for

Deletion

Number of legal instruments

adopted by riparian countries

for integrated water resources

management at regional level.

Text Value Niger Basin

Agreement

3 4

Date 20-Nov-2007 14-Mar-2014 31-Dec-2014

Comment The water Charter

and the Annex 1

of the water

Charter. The

second Annex of

the water Charter

is under

preparation. It is

expected to be

presented to the

Council of

Ministers for

endorsement in

the last quarter of

the CY 2013.

Ministers

received the

documents in

Yaounde on

November 2013

The Niger Basin

Water Charter

entered in force

in 2011.

The last of the 9

member States

has ratified the

NB Water

Charter in 2014

Annex 1 of NB

Water Charter

(Environment)

adopted in 2012

Annex 2 of NB

Water Charter

(Coordinated

Management of

Large Dams)

Annex 3 of

Water Charter

(Prior

Notification of

Planned

Measures)

Page 30: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

28

o Disbursement arrangements

Estimated disbursements (Bank FY/US$m)

FY 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Annual 11.019 00 2.004 19.444 8.007 30.615 74.13 34.29 5.49 1.00

Cumulative 11.019 11.019 13.023 32.468 40.475 71.090 145.22 179.51 185 186

Project implementation period (phase 1): 5 years

Expected effectiveness date: 11/01/2007

Expected closing date: 01/31/13

First extension: 12/31/2014

Second extension: 12/31/2015 for Niger;

06/30/2016 for Benin, Mali and Nigeria;

12/31/2017 for Guinea

o Reallocations

Country

Category of Expenditure

Re-Allocation

only from category 2 to

category 1

% of Financing

category 1 category 2 category 1 category 2

category 1 category 2

Current Revised Current Revised Current Revised Current Revised

Benin 0.98 1.08 8.02 7.92 +0.10 - 12.63% 10.07% 4.50% 4.52%

Guinea 0.98 1.08 8.02 7.92 +0.10 - 12.63% 10.07% 4.50% 4.52%

Mali 1.87 2.59 16.13 15.41 +0.72 - 24.10% 24.14% 9.05% 8.79%

Niger 1.28 1.33 13.72 13.67 +0.05 - 16.49% 12.40% 7.70% 7.80%

Nigeria 2.65 4.65 132.35 130.35 +2.00 - 34.15% 43.34% 74.25% 74.37%

Total 7.76 10.73 178.24 175.28 +2.97 - 100% 100% 100% 100%

Page 31: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

29

Closing dates

Given the delays in commencement of works in Nigeria, Niger, Mali, Benin and Guinea, all these beneficiary countries have requested an

extension of the closing date, which is currently December 31, 2014. A joint detailed work between the NBA and the beneficiary countries

was conducted to suggest sequencing closing dates based on the actual levels of progress and on the specific health context in Guinea where

Ebola Hemorrhagic Fever is prevailing. The proposed closing dates are presented in the table below.

Credit No. Beneficiary Country Requested closing date

IDA H3200 Niger 12/31/2015

IDA 43480 Nigeria 06/30/2016

IDA 43420 Benin 06/30/2016

IDA 43430 Mali 06/30/2016

IDA H3210 Guinea 12/31/2017

Implementation schedule

The implementation schedule has been revised to reflect current progress as shown in the table below:

Countries/Actions 2015 2016 2017

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

NBA/PMCU

Component 1

Organization of the Permanent Technical Committee (PTC) meetings and follow-up of

the recommendations ---- --- ---- --- ---- ---

Follow-up the Panel of Experts (PoE) activities ---- ---- ---- ---- ---- ----

Facilitation of annual external financial audits ---- ---- ----

Technical and administrative supports to the 5 National Implementing Agencies (NIAs)

and the NBA/National Focal Structures ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----

Niger

Component 3

Remedial additional works for Djamballa irrigated scheme ---- ----

Rehabilitation and development of twenty-two (22) nursery gardens ---- ---- ---- ----

Fish stocking of ponds ---- ---- ----

Nigeria

Component 2

Completion of rehabilitation works and testing of units 5, 6 & 12 and auxiliaries at

Kainji Hydropower Plant including the observance of the operation of the units for

one (1) year during the performance guarantee period ---- ---- ---- ---- ---- ----

Additional remedial works in the main spillway discharge channel of Jebba dam ----

Page 32: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

30

Countries/Actions 2015 2016 2017

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Completion of the establishment of dam safety system and epidemiological survey for

waterborne diseases for Kainji and Jebba dams ---- ----

Supply, rehabilitation and installation of hydrological / meteorological measuring

instrumentation, telemetry and flood warning communication equipment for Kainji and

Jebba dams ---- ---- ----

Rehabilitation of concrete structures and flushing of pressure relief wells and channels at

