Document of The World Bank FOR OFFICIAL USE ONLY Report No: 34507-VN PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 83.9 MILLION (US$124.7 MILLION EQUIVALENT) TO THE SOCIALIST REPUBLIC OF VIETNAM FOR A COASTAL CITIES ENVIRONMENTAL SANITATION PROJECT November 14, 2006 Urban Development Sector Unit East Asia and Pacific Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

Document of The World Bank

FOR OFFICIAL USE ONLY

Report No: 34507-VN

PROJECT APPRAISAL DOCUMENT

ON A

PROPOSED CREDIT

IN THE AMOUNT OF SDR 83.9 MILLION (US$124.7 MILLION EQUIVALENT)

TO THE

SOCIALIST REPUBLIC OF VIETNAM

FOR A

COASTAL CITIES ENVIRONMENTAL SANITATION PROJECT

November 14, 2006

Urban Development Sector Unit East Asia and Pacific Region

This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

CURRENCY EQUIVALENTS

(Exchange Rate Effective May 31, 2006)

Currency Unit = Vietnamese Dong (VND) 15,969 VND = US$1 1.48703 US$ = SDR 1

FISCAL YEAR

January 1 – December 31

ABBREVIATIONS AND ACRONYMS

AAA Analytical and Advisory Activities CAS Country Assistance Strategy CEPT Chemically Enhanced Primary Treatment CMC Construction Management Consultant CSO Combined Sewer Overflow CSO Central Statistical Office DARD Department of Agriculture and Rural Development DCA Development Credit Agreement DoC Department of Construction DoE Department of Education DONRE Department of Natural Resources and Environment (in Provinces) DP Displaced People EMPF Ethnic Minority Policy Framework FM Financial Management FMR Financial Monitoring Report FRR Financial Rate of Return FS Feasibility Study GoV Government of Vietnam HCP Healthy City Partnership HH Households IA Implementing Agencies ICB International Competitive Bidding IDA International Development Association IEC Information, Education and Communication ISM Independent Safeguards Monitoring MDG Millennium Development Goals MoC Ministry of Construction MONRE Ministry of Natural Resources and Environment MTR Mid Term Review NCB National Competitive Bidding NGO Non Government Organization NPL Non Performing Loan ODA Overseas Development Assistance PAP Project Affected People PFS Pre Feasibility Study PIP Project Implementation Plan PMU Project Management Unit

Page 3: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

POM Project Operations Manual PPC Provincial People’s Committee PPIAF Private Participation in Infrastructure Advisory Facility PMU Project Management Unit PPU Project Preparation Unit PSC Project Steering Committee PSP Private Sector Participation PWC Provincial Water Company RPA Regional Procurement Advisor SBD Standard Bid Document SDC Swiss Agency for Development and Cooperation SIL Specific Investment Loan SoE Statement of Expenditures SWM Solid Waste Management ToR Terms of Reference UAFW Unaccounted for Water URENCO Urban Environment Company VDG Vietnam Development Goals VDIC Vietnam Development Information Center VLSS Vietnam Living Standards Survey WHO World Health Organization WR Working Ratio WSC Water Supply Company (Provincial Water Company) WSDC Water Supply and Drainage Company WSS Water and Sanitation Sector WW Waste Water

Vice President: Mr James Adams (EAPVP) Country Director: Mr. Klaus Rohland, EACVF

Sector Director: Mr. Keshav Varma, EASUR Task Team Leader: Mr. William Kingdom, EASUR

Page 4: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

VIETNAM Coastal Cities Environmental Sanitation Project

CONTENTS

Page

A. STRATEGIC CONTEXT AND RATIONALE ..........................................................................4

1. Country and sector issues.................................................................................................... 4

2. Rationale for Bank involvement ......................................................................................... 5

3. Higher level objectives to which the project contributes.................................................... 5

B. PROJECT DESCRIPTION ..........................................................................................................5

1. Lending instrument ............................................................................................................. 5

2. Project development objective and key indicators.............................................................. 5

3. Project components............................................................................................................. 6

4. Lessons learned and reflected in the project design............................................................ 7

5. Alternatives considered and reasons for rejection .............................................................. 8

C. IMPLEMENTATION ...................................................................................................................8

1. Partnership arrangements.................................................................................................... 8

2. Institutional and implementation arrangements.................................................................. 9

3. Monitoring and evaluation of outcomes/results................................................................ 10

4. Sustainability..................................................................................................................... 10

5. Critical risks and possible controversial aspects............................................................... 11

6 Loan/credit conditions and covenants............................................................................... 11

D. APPRAISAL SUMMARY ..........................................................................................................12

1. Economic and financial analyses ...................................................................................... 12

2. Technical........................................................................................................................... 13

3. Fiduciary ........................................................................................................................... 14

4. Social................................................................................................................................. 14

5. Environment...................................................................................................................... 15

6. Safeguard policies............................................................................................................. 16

7. Policy Exceptions and Readiness...................................................................................... 16

Annex 1: Country and Sector or Program Background .......................................................................18

Annex 2: Major Related Projects Financed by the Bank and/or other Agencies ...............................22

Annex 3: Results Framework and Monitoring.......................................................................................24

Annex 4: Detailed Project Description....................................................................................................28

Page 5: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

Annex 5: Project Costs .............................................................................................................................34

Annex 6: Implementation Arrangements ...............................................................................................41

Annex 7: Financial Management and Disbursement Arrangements ...................................................47

Annex 8: Procurement Arrangements ....................................................................................................51

Annex 9: Economic and Financial Analysis ...........................................................................................72

Annex 10: Safeguard Policy Issues ..........................................................................................................79

Annex 11: Project Preparation and Supervision ...................................................................................84

Annex 12: Documents in the Project File................................................................................................85

Annex 13: Statement of Loans and Credits ............................................................................................86

Annex 14: Country at a Glance ...............................................................................................................88

Annex 15: Maps.........................................................................................................................................89

Page 6: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

VIETNAM

COASTAL CITIES ENVIRONMENTAL SANITATION PROJECT

PROJECT APPRAISAL DOCUMENT

EAST ASIA AND PACIFIC

EASUR

Date: Novembere 14, 2006 Team Leader: William D. Kingdom Country Director: Klaus Rohland Sector Manager/Director: Keshav Varma

Sectors: Sanitation (90%); Sub-national government administration (10%) Themes: Access to urban services and housing (P);Municipal governance and institution building (S)

Project ID: P082295 Environmental screening category: Full Assessment

Lending Instrument: Specific Investment Loan Safeguard screening category: A

Project Financing Data [ ] Loan [X] Credit [ ] Grant [ ] Guarantee [ ] Other: For Loans/Credits/Others: Total Bank financing (US$m.): 124.7 Proposed terms: Standard IDA Terms

Financing Plan (US$m) Source Local Foreign Total

BORROWER/RECIPIENT 21.8 16.0 37.8 INTERNATIONAL DEVELOPMENT ASSOCIATION

72.1 52.6 124.7

GLOBAL ENVIRONMENT FACILITY 3.0 2.0 5.0 JAPAN: MINISTRY OF FINANCE - PHRD GRANTS

2.6 2.0 4.6

Total: 99.5 72.6 172.1 Borrower: SOCIALIST REPUBLIC OF VIETNAM Responsible Agency: Project Management Unit in Dong Hoi 59 Ly Thuong Kiet, Dong Hoi, Quang Binh Province Tel: (84) 52841215 Fax: (84) 52840734 Email: [email protected]

Project Management Unit in Quy Nhon 68B Nguyen Du, Quy Nhon city, Binh Dinh Province Tel: (84) 56822859 Fax: (84) 56817249 Email: [email protected]

Project Management Unit in Nha Trang 58 Yersin, Nha Trang City, Khanh Hoa Province Tel: (84) 58810858 Fax: (84) 58810740 Email: [email protected]

Page 7: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

2

Estimated disbursements (Bank FY/US$m) FY 2007 2008 2009 2010 2011 2012 2013 2014 Annual 0.00 1.00 9.00 22.00 26.00 26.00 24.00 16.70 Cumulative 0.00 1.00 10.00 32.00 58.00 84.00 108.00 124.70 Project implementation period: Start December 31, 2006 End: May 31, 2014 Expected effectiveness date: May 31, 2007 Expected closing date: November 30, 2014 Does the project depart from the CAS in content or other significant respects? Ref. PAD A.3

[]Yes [X] No

Does the project require any exceptions from Bank policies? Ref. PAD D.7 Have these been approved by Bank management? Is approval for any policy exception sought from the Board?

[ ]Yes [X] No [ ]Yes [ ] No [ ]Yes [ ] No

Does the project include any critical risks rated “substantial” or “high”? Ref. PAD C.5

[X]Yes [ ] No

Does the project meet the Regional criteria for readiness for implementation? Ref. PAD D.7

[X]Yes [ ] No

Project development objective Ref. PAD B.2, Technical Annex 3 The objective is to improve the environmental sanitation in the project cities in a sustainable manner and thereby enhancing the quality of life for city residents. Project description [one-sentence summary of each component] Ref. PAD B.3.a, Technical Annex 4 Component 1: Investment in flood control, drainage and wastewater collection Component 2: Investment in wastewater treatment plant Component 3: Investment in sanitary landfills and provision of solid waste management equipment Component 4: Investment in infrastructure for resettlement sites in two project cities Component 5: Establishment of revolving fund to provide financing for household sanitation improvements, and to build water and sanitation facilities in schools Component 6: Technical assistance for project implementation and capacity building of service providers and other stakeholders Which safeguard policies are triggered, if any? Ref. PAD D.6, Technical Annex 10 Environmental Assessment (OP/OB/GP 4.01) Involuntary Resettlement (OP/OB 4.12) Cultural Resources (OP 4.11) Significant, non-standard conditions, if any, for: Ref. PAD C.7 Board presentation: None Loan/credit conditions and covenants Conditions for Effectiveness: 1. Execution of PHRD capacity building grant agreement 2. Key PMU staff recruited with qualifications acceptable to IDA; 3. Financial management (FM) and procurement systems in place and key PMU staff trained in

procurement, FM and project management; 4. People’s Council resolution approving the cost recovery profile agreed at negotiations; and 5. Adoption of the Project Implementation Plan by the PPC Conditions of Disbursement: 1. Adoption of a Healthy City Partnership (HCP) operations manual prior to disbursement of HCP

grants;

Page 8: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

3

2. Adoption of a Sanitation Fund Manual and execution of implementation arrangement between Province and Women’s Union prior to disbursement of loans under household sanitation revolving fund;

Implementation Covenants: 1. Adoption of a sewer connection policy, and the formal transfer of wastewater and septage functions,

staff, assets and budget to the water company; 2. Execution of service contracts between the Dong Hoi City Hospital and relevant service providers for

disposal of hospital waste and operation of the hospital wastewater treatment plant; 3. Engagement of a Construction Management Consultant prior to the award of any construction

contract; 4. Implementation of actions, as necessary, to achieve cost recovery levels for service providers agreed

at negotiations; 5. Bidding, by mid term review through a competitive process, solid waste management operations in

three wards and septage cleaning in one ward.

Page 9: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

4

A. STRATEGIC CONTEXT AND RATIONALE 1. Country and sector issues 1. Sanitation in Vietnam is predominantly a private good with households investing in septic tanks or latrines, depending on location. Access to hygienic latrines has been estimated at 68% in urban areas in 2003, but service efficacy is low. There are a limited number of wastewater treatment plants in the country, all in the major cities. In addition, solid waste is disposed to dumps, but of 91 landfills only 17 are sanitary. Meanwhile urban solid waste collection rates vary considerably with an average 70% but amongst the urban poor the levels of collection are only 10-20%. As a result, watercourses, especially in the big cities, are severely polluted by both liquid and solid wastes. 2. This situation will be exacerbated by urban growth. The proportion of people living in urban areas in Vietnam is one of the lowest in East Asia, comprising around 23% of the total population, or 19 million people. This is anticipated to increase to 33% by 2010. 3. The country’s urban sewerage policy is presented in Decision #35/1999/QD-TTG. The policy is to: a) rehabilitate existing networks and facilities, expand coverage and introduce wastewater treatment as resources permit, with priority to major cities and tourist centers; b) promote market oriented approaches to service provision; c) develop a better awareness of the impact of sanitation on public health, environmental sustainability and economic development; and, d) gradually replace subsidies with user charges. 4. Solid waste management (SWM) policy is set by a) Management of Solid Waste in Vietnamese Cities and Industrial Parks - Strategy to 2020 (1999) and b) National Strategy for Environmental Protection – Strategy to 2020 (2003). Together the documents focus on: i) legal reform ii) increased awareness and training iii)increased privatization and cost recovery iv) use of appropriate and modern technologies v) promotion of economic approaches to environmental protection and vi) public and civil society involvement. 5. There are significant investment needs for both sectors to cover the rehabilitation of existing systems and the expansion of new systems. The Government of Vietnam (GOV) has estimated these at $3.8 billion for urban sanitation and $700 million for urban SWM over the period 2000 – 2010. 6. Combined investment in urban water supply and sanitation has totaled $1billion over the last decade, mostly for water supplies, whilst $200million has been invested over the last four years in SWM. There is a large shortfall in investment funding in both sectors. 7. The Urban Environmental Companies (URENCOs), normally responsible for drainage, sewerage, solid waste management and other urban activities, are institutionally and financially relatively weak, especially compared with water supply companies. Wastewater fees, typically between VND 250-500/m3, and rising, are charged in cities where sanitation facilities are being developed. SWM fees are typically between 4,600 to 6,600 VND per HH per month. 8. This project will address many of the above issues and support articulated government policies. It will invest in three coastal cities which are the next priorities for government being relatively large and, importantly, growing tourist destinations.

