    Annex 1 -

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application) Control No: __________

    1st 2nd 3rd ___ th Screening

    Date Submitted for Screening: _______________________________________________________________

    Form of Submission: ___ Hard ___ DigitalProject Title: _____________________________________________________________________________Project Location: _________________________________________________________________________Project Proponent: ________________________________________________________________________Address: ________________________________________________________________________________Contact No: FaxNo:_________________ Contact Person:______________________EIS Consultant: ___________________________________________________________________________Address: ________________________________________________________________________________Contact No: Fax No: ______________ Contact Person:______________________Project Classification & Type: _______________________________________________________________

    Project Classification Code (Refer to RPM for DAO 2003-30): _____________________________________Project Size based on Classification: _________________________________________________________

    Date of Technical Scoping:______________________________________________________________Venue of Technical Scoping:_____________________________________________________________

    Checklist of Documentary Requirements

    To be filled-up upon submission of EISAcceptable?

    Screening Officers RemarksYes No

    Environmental Impact Statement (EIS)1

    Proof of Compatibility with the existing LandUse Plan

    Proof of Authority over the Project Site

    Accountability Statements of Preparers &

    Proponents (see Annexes 2-21 & 2-22 ofRevised Procedural Manual for DAO 2003-30)

    Photographs or plates of the project site,

    impact areas and affected areas andcommunities

    Duly Accomplished Project EnvironmentalMonitoring & Audit Prioritization Scheme(PEMAPS) Questionnaire (see Annex 2-7d ofRevised Procedural Manual for DAO 2003-30)

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    2/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd 3rd ___ th Screening

    Checklist of EIS Contents

    Executive Summary (maximum of 5 pages)

    CONTENTSPage # Acceptable?

    REMARKS

    Project Fact Sheet PD Summary (1 page)

    Process Documentation of the conduct of EIA (1 page) (EIA Team,

    EIA Study Schedule & Area, EIA Methodology, Public Participation)

    Summary of Baseline Characterization, Key Environmental Impacts,

    Management & Monitoring Plan, and EMF and EGF Commitments

    Items to beDescribed

    Specific Data Requirement Page # Acceptable? REMARKS

    I. Project Description

    1)Project Locationand Area

    a)Map showing sitio, barangay, municipality,province, region boundaries, vicinity,

    proposed buffers surrounding the area andprimary & secondary impact areas

    b)Geographic coordinates (shape file data) ofproject area (use PRS 92 datum - GPSsetting)

    c) Rationale for selection primary & secondaryimpact areas

    d)Discussion on the accessibility of the projectsite/area

    4)Project Rationale Cite and focus on the need for the project

    based on national and regional/localeconomic development in terms ofcontribution to sustainable developmentagenda or current development thrusts.

    Describe the justification for the Project

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    3/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd 3rd ___ th Screening

    Items to beDescribed

    Specific Data Requirement Page # Acceptable? REMARKS

    location) considered and nominatedduring the course of selecting the best

    option for which the EIS is prepared;

    Describe the bases upon which the

    alternatives were rejected in favor of the

    preferred option;

    Describe the significant differences in

    environmental impacts among the

    alternatives considered.

    Siting: Cite alternative project locationsincluding factors significant to the selection,

    such as perception of affected communities

    with regards to project, ancestral domain

    issues, land classification, etc. Discuss

    other options on the siting of major

    components of the project within the project

    area.

    Technology Selection/Operation Processes:Discuss the projects advantage over

    alternative technologies, operation

    processes and engineering design.

    Discuss alternative measures to prevent

    occurrence of major impacts.

    Resources: Discuss the alternatives

    considered for power generation and howthe decisions were made. Discussion

    should also be in the context of climate

    change (e.g., use of non renewable vs.

    renewable energy)

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    4/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd 3rd ___ th Screening

    Items to beDescribed

    Specific Data Requirement Page # Acceptable? REMARKS

    corresponding facility being served orconnected

    Identification of safety devices/ emergency

    facilities to be used in the occurrence ofindustrial accidents/emergencies (ie. fire,explosion, accidental oil spillage etc.)

    General layout of facilities

    Footprint of proposed layout of project

    facilities (if any)

    Maps should be provided showing the

    precise location of the project area, and inparticular, the location and boundaries ofproject area, location and footprint of projectcomponents, and location of all proposedbuffers.

