8/16/2019 Thesill Bldgservices Scheme Design
1/23
Planning Application for the demolition of existing National Park Visitor Centre (D1),
Offices (B1), Retail (A1) and Café (A3) and 79 bed Youth Hostel (Sui Generis) andassociated car parking, and redevelopment of site as new Landscape DiscoveryCentre incorporating Exhibition Space (D1), Retail (A1), Café (A3), Offices (B1) and86 bed Youth Hostel (Sui Generis) together with 87 Permanent Car Parking Spaces,93 Overflow car parking spaces, associated landscaping, substation and crossing
The Sill
8/16/2019 Thesill Bldgservices Scheme Design
2/23
Building Services Scheme Design
RIBA Stage D
The Sill
Document: 473949-RPT-004-P1
Northumberland National ParkAuthority
December 2013
This document has been issued and amended as follows:
Version Date Description Created by Verified by Approvedby
P0 16/12/13 P S D R T H
S
D D
P1 19/12/13 P S D R T H
S
D D
Contents
1.1 Design Approach 1
1.2 Utilities & Incoming Supplies 2
1.3 Load Assessment 3
1.4
Mechanical 4
1.5 Plumbing and Drainage 10
1.6 Electrical 11
1.7 Sustainability Strategy 17
1.8 BREEAM 18
1.9 Energy Strategy 18
1.10 Codes & Standards 21
8/16/2019 Thesill Bldgservices Scheme Design
3/23
T S MEP S D R
1
1 Building Services
1.1 Design Approach
IntroductionT B S E
.
I B S S D
B S .
T
B S .
T
.
Project Description
T S L D C HA H. T
2,500
N N P H W H S.
T 79 O B H N
P C :
/ ( ), , , ,
;
AV
;
;
28 , , , ,
.
, , ;
L/ .
E N N P C O B
8/16/2019 Thesill Bldgservices Scheme Design
4/23
8/16/2019 Thesill Bldgservices Scheme Design
5/23
8/16/2019 Thesill Bldgservices Scheme Design
6/23
8/16/2019 Thesill Bldgservices Scheme Design
7/23
8/16/2019 Thesill Bldgservices Scheme Design
8/23
8/16/2019 Thesill Bldgservices Scheme Design
9/23
8/16/2019 Thesill Bldgservices Scheme Design
10/23
8/16/2019 Thesill Bldgservices Scheme Design
11/23
T S MEP S D R
9
AHU Ventilation Systems
E CO2 . W
, AHU .
F / . A
.
T
.
Plant Replacement Strategy
A ,
. A
.
8/16/2019 Thesill Bldgservices Scheme Design
12/23
8/16/2019 Thesill Bldgservices Scheme Design
13/23
8/16/2019 Thesill Bldgservices Scheme Design
14/23
8/16/2019 Thesill Bldgservices Scheme Design
15/23
8/16/2019 Thesill Bldgservices Scheme Design
16/23
8/16/2019 Thesill Bldgservices Scheme Design
17/23
8/16/2019 Thesill Bldgservices Scheme Design
18/23
8/16/2019 Thesill Bldgservices Scheme Design
19/23
T S MEP S D R
17
1.7 Sustainability Strategy
H G L RIBA S A
BREEAM , , T S P
H W N N P. O
, BREEAM E , NNPA D G SPD S
D.
T H
, .
T S S C S P 1
. T
:
1. C N P.
2. M , , .
3. P
N P.
4. P
.
5. R ,
.
6. D
.
7. P , ,
.
8. C .
T BREEAM E
.
F S S, RIBA S D, T S P, D:473949D003 V: 1, .
A .
S
S
S
S
BREEAM AP
& I S
D G SPD
(NNPA)
BREEAM
P
A
S D
S C
8/16/2019 Thesill Bldgservices Scheme Design
20/23
T S MEP S D R
8/16/2019 Thesill Bldgservices Scheme Design
21/23
T S MEP S D R
19
PV Panels
T PV CO2
. T PV
PV .
PV S D .
T S R .
Biomass Boilers
B
. T
, , . T
.RHI . A 20
500,000 20 .
B S D.
T S P S D D E
Solar Thermal Panels
S . I
12 13%
.
S RHI . B 47,000 20 .
S .
S W H
Summary
B S D
:
T E R (TER) 18.5 CO2/ 2
B E R (BER): 12.8 CO 2/ 2
T P L 2010 R.
A 30% (BER/TER)
BREEAM E .
I 45 . T
10% .
T S MEP S D R
8/16/2019 Thesill Bldgservices Scheme Design
22/23
T S MEP S D R
20
T S T S E , PV
F E S, D: 473949D001 V: 1, T S
D C, J 2014 S D
.
T S MEP S D R
8/16/2019 Thesill Bldgservices Scheme Design
23/23
T S MEP S D R
21
1.10 Codes & Standards
General
T B S .
• HA B G
• R L A
o E H D
o B C O
• B R P L2A 2010 L B W
• R B S C P
• L E CIBSE G
• 17 E IET R
• CIBSE T M M
• H S W
• R C A A
• R
• COSHH (C S H H) R
• R E B.
•
L E IOP G
• W B
• R F A F.O.C.
• T .
o T ( ) H S
H (G) 70:1991
o T 1991.
o M TM13:1991