Page 10: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

5

2. Rationale for Bank involvement 9. The urban sanitation sector remains in its infancy. The Bank can work with the Borrower to bring regional and international best practice into the project design and thus further develop/consolidate the urban environmental policy agenda technically (sewerage, waste water treatment and solid waste management), financially (cost recovering charges) and institutionally (efficient and effective service providers) 10. This project builds on the relationship and experiences gained in Quang Ninh, Haiphong, Da Nang and Ho Chi Minh City. Taken as a package this experience will allow the Government to scale up using approaches based on a “tried and tested” model. 11. IDA has also mobilized resources to further advance the sanitation agenda in Vietnam. The Global Environment Fund (GEF) is supporting the demonstration of a new, and appropriate, treatment technology in Quy Nhon, whilst a PHRD co-financing grant will build the capacity of service providers and raise public awareness of the project. 3. Higher level objectives to which the project contributes 12. The last CAS, which links to the GoV’s Comprehensive Poverty Reduction and Growth Strategy (CPRGS), was completed in September 2002. It lists three key objectives:

(a) High growth through a transition to a market economy; (b) An equitable, socially inclusive, and sustainable pattern of growth; and (c) Modern public administration, legal and governance systems.

13. The CAS describes the Bank’s support for each objective and the project supports the following parts of the CAS:

• Enhancing environmental sustainability (Sub-theme 2.6) through improved sewerage, drainage and solid waste services

• Public administration reform (Sub-theme 3.3) through improved institutional arrangements and increased financial sustainability of service providers

• Reducing deficiencies in basic urban services (Key sectoral issue) through provision of access to sanitation services

14. Finally, the CAS Progress Report considered by the Board on February 19, 2004 identified the need for increased investment in infrastructure to help attain the twin objectives of poverty alleviation and growth. B. PROJECT DESCRIPTION 1. Lending instrument

15. The lending instrument will be a Specific Investment Loan (SIL). 2. Project development objective and key indicators 16. The objective is to improve the environmental sanitation in the project cities in a sustainable manner and thereby enhancing the quality of life for city residents. 17. The following indicators will measure progress towards achievement of the objective:

• Number of people benefiting from reduced incidence of flooding;

Page 11: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

6

• Number of people whose solid waste will be regularly collected and disposed to sanitary landfills;

• Number of people gaining access to improved sanitation; • Number of poor people who access and repay loans to improve household sanitation

facilities; and

• Proportion of service providers’ costs recovered from user fees. 3. Project components

Project Location 18. The project will be carried out in three cities along the coast of central Vietnam.

• Nha Trang is the project’s southernmost city and is the capital of Khanh Hoa Province, with a total population of 350,000 in 2002.

• Quy Nhon is located in the south-central region of Vietnam and is the capital city of Binh Dinh Province with a total population of 252,000 in 2003.

• Dong Hoi is the northernmost city of the project and is the capital of Quang Binh Province with a total population of 98,000 in 2003.

Component 1 - Flood control, drainage and wastewater collection ($79 million) 19. The project will improve the collection of sewage by building new sewers, interceptors, rehabilitating existing sewers, and transporting the wastes to new treatment plants. Drainage will be provided by rehabilitating existing drains, constructing new drains where regular flooding occurs and enhancing the capacity of flood retention ponds. 20. Existing combined sewer system will be utilized to the greatest extent possible in the central urban core areas with high population densities. Interceptor sewers will be constructed to pick up flows that currently discharge at a number of locations along the sea front or into rivers. In newly developing areas separate or combined systems will be constructed, depending on assessments of cost effectiveness. Component 2 - Wastewater treatment plant ($40 million) 21. New wastewater treatment plant will be built during Phase 2 of the project to meet Vietnamese national effluent standards. In Nha Trang two plants will be constructed, one to serve the urban core and a second will serve the southern residential area. In Quy Nhon two wastewater plants will serve the old city area and a third will serve the south-western area some 15 km form the city core. In Dong Hoi a single new treatment plant serving the city will be constructed and the existing plant at the city hospital will be rehabilitated. Component 3 - Solid waste management ($15 million) 22. The collection of solid wastes will be improved and they will be transported to new or existing sanitary landfills for final disposal. In Nha Trang a new sanitary landfill will be constructed at Luong Hoa and the existing Ru Ri dump will be safely closed. In Quy Nhon the existing landfill at Long My will be rehabilitated and expanded. In Dong Hoi a sanitary landfill is under development with bi lateral funding and the project will provide additional equipment or functionality as determined during implementation.

23. Solid waste management (SWM) collection equipment will be financed for all cities and transfer stations/collection points are planned for Nha Trang and Quy Nhon. The amount and phasing of the SWM equipment will follow demand over the project life, and will take account of possible PPP activities.

Page 12: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

7

In Dong Hoi the facilities for safe disposal of medical waste will be constructed. These will be operated by the Urban Works Company (UWC) under contract with the hospital.

Component 4 – Resettlement ($12 million) 24. Construction of services (roads and utilities) to new housing plots for relocation of project affected people in Quy Nhon and Nha Trang. Component 5 - Household Revolving Fund and School Sanitation Program ($2 million) 25. Revolving funds will be established in each city to provide small loans for construction of household sanitation facilities. The funds will be managed by the Women’s Union according to the procedures set out in the household revolving fund manual. Eligibility criteria and loan terms and conditions are designed to ensure that low income households are able to access and to pay back the loans. 26. Water supply and sanitation facilities will be built at city schools in response to demand from those schools. Demand assessment and proposed investment for different types of schools will follow the design standards set by the Ministry of Education (MoE). Component 6 - Capacity Building and Project Implementation ($24 million) 27. Support to Project Management Units (PMU) in project implementation including a) overall project management support b) preparation of Phase 2 feasibility studies, detailed engineering designs and bid documents c) construction management supervision for Phases 1 and 2 d) independent safeguards monitoring and e) financial auditing. Equipment to support the PMUs will also be financed. 28. Capacity building for the service providers and city departments including a) institutional study to establish long term structure and staffing for service providers b) purchase, installation and commissioning of financial management, management information, and billing/collection software for the service providers, and training in its use c) joint development, with other city departments, of procedures and plans to support operation and management of new or rehabilitated project facilities d) technical and managerial training to the service providers, including operation and maintenance of the facilities and in financial planning e) workshops and study tours and f) miscellaneous other capacity building activities. 29. Capacity building for design and implementation of a Healthy City Partnership (HCP) including a) development of the framework for design and implementation of the HCP b) implementation of the HCP including training and public awareness, small investments in goods and works, and small grants and c) preparation and delivery of public awareness campaigns to support sanitation behavior change, and explain benefits from the project and its costs. 4. Lessons learned and reflected in the project design 30. The project draws on lessons learnt both nationally and internationally. These include: 31. Enhancing technical and managerial capacity of service providers: The service providers will significantly increase the scope and extent of their activities as a result of project investments. Efficient and effective service providers are essential for long term sustainability. The project therefore includes extensive capacity building to transform the service providers to meet these new demands. 32. Financial sustainability is strongly linked to user fees: Service providers need reliable sources of revenue to pay for operations and maintenance costs, and replace short lived assets. The most reliable source of such revenue is user fees. The project will gradually introduce

Page 13: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

8

affordable user fees over the project life to achieve the required levels of cost recovery. This approach was successfully applied in the Three Cities Sanitation Project. 33. Physical investments only deliver part of the benefits: The benefits from sanitation infrastructure are significantly increased when beneficiaries are exposed to IEC on household sanitation practices. Such IEC also generates demand for household sanitation facilities. The project includes activities for improving sanitation behavior (component 6) and facilitating construction of household facilities (component 5). 34. Laying sewer networks doesn’t guarantee connections to households: House owners have often invested in septic tanks and may not want to connect to the new system. The project addresses this issues through i) public awareness campaigns about system benefits; ii) house connections financed under the project; and iii) wastewater fees applied to all households with water connections – thus reducing disincentives to connect to the system once available. 35. Project management capacity at the sub national level is weak: Capacity building of the PMUs is included as part of the PHRD funded preparation activities, and will be further expanded during implementation. Practical learning is reinforced by regular meetings of the PMUs, and from visits to the Three Cities Sanitation Project PMUs. 36. Competition can be introduced in municipal services: Opportunities will be introduced for the local private sector to compete for collection of solid waste and septage. 37. Septic tank cleaning provides tangible evidence of project benefits: Routine septic cleaning will be provided during project implementation, paid from the user fees. 5. Alternatives considered and reasons for rejection 38. Wastewater services are often seen as part of public works departments, alongside roads or lighting. This institutional arrangement, with limited clarity on resource utilization and financial sustainability, was rejected in favor of combining the wastewater services with the operations of the water companies. The combined water/wastewater model will lead to improved technical and financial management and enhance the quality and sustainability of wastewater services. Consideration was given to establishing separate SWM companies but it was concluded these would not be viable. 39. Centralized project management was considered as a route to speed up project preparation and implementation. This was rejected because it lessened ownership, and would not build capacity, at the municipal level. 40. The immediate introduction of higher tariffs would improve the financial health of the service providers. However consumer resistance was likely and a phased approach has been adopted which will meet the needs of both the service providers and the customers. C. IMPLEMENTATION 1. Partnership arrangements 41. A PHRD co financing grant has been secured to build the capacity of the service providers, city agencies and community organizations associated with the project.

Page 14: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

9

42. GEF financing is being sought to construct a wastewater plant in Quy Nhon to demonstrate the applicability of the chemically enhanced primary treatment (CEPT) technology in Vietnam. A grant has been secured from GEF to prepare the project and investment grant financing is likely. 2. Institutional and implementation arrangements 43. Implementation Agencies: At the national level the Ministry of Planning and Investment (MPI) which provides overall guidance on investment policy will supervise and monitor progress. For sector-specific and technical issues, MPI will consult the Ministry of Construction (MoC), which is responsible for urban sector sanitation policy and technical standards, and with Ministry of Natural Resources and Environment (MONRE) which is responsible for environmental standards and policy. 44. At the provincial level the project will be implemented by a Project Management Unit (PMU). The PMUs report to the Province People’s Committee (PPC), and is supported by consultants, by provincial and city level departments, and by a Project Steering Committee (PSC) which will include representatives from all relevant departments. The PMU directors, or their deputies, are experienced staff from the service providers. 45. During project implemention, the PMU will coordinate and work directly with the related provincial and city departments. However, if there are matters which cannot be resolved then the PMU will seek direction from the PSC. 46. The Women’s Union (WU) will implement the sanitation fund on behalf of the PMUs, based on its successful track record in administering saving and credit schemes of this nature in Vietnam. 47. Financing and Fund Flow: Funds, in Vietnamese Dong, will be on-lent or on-granted to the Provinces and service providers from the MoF as follows:

Component On-lending arrangements 1. Flood control, drainage and wastewater collection Grant to Province 2. Wastewater treatment plant Grant to Province 3. Solid waste management – landfill Grant to Province 3. Solid waste management – collection equipment Loan to URENCO/UWC at 6.6% interest

over 20 years, with 5 years grace period 4. Resettlement Loan to Province at 0% interest over 20

years, with 3 years grace period 5. Household and Public Sanitation program Grant to Province 6. Institutional strengthening and capacity building Grant to Province

48. On-lending of the sanitation fund by the WU will be on terms consistent with micro-finance operations in Vietnam: interest rates of 0.5% per month, and terms of two years. 49. A total of three special accounts will be established - one for each PMU. 50. To monitor the financial performance of the service providers, and to ensure project assets enter into the balance sheets of the service providers, a separate audit will be conducted for each service provider. 51. Financial reporting and auditing: In each city, the project accounts will be kept using accounting principles and practices acceptable to IDA. Each PMU will prepare their own project

Page 15: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

10

accounts and have them audited annually in accordance with international standards on auditing and in compliance with the independent auditing regulations of Vietnam. The auditor’s reports will be made available to IDA within six months of the close of the fiscal year. For each PMU, the audit will provide a single opinion covering project account, SOEs and Special Account. A management letter addressing internal control weaknesses of implementing agencies will also be provided by the auditor together with the audit report. 52. Phasing of implementation: The project will be implemented over a period of seven years in two phases. Phase 1 will focus primarily on drainage and combined sewer systems in the old urban centers, provide serviced resettlement sites in Nha Trang and Quy Nhon, and the new landfill in Nha Trang. Phase 2 will continue with drainage and sewerage investments, including all the wastewater treatment plant, and the bulk of the solid waste management investments, including the expanded landfill at Quy Nhon. 3. Monitoring and evaluation of outcomes/results 53. Each PMU will compile data and monitor the performance of its sub-project. The results indicators are straightforward and no capacity constraints are foreseen. 54. A comprehensive assessment of performance will be made at the mid-term review of the project. Based on this assessment, the IDA and the borrowers will, if necessary, adjust the investment allocation between the various components. 4. Sustainability 55. Borrower’s Commitment. At the national level the Government has demonstrated commitment to sector sustainability with its policy of cost recovering tariffs. Participating cities have demonstrated strong commitment by financing their own Pre-Feasibility Studies, establishing PPU with experienced staff, and borrowing project funds to purchase SWM equipment. 56. The borrowers understand that extensive capacity building of the service providers, the PMU, and the communities is essential for long term sustainability. The borrower has committed, through component 6, to achieve this. 57. On the critical area of tariff reform each city has agreed to phased increases so that operating costs and depreciation of short lived assets is fully funded from user fees by the end of the project. This is included as a project covenant. 58. Beneficiary’ support. Improved drainage, wastewater and solid waste management services will improve the urban environment in each city and the quality of life of residents. This has been confirmed by household surveys. However the provision of such services is relatively new in Vietnam and further support will be built through public awareness campaigns during project implementation. 59. Managing the implementation process. In each city the PMU will be a continuation of the PPU that prepared the project. Some capacity has therefore already been built in the PPU/PMU and this will be further enhanced as part of component 6.

Page 16: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

11

5. Critical risks and possible controversial aspects Risk Risk

Rating Risk Mitigation Measure

From Outputs to Objective Improved sanitation behavior by beneficiaries

S IEC program to promote changed behaviors

Customers unwilling to pay for services

S Public awareness campaign. Collection of waste-water fees through the water bill.

Province authorities unwilling to charge for services

S Extensive discussion with authorities during preparation and covenant on cost recovery levels.