    When applicable, contextualize using the

    PAG-ASA 2020 and 2050 projectedrainfall/temperature data.

    7) Process/Technology

    Technology Description and Performance

    Specifications

    Include process flow-sheets for the operationsand the anticipated rates of inputs, wastesand recycle streams

    Power & water supply system

    Waste Management Systems

    (water/wastewater treatment facility,

    electrostatic precipitators, baghouse filter,

    desulfurizer, other air pollution control

    devices, ash disposal, cooling system, etc.)

    8) Project Size Total power generating capacity, filter plantcapacity, and port capacity and dimension

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    5/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd 3rd ___ th Screening

    Items to beDescribed

    Specific Data Requirement Page # Acceptable? REMARKS

    power, water supply and storage, stormwater drainage, sewerage,telecommunications, accommodation andother infrastructure), waste management(characteristics and quantities of wastematerials: wastewater, air emissions, solidwastes - toxic and hazardous, non toxic andnon hazardous)

    Abandonment

    Final Rehabilitation/ Decommissioning Plan,

    to include land/soil restoration,decontamination or remediation activities and

    procedures & projected schedule. There

    should also be discussions about strategies

    and methods for final rehabilitation of the

    environment disturbed by the project. The

    land use suitability of the various land

    disturbance types should likewise be

    described.

    The proposed decommissioning plan should

    be in terms of the following:

    Procedures for the decommissioning of the

    project components;

    Transport/disposal of equipment and other

    materials used in the plants operation;

    Remediation of contaminated soil and

    water resources due to spills and leakage

    of chemicals and other materials used inthe operation;

    Alternatives for the future use of

    abandoned area;

    Consistency with long-term zoning and

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    6/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd 3rd ___ th Screening

    General Contents Specific Content RequirementPage # Acceptable? REMARKS

    II. KeyEnvironmentalImpacts andManagement/Monitoring Plan

    See attached checklist of contents

    When applicable, include appropriate climatechange adaptation measures/options(embedded in each sector).

    III. Environmental

    Risk Assessment

    See attached checklist of contents

    IV. ImpactManagement Plan

    Limit to most significant impacts per projectphase and per environmental component

    arising from key environmental aspects (See

    Annex 2-17 of RPM for DAO 2003-30)

    V. Social

    Development Plan

    (SDP) and IEC

    Framework

    SDP

    Community development or livelihood

    programs/activities, projected beneficiaries,

    partner institutions, timeframe of

    implementation as well as source and amount

    allotted per activity/component (See Annex

    2-18 of RPM for DAO 2003-30)

    IEC

    Target sector, key messages,scheme/strategy/methods, Informationmedium, timelines and frequency, cost (See

    Annex 2-19 of RPM for DAO 2003-30)VI. Environmental

    Compliance

    Monitoring

    Self-Monitoring Plan

    Use Annex 2-20 of RPM for DAO 2003-30 astemplate

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    7/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd 3rd ___ th Screening

    General Contents Specific Content RequirementPage # Acceptable? REMARKS

    Response Policy

    and Generic

    Guidelines

    requirements. Emergency Preparedness

    should also consider natural hazards to the

    infrastructures and facilities.

    Note: The proponents final safety/

    contingency/emergency guidelines (based on

    safety assessment eg. HAZOP) must be

    submitted to EMB prior to operation.

    VIII. Abandonment/

    Decommissioning/

    Rehabilitation Policy

    Statement on proponents policies and

    generic procedures for Rehabilitation/

    Decommissioning/Abandonment to be

    submitted as post-ECC, within a timeframe

    specified in the ECC.

    IX. Institutional Plan

    for EMP

    Implementation

    Discuss the organizational scheme of the

    proponent including line of command and

    reporting procedures as well as manpower

    complement and relationships with other

    operating departments.

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    8/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    Checklist of EIS Contents

    Key Environmental Impacts and Management/Monitoring Plan

    List of Key Impacts

    Baseline Data Parameter

    Requirements

    Required Assessment

    Methodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Writespecific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    1. THE LAND

    1.1 Land Use and Classification1.1.1 Change/Inconsistency in

    land useDescription & Map showing the project

    area in relation to existing land use.

    Assessment of thecompatibility of theproposed project inrelation to land useand/or the coastalresource managementplan of the LGU, if any.