Kainji and Jebba dams ----

Screening of potential hydropower sites in the Niger Basin within Nigeria and

preparation of the Benue sub-basin master plan ---- ---- ---- ---- ---- ----

Benin

Component 3

Rehabilitation of seven (7) small dams ---- ---- ---- ----

Development of 700 ha of fragile zones upstream the seven rehabilitated dams ---- ---- ----

Completion of development of small irrigated schemes over 1,500 ha ---- ---- ---- ----

Completion of restoration of watersheds and development of agro forestry over 1,115 ha ---- ---- ---- ---- ---- ----

Mali

Component 3

Development of 2,366 ha of Djambacourou plain for controlled immersion agriculture ---- ---- ---- ---- ---- ----

Development of 5 ha of Djambacourou women gardens ---- ---- ---- ----

Development of traditional fisheries ---- ---- ---- ---- ---- ----

Guinea

Component 2

Technical studies (update of feasibility, Detailed Engineering Design and Bidding

Document) for Fomi dam ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----

Update of safeguard studies (ESIA and RAP) to standard level for Fomi dam ---- ---- ---- ---- ----

Component 3

Completion of development of 500 ha of agro forestry at Faranah and Kissidougou ---- ---- ---- ---- ---- ----

Completion of development of 450 ha of lowlands at Faranah and Kissidougou ---- ---- ---- ---- ----

Others (please specify)

There are no other changes.

Page 33: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

31

ANNEX 2: Reallocation of Proceeds

NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE ECOSYSTEMS MANAGEMENT PROGRAM

PROJECT ID: P093806

Restructuring Paper

1. Proceeds for the Republic of Benin, IDA 43420,

2. Proceeds for the Republic of Guinea, IDA H3210,

3. Proceeds for the Republic of Mali, IDA 43430,

4. Proceeds for the Republic of Niger, IDA H3200,

5. Proceeds for the Federal Republic of Nigeria, IDA 43480,

will be reallocated as follow:

Country

Category of Expenditure

Re-Allocation

only from category 2 to

category 1

% of Financing

category 1 category 2 category 1 category 2

category 1 category 2

Current Revised Current Revised Current Revised Current Revised

Benin 0.98 1.08 8.02 7.92 +0.10 - 12.63% 10.07% 4.50% 4.52%

Guinea 0.98 1.08 8.02 7.92 +0.10 - 12.63% 10.07% 4.50% 4.52%

Mali 1.87 2.59 16.13 15.41 +0.72 - 24.10% 24.14% 9.05% 8.79%

Niger 1.28 1.33 13.72 13.67 +0.05 - 16.49% 12.40% 7.70% 7.80%

Nigeria 2.65 4.65 132.35 130.35 +2.00 - 34.15% 43.34% 74.25% 74.37%

Total 7.76 10.73 178.24 175.28 +2.97 - 100% 100% 100% 100%

.

Page 34: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

32

6. Briefly summarize project implementation progress.

The overall physical execution rate of the NB/WRDSEM Program is around 73% with a disbursement rate of 68.71 % as at October 31, 2014. Many signed

contracts are under implementation. The key achievements on the ground are summarized as follow:

(i) in Mali, completion of some works, notably mechanical bank protection at Sofara (1,560 m) and Gnimitongo (420 m) and restoration of 590 ha of bourgou

crops and technical and safeguard studies for the development of 2,366 ha of irrigated scheme at Djambacourou plain;

(ii) in Niger, continuation of complementary studies for Kandadji dam (urban development master plan for Ayorou city, operation manual for Kandadji dam

in case of emergency), completion of Theim dam works and restoration of 1,370 ha of degraded lands in banquets and half-moon technics;

(iii) in Benin, continuation of agro-forestry works with plantation of 1,115 ha and development of small irrigated schemes (1,500 ha) and finalization of

technical and safeguard studies for rehabilitation works of 7 small dams;

(iv) in Nigeria, completion of initial works for rehabilitation of the main spillway discharge channel of Jebba dam, continuation of rehabilitation of Units 5, 6

& 12 and auxiliary equipment of Kainji HydroPower Plant, continuation of the study related to establishment of dam safety system and epidemiological

survey for waterborne diseases at Kainji and Jebba dams;

(v) in Guinea, start-up of development of 450 ha of low land works and 500 ha of agro-forestry works, resumption of the process for selecting consultants to

update the Fomi multipurpose dam’s technical, environmental and social studies;

(vi) at the NBA/PMCU, continuation of technical and administrative supports to the five (5) National Implementing Agencies (NIAs) and to the NBA/National

Focal Structures, management and coordination of the Program, facilitation of annual external financial audits, conduct the process for selecting the

consultant for the NBA institutional and organizational audit and organization of the third mission of the NBA Panel of Experts (PoE) for Kandadji dam in

Niger Republic.