Inadequate operation of the new facilities

M Training of operators included in the TA component

From Components to Outputs

Limited willingness to connect to the new systems

M Public education, access to credit, universal charging to all customers with water connection.

Collusive and corrupt practices during project implementation

M Low prior review thresholds, enhanced PMU procurement and FM training by IDA prior to effectiveness and hiring of consultants to assist in the procurement process, enforcing procurement complaint-handling and disclosure requirements, enhanced supervision by IDA during early implementation, and the preparation and implementation of a fairness and transparency plan.

Capacity of the PMUs in project management

S Extensive training of PMU as part of TA component

Overall Risk Rating S Risk Rating – H (High), S (Substantial), M (Modest), N (Negligible or Low) 6 Loan/credit conditions and covenants Conditions for Effectiveness: 1. Execution of PHRD capacity building grant agreement 2. Key PMU staff recruited with qualifications acceptable to IDA; 3. Financial management (FM) and procurement systems in place and key PMU staff trained in

procurement, FM and project management; 4. People’s Council resolution approving the cost recovery profile agreed at negotiations; and 5. Adoption of the Project Implementation Plan by the PPC Conditions of Disbursement: 1. Adoption of a Healthy City Partnership (HCP) operations manual prior to disbursement of

HCP grants; 2. Adoption of a Sanitation Fund Manual and execution of implementation arrangement

between Province and Women’s Union prior to disbursement of loans under household sanitation revolving fund;

Implementation Covenants: 1. Adoption of a sewer connection policy, and the formal transfer of wastewater and septage

functions, staff, assets and budget to the water company;

Page 17: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

12

2. Execution of service contracts between the Dong Hoi City Hospital and relevant service providers for disposal of hospital waste and operation of the hospital wastewater treatment plant;

3. Engagement of a Construction Management Consultant prior to the award of any construction contract;

4. Implementation of actions, as necessary, to achieve cost recovery levels for service providers agreed at negotiations;

5. Bidding, by mid term review through a competitive process, solid waste management operations in three wards and septage cleaning in one ward.

D. APPRAISAL SUMMARY 1. Economic and financial analyses Financial Analysis (See Annex 9): Financing Arrangement and Fiscal Impacts: 60. The total counterpart fund requirement of the project is estimated at USD 38 million representing 22% of the total project cost. The counterpart financing will be provided by the Provincial budget with the exception of Dong Hoi which will receive support from Central Government. Assessment of the provincial budgets showed that each city has the necessary counterpart funds for their respective sub-projects. Cost Recovery for Environmental Sanitation Services 61. The project, in line with government policy, will recover from user charges the O&M costs of the wastewater, drainage and solid waste facilities, depreciation of short lived assets, such as vehicles and equipment, and any loan interest charges. This allows for affordable tariffs and gives sufficient revenue to the service provider to operate the system and finance replacement of short lived assets. This level of cost recovery by the service providers will be achieved by the end of project implementation by gradually increasing tariffs each year coupled with expansions in service coverage and improvements in tariff collection efficiency. 62. The cost recovery schedules for the service providers have been agreed with local governments and their implementation is a project covenant. Financial Internal Rates of Return (FIRR): 63. The FIRR for each sub project vary between 18.6% and 28.2% (wastewater) and between 25.9% and 32.6% (solid waste) and are higher than the weighted average cost of capital of between 10-12%. 64. Affordability: The assessment of affordability is based on the combined costs of water supply, wastewater and solid waste charges. The monthly water and sanitation cost to households, including for low income families, remain below the affordability level of 5% of household income. 65. Willingness to pay monthly sanitation charges: Most households are willing to pay for wastewater and solid waste services. Customers will, however, need to better understand the reason for, and basis of, payments for wastewater services. A public awareness activity is therefore included in Component 6 to improve beneficiaries’ understanding about the benefits of improved sanitation and the costs of service provision. 66. Willingness and affordability to pay for a connection to the new system: Nearly all (98%) households expressed their willingness to connect their existing gray water outlets to the new

Page 18: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

13

wastewater system. Results from the social assessment survey showed that householders were more reluctant to connect their existing black water systems (primarily septic tanks) to the new networks with only about 43 % of people in Nha Trang, 34 % in Quy Nhon and 30 % in Dong Hoi expressing an interest. The project design therefore minimizes the obstacles to making black water connections by a) having no connection fee b) making the house connections under the project. 67. Collection of user fees: Wastewater fees will be collected by the new water/ wastewater companies formed under the project. The local governments have allowed the new companies to retain the wastewater revenues for operation and maintenance of the combined drainage/wastewater systems. SWM fees will continue to be collected by the URENCOs in Nha Trang and Quy Nhon and the Urban Works Company (UWC) in Dong Hoi. Economic Analysis 68. The benefits of the project include: (a) reduced flood damage, (b) health benefits, (c) savings in installation and desludging of septic tanks, (d) savings in drainage maintenance (e) increased tourism due to an improved environment for tourists and potential investors, (f) improved financial positions of the service providers as tariffs are increased resulting in better management of service provision and the elimination of subsidies from the provincial governments, (g) enhancement of the development potential of the cities especially the areas along canals and previously flooded areas, (h) creation of new business opportunities such as restaurants, retail stores, and other entertainment activities, and (i) land value appreciation in the area, the extent of which will largely depend on the new economic activities created by the proposed investments. 69. It is not feasible to quantify all the above benefits, or to evaluate accurately those that are quantifiable. In this analysis, only the first five benefits were assessed. The economic rate of return of the project was estimated at 18.5 percent, which is higher than the assumed 12 percent discount rate, and highlights the robustness of the project in terms of its contribution to economic growth in the participating cities.

2. Technical 70. Designs for the project follow current Vietnamese standards for the urban sector. 71. In the older urban areas lack of construction space requires the use, or continued use, of combined systems whilst in newer areas there is the option to build separate systems. The costs and benefits of combined versus separate systems will be presented to local authorities during the Phase 2 design activities to allow an informed decision to be made. 72. Interceptor sewers will capture flows from the combined sewers. It is not economic to design these interceptors to carry the full drainage and sewerage flows. Instead they will be designed according to carry peak flows according to government standards, with excess flows spilled to the rivers or coasts, at combined sewer overflows (CSO). At times of high rainfall the first flush of wastewaters is carried forward in the interceptor, and the follow on flows, which are primarily rainwater, are spilt. 73. Wastewater treatment technologies will be selected in Phase 2 based on costs and also on their robustness and ease of operation. Currently oxidation ditches are the preferred method. The planned GEF funded project in Quy Nhon is piloting the use of CEPT as a cost effective alternative. Septage will be disposed to wastewater plant or to landfill as assessed during Phase 2.

Page 19: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

14

74. The cities are low lying and high tides, coupled with major storms, can adversely impact the capacity of pipes and channels to discharge flood waters into the rivers and sea. The project has emphasized the need to maintain the buffering capacity of existing lakes and rivers through investments and capacity building activities. 75. Solid waste management equipment will be procured in both phases to match demands from the service providers. The design of the sanitary landfill to be constructed in Nha Trang in Phase 1 follows standard international practice. 76. Institutionally the provision of wastewater services (including drainage, sewerage, septage collection and disposal) will be the responsibility of an expanded water service company. This joint water and wastewater company approach will provide economies of scale and scope. The accounts and assets of the wastewater services will be separated from those of water services to ensure transparency of operation. 3. Fiduciary Procurement capacity 77. A procurement capacity assessment found that the project implementing agencies do not currently have sufficient capacity to carry out the Project procurement. As a result, the procurement risk of the Project is rated as high and review thresholds have been set accordingly. To build up their procurement capacity specific actions, including enhanced training and supervision by IDA, have been agreed with the Borrower and are summarized in Annex 8.

Procurement Arrangements

78. Procurement for the proposed project would be carried out in accordance with the World Bank’s “Guidelines: Procurement Under IBRD Loans and IDA Credits” dated May 2004; and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated May 2004, and the provisions stipulated in the Credit Agreement. The project procurement arrangements and Phase 1 Procurement Plan are held in Annex 8. Overall 95% of contracts, by value, will be subject to prior review. Financial management 79. A financial management assessment identified the following weaknesses: (i) lack of financial staff with adequate skills and experience; (ii) lack of suitable accounting systems; and (iii) lack of detailed FM manual. The Financial Management Action Plan agreed with the Borrower (see Annex 7) will address these weaknesses, supplemented by enhanced supervision by IDA, particularly early in project implementation. 80. Project accounts in each Province, including the household revolving fund managed by the Women’s Union, will be audited annually according to international standards and in compliance with the country’s independent auditing regulations. The auditors’ reports will be available to IDA within six months of the end of the fiscal year. To date there is no audit report overdue from the implementing agencies to be involved in the project. 4. Social

81. The project will bring substantial social benefits to the residents of the participating cities. An estimated 700,000 residents of the three cities will benefit from improved environmental services (wastewater collection and treatment, solid waste management, and protection from flooding). Of these beneficiaries, the government classifies about 1.8% (Nha Trang), 4.3% (Quy Nhon) and 7.6% (Dong Hoi) as poor. The socio-economic survey shows no

Page 20: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

15

ethnic minority groups living in the project areas. Adverse social impacts involve permanent and temporary land acquisition for the construction of WWTPs, landfills, drains and pipelines. 82. The Borrower prepared RAPs for Phase 1 activities that are acceptable to IDA. The phase I investments would affect 161 households, of which 77 would be relocated and 78 would be severely affected by losing income sources. Land acquisition for the whole project would affect 912 households, of which 356 households would be relocated and 172 households would be severely affected by the loss of income sources. 83. A Resettlement Policy Framework (RPF) acceptable to IDA has been prepared by the Borrower. This has been approved by the Prime Minister and adopted by the participating Provinces. The RAPs for Phase 2 investments will be prepared in accordance with the RPF. 84. Stakeholder participation and NGO collaboration. Household surveys confirmed that the project responds to beneficiary demand. The two most serious problems identified by residents in the three cities were flooding and the lack of a proper drainage and sewer system. Improving sanitation outcomes requires continued interaction with a range of stakeholders during implementation. A PHRD grant will support capacity building of mass organizations to improve stakeholder understanding of the issues. Implementation of Component 5 will require working with the Women’s Union (for the sanitation fund) and the Department of Education (for school sanitation). The sanitation fund will be implemented on behalf of the PMUs by the city/provincial Women’s Unions (WU), which have significant experience working with communities in micro-finance. Implementing the Healthy City Partnership (component 6) will require collaboration with other NGOs, the public and private sectors. 85. Monitoring social impacts. The PMUs, supported by independent monitoring consultants, will be responsible for monitoring social outcomes and managing the RAPs. 5. Environment 86. The Borrower prepared Environmental Assessments (EAs) and Environmental Management Plans (EMPs) acceptable to IDA for the Phase 1 investments in each city. Approximately 70% of the project investments are planned for Phase 2 activities. Environmental Guidelines have been developed to be used in preparation of Phase 2 sub-projects, and will be used by the Borrower to ensure compliance with the Bank’s safeguards requirements. These guidelines have been adopted by the participating Provinces. 87. The project is expected to have significant positive benefits for the environment, public health and the tourism-based economy due to reduced frequency and level of flooding in the cities, improved collection and handling of liquid and solid wastes, and improvements in sanitation service and capacity. 88. Wastewater treatment (WWT) is new for these cities, but appropriate WWT technology has been chosen to meet the national environmental standards at acceptable costs. In order to better understand the issues associated with making connections to the new sewers, a limited house connection program will be implemented prior to completion of wastewater treatment plants. This will result in the temporary discharge of some household liquid wastes (from gray water and septic tank outlets) into rivers and lakes, until the wastewater treatment plant are built. These house connections will only be made where studies have shown that the impact of the temporary discharges is within national standards. Specific mitigation measures will be adopted to reduce pollution discharge at each of the outlets, and water quality of the receiving waters will be carefully monitored.

Page 21: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

16

89. Cultural Property (OP4.11). Cultural property exists in the project cities but identified impacts are limited. A new temple in Quy Nhon will be relocated as decided by the city’s People Committee. The Citadel in Dong Hoi is 150 meters away from the drainage works and thus careful construction methods are required. Proper construction supervision will be needed during project implementation to check for possible buried artifacts. Safeguard screening will be made during implementation to determine whether this policy is triggered in Phase 2 subprojects. 6. Safeguard policies 90. The project environmental screening category is “A” (full assessment); and the policies triggered for Phase 1 investments are listed below.