    1.1.2 Encroachment in

    Environmentally Critical

    Areas (ECAs)

    Identify ECA where the project is

    located or near the project area.

    Identify areas vulnerable/susceptible

    to natural hazards where the project is

    located or near the project area

    (include map/s).

    1.1.3 Possible tenurial / land

    issue

    Identify areas under CARP or with

    CADC / CADT / CALT / CALC where

    the project is located or near the

    project area.

    Specify other conflicting tenurial/landissues (eg. ROW, informal settlersetc.)

    1.2 Geology/Geomorphology

    1.2.1 Change in surface

    landform/ topography/

    terrain/slope

    Slope and Elevation/Topographic Map

    1.2.2 Change in sub-surface/

    underground

    geomorphology

    Regional/General Geological Map

    1.2.3 Inducement of subsidence,

    liquefaction, landslides,

    Geological Map as needed.; hazard

    maps (NAMRIA, NDRRMC, MGB,

    Include discussions on

    impacts/effects of natural

    8

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    9/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    List of Key Impacts Baseline Data ParameterRequirements

    Required AssessmentMethodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Write

    specific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    mud / debris flow, etc. PHIVOLCS, PAG-ASA) hazard on the project.

    1.3 Pedology

    1.3.1 Soil erosion / Loss of

    topsoil/overburden

    Summary of Soil Investigation Report

    on soil type and quality; Erodibility

    potential; Bank stability

    Include discussions onpotential landcontamination due toproject operations. Relatediscussions to soilcharacteristics.

    1.4 Terrestrial Ecology

    1.4.1 Vegetation removal and

    loss of habitat

    Flora and fauna species inventory or

    survey report;

    Historical occurrences of pestinfestation, forest/grass fire and/orsimilar incidences

    Quadrat sampling for

    flora

    Use of mist nets, traps,

    transect walk for fauna

    Include discussions on

    overall impact to flora

    and fauna

    Include impactassessment onvegetation (e.g.,likelihood of destruction)and specific managementmeasures (e.g.,protection, balling,transplanting,replacement, etc.)

    1.4.2 Threat to existence and/orloss of important localspecies

    Summary of endemicity / conservationstatus

    1.4.3Threat to abundance,frequency and distributionof important species

    Summary of abundance, frequency

    and distribution

    Economic importance and uses of

    significant flora and fauna

    1.4.4 Hindrance to wildlifeaccess

    Sampling / survey map in relation tothe project site

    2. THE WATER

    2.1 Hydrology/Hydrogeology

    2.1.1 Change in drainage

    morphology / Inducement

    of flooding/ Reduction in

    stream volumetric flow

    Drainage map; historical

    flooding/drought occurrences, stream

    flow measurements/estimates;

    Delineation of watershed /sub-

    watersheds/ floodplain; and

    Discuss possible impacts

    of the project on the

    occurrence of flooding

    and vice versa. Consider

    extreme weather

    9

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    10/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    List of Key Impacts Baseline Data ParameterRequirements

    Required AssessmentMethodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Write

    specific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    identif ication of aquifers, i f any condit ions and the PAG-

    ASA 2020 and 2050

    climate projections.

    Assessment shouldinclude potentialoccurrence oraggravation of flooding innearby areas.

    2.1.2 Change in stream, lakewater depth

    Regional hydrogeological map

    2.1.3 Depletion of water

    resources / competition in

    water use

    Identification of current / projected

    water use (groundwater/surface water)

    in the area and adjacent areas

    Spring and well inventory and location

    map; depth of water table

    Analysis/estimation of wateravailability taking into considerationthe PAG-ASA 2020 and 2050 climateprojections

    For project with

    significant water

    requirement, conduct

    water balance / budget

    analysis

    2.2 Oceanography

    2.2.1 Change/disruption incirculation pattern Predicted tides; 24-hour tidal cycles;Surface current system

    2.2.2 Change in bathymetry Bathymetric map USLE / similar modelingwhen applicable

    2.3 Water Quality2.3.1 Degradation of

    groundwater qualityPhysico-Chemical characterization ofwater:

    pH BOD5 COD

    Use DENR standard

    methods and procedures

    for sampling and

    analysis.