7. The proposed reallocation is necessary to ensure full implementation of key remaining activities to achieve the PDO.

Page 35: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

33

ANNEX 3a: Extension of Closing Date - Niger

REPUBLIC OF NIGER– NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE ECOSYSTEMS MANAGEMENT PROGRAM

PROJECT ID: P093806

IDA H3200

Restructuring Paper

1. The closing date for Niger Republic, Niger Basin Water Resources Development and Sustainable Ecosystems Management, IDA H3200 will be extended from

12/31/2014 until 12/31/2015.

2. The overall physical execution rate of the NB/WRDSEM Program in Niger is around 92% with a disbursement rate of 91.06 % as at October 31, 2014.

Contract of remedial additional works for Djamballa 689 ha irrigated scheme is under mobilization. The key achievements on the ground are summarized as

follow: continuation of complementary studies for Kandadji dam (urban development master plan for Ayorou city, operation manual for Kandadji dam in case

of emergency), completion of Theim dam works and restoration of 1,370 ha of degraded lands in banquets and half-moon technics. One year extension is

needed to achieve the project objectives in Niger

3. The proposed extension is necessary to complete the ongoing activities quoted above and the key remaining activities. Please see below the action plan to

complete the project.

Key actions remaining 2015

Q1 Q2 Q3 Q4

Component 3

Remedial additional works for Djamballa irrigated scheme ---- ----

Rehabilitation and development of twenty-two (22) nursery gardens ---- ---- ---- ----

Fish stocking of ponds ---- ---- ----

4. This will be the second extension of the project. The project was extended before from February 2013 to December 2014.

Page 36: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

34

ANNEX 3b: Extension of Closing Date - Nigeria

FEDERAL REPUBLIC OF NIGERIA – NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE ECOSYSTEMS

MANAGEMENT PROGRAM

PROJECT ID: P093806

IDA 43480

Restructuring Paper

1. The closing date for Federal Republic of Nigeria, Niger Basin Water Resources Development and Sustainable Ecosystems Management, IDA 43480 will be

extended from 12/31/2014 until 06/30/2016.

2. The overall physical execution rate of the NB/WRDSEM Program in Niger is around 75% with a disbursement rate of 69.06 % as at October 31, 2014. The

key achievements on the ground are summarized as follow: completion of initial works for rehabilitation of the main spillway discharge channel of Jebba dam

to secure the all production capacity (758 MW), continuation of rehabilitation of Units 5, 6 & 12 and auxiliary equipment of Kainji HydroPower Plant for

additional power of 340 MW, continuation of the study related to establishment of dam safety system and epidemiological survey for waterborne diseases at

Kainji and Jebba dams. Eighteen months extension is needed to achieve the project objectives in Nigeria

3. The proposed extension is necessary to complete the ongoing activities quoted above and the key remaining activities. Please see below the action plan to

complete the project.

Key actions remaining 2015 2016

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Component 2

Completion of rehabilitation works and testing of units 5, 6 & 12 and auxiliaries at Kainji Hydropower Plant including

the observance of the operation of the units for one (1) year during the performance guarantee period ---- ---- ---- ---- ---- ----

Additional remedial works in the main spillway discharge channel of Jebba dam ----

Completion of the establishment of dam safety system and epidemiological survey for waterborne diseases for Kainji and

Jebba dams ---- ----

Supply, rehabilitation and installation of hydrological / meteorological measuring instrumentation, telemetry and flood

warning communication equipment for Kainji and Jebba dams ---- ---- ----

Rehabilitation of concrete structures and flushing of pressure relief wells and channels at Kainji and Jebba dams ----

Screening of potential hydropower sites in the Niger Basin within Nigeria and preparation of the Benue sub-basin master

plan ---- ---- ---- ---- ---- ----

4. This will be the second extension of the project. The project was extended before from February 2013 to December 2014.

Page 37: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

35

ANNEX 3c: Extension of Closing Date - Benin

REPUBLIC OF BENIN – NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE ECOSYSTEMS MANAGEMENT

PROGRAM

PROJECT ID: P093806

IDA 43420

Restructuring Paper

1. The closing date for Republic of Benin, Niger Basin Water Resources Development and Sustainable Ecosystems Management, IDA 43420 will be extended

from 12/31/2014 until 06/30/2016.

2. The overall physical execution rate of the NB/WRDSEM Program in Benin is around 78% with a disbursement rate of 76.03 % as at October 31, 2014. The

key achievements on the ground are summarized as follow: continuation of agro-forestry works with plantation of 1,115 ha, development of small irrigated

schemes (1,500 ha), finalization of technical and safeguard studies for rehabilitation works of 7 small dams, rehabilitation of the said small dams and

development of 700 ha of fragile zones upstream them. Eighteen months extension is needed to achieve the project objectives in Benin.

3. The proposed extension is necessary to complete the ongoing activities quoted above and the key remaining activities. Please see below the action plan to

complete the project.