Safeguard Policies Triggered by the Project Yes No Environmental Assessment (OP/BP/GP 4.01) [ X] [ ] Natural Habitats (OP/BP 4.04) [ ] [X ] Pest Management (OP 4.09) [ ] [ X] Cultural Resources (OP 4.11) [X] [] Involuntary Resettlement (OP/BP 4.12) [ X] [] Indigenous Peoples (OD 4.20, being revised as OP 4.10) [ ] [X] Forests (OP/BP 4.36) [ ] [X] Safety of Dams (OP/BP 4.37) [ ] [X] Projects in Disputed Areas (OP/BP/GP 7.60) [ ] [X] Projects on International Waterways (OP/BP/GP 7.50) [ ] [X]

91. Public consultation. The Borrower held initial consultations with local government agencies and communities about route alternatives, landfill sites, transfer stations, public toilets, WWTP locations, and potential project impacts. The second public consultations with DPs and local NGO representatives discussed the main findings of the EAs. Additional public consultation with the DPs living around the drainage outlets was conducted on the possible impacts of temporary discharge of liquid wastes. There were no objections to the project, and all environmental and social concerns raised during this process were addressed in the EAs and RAPs. 92. Public disclosure (BP 17.50). The Bank’s disclosure requirements have been followed. The documents were disclosed in Washington DC, and the VDIC in Hanoi. Locally the documents were disclosed in Vietnamese in the city Peoples’ Committees, the DONREs, the Project Preparation Units, and the affected wards where they were accessible to local NGOs and DPs. 93. Due Diligence Reviews. An environmental due diligence review was undertaken by the Borrower for investments by the Swiss Agency for Development and Cooperation at the Ly Trach landfill in Dong Hoi, and the associated closure of Loc Ninh dump site. Ly Trach will receive waste delivered by trucks financed under the IDA project. The reviews showed that there was either no risk to the Bank arising from the linked activities, or the risks can be mitigated by designing appropriate activities under Phase 2 of the IDA project. Due diligence reviews will be undertaken during project implementation to confirm that any DPs from linked activities have been able to restore their living and income sources. 7. Policy Exceptions and Readiness 94. Policy exceptions. The project has not required any exceptions from Bank policies and none are being sought from the Board. Readiness criteria:

Page 22: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

17

1. Fiduciary (financial management and procurement) arrangements in place – yes; 2. Project staff and consultants mobilized – yes; 3. Counterpart funds budgeted – yes; 4. Tender documents for first year procurement have been prepared - yes; 5. Disclosure requirements met – yes; 6. Results assessment arrangements completed: monitoring and evaluation (M&E)

institutional obligations spelled out, M&E capacity in place; indicators specified; baseline data collected – yes;

7. Co-financing agreements signed – to be signed on equal date with DCA; and 8. Land acquisition plans ready – yes.

Page 23: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

18

Annex 1: Country and Sector or Program Background

VIETNAM: Coastal Cities Environmental Sanitation Project Country Assistance Strategy (CAS) The last full CAS, which was discussed by the Board in September 2002, supports the country’s Comprehensive Poverty Reduction and Growth Strategy (CPRGS). CPRGS provide the basis for the Government’s 10-year Socio-Economic Development Strategy (2001-2010). The CPRGS has three overall objectives:

• High growth through a transition to a market economy; • An equitable, socially inclusive and sustainable pattern of growth; and • Adoption of modern public administration, legal and governance systems.

The CAS describes the Bank’s support for each objective and the project supports the following parts of the CAS:

• Enhancing environmental sustainability (Sub-theme 2.6) through improved sewerage, drainage and solid waste services

• Public administration reform (Sub-theme 3.3) through improved institutional arrangements and increased financial sustainability

• Reducing deficiencies in basic urban services (Key sectoral issue) through provision of access to sanitation services

The CAS Progress Report considered by the Board on February 19, 2004 identified the need for increased investment in infrastructure to help attain the twin objectives of poverty alleviation and growth. Background a) General Sanitation in Vietnam is predominantly a private good with the majority of households investing in septic tanks or latrines, depending on location. There are currently a limited number of wastewater treatment plants in the country, all of them in the major cities. Solid waste is disposed of mainly to dumps, with few sanitary landfills, and solid waste collection is estimated at serving some 70% of the urban population, although the poor see levels of service between 10 and 20%. As a result, the watercourses, especially in the big cities, are severely polluted by both liquid and solid wastes. This situation will be further exacerbated by urban growth in the country. The proportion of people living in urban areas in Vietnam is one of the lowest in East Asia, comprising around 23% of the total population, or 19 million people. This is anticipated to increase to 33% by 2010 due to migration from rural areas and the higher incomes available in urban areas. b) Sanitation – Current Situation The country’s urban sewerage policy is presented in Decision #35/1999/QD-TTG, approved in March 1999. The policy is to: a) rehabilitate existing networks and facilities, expand coverage and introduce wastewater treatment as resources permit, with priority given to the major cities and tourist centers; b) promote market oriented approaches to service provision; c) develop, through public education, a better awareness of the impact of sanitation on public health, environmental sustainability and economic development; and, d) gradually replace subsidies with user charges. The policy aims to ensure that all urban areas should have suitable water drainage systems and wastewater treatment facilities that guarantee environmental hygiene and address flooding issues. Wastewater should be treated before entering the sewerage system, mostly through the use of septic tanks. The application of these policy elements is in its very early stage.

Page 24: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

19

Various targets for wastewater treatment have been promulgated by the Government, including through the Vietnam Development Goals and the 2010 environmental strategy, issued in December 2003. Whilst not always consistent in their target values, they do indicate a keen awareness in Government about the importance of improved sanitation. Based on the Vietnam Living Standards Survey (VLSS) the Central Statistical Office (CSO)

estimated the following levels of urban sanitation coverage:

Access to hygienic latrines

Year 1993 Year 2002 Growth rate

p.a. Year 2010

Urban coverage 44.9 68.3 4.8 99.2

Environmentally acceptable sanitation facilities in urban areas are generally unavailable. Under existing regulations, human waste should be treated in septic tanks before being discharged to the sewer. While around 40% of households in provincial towns have septic tanks, only a small portion of these septic tanks is connected to sewers or drains. In many urban areas, septic tank effluent or seepage contaminates the groundwater. For example, less than 65% of the HCMC population has septic tanks and “gray” domestic water is not treated. Only 50% of the existing septic tanks in HCMC are reportedly designed and constructed properly and most of them have not been regularly subjected to solids removal. This situation is likely to be replicated in other cities. Whilst the provision of latrines and sanitation infrastructure brings improved outcomes, these are significantly increased when beneficiaries are exposed to IEC on household sanitation practices. Such IEC also generates demand for household sanitation facilities and should be considered as complementary to any physical sanitation investments. Urban wastewater and storm waters are typically discharged through combined systems to nearby watercourses, without treatment. Large sections of these combined networks, constructed decades ago, need rehabilitation due to lack of maintenance and flooding is common in urban centers. Many drains were constructed without adequate grades for self-cleansing and there are often no design provisions for odor control or dry weather flow. The untreated sewage and industrial wastewater is discharged directly into water bodies and streams in the surrounding areas and pose high risks to aquatic ecosystems. Most of the government attention is being given to sewerage and drainage investments. Consequently, the coverage of wastewater treatment is virtually zero. However, the government is taking action and the biggest cities Hanoi, HCMC, Haiphong, Danang, and Halong will all have sewerage and sewage treatment facilities in place in the next few years. The project cities comprise the next tier of government focused activity being relatively large and, importantly, they are all tourist destinations for both national and, increasingly, international visitors. c) Solid Waste Management – Current Situation Solid waste management policy is set by two documents a) Management of Solid Waste in Vietnamese Cities and Industrial Parks – Strategy to 2020 (1999) and b) National Strategy for Environmental Protection 2003 – Strategy to 2020. Both documents are similar with the latter building on the former. Together the documents focus on a range of issues including i) Legal reform ii) Increased awareness and training iii)Increased privatization and cost recovery iv) Use

Page 25: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

20

of appropriate and modern technologies v)Promotion of economic approaches to environmental protection and vi) Promotion of public and civil society involvement. The 2003 document sets a target of 90% for collection of municipal waste, adequate disposal of over 60% of hazardous waste and 100% of healthcare waste. These targets are very ambitious given weak capacity and financial constraints. The country produces around 15million tons of solid waste per year of which 12 million is from municipal sources, with most of the rest being industrial. Only 160,000 t/y or 1 percent of waste is hazardous. Around 50% of the waste is generated in urban areas although less than 25% of population is urban. On average 70% of urban waste is collected but amongst the urban poor the levels of collection are much lower at 10-20%. There are 91 solid waste disposal facilities in Vietnam but only 17 (19%) are sanitary landfills. By 2010, due to rapid urbanization, and increasing consumption, the volumes of municipal waste are projected to grow by 60%. d) Institutions The Urban Environmental Companies (URENCO), or Urban Works Companies (UWC) who are typically responsible for drainage, sewerage, solid waste management and other urban activities, are institutionally and financially much weaker than WSCs. Given the size of the project cities, the combination of the water and sewerage functions into a single entity is preferred, leaving solid waste management with the URENCO. e) Cost recovery and investment Local governments understand the need to recover costs through user fees. For example Hanoi and Haiphong levy a drainage and wastewater surcharge of 15% of the water bill which results in fees ranging from VND 450 to VND 1,275 per cubic meter for domestic and commercial consumers respectively. Da Nang charges between VND 300 per cubic meter (domestic) and 500 VND per cubic meter (commercial/tourism) and Ha Long and Cam Pha have a tariff based on customer category ranging from VND250 to VND500 per cubic meter. HCMC has wastewater tariffs of between VND250 and VND400 per cubic meter depending on consumption level and customer category. All these cities plan to increase wastewater charges gradually to achieve recovery of O&M costs, and depreciation of short lived assets, by 2006 – 2009. A recent GoV Decree (67/2003) introduced some confusion into the sector as it proposes the application of a uniform environmental protection charge for wastewater consumers (both industrial and domestic) which must not exceed 10% of the clean water tariff. The Provinces believe this is the wastewater fee, whereas, in fact, MONRE’s purpose was to establish this as a separate environmental charge, in addition to any wastewater fees. Revenues from solid waste management user fees cover on average only 58% of O&M costs and this resulted in the URENCOs/UWC receiving a total of VND 404 BN in government subsidies in 2003. Whilst user fees are generally affordable (according to Vietnam Household Living Standards Survey 2003 the amount paid in SWM fees ranges from 4,600 to 6,600 per HH per month and range between 0.2 and 0.5% of HH expenditures), collection rates are low, typically only 50% of the amount billed. This compares unfavorably with the water fee where collection rates are usually around 95%. There are significant investment needs for the sector to cover both the rehabilitation of existing systems and the expansion of new systems whether for sanitation or solid waste management. The government has estimated these needs as follows:

Page 26: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

21

Sector Government Investment Estimates (US $)

2000- 2010 Urban sanitation 3,800,000,000

Urban Solid Waste Management 700,000,000

Combined investment in the urban water supply and sanitation sector has totaled some $1billion over the last 10 years, most of which has been used for water supplies. In addition, some $200million has been invested over the last four years in SWM. It is clear, therefore, that there is a massive shortfall in investment funding in both sectors. Implications for Project Design Based on the above the project design must aim to:

• Maximize the efficiency of investment in order to capture all the benefits that can accrue from each dollar spent

• Improve the institutional arrangements, and the technical and financial management of the service providers, to ensure efficient and effective service delivery, thus minimizing customer charges and maximizing service quality

• Introduce tariffs for both wastewater services and solid waste management services that will reliably recover at least O&M costs and depreciation of short lived assets through user fees

• Encourage IEC activities that will maximize the benefits that accrue to the beneficiaries from the physical investments

Page 27: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

22

Annex 2: Major Related Projects Financed by the Bank and/or other Agencies

VIETNAM: Coastal Cities Environmental Sanitation Project

Sector Issue Project Latest Supervision (ISR) Ratings

(Bank-financed projects only)

Bank-financed Implementation Progress (IP)

Development Objective (DO)

Deterioration of water supply systems and institutional weakness (completed)

Water Supply Project (Cr. N0260 ) S S

Deterioration of sanitation systems and institutional weakness (ongoing)

Three Cities Sanitation Project (Cr. 32110 )

U S

Deterioration of sanitation systems and institutional weakness (ongoing)

Ho Chi Minh City Environmental Sanitation Project (Cr. 34750)

U MS

Lack of access to infrastructure and tenure insecurity in urban poor areas

Urban Upgrading Project (Cr.38870) S S

Lack of access to water supplies, deterioration of water supply systems and institutional weakness (ongoing)

Urban Water Supply Development Project (Cr.4028)

MS S

Red River Delta Rural Water Supply and Sanitation Project (Cr. 4115)

MS S

Other development agencies

Deterioration of infrastructure and institutional weakness

ADB: Credit to improve water supply in seven medium cities (ongoing) and eight towns and medium cities (planned).

SDC: Grant to enhance development of Dong Hoi City, including SWM and drainage activities (ongoing)

GTZ/KfW: Financial assistance for wastewater collection and treatment in six cities, including TA for institutional strengthening (ongoing)

AusAID: Grant to improve water supply in three small towns (ongoing); Grant for five Mekong Delta provinces rural water supply and sanitation

Danida: Grant for sanitation in two provincial towns (ongoing). Co-financing with World Bank on water and sanitation projects in Quang Ninh (ongoing)

Finnida: Co-financing for sanitation project in HaiPhong (on-going); Grant

Page 28: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

23

for small town water supply and sanitation program in four provinces (on-going)

JBIC: Soft loans for drainage and sewerage in Hanoi and HCMC (ongoing)

French Government: small rehab projects in several cities and provinces (mostly completed)

GTZ: Grants for sanitation in Viet Tri town (on going)

IP/DO Ratings: HS (Highly Satisfactory), S (Satisfactory), U (Unsatisfactory), HU (Highly Unsatisfactory) Though many of these projects are grants to the GoV, the Government then lends to the water

companies at near commercial rates.

Page 29: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

24

Annex 3: Results Framework and Monitoring

Results Framework

PDO Project Outcome Indicators

Use of Project Outcome Information

To improve environmental sanitation in project cities in a sustainable manner and thereby enhancing the quality of life for city residents

1. The number of people benefiting from reduced incidence and severity of flooding

2. The additional number of people whose solid waste will be regularly collected

3. The number of people gaining access to improved sanitation

4. The proportion of service providers’ costs, including loan repayments, recovered from user fees1.

To assess the impact of the project

Intermediate Outcomes Intermediate Outcome Indicators

Use of Intermediate Outcome Monitoring

Component 1: Access to improved drains and sewers

1. The number of people gaining access to piped sewers

To confirm service is being expanded

Component 2: Wastewater treatment capacity is being provided and is operating

1. The BOD removed by treatment plant

To confirm that treatment is being provided

Component 3: Solid waste is being collected and disposed to sanitary landfills

1. The additional amount of solid waste that will be disposed of to sanitary landfills

To confirm waste is being collected and disposed to sanitary landfills

Component 4: Resettlement PAPs compensated at replacement cost, resettled to agreed sites, and incomes restored

1. PAP HHs have received a)compensation as stipulated in the RAP before the assets are taken from them; b) relocation, transition, and subsistence allowances; and c) incomes restored to pre-project levels.

