(Steam power Plant)
7/30/2019 thermalpowerplant-100901040347-phpapp02
2/18
INTRODUCTION India is one of the worlds largest consumer of energy
Conventional sources: Thermal, Hydro and Nuclear.
Non- conventional: Wind, solar, Geothermal, tidal.
Installed capacity 1,61,352MW Thermal = 95151.74MW
Nuclear = 4,120MW
Hydro =36877.76MW
RES = 13242.41MW
Annual power production 680 billion KWH
7/30/2019 thermalpowerplant-100901040347-phpapp02
3/18
Break up of Power Thermal Power Plants 75%
Hydro Electric Power Plants - 21%
Nuclear Power Plants - 4% Installed wind power Generation 9655MW
30% to 40% of electrical power is lost in transmissionand distribution
7/30/2019 thermalpowerplant-100901040347-phpapp02
4/18
STRUCTURE OF POWER SYSTEM
7/30/2019 thermalpowerplant-100901040347-phpapp02
5/18
STRUCTURE OF POWER SYSTEMPower system owned by state electricity
boards.
Private sector utilities operate in Mumbai,
Kolkata, AhmedabadRegional electricity boards Northern,
Southern, Eastern, Western, North-eastern.
Power Grid corporation- Central.
7/30/2019 thermalpowerplant-100901040347-phpapp02
6/18
Thermal Power Plants Installed Capacity 93,392.64MW
1. Coal based 77,458.88MW
2. Gas Based 14,734.01MW3. Oil Based 1199.75MW
7/30/2019 thermalpowerplant-100901040347-phpapp02
7/18
General Layout of Thermal Power Station
7/30/2019 thermalpowerplant-100901040347-phpapp02
8/18
Main Components Fuel Handling Unit
Ash Handling Unit
Boiler Unit Feed Water Unit
Cooling Water Unit
Generator Unit
Turbine Unit
7/30/2019 thermalpowerplant-100901040347-phpapp02
9/18
Main Circuit Fuel And Ash Circuit
Air And Gas Circuit
Feed Water And Steam Circuit Cooling Water Circuit
7/30/2019 thermalpowerplant-100901040347-phpapp02
10/18
Fuel And Ash Circuit Fuel stored and fed to the boiler through conveyor
belts. Broken down into proper shape for completeburning.
Ash thus generated after burning is removed from theboiler through ash handling equipment
7/30/2019 thermalpowerplant-100901040347-phpapp02
11/18
Air And Gas CircuitAir is required for combustion of fuel and is supplied
through fans
Air is passed through air preheater to extract energyfrom flue gases for proper burning of the fuel
Flue gases have ash and several gases which are passedthrough the precipitator(dust collector) and go to
atmosphere through chimney.
7/30/2019 thermalpowerplant-100901040347-phpapp02
12/18
Feed Water And Steam Circuit Steam Converted to water by condenser.Water is demineralized & hence not wasted to have
better economic operation of the plant.
Some part of steam and water is lost while passingthrough different parts.
Boiler feed pump feeds water into the boiler drumwhere it is heated to form steam.
Wet steam is again heated in super heater beforepassing through the turbine
Steam is expanded in the turbine to run it. After whichagain it goes to boiler for reheating
7/30/2019 thermalpowerplant-100901040347-phpapp02
13/18
Cooling Water Circuit
To condensate the steam, large quantity of coolingwater is required which is taken from river or pondage
After passing through the condenser, it is fed back tothe river or Pondage
7/30/2019 thermalpowerplant-100901040347-phpapp02
14/18
Boiler
7/30/2019 thermalpowerplant-100901040347-phpapp02
15/18
Turbine
7/30/2019 thermalpowerplant-100901040347-phpapp02
16/18
Turbine Full View
7/30/2019 thermalpowerplant-100901040347-phpapp02
17/18
Economizer
7/30/2019 thermalpowerplant-100901040347-phpapp02
18/18
Selection Of siteAvailability of cheap land.
Availability of water.
Availability of fuel. Possibility of future expansion of the plant.
Away from the urban areas due to pollution.
The initial cost of plant.
Magnitude and nature of load to be handled.