    For project with

    2.3.2 Degradation of surfacewater quality

    2.3.3 Degradation of

    10

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    11/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    List of Key Impacts Baseline Data ParameterRequirements

    Required AssessmentMethodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Write

    specific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    coastal/marine waterquality

    DO Oil and grease TSS Heavy

    Metals:____________________

    fecal / total coliform Others:

    __________________________

    sampling site map

    coastal/marine structures

    and /or significant marine/

    coastal discharges,

    conduct circulation /

    plume modeling (include

    worst case scenario of

    failure of WWTF).

    Include discussions on

    possible contamination

    due to leaks/spills

    Provide Aquifer(Groundwater)vulnerability Assessment(i.e., discussions ongroundwatercontamination due toproject operation).

    2.4 Freshwater Ecology

    2.4.1 Threat to existence and/or

    loss of important local

    species and habitat

    Summary of endemicity /

    conservation status

    Abundance of ecologically and

    economically important species

    (fishes, benthos, planktons) Presence of pollution indicator

    species

    sampling site map

    Include discussions onoverall impact tofreshwater ecology

    2.5 Marine Ecology

    2.5.1 Threat to existence and/or

    loss of important local

    species and habitat

    Abundance/densities/distribution of

    ecologically and economicallyimportant species (mangroves,fishes, benthos, planktons, coral

    Quadrat, transect, line

    intercept, spot dive,

    manta tow, marine

    11

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    12/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    List of Key Impacts Baseline Data ParameterRequirements

    Required AssessmentMethodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Write

    specific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    reefs, algae, seaweeds, seagrasses)

    Presence of pollution indicator

    species

    Historical occurrences of red-tide,

    fish kill or any related event

    Marine resource map

    sampling site map

    resource

    characterization (e.g.,

    municipal and

    commercial fisheries

    data)

    Include discussions on

    overall impact to

    marine ecology

    2.5.2 Threat to abundance,frequency and distribution

    3. THE AIR

    3.1 Meteorology/Climatology3.1.1 Change in the local

    climate, e.g., local

    temperature

    Monthly average rainfall and

    temperature of the area; Climatological

    normals/extremes; Wind rose

    diagrams; Frequency of Tropical

    cyclones

    In the assessment,consider the PAG-ASAclimate changeprojections for 2020 and2050.

    3.1.2 Contribution in terms of

    greenhouse gas emissions

    Data on Greenhouse gasses (i.e.,

    carbon dioxide, nitrous oxide);

    Calculation of projected GHG emission

    Discuss the projects

    contribution in terms of

    greenhouse gas

    emissions

    3.2 Air Quality (and Noise)3.2.1 Degradation of air quality Characterization of ambient air quality:

    TSP PM10 SOx NOx Trace Metals (for coal fired power

    plant only) :_________________

    Use DENR standardmethods and proceduresfor sampling andanalysis.

    Provide air dispersionmodeling (include worstcase scenario of failure ofAPCD)

    12

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    13/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    List of Key Impacts Baseline Data ParameterRequirements

    Required AssessmentMethodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Write

    specific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    others:__________________________

    (for sampling methods refer to Clean

    Air Act)

    sampling site map3.2.2 Increase in ambient noise

    level

    Characterization of ambient noise level

    sampling site map

    Use DENR standard

    methods and procedures

    for sampling and

    measurement.

    If applicable, noiseattenuation modeling(applicable if there is asource capable ofgenerating 200 dB ormore).

    4. THE PEOPLE

    4.1 Displacement of settler/s

    Displacement / disturbanceof properties

    Change/conflict in land

    ownership

    Change/conflict in right ofway

    Demographic data of impact area:

    - Number of households andhousehold size

    - Land area,- Population,

    - Population density /growth- Gender and age profile,- Literacy rate, profile of educational

    attainment

    Settlements map

    Census of population / property thatwill be displaced / disturbed

    Housing ownership profile / availability

    Discuss how the project

    would affect existing

    properties in the area in

    terms of relocation and

    devaluation

    4.2 In-migration

    Proliferation of informalsettlers

    Discuss the in-migrationpatterns as a result ofproject implementation

    13

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    14/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    List of Key Impacts Baseline Data ParameterRequirements

    Required AssessmentMethodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Write

    specific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    of housing/ number of informal settlers

    4.3 Cultural/Lifestyle change(especially on IndigenousPeoples, if any)

    Demographic data on IndigenousPeoples ( if any) and existingCulture/Lifestyle that may besignificantly affected