Assess implementation of RAP measures for the project affected population at three key stages of the RAP implementation process

Component 5: Household sanitation loans are being made on sustainable basis and school water supplies and sanitation facilities are being implemented

1. The number of poor people that access and repay loans to improve household sanitation

2. The number of pupils gaining access to improved sanitation facilities in their schools

To confirm that the household fund is functioning effectively and school sanitation is being built

Component 6: Capacity building is taking place in PMU and service providers

1. Value of capacity building contracts awarded in accordance with the agreed procurement plan

To confirm that capacity building is taking place in a timely manner.

1 In addition a pilot Balanced Scorecard will be considered under Component 6 to assess the performance of the service providers.

Page 30: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

25

Arrangements for results monitoring – Project Outcomes Phase 1 The following table presents the project outcome indictors for the sub projects in Phase 1. Responsibility for data collection lies with the PMU in each Province and the data will be collected annually. Sources of data will include the following:

1. Audited accounts of the service provider for financial data 2. Annual reports of the service providers for non financial indicators (e.g. volumes of

treated effluents, amounts of solid waste collected) 3. Department of Education (for school sanitation) 4. The Provincial Women’s Union for data related to the sanitation funds 5. Hydraulic models for assessment of reduced flooding

Page 31: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

26

P

ha

se 1

Mo

nit

ori

ng

an

d E

va

lua

tio

n I

nd

ica

tors

Ta

rget

Va

lues

P

roje

ct O

utc

om

e In

dic

ato

rs

Ba

seli

ne

FY

08

F

Y0

9

FY

10

F

Y1

1

FY

12

F

Y1

3

FY

14

N

ha T

ran

g C

ity

1.

The

num

ber

of

peo

ple

ben

efit

ing f

rom

red

uce

d i

nci

den

ce

and s

ever

ity o

f fl

oodin

g (

Phas

e 1)

0

U.C

. U

.C.

U.C

8

,00

0

8,2

00

8

,40

0

TB

D.

2.

The

num

ber

of

peo

ple

wit

h w

aste

wat

er c

oll

ecte

d a

nd

dis

pose

d o

f th

rough p

iped

net

work

s (*

)

P

H

A

S

E

2

3.

Am

ount

of

BO

D (

tons)

rem

oved

by t

reat

men

t pla

nt

P

H

A

S

E

2

4.

Tota

l num

ber

of

peo

ple

whose

soli

d w

aste

wil

l be

coll

ecte

d (

Phas

e 1 a

nd 2

) 2

42

,00

0

28

0,0

00

3

00

,00

0

32

0,0

00

3

40

,00

0

36

0,0

00

3

85

,00

0

41

0,0

00

5.

Am

ounts

(kil

oto

ns)

of

was

te d

ispose

d t

o s

anit

ary l

andfi

ll

(Phas

e 1 a

nd 2

) 0

U

.C.

U.C

. 8

0

11

0

13

0

13

6

14

0

6.

The

num

ber

of

poor

peo

ple

that

acc

ess

loan

s to

im

pro

ve

house

hold

s sa

nit

atio

n (

Phas

e 1)

0

600

1200

1200

1200

600

7.

The

num

ber

of

pupil

s gai

nin

g a

cces

s to

im

pro

ved

sa

nit

atio

n f

acil

itie

s in

thei

r sc

hools

(P

has

e 1)

0

U.C

. 8

,00

0

12

,00

0

12

,00

0

12

,00

0

TB

D.

TB

D.

8.

Per

centa

ge

of

was

te w

ater

pro

vid

er’s

co

sts,

incl

ud

ing

loan

rep

aym

ents

, re

cover

ed f

rom

use

rs (

Phas

e 1 a

nd 2

) (B

y D

ec 3

1 i

n r

elev

ant

FY

)

68

74

76

87

92

96

99

100

9.

Per

centa

ge

of

soli

d w

aste

pro

vid

er’s

cost

s, i

ncl

udin

g l

oan

re

pay

men

ts,

reco

ver

ed f

rom

use

rs (

Phas

e 1 a

nd 2

) (B

y

Dec

31 i

n r

elev

ant

FY

)

59

66

71

75

81

94

98

100

Qu

y N

hon

Cit

y

1.

The

num

ber

of

peo

ple

ben

efit

ing f

rom

red

uce

d i

nci

den

ce

and s

ever

ity o

f fl

oodin

g (

Phas

e 1)

U

.C.

U.C

. U

.C.

13

,50

0

13

,70

0

13

,90

0

TB

D.

2.

The

num

ber

of

peo

ple

wit

h w

aste

wat

er c

oll

ecte

d a

nd

dis

pose

d o

f th

rough p

iped

net

work

s (*

)

P

H

A

S

E

2

3.

Am

ount

of

BO

D (

tons)

rem

oved

by t

reat

men

t pla

nt

P

H

A

S

E

2

4.

Tota

l num

ber

of

peo

ple

whose

soli

d w

aste

wil

l be

coll

ecte

d (

Phas

e 1 &

2)

18

0,0

00

1

84

,60

0

18

7,4

00

1

90

,00

0

19

4,3

00

1

98

,20

0

20

1,4

00

2

04

,60

0

5.

Am

ounts

(kil

oto

ns)

of

was

te d

ispose

d t

o s

anit

ary l

andfi

ll

(Phas

e 1 &

2)

P

H

A

S

E

2

Page 32: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

27

6.

The

num

ber

of

poor

peo

ple

that

acc

ess

loan

s to

im

pro

ve

house

hold

san

itat

ion (

Phas

e 1)

0

275

550

550

550

275

7.

The

num

ber

of

pupil

s gai

nin

g a

cces

s to

im

pro

ved

sa

nit

atio

n f

acil

itie

s in

thei

r sc

hools

(P

has

e 1)

U

.C.

8,0

00

1

0,0

00

1

0,0

00

1

0,0

00

T

BD

. T

BD

.

8.

Per

centa

ge

of

was

te w

ater

pro

vid

er’s

co

sts,

incl

ud

ing

loan

rep

aym

ents

, re

cover

ed f

rom

use

rs (

Phas

e 1 &

2)

(By

Dec

31 i

n r

elev

ant

FY

)

32

41

45

59

71

81

92

100

9.

Per

centa

ge

of

soli

d w

aste

pro

vid

er’s

cost

s, i

ncl

udin

g l

oan

re

pay

men

ts,

reco

ver

ed f

rom

use

rs (

Phas

e 1 &

2)

(By D

ec

31 i

n r

elev

ant

FY

)

42

52

62

73

79

83

94

100

Don

g H

oi

Cit

y

1.

The

num

ber

of

peo

ple

ben

efit

ing f

rom

red

uce

d i

nci

den

ce

and s

ever

ity o

f fl

oodin

g

0

U.C

. U

.C.

U.C

. 1

8,5

00

1

9,0

00

1

9,5

00

T

BD

2.

The

num

ber

of

peo

ple

wit

h w

aste

wat

er c

oll

ecte

d a

nd

dis

pose

d o

f th

rough p

iped

net

work

s (*

)

P

H

A

S

E

2

3.

Am

ount

of

BO

D (

tons)

rem

oved

by t

reat

men

t pla

nt

P

H

A

S

E

2

4.

Tota

l num

ber

of

peo

ple

whose

soli

d w

aste

wil

l be

coll

ecte

d

51

,00

0

53

,40

0

54

,60

0

57

,40

0

59

,00

0

60

,80

0

62

,50

0

64

,30

0

5.

Am

ounts

(kil

oto

ns)

of

was

te d

ispose

d t

o s

anit

ary l

andfi

ll

0

U.C

. 20

21

21.5

22

23

24

6.

The

num

ber

of

poor

peo

ple

that

acc

ess

loan

s to

im

pro

ve

house

hold

san

itat

ion (

Phas

e 1)

0

275

550

550

550

275

7.

The

num

ber

of

pupil

s gai

nin

g a

cces

s to

im

pro

ved

sa

nit

atio

n f

acil

itie

s in

thei

r sc

hools

0

U

.C.

8,0

00

1

0,0

00

1

0,0

00

1

0,0

00

T

BD

. T

BD

.

8.

Per

centa

ge

of

was

te w

ater

pro

vid

er’s

co

sts,

incl

ud

ing

loan

rep

aym

ents

, re

cover

ed f

rom

use

rs (

By D

ec 3

1 i

n

rele

van

t F

Y)

29

33

44

56

66

75

88

100

9.

Per

centa

ge

of

soli

d w

aste

pro

vid

er’s

cost

s, i

ncl

udin

g l

oan

re

pay

men

ts,

reco

ver

ed f

rom

use

rs (

By D

ec 3

1 i

n r

elev

ant

FY

)

48

56

60

71

77

83

94

100

No

te:

U.C

= U

nd

er c

on

stru

ctio

n

(*)

= A

ny

ho

use

ho

lds

con

nec

ted i

n P

has

e 1

wo

uld

on

ly b

e o

n a

pil

ot

bas

is

TB

D =

To

be

det

erm

ined

, to

in

corp

ora

te b

oth

Ph

ase

1 a

nd

Ph

ase

2 o

utc

om

es

Page 33: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

28

Annex 4: Detailed Project Description

VIETNAM: Coastal Cities Environmental Sanitation Project Existing Situation: Each city faces the similar challenges with regard to liquid and solid urban wastes, and drainage. Urban drainage master plans pay inadequate attention to flood control, allowing uncontrolled development to encroach on the natural routes required for effective discharge and storage of flood waters. Drainage network are in poor condition with inadequately sized pipes. In Nha Trang and Quy Nhon surrounding mountains cause rapid run off into the low lying central areas. Black water facilities consist mainly of septic tanks with discharge to the existing drainage network or to the ground. In Dong Hoi there are many pit latrines. Grey water infiltrates into the ground or is discharged to the drainage network. Since no centralized treatment facility exists this causes pollution of the open channels, lakes and rivers. Septage sludge removal is performed when the system gets clogged, long after it has ceased to function properly. URENCOs and the private sector operate septage collection services with disposal at the solid waste dumpsite. Industries and hospitals are required to have their own wastewater treatment facilities; however industrial waste water is often disposed of with insufficient treatment whilst hospital and health centre waste is generally treated by septic tank. Household solid waste is collected by handcarts and taken to informal transfer sites, loaded onto compacting trucks, or older open trucks, and transported to the existing landfills for disposal. In Nha Trang the existing landfill can be considered a dump, whilst in Quy Nhon the existing landfill is reasonably well designed and operated but needs to be upgraded and rehabilitated. In Dong Hoi the landfill is a sanitary landfill developed with the support of SDC. The project will make investments to tackle these challenges and are described below. Component 1 - Flood control, drainage and wastewater collection

In Nha Trang the following activities are proposed.

Flood mitigation to include i) rehabilitation of the Dong Bo/Quan Truong river to preserve buffering and increase capacity; ii) construction of cut off drains at the bases of the San and Hon Kho Mountains; and iii) construction of tidal gates to reduce backflow during high tides. Drainage works to include i) rehabilitation and extension of piped systems and flood channels and ii) the dredging/cleaning of existing lagoons. Phase 1 will provide bigger capacity drains in the City center, and a new system in north Nha Trang. Phase 2 will concentrate on new drainage facilities in south Nha Trang.

Wastewater collection to include i) interceptors and storm water overflows along the Cai River, the Quan Trung channel and Tran Phu Street, ii) combined or separate sewerage systems in north and part of south Nha Trang, iii) tertiary pipes including house connections, and iv) about thirteen pumping stations. In Quy Nhon the following drainage and sewerage activities will be undertaken:

Page 34: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

29

Flood mitigation to include i) the rehabilitation of Bau Sen and Bong Hong lakes to improve their buffer function, ii) cut off drains at the bases of Ba Hoa and Vung Chua Mountains and iii) construction of tidal gates to reduce backflow during high tides. Drainage works to include i) rehabilitation and extension of piped systems and flood channels and ii) dredging/cleaning of lagoons. Phase 1 will provide bigger capacity drains in the City center, including around Bau Lac Lake. Phase 2 activities will continue the Phase 1 works and will include improvement to the drainage system around Bong Hong Lake. Wastewater collection to include i) interceptors and storm water overflows along the Bau Sen, Bong Hong and Dong Da lakes, and the municipal beach, ii) combined or separate systems in west Quy Nhon and parts of Bui Thi Xuan/Phu Tai wards, iii) expansion of sewers to the other wards such as Nhon Binh/Nhon Phu, iv) tertiary pipes including house connections, and v) about nine pumping stations.

In Dong Hoi the following drainage and sewerage activities will be undertaken:

Flood mitigation to include i) improvement of the buffer function of the Cau Rao river through dredging and embankment improvement, ii) rehabilitation of the Phong Thuy channel, iii) rehabilitation of the Nam Ly lake, and iv) tidal gates to reduce backflow during high tides. Drainage works to include i) rehabilitation and extension of piped systems and flood channels and ii) the dredging/cleaning of lagoons. Phase 1 will provide bigger capacity drains in the City center, including the Bac Ly, Hai Dinh, Dong My, Nam Ly and Dong Phu areas. Phase 2 will include improvement to the drainage system around Doc Ninh, Phu Hai and Dong Son. Wastewater collection to include i) interceptors and storm water overflows along the Nhat Le river, the Phong Thuy channel and the city moat, ii) a combined or separate sewerage system in Dong Phu, Hai Thanh, Nam Ly and part of the Bac Ly and Duc Ninh wards, iii) tertiary pipes including house connections, and iv) about nine pumping stations. Component 2 - Wastewater treatment plant In Nha Trang the central urban core and the southern residential area will be served by a new wastewater treatment plant located east of the Tac River whilst the North Nha Trang residential area will be served by a new wastewater plant located adjacent to Nghe Mountain. The capacities of the treatment plant are estimated as follows:

Population Served Plant Flows (m3/day) Areas

Yr 2010 Yr 2020 Yr 2010 Yr 2020 Northern Plant 23,431 94,351 3,749 18,870 Central and Southern Plant 119,654 292,327 19,145 58,465

In Quy Nhon two new wastewater plant will serve the old city area at the Ha Thanh River estuary and adjacent to Phu Hoa Lake at the base of Ba Hoa Mountain. The south-western area of the city is 15 km form the city core, requiring a third WWTP adjacent to Bau Lac Lake. The

capacities of the treatment plant are estimated as follows:

Page 35: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

30

Population Served Plant Flows (m3/day) Areas Yr 2010 Yr 2020 Yr 2010 Yr 2020

Ha Thanh Plant 54,525 134,280 5,234 21,485 Phu Hoa Plant 44,600 92,970 4,282 14,875 Western Plant 9,900 51,300 950 8,202

In Dong Hoi a new treatment plant serving the city will be constructed in Duc Ninh, in the south of the city adjacent to the le Ky river. The capacities of the treatment plant are estimated as follows:

Population Served Plant Flows (m3/day) Areas Yr 2010 Yr 2020 Yr 2010 Yr 2020

Duc Ninh Plant 35,766 56,543 4,335 8,570 The WWTP of the city hospital will rehabilitated under the project, and will be operated under contract by the wastewater service provider. In all cities the proposed treatment process will be oxidation ditch except for Ha Thanh in Quy Nhon where GEF funding is being sought to construct a pilot Chemically Enhanced Primary Treatment (CEPT) plant. Component 3 – Solid Waste Management The scope of works for solid waste management is similar in each city and comprises improvements to solid waste collection and transfer, and to solid waste disposal. Waste Collection and Transfer: Investments will be made for collection and transfer equipment in all cities; and constructing transfer stations or collection points in Nha Trang and Quy Nhon. The collection/transfer equipment will comprise: collection bins; hand carts; pedi-carts; compactor trucks (5 – 15m3); and hook-lift trucks with containers. The transfer stations and collection points will enable waste collected by hand carts and pedi-carts to be transferred into containers for disposal to the landfills. Special equipment will be procured to collect and dispose of medical waste in Dong Hoi. Waste Disposal Facilities: In Nha Trang a new sanitary landfill will be constructed at Luong Hoa comprising lined waste disposal cells, cut-off drains, leachate treatment facilities, administration buildings, access roads and fencing. Equipment will be procured to weigh the waste, spread and compact the waste, and excavate materials. The existing Ru Ri dumpsite, which is almost full, has been identified by Government as an environmental “hot-spot”. It will be safely closed to minimize the risk of future environmental impacts by adding an impermeable capping to prevent rainwater penetration; and installing cut-off drains, gas vents and leachate handling facilities as necessary. In Quy Nhon the existing engineered landfill at Long My will be extended and cut off drains, and leachate collection and treatment facilities will be constructed. In Dong Hoi a second waste cell will be constructed for the new sanitary landfill financed with Swiss Development Cooperation support and the existing dump site will be safely closed. The UWC will also procure specialized collection equipment and a new incinerator to dispose of medical waste, under contract to the provincial Department of Health.

Page 36: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

31

The following table lists the approximate amount of equipment to be procured for each city:

Equipment Nha Trang Quy Nhon Dong Hoi Waste Collection & Transfer

Collection bins (240l) 2000 2000 700 Hand carts 0 0 150 Pedi-carts 75 70 0 Compactor Trucks (to 5m3) 0 0 0 Compactor Trucks (to 7-9m3) 3 3 2 Compactor Trucks (to 12-15m3) 4 1 Immobile compactor 0 0 0 Hook-Lift Trucks 6 primary coll.

2 transfer 6 primary coll. 2 transfer

1

Waste containers 45@ 5m3 8@15m3

45@ 5m3 8@15m3

6@6m3

Street sweeper 0 0 1 Street watering truck 0 0 1

Waste Disposal Compactor 0 0 0 Bulldozer 0 0 1 Tracked loader 1 1 0 Excavator 1 1 0 Weighbridge 0 0 0 Medical waste bins 90 0 30 Frozen storage for medical 1 0 0 Med waste pick up truck 1 0 1 Incinerator 0 0 1 Boat for island waste 1 0 0 Boat for shipping waste 1 0 0

Component 4 - Resettlement Investments will be made to provide serviced housing plots for resettlement of project affected people in Quy Nhon and Nha Trang. This will comprise the provision of graded sites, accessed by surfaced roads, with drainage, power, telecommunications, and water supplies. The total areas of the sites will be approximately 5 ha in each city. Component 5 - Household Revolving Fund and School Sanitation Program a) Household Revolving Fund

Revolving funds will be established in each City to provide loans to households that have difficulties in financing the construction of sanitation facilities. The revolving fund will be managed by the Women’s Union in accordance with procedures presented in the agreed household revolving fund manual. The City Women’s Union will have a monitoring/ coordinating role and the Ward and Commune Women’s Union will organize community meetings and administer the account. Groups of interested households will be formed who will elect their own leader/coordinator to administer the fund and collect the payments. Payments are cycled back to a special revolving fund account of the Women Union, from where it becomes available for subsequent loans.

Page 37: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

32

Eligibility criteria and loan terms and conditions are designed to ensure that low income households are able to access and to pay back the loans. Maximum loan size will be 4 million VND with a 24 month term and an interest rate of 0.5% per month, consistent with terms of other micro finance operations in Vietnam. An IEC campaign will be funded as part of this activity. b) School Sanitation

The project will fund water supply and sanitation facilities at city schools in response to demand from those schools. Provision of proper water and sanitation facilities in schools has been shown to be an effective way to improve hygiene practices and encourage attendance at schools. Demand assessment and proposed investment for different types of schools will follow the design standards set by the Ministry of Education (MoE). Component 6 - Capacity Building and Project Implementation This component will finance project implementation activities and capacity building of stakeholders. This will comprise: Support to Project Management Units (PMU) in project implementation including a) overall project management support b) preparation of Phase 2 feasibility studies, detailed engineering designs and bid documents c) construction management supervision for Phases 1 and 2 d) independent safeguards and M&E monitoring and e) financial auditing. Equipment to support the PMUs will also be financed including office equipment and vehicles where required. Capacity building for the service providers and city departments including a) institutional study to set out long term organizational structure and staffing for service providers, b)purchase, installation and commissioning of financial management, management information, and billing/collection software for the service providers, and training in its use c) joint development, with other city departments, of procedures and plans to support operation and management of new or rehabilitated facilities constructed under the project (e.g. medical and hazardous waste management, flood control, industrial pollution control, emission credits) d) development of standard PPP contracts for septage, and solid waste collection e) technical and managerial training to the service providers, including operation and maintenance of the networks, the treatment plant, collection equipment and landfill sites, and in financial planning f) workshops and study tours and g) miscellaneous other capacity building activities. Capacity building for design and implementation of a Healthy City Partnership (HCP) including a) preparation and delivery of public awareness campaigns to support household sanitation behavior change, and general material to explain benefits from the project, its costs, and the need to introduce user fees b) development of the framework for design and implementation of the HCP c) implementation of the HCP including training and public awareness, small investments in goods and works, and small grants. The partnership will build on work previously undertaken in Vietnam by the Ministry of Health in partnership with the World Health Organization (WHO) and will work through a range of stakeholders to establish, for each city, a vision for their Healthy City. An action plan, with monitoring indicators, will be developed to operationalize the vision, which will be implemented by a range of means including capacity building activities, public awareness programs, the purchase of goods (e.g. water quality monitoring equipment), works (e.g. additional disposal facilities) and grants (whereby local NGOs and community groups can implement the vision). The framework for implementation of the HCP will be prepared by

Page 38: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

33

consultants who will produce an HCP Operations Manual. Delivery of a manual, acceptable to IDA, will be a condition for disbursement of the implementation funds. Component 6 will be co-financed with a PHRD capacity building grant of US$4.6 million.

Page 39: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

34

Annex 5: Project Costs

VIETNAM: Coastal Cities Environmental Sanitation Project

Total Project

Expenditure Category Nha Trang Quy Nhon Dong Hoi of base cost of total

Component 1 : Flood control, drainage and wastewater collection

Civil Works 23,833,526 20,302,897 19,309,626 63,446,049 43.38% 36.87%Goods /Eqpt 713,865 483,000 350,000 1,546,865 1.06% 0.90%Sub-Total 24,547,391 20,785,897 19,659,626 64,992,914 44.44% 37.77%

Component 2: Wastewater treatment plant

Civil Works 19,266,000 10,938,500 2,887,788 33,092,288 22.63% 19.23%Sub-Total 19,266,000 10,938,500 2,887,788 33,092,288 22.63% 19.23%

Component 3: Solid waste management

Civil Works 4,612,770 3,512,500 200,000 8,325,270 5.69% 4.84%Goods /Eqpt 1,785,980 1,918,500 813,749 4,518,229 3.09% 2.63%Sub- Total 6,398,750 5,431,000 1,013,749 12,843,499 8.78% 7.46%

Component 4: Resettlement and site clearance

Civil Works 1,214,511 1,380,000 2,594,511 1.77% 1.51%Compensation 4,177,748 2,120,000 1,162,000 7,459,748 5.10% 4.33%Mine Clearance 233,844 17,100 476,311 727,255 0.50% 0.42%Sub- Total 5,626,103 3,517,100 1,638,311 10,781,514 7.37% 6.26%

Component 5: Household revolving fund and school sanitation program

Civil Works 374,104 262,000 300,000 936,104 0.64% 0.54%Loans 280,000 340,000 230,000 850,000 0.58% 0.49%Inc. operating cost 14,000 17,000 11,500 42,500 0.03% 0.02%Sub- Total 668,104 619,000 541,500 1,828,604 1.25% 1.06%

Component 6: Capacity building and project implementation

Civil Works 40,000 30,000 35,000 105,000 0.07% 0.06%Goods /Eqpt 345,000 335,000 330,000 1,010,000 0.69% 0.59%Consulting Service 7,058,200 5,454,100 4,973,100 17,485,400 11.96% 10.16%Training/Workshops 288,000 237,000 220,000 745,000 0.51% 0.43%Grants 40,000 30,000 30,000 100,000 0.07% 0.06%PMU Costs 1,150,000 1,100,000 1,013,000 3,263,000 2.23% 1.90%Sub-Total 8,921,200 7,186,100 6,601,100 22,708,400 15.53% 13.20%Total Base Cost 65,427,548 48,477,597 32,342,074 146,247,219 100.00% 84.98%Contingencies 5,180,076 3,879,740 2,386,116 11,445,932 6.65%Taxes 6,406,783 4,844,814 3,148,128 14,399,725 8.37%Grand Total 77,014,407 57,202,150 37,876,318 172,092,875 100.00%

Total Each City Percentage

Total Project Cost by Component and Expenditure Category (US$)

Page 40: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

35

Total ProjectCategory Nha Trang Quy Nhon Dong Hoi of base cost of total

Component 1 : Flood control, drainage and wastewater collection

Civil Works 21,450,173 18,272,607 17,378,663 57,101,444 49.74% 45.79%Goods /Eqpt 713,865 483,000 350,000 1,546,865 1.35% 1.24%Sub- Total 22,164,038 18,755,607 17,728,663 58,648,309 51.09% 47.03%

Component 2: Wastewater treatment plant

Civil Works 17,339,400 5,344,650 2,599,009 25,283,059 22.02% 20.27%Sub-Total 17,339,400 5,344,650 2,599,009 25,283,059 22.02% 20.27%

Component 3: Solid waste management

Civil Works 4,151,493 3,161,250 180,000 7,492,743 6.53% 6.01%Goods /Eqpt 1,785,980 1,918,500 783,591 4,488,071 3.91% 3.60%Sub- Total 5,937,473 5,079,750 963,591 11,980,814 10.44% 9.61%

Component 4: Resettlement and site clearance

Civil Works 1,093,060 1,242,000 0 2,335,060 1.87% 1.87%Sub- Total 1,093,060 1,242,000 0 2,335,060 2.03% 1.87%

Component 5: Household revolving fund and school sanitation program

Civil Works 336,694 235,800 270,000 842,494Loans 280,000 340,000 230,000 850,000 0.74% 0.68%Inc. operating cost 14,000 17,000 11,500 42,500 0.04% 0.03%Sub- Total 630,694 592,800 511,500 1,734,994 1.51% 1.39%

Component 6: Capacity building and project implementation

Goods /Eqpt 345,000 335,000 330,000 1,010,000 0.88% 0.81%Civil Works 36,000 27,000 31,500 94,500 0.08% 0.08%Consulting Services 5,224,000 4,039,000 3,606,000 12,869,000 11.21% 10.32%Training/Workshops 288,000 237,000 220,000 745,000 0.65% 0.60%Grants 40,000 30,000 30,000 100,000 0.09% 0.08%Sub- Total 5,933,000 4,668,000 4,217,500 14,818,500 12.91% 11.88%

Total Base cost 53,097,665 35,682,807 26,020,263 114,800,736 100.00% 92.05%Contingencies 4,687,066 3,065,781 2,156,126 9,908,974 7.95%

Grand Total 57,784,731 38,748,588 28,176,390 124,709,709 100.00% 100.00%

Total Each City

IDA Financing by Component and Expenditure Category (US$)

Percentage

Page 41: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

36

Total Project Costs by Expenditure Category (US$)

Category Nha Trang Quy Nhon Dong Hoi Total Project

Civil Works 49,340,911 36,425,897 22,732,414 108,499,222Goods /Eqpt 2,844,845 2,736,500 1,493,749 7,075,094Consulting Services 7,058,200 5,454,100 4,973,100 17,485,400Compensation 4,177,748 2,120,000 1,162,000 7,459,748Loan (Revolving Fund) 280,000 340,000 230,000 850,000Inc. operating cost 14,000 17,000 11,500 42,500

Mine Clearance 233,844 17,100 476,311 727,255Training/Workshops 288,000 237,000 220,000 745,000Grants 40,000 30,000 30,000 100,000PMU Cost 1,150,000 1,100,000 1,013,000 3,263,000Contingencies 5,180,076 3,879,740 2,386,116 11,445,932Taxes 6,406,783 4,844,814 3,148,128 14,399,725Total Cost 77,014,407 57,202,150 37,876,318 172,092,875

Grant Programs: PHRD & GEF Nha Trang Quy Nhon Dong Hoi Total

PHRD (Component 6) Consulting Service 1,834,200 1,415,100 1,367,100 4,616,400PHRD Total 1,834,200 1,415,100 1,367,100 4,616,400GEF (Component 2) Civil Works - 4,950,000 - 4,950,000GEF Total 0 4,950,000 0 4,950,000

Page 42: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

37

Proj

ect F

inan

cing

Pla

n by

Com

pone

nt (U

S$)

Fore

ign

Loca

lTo

tal

IDA

%PH

RD

%G

EF%

Cnt

prt

%C

om

po

nen

t 1 :

Flo

od

co

ntr

ol,

dra

ina

ge a

nd

wast

ew

ate

r co

llect

ion

27,0

93,1

7137

,899

,743

64,9

92,9

1458

,648

,309

90.2

4%0

0.00

%0

0.00

%6,

344,

605

9.76

%C

om

po

nen

t 2:

Wast

ew

ate

r tr

eatm

en

t pla

nt

13,2

36,9

1519

,855

,373

33,0

92,2

8825

,283

,059

76.4

0%0

0.00

%4,

500,

000

13.6

0%3,

309,

229

10.0

0%C

om

po

nen

t 3:

So

lid W

ast

e M

an

ag

em

ent

7,05

4,84

95,

788,

650

12,8

43,4

9911

,980

,814

93.2

8%0

0.00

%0

0.00

%86

2,68

56.

72%

Com

po

nen

t 4:

Re

sett

lem

en

t a

nd S

ite C

lea

ran

ce0

10,7

81,5

1410

,781

,514

2,33

5,06

021

.66%

00.

00%

00.

00%

8,44

6,45

478

.34%

Com

po

nen

t 5:

Ho

use

ho

ld r

evo

lvin

g f

un

d a

nd

sch

oo

l sanita

tion p

rog

ram

01,

828,

604

1,82

8,60

41,

734,

994

94.8

8%0

0.00

%0

0.00

%93

,610

5.12

%C

om

po

nen

t 6:

Ca

pa

city

bu

ildin

g a

nd p

roje

ct im

ple

men

tatio

n14

,446

,580

8,26

1,82

022

,708

,400

14,8

18,5

0065

.26%

4,61

6,40

020

.33%

00.

00%

3,27

3,50

014

.42%

Base C

ost

61,8

31,5

1584

,415

,704

146,

247,

219

114,

800,

736

78.5

0%4,

616,

400

3.16

%4,

500,

000

3.08

%22

,330

,083

15.2

7%C

on

ting

ency

4,

738,

494

6,70

7,43

811

,445

,932

9,90

8,97

486

.57%

00.

00%

450,

000

3.93

%1,

086,

958

9.50

%T

axe

s 6,

103,

264

8,29

6,46

014

,399

,725

14,3

99,7

25T

ota

l C

os

t72

,673

,273

99,4

19,6

0217

2,09

2,87

512

4,70

9,70

94,

616,

400

4,95

0,00

037

,816

,766

Item

Cos

t ( C

ities

)Fu

ndin

g

Page 43: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

38

Phase 1 Phase 2 Total % WB WB PHRD Counterpart

FundingComponent 1: Flood control, drainage and Wastewater collection

I Flood control, drainage 4,872,665 5,644,149 10,516,814 90% 9,516,633 1,000,1811 Primary combined sewers 4,384,727 1,037,985 5,422,712 90% 4,880,441 542,271a North of Cai river

Channel No.1 850,375 0 850,375 90% 765,338 85,038Channel No.2 475,963 0 475,963 90% 428,367 47,596

b City center areaYersin sewer pipeline 1,051,255 415,194 1,466,449 90% 1,319,804 146,645Line from Nga 5 to Quan Truong River 1,064,289 622,791 1,687,080 90% 1,518,372 168,708Hoang Van Thu sewer pipe line 251,568 0 251,568 90% 226,411 25,157Thong Nhat sewer pipeline 381,691 0 381,691 90% 343,522 38,169Tran Quy Cap sewer pipeline 309,586 0 309,586 90% 278,627 30,959

2 Secondary sewers 487,938 4,091,164 4,579,102 90% 4,121,192 457,9103 Equipment for street, drainage cleans 515,000 515,000 100% 515,000 0II Waste water collection 200,857 10,993,930 11,194,787 90% 10,075,308 1,119,4791 Pumping stations 200,857 1,316,399 1,517,256 90% 1,365,530 151,7262 New main sewers (separate sewerage system) 0 6,197,046 6,197,046 90% 5,577,341 619,7053 Pressure pipe lines 0 1,103,235 1,103,235 90% 992,912 110,3244 Branch sewers (separate sewerage system) 0 762,643 762,643 90% 686,379 76,2645 New manholes 0 1,614,607 1,614,607 90% 1,453,146 161,461

IIIReha. Secondary, Tertiary sewers and alley upgrading works 386,925 2,250,000 2,636,925 90% 2,373,233 263,693

IV Equipment for cleaning sewers 198,865 0 198,865 100% 198,865 01 Vacuum truck 189,401 189,401 189,401 02 Sludge dredging manual equipment 9,464 9,464 9,464 0

Subtotal (Component 1) 5,659,312 18,888,079 24,547,391 22,164,038 0 2,383,353Component 2: Wastewater treatment plant

1 WWTP of South Q=59,000m3/day 0 14,573,000 14,573,000 90% 13,115,700 1,457,3002 WWTP of North Q=19,000m3/day 0 4,693,000 4,693,000 90% 4,223,700 469,300

Subtotal (Component 2) 0 19,266,000 19,266,000 17,339,400 0 1,926,600Component 3: Solid waste management

1 Collection vehicles and equipment 387,000 580,500 967,500 100% 967,500 02 Transfer station/collection point/ Public toilet 0 100,000 100,000 90% 90,000 10,0003 Closure of Ru Ri dump site 334,646 0 334,646 90% 301,181 33,4654 Landfill site Luong Hoa 3,900,000 278,124 4,178,124 90% 3,760,312 417,8125 Equipment for Luong Hoa 818,480 0 818,480 100% 818,480 0

Subtotal (Component 3) 5,440,126 958,624 6,398,750 5,937,473 0 461,277Component 4: Resettlement and site clearance

1 Resettlement site infrastructure 1,214,511 0 1,214,511 90% 1,093,060 121,4512 Compensation (all component) 858,015 3,319,733 4,177,748 0% 0 4,177,7483 Mine clearance (all sites) 96,951 136,893 233,844 0% 0 233,844

Subtotal (Component 4) 2,169,477 3,456,626 5,626,103 1,093,060 0 4,533,043Component 5: Household revolving fund and school sanitation program

1 Revolving fund 100,000 180,000 280,000 100% 280,000 0Incremental cost for operating RF 5,000 9,000 14,000 100% 14,000 0

2 School Sanitation (10 schools in phase) 129,001 245,103 374,104 90% 336,694 37,410Subtotal (Component 5) 234,001 434,103 668,104 630,694 0 37,410

Component 6: Capacity building and project implementationI Capacity building of Service Provider 803,000 540,000 1,343,000 16% 216,000 1,127,000 01 Training and workshops 66,000 28,000 94,000 100% 94,000 0 02 GIS & MIS system design 70,000 0 70,000 0% 0 70,000 03 GIS & MIS system and implementation 70,000 0 70,000 100% 70,000 0 04 TA for Institutional Analysis of Service provider 55,000 0 55,000 0% 0 55,000 05 TA for landfill operation 0 220,000 220,000 0% 0 220,000 06 TA for private sector participation 37,000 0 37,000 0% 0 37,000 07 Oversea Study Tour for Landfill operation 0 22,000 22,000 100% 22,000 0 08 Oversea Study Tour for WWTP Operation 0 30,000 30,000 100% 30,0009 Capacity building 505,000 0 505,000 0% 0 505,000 0

10 WWTP Operation Assistance 0 240,000 240,000 0% 0 240,000 0II Capacity building of Related Department 45,000 45,000 90,000 0% 0 90,000 01 Capacity building for Khanh Hoa Department 45,000 45,000 90,000 0% 0 90,000 0

III Healthy City Partnership 57,200 300,000 357,200 56% 201,000 152,200 4,0001 TA to develop framework, monitoring, evaluation 42,200 0 42,200 0% 0 42,200 02 TA for Implementation 0 110,000 110,000 0% 0 110,000 03 Training / Public Awareness 0 40,000 40,000 100% 40,000 0 04 IEC (information, HC, and hygience education etc.) 15,000 30,000 45,000 100% 45,000 0 05 Works 0 40,000 40,000 90% 36,000 0 4,0006 Goods 0 40,000 40,000 100% 40,000 0 07 Grants 0 40,000 40,000 100% 40,000 0 0

IV Capacity Building of PMU 504,000 18,000 522,000 11% 57,000 465,000 01 TA for project management support 267,000 0 267,000 0% 0 267,000 02 TA for support to PMU for drafting TORs, RFPs 68,000 0 68,000 0% 0 68,000 03 TA for development and Management of Training 65,000 0 65,000 0% 0 65,000 04 TA for carbon finance proposal 65,000 0 65,000 0% 0 65,000 05 Training and workshops 39,000 18,000 57,000 100% 57,000 0 0V Implementation support 3,152,000 3,457,000 6,609,000 83% 5,459,000 0 1,150,0001 Preparation of FS/DD/BD Phase 2 1,900,000 0 1,900,000 100% 1,900,000 0 02 Construction supervision for comp. 1-3 Phase 1 551,000 0 551,000 100% 551,000 0 03 Construction supervision for comp. 1-3 Phase 2 0 2,420,000 2,420,000 100% 2,420,000 0 04 Construction Supervision Compoonent 4-5 49,000 59,000 108,000 100% 108,000 0 05 Vehicles and equipment for PMU 180,000 0 180,000 100% 180,000 0 06 Equipment for quality control 55,000 0 55,000 100% 55,000 0 07 Administratin and Operation Cost 300,000 850,000 1,150,000 0% 0 0 1,150,0008 Independent Auditing 50,000 50,000 100,000 100% 100,000 0 09 Safeguards Monitoring (Env.) 25,000 30,000 55,000 100% 55,000 0 0

10 Safeguards Monitoring (Reset.) 36,000 42,000 78,000 100% 78,000 011 Evaluation/review of project document 6,000 6,000 12,000 100% 12,000 0 0

Subtotal (Component 6) 4,561,200 4,360,000 8,921,200 5,933,000 1,834,200 1,154,000Total Base Cost 18,064,116 47,363,432 65,427,548 53,097,665 1,834,200 10,495,683

Contingencies 1,244,295 3,935,781 5,180,076 4,687,066 0 493,009Sub-Total 19,308,411 51,299,213 70,607,624 57,784,731 1,834,200 10,988,692

Taxes VAT 1,702,925 4,703,859 0 0 6,406,783GRAND TOTAL 21,011,336 56,003,071 77,014,407 57,784,731 1,834,200 17,395,475

Financing (US$) Cost (US$)

Project Costs: NHA TRANG CITY

No Basic Items

Page 44: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

39

Phase I Phase II Total % WB WB PHRD GEF

Counter-part

Funding

Component 1: Flood Control, Drainage & Wastewater Collection

I Flood control, drainage 3,765,054 4,549,405 8,314,459 91% 7,531,313 783,146

1 Rehabilitation, new construction of drain line 2,954,520 3,324,342 6,278,862 90% 5,650,976 627,8862 Existing sewers rehabilitation 431,337 124,160 555,497 90% 499,947 55,5503 New outlets 69,000 71,953 140,953 90% 126,858 14,0954 Drainage management equipment 103,000 380,000 483,000 100% 483,000 05 Dredge sludge and reiservoir lake 207,197 0 207,197 90% 186,477 20,7206 Lake excavation 0 648,950 648,950 90% 584,055 64,895II Wastewater collection 3,091,595 6,379,843 9,471,438 90% 8,524,294 947,144

1 Gravity sewer 546,530 2,500,253 3,046,783 90% 2,742,105 304,6782 Forcemain pipe 343,565 769,204 1,112,769 90% 1,001,492 111,2773 Wastewater pumping stations 406,100 567,886 973,986 90% 876,587 97,3994 Combined sewer overflows 112,400 100,000 212,400 90% 191,160 21,2405 Outfalls 0 742,500 742,500 90% 668,250 74,2506 Tertiary lines (to be identified) 1,683,000 1,700,000 3,383,000 90% 3,044,700 338,300

III Secondary lines (to be identified) 400,000 2,600,000 3,000,000 90% 2,700,000 300,000Subtotal (Component 1) 7,256,649 13,529,248 20,785,897 18,755,607 0 0 2,030,290

Component 2: Wastewater treatment plants1 Nhon Binh WWTP (1b), Q=21,500 m3/day 0 5,000,000 5,000,000 0% 0 4,500,000 500,0002 Phu Hoa WWTP (1c), Q=14,900 m3/day 0 3,776,250 3,776,250 90% 3,398,625 0 377,6253 Bau Lac WWTP (2a), Q=8,200 m3/day 0 2,162,250 2,162,250 90% 1,946,025 0 216,225

Subtotal (Component 2) 0 10,938,500 10,938,500 5,344,650 0 4,500,000 1,093,850Component 3: Solid Waste Management

1 Collection vehicles and equipment 322,750 968,250 1,291,000 100% 1,291,000 02 Transfer station/collection point/ Public toilet 0 200,000 200,000 90% 180,000 20,000

3 Landfill site 0 3,312,500 3,312,500 90% 2,981,250 331,2504 Equipment for landfill 0 515,000 515,000 100% 515,000 0

5 Miscellaneous equipment 0 112,500 112,500 100% 112,500 0Subtotal (Component 3) 322,750 5,108,250 5,431,000 5,079,750 0 0 351,250

Component 4: Resettlement and Site Clearance

1 Resettlement site 1,380,000 0 1,380,000 90% 1,242,000 138,0002 Compensation (all component) 2,120,000 0 2,120,000 0% 0 2,120,0003 Mine clearance 17,100 0 17,100 0% 0 17,100

Subtotal (Component 4) 3,517,100 0 3,517,100 1,242,000 0 0 2,275,100Component 5: Household revolving fund and school sanitation program

1 Revolving Fund 170,000 170,000 340,000 100% 340,000 0Incre. Cost for Operating RF 8,500 8,500 17,000 100% 17,000 0

2 School Sanitation 97,000 165,000 262,000 90% 235,800 26,200Subtotal (Component 5) 275,500 343,500 619,000 592,800 0 0 26,200

Component 6: Capacity building and project implementation

I Capacity building of Service Provider 690,000 404,000 1,094,000 18% 193,000 901,000 0

1 Training and workshops 52,000 23,000 75,000 100% 75,000 0 02 GIS & MIS design & training 60,000 0 60,000 0% 0 60,000 03 GIS & MIS system and implementation 70,000 0 70,000 100% 70,000 0 04 TA for Institutional Analysis of Service provider 35,000 0 35,000 0% 0 35,000 05 TA for Landfill operation assistance 0 154,000 154,000 0% 0 154,000 06 TA for private sector participation 27,000 0 27,000 0% 0 27,000 07 Oversea Study Tour for Landfill operation 0 20,000 20,000 100% 20,000 0 08 Oversea Study Tour for WWTP Operation 0 28,000 28,000 100% 28,000 0 09 Capacity building 446,000 0 446,000 0% 0 446,000 09 WWTP Operation Assistance 0 179,000 179,000 0% 0 179,000 0II Capacity building of Related Department 40,000 40,000 80,000 0% 0 80,000 0

1 Capacity building for Binh Dinh Department 40,000 40,000 80,000 0% 0 80,000 0III Healthy City Partnership 56,100 230,000 286,100 53% 152,000 131,100 3,000

1 TA for program preparation and M&E design 41,100 0 41,100 0% 0 41,100 02 TA for Implementation and M&E 0 90,000 90,000 0% 0 90,000 03 Training / Public Awareness 0 20,000 20,000 100% 20,000 0 04 IEC (information, HC, and hygience education etc.) 15,000 30,000 45,000 100% 45,000 0 05 Works 0 30,000 30,000 90% 27,000 0 3,0006 Goods 0 30,000 30,000 100% 30,000 0 07 Grants 0 30,000 30,000 100% 30,000 0 0

IV Capacity Building of PMU 336,000 16,000 352,000 14% 49,000 303,000 0

1 TA for project management support 209,000 0 209,000 0% 0 209,000 02 TA for support to PMU for drafting TORs, RFPs 41,000 0 41,000 0% 0 41,000 03 TA for needs assessment 53,000 0 53,000 0% 0 53,000 04 Training and workshops 33,000 16,000 49,000 100% 49,000 0 0V Implementation support 2,631,000 2,743,000 5,374,000 80% 4,274,000 0 1,100,000

1 Preparation of FS/DD/BD Phase 2 1,100,000 0 1,100,000 100% 1,100,000 0 0

2 Construction supervision for comp. 1-3 Phase 1 603,000 0 603,000 100% 603,000 0 03 Construction supervision for comp. 1-3 Phase 2 0 2,034,000 2,034,000 100% 2,034,000 0 04 Construction Supervision Compoonent 4-5 49,000 59,000 108,000 100% 108,000 0 05 Vehicles and equipment for PMU 180,000 0 180,000 100% 180,000 0 06 Equipment for quality control 55,000 0 55,000 100% 55,000 0 07 Administratin and Operation Cost 550,000 550,000 1,100,000 0% 0 0 1,100,0008 Independent Auditing 49,000 49,000 98,000 100% 98,000 0 09 Safeguards Monitoring (Env.) 16,000 19,000 35,000 100% 35,000 0 0

10 Safeguards Monitoring (Reset.) 23,000 26,000 49,000 100% 49,000 0 011 Evaluation/review of project document 6,000 6,000 12,000 100% 12,000 0 0

Subtotal (Component 6) 3,753,100 3,433,000 7,186,100 4,668,000 1,415,100 0 1,103,000Total of Basic Cost 15,125,099 33,352,498 48,477,597 35,682,807 1,415,100 4,500,000 6,879,690

Contingencies 905,640 2,974,100 3,879,740 3,065,781 0 450,000 363,959

Total Sub-total 16,030,739 36,326,598 52,357,337 38,748,588 463,000 4,950,000 7,243,649

Taxes VAT 1,276,304 3,568,510 4,844,814 4,844,814

GRAND TOTAL 17,307,043 39,895,108 57,202,150 38,748,588 1,415,100 4,950,000 12,088,462

Financing (US$) Cost (US$)

Project Costs: QUY NHON CITY

No Basic Items

Page 45: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

40

Phase I Phase II Total % WB WB PHRD

Counter-part

Funding

Component 1 : Flood control, drainage and wastewater collectionI Dredging and embankment works 2,854,439 0 2,854,439 90% 2,568,995 285,444

I.1 Dredging Cau Rao River 322,137 0 322,137 90% 289,923 32,214

I.2 Dredging Phong Thuy Channel 55,677 0 55,677 90% 50,109 5,568

I.3 Dredging Nam Ly Lake 47,807 0 47,807 90% 43,026 4,781

I.4 Embankment of Cau Rao river - Phase 1 957,580 0 957,580 90% 861,822 95,758

I.5 Embankment of Phong Thuy Channel 1,216,358 0 1,216,358 90% 1,094,722 121,636

I.6 Embankment of Nam Ly Lake 254,880 0 254,880 90% 229,392 25,488

II Combined drainage system 4,273,677 7,350,000 11,623,677 90% 10,461,309 1,162,368

II.1 Dong My Ward 740,825 0 740,825 90% 666,743 74,083

II.2 Hai Dinh Ward 775,168 0 775,168 90% 697,651 77,517

II.3 Dong Phu Ward 1,520,539 0 1,520,539 90% 1,368,485 152,054

II.4 Bac Ly Ward 685,989 0 685,989 90% 617,390 68,599

II.5 Nam Ly Ward 499,178 0 499,178 90% 449,260 49,918

II.6 Street surface and pavement improvement 30,938 0 30,938 90% 27,844 3,094

II.7 Tertiary network (R3) 21,040 0 21,040 90% 18,936 2,104

II.8 New drains in other wards 0 7,350,000 7,350,000 90% 6,615,000 735,000

III Wastewater collection 0 4,799,860 4,799,860 90% 4,319,874 479,986

III.1 Interceptor pipes and storm water overflows 0 403,530 403,530 90% 363,177 40,353III.2 New separated sewers in other wards 0 3,179,190 3,179,190 90% 2,861,271 317,919III.3 New tertiary sewers 0 348,100 348,100 90% 313,290 34,810III.4 Pumping station (9no) 0 869,040 869,040 90% 782,136 86,904

IV Sanitation facilities 0 381,650 381,650 99% 378,485 3,165

IV.1 Public toilets (10no) 0 31,650 31,650

IV.2 Operation and maintenance equipment 0 350,000 350,000

Subtotal (Component 1) 7,128,116 12,531,510 19,659,626 17,728,663 0 1,930,963

Component 2: Wastewater treatment plant1 Duc Ninh WWTP, Q=8,000 m3/day 0 2,792,851 2,792,851 90% 2,513,566 279,2852 Reha. WWTP in VN-CB Hospital Q=300 m3/day 0 94,937 94,937 90% 85,443 9,494

Subtotal (Component 2) 0 2,887,788 2,887,788 2,599,009 0 288,779

Component 3: Solid Waste Management1 Solid waste collection equipment 128,750 307,468 436,218 100% 436,218 0

2Ly Trach landfill development/closure of Loc Ninh landfill (Phase 2) 0 200,000 200,000 90% 180,000 20,000

3 Ly Trach landfill equipment 0 75,949 75,949 100% 75,949 0

4Hazardous waste collection and treatment ( centralised incinerator and equipment) 0 301,582 301,582 90% 271,424 30,158

Subtotal (Component 3) 128,750 884,999 1,013,749 963,591 0 50,158

Component 4: Resettlement and Site Clearance1 Land compensation 679,700 75,140 754,840 0% 754,8402 Structures, property compensation and support 98,200 308,960 407,160 0% 407,1603 Mine clearance 343,400 132,911 476,311 0% 476,311

Subtotal (Component 4) 1,121,300 517,011 1,638,311 0 0 1,638,311Component 5: Household revolving fund and school sanitation program

1 Revolving fund loan 70,000 160,000 230,000 100% 230,000 0Incremental cost for operating RF 3,500 8,000 11,500 100% 11,500 0

2 School sanitation 90,000 210,000 300,000 90% 270,000 30,000

Subtotal (Component 5) 163,500 378,000 541,500 511,500 0 30,000Component 6: Capacity building and project implementation

I Capacity building of Service Providers 682,000 385,000 1,067,000 17% 181,000 886,000 01 Training and workshops 50,000 21,000 71,000 100% 71,000 0 02 GIS & MIS design & training 60,000 0 60,000 0% 0 60,000 03 GIS & MIS system and implementation 70,000 0 70,000 100% 70,000 0 04 TA for Institutional Analysis of Service provider 33,000 0 33,000 0% 0 33,000 05 TA for Landfill operation assistance 0 151,000 151,000 0% 0 151,000 06 TA for private sector participation 27,000 0 27,000 0% 0 27,000 07 Oversea Study Tour for Landfill operation 0 18,000 18,000 100% 18,000 0 08 Oversea Study Tour for WWTP Operation 0 22,000 22,000 100% 22,000 0 09 Capacity building 442,000 0 442,000 0% 0 442,000 0

10 WWTP Operation Assistance 0 173,000 173,000 0% 0 173,000 0II Capacity Building for Related Departments 35,000 35,000 70,000 0% 0 70,000 0

Capacity Building for Quang Binh Departments 35,000 35,000 70,000 0% 0 70,000 0III Healthy City Partnership 55,100 220,000 275,100 57% 156,500 115,100 3,500

1 TA for program preparation and M&E design 40,100 0 40,100 0% 0 40,100 02 TA for Implementation and M&E 0 75,000 75,000 0% 0 75,000 03 Training / Public Awareness 0 20,000 20,000 100% 20,000 0 04 IEC (information, HC, and hygience education etc.) 15,000 30,000 45,000 100% 45,000 0 05 Works 0 35,000 35,000 90% 31,500 0 3,5006 Goods 0 30,000 30,000 100% 30,000 0 07 Grants 0 30,000 30,000 100% 30,000 0 0

IV Capacity building of PMU 326,000 14,000 340,000 13% 44,000 296,000 0

1 TA for project management support 204,000 0 204,000 0% 0 204,000 02 TA for support to PMU for drafting TORs, RFPs 40,000 0 40,000 0% 0 40,000 03 TA for needs assessment 52,000 0 52,000 0% 0 52,000 04 Training and workshops 30,000 14,000 44,000 100% 44,000 0 0V Implementation support 2,428,500 2,420,500 4,849,000 79% 3,836,000 0 1,013,0001 Preparation of FS/DD/BD Phase 2 780,000 0 780,000 100% 780,000 0 02 Construction supervision for comp. 1-3 Phase 1 781,000 0 781,000 100% 781,000 0 03 Construction supervision for comp. 1-3 Phase 2 0 1,755,000 1,755,000 100% 1,755,000 0 04 Construction Supervision Compoonent 4-5 49,000 59,000 108,000 100% 108,000 0 05 Vehicles and equipment for PMU 180,000 0 180,000 100% 180,000 0 06 Equipment for quality control 50,000 0 50,000 100% 50,000 0 07 Administratin and Operation Cost 500,000 513,000 1,013,000 0% 0 0 1,013,0008 Independent Auditing 47,500 47,500 95,000 100% 95,000 0 09 Safeguards Monitoring (Env.) 15,000 17,000 32,000 100% 32,000 0 0

10 Safeguards Monitoring (Reset.) 21,000 24,000 45,000 100% 45,000 0 011 Evaluation/review of project document 5,000 5,000 10,000 100% 10,000 0 0

Subtotal (Component 6) 3,526,600 3,074,500 6,601,100 4,217,500 1,367,100 1,016,500

Total base cost 12,068,266 20,273,808 32,342,074 26,020,263 1,367,100 4,954,711

Contingencies 734,687 1,651,430 2,386,116 2,156,126 0 229,990

Total Sub-total 12,802,953 21,925,238 34,728,190 28,176,390 1,367,100 5,184,701Taxes VAT 1,067,505 2,080,623 3,148,128 0 0 3,148,128

GRAND TOTAL COST 13,870,458 24,005,860 37,876,318 28,176,390 1,367,100 8,332,828

Financing (US$) Cost (US$)

Project Costs: DONG HOI CITY

TT Items

Page 46: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

41

Annex 6: Implementation Arrangements

VIETNAM: Coastal Cities Environmental Sanitation Project Pre Feasibility Studies have been prepared for each City and approved by the Prime Minster, including delegation of authority for approval of the sub project FS, and bidding plan, to the participating PPC. The following implementation arrangements result.

Overall Implementation Arrangements: At the national level the Ministry of Planning and Investment (MPI) which provides overall guidance on investment policy will supervise and monitor progress. For sector-specific and technical issues, MPI will consult the Ministry of Construction (MoC), which is responsible for urban sector sanitation policy and technical standards, and with Ministry of Natural Resources and Environment (MONRE) which is responsible for environmental standards and policy. At the provincial level the project will be implemented by a Project Management Unit (PMU). The PMUs report to the PPC, and are supported by consultants, by provincial and city level departments, and by a Project Steering Committee (PSC). The PMU structure typically includes one director, three deputy directors and four divisions. The directors, or their deputies, are experienced representatives from the service providers. During project implemention, the PMU should coordinate and work directly with the related departments. However, if there are matters which cannot be resolved then the PMU will seek direction from the PSC. The PSC