Key actions remaining 2015 2016

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Component 3

Rehabilitation of seven (7) small dams ---- ---- ---- ----

Development of 700 ha of fragile zones upstream the seven rehabilitated dams ---- ---- ----

Completion of development of small irrigated schemes over 1,500 ha ---- ---- ---- ----

Completion of restoration of watersheds and development of agro forestry over 1,115 ha ---- ---- ---- ---- ---- ----

Screening of potential hydropower sites in the Niger Basin within Nigeria and preparation of the Benue sub-basin master

plan ---- ---- ---- ---- ---- ----

4. This will be the second extension of the project. The project was extended before from February 2013 to December 2014.

Page 38: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

36

ANNEX 3d: Extension of Closing Date - Mali

REPUBLIC OF MALI – NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE ECOSYSTEMS MANAGEMENT PROGRAM

PROJECT ID: P093806

IDA 43430

Restructuring Paper

1. The closing date for Republic of Mali, Niger Basin Water Resources Development and Sustainable Ecosystems Management, IDA 43430 will be extended

from 12/31/2014 until 06/30/2016.

2. The overall physical execution rate of the NB/WRDSEM Program in Benin is around 70% with a disbursement rate of 64.79 % as at October 31, 2014. The

key achievements on the ground are summarized as follow: completion of mechanical bank protection at Sofara (1,560 m) and Gnimitongo (420 m),

restoration of 590 ha of bourgou crops and technical, completion safeguard studies for the development of 2,366 ha of irrigated scheme at Djambacourou plain

and development of the said irrigated scheme, and development of 5 ha of Djambacourou women gardens. Eighteen months extension is needed to achieve the

project objectives in Mali.

3. The proposed extension is necessary to complete the ongoing activities quoted above and the key remaining activities. Please see below the action plan to

complete the project.

Key actions remaining 2015 2016

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Component 3

Development of 2,366 ha of Djambacourou plain for controlled immersion agriculture ---- ---- ---- ---- ---- ----

Development of 5 ha of Djambacourou women gardens ---- ---- ---- ----

Development of traditional fisheries ---- ---- ---- ---- ---- ----

4. This will be the second extension of the project. The project was extended before from February 2013 to December 2014.

Page 39: The World Bank · report no: res16175 international development association restructuring paper on a proposed project restructuring of the niger basin water resources development

37

ANNEX 3e: Extension of Closing Date - Guinea

REPUBLIC OF GUINEA – NIGER BASIN WATER RESOURCES DEVELOPMENT AND SUSTAINABLE ECOSYSTEMS MANAGEMENT

PROGRAM

PROJECT ID: P093806

IDA H3210

Restructuring Paper

1. The closing date for Republic of Guinea, Niger Basin Water Resources Development and Sustainable Ecosystems Management, IDA H3210 will be extended

from 12/31/2014 until 12/31/2017.

2. The overall physical execution rate of the NB/WRDSEM Program in Guinea is around 30% with a disbursement rate of 26.87 % as at October 31, 2014. The

key achievements on the ground are summarized as follow: start-up of development of 450 ha of low land works and 500 ha of agro-forestry works,

resumption of the process for selecting consultants to update the Fomi multipurpose dam’s technical, environmental and social studies. Additional time is

required to complete technical and safeguard studies for Fomi dam to the international standard level of quality. This transboundary project enjoys high levels

of support, especially from Mali and Guinea, and could be a major pillar of the Bank’s strategic engagement in the Sahel, with potential to scale up irrigation

by over 200,000 ha in addition to hydropower. It is also an inherently complex case that few other organizations than the Bank can tackle through exemplary

multidisciplinary work. To this effect, a US $7.5 Million Niger River Basin Management Project (NRBMP) grant for the multidonor CIWA trust fund is

currently under preparation. This grant has, inter-alia, been designed to support these studies designed largely to ensure quality and sound decision making,

and will go to the Board in January 2015 so that it can be implemented simultaneously. Considering about twenty-four months for procurement process and to

conduct the studies and the breakout of Ebola HF in Guinea, thirty-six (36) months extension is needed to achieve the project objectives in Guinea.

3. The proposed extension is necessary to complete the ongoing activities quoted above and the key remaining activities. Please see below the action plan to

complete the project.

Key actions remaining 2015 2016 2017

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Component 2

Technical studies (update of feasibility, Detailed Engineering Design and Bidding Document) for Fomi dam ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----

Update of safeguard studies (ESIA and RAP) to standard level for Fomi dam ---- ---- ---- ---- ----

Component 3

Completion of development of 500 ha of agro forestry at Faranah and Kissidougou ---- ---- ---- ---- ---- ----

Completion of development of 450 ha of lowlands at Faranah and Kissidougou ---- ---- ---- ---- ----

4. This will be the second extension of the project. The project was extended before from February 2013 to December 2014.