    Discuss the impacts onIPs and Culture/Lifestyle

    4.4 Threat to delivery of basic

    services /resource

    competition

    Availability of public services in termsof:

    Water supply

    Power supply

    Communications /transportation

    Health resources (Government and

    Private)

    Peace and order / crime

    Education facilities

    Recreational facilities / sports

    facilities

    Statistical data / information related topublic services:

    Literacy rate, profile of educational

    attainment

    Morbidity and mortality rates (infants

    and adults - 5-year trend)

    Common diseases in the area

    including endemic diseases Environmental Health and Sanitation

    Profile

    Crime rate

    Food security

    Discuss how the project

    would affect the delivery

    of basic services and may

    result in resource

    competition in the area

    4.5 Threat to public health andsafety

    Discuss the project

    implementations threat to

    public health vis--vis the

    baseline health conditions

    in the area

    Analysis of diseases that

    may be affected by

    climate change.

    4.6 Generation of Local Benefitsfrom the projectEnhancement of

    employment and livelihood

    opportunities

    Socioeconomic data:

    Main sources of Income

    Employment rate/ profile

    Sources of livelihood

    Poverty Incidence

    Commercial establishments and

    14

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    15/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    List of Key Impacts Baseline Data ParameterRequirements

    Required AssessmentMethodology/Approach

    forcompleteness during procedural screening; page numbers should be providedupon submission of the EIS

    BaselineConditions

    ImpactAnalysis

    Mgmt. P lan Monito ringPlan Remarks

    During scoping: Unless otherwise specified as agreed during scoping, all items listed are required. Write

    specific instructions (if any) on the blanks/spaces provided.

    Page Page Page Page

    Increased businessopportunities and associatedeconomic activities

    Increased revenue of LGUs

    activities

    Banking and financial institutions

    4.7 Traffic congestion Road network/ systems

    Existing transportation/traffic situation

    Traffic impactassessment, if applicable(including capacity ofroad system in terms ofload/count)

    15

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    16/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    III. Environmental Risk Assessment

    Type of Risks Scope of Assessment Report/Output Required forcompleteness during procedural screening; page numbers

    should be provided upon submission of the EIS

    ERA ERP MonitoringPlan

    RemarksDuring scoping: Check () required/applicable items; items with are automatically required; write specific instructions ( ifany) on the blanks/spaces provided.

    Page Page Page

    Safety Risks

    FireExplosionRelease of toxic

    substances

    - Identification of conditions, events andcircumstances which could be significant inbringing about identified safety risks

    - Description & assessment of the possibleaccident scenarios

    - Assessment of whether the project location isprojected to have extreme climate events for2020 and/or 2050 that could contribute to thetriggering identified scenarios

    -Description of the hazards, both immediate(acute effects) and delayed (chronic effects)for man and the environment posed by therelease of toxic substance (include unloadingof raw materials/fuel), as applicable

    ERA REQUIREMENT

    Quantitative Risk

    Assessment(QRA) -

    Report for submission

    prior to operation

    Specific Instructions :

    ________________________

    Descriptive/Qualitative

    Risk Assessment

    Specific Instructions :

    __________________________

    EMERGENCY PLAN :

    Specific Instructions :

    ________________________

    Refer to Annex 2-7e for the decision

    criteria outline

    Physical Risks

    (Failure of Structure which

    could endanger life, property

    and/or the environment)

    - Identification of conditions, events and triggerwhich could be significant in bringing aboutidentified physical risks

    - Description & assessment of the possibleaccident scenarios

    - Assessment of whether the project location isprojected to have extreme climate events for2020 and/or 2050 that could contribute to the

    triggering identified scenarios- Description of the hazards both immediate

    (acute effects) and delayed (chronic effects)for man and the environment posed by thefailure of structure, as applicable.

    16

  • 7/27/2019 Thermal Power Plants IEE Checklist Format

    17/17

    ECC APPLICATION SCREENING FORM FOR THERMAL POWER PLANT PROJECTS(Requiring EIS for ECC Application)

    Control No: __________

    1st 2nd3rd ___ th Screening

    17

    Noted By: Signature Signature

    Review Committee Members EMB Representatives

    1. 1.

    2. 2.

    3. 3.

    4. Project Proponent:

    5.

    6. Project Preparer/Consultant:

    Resource Person

    1.


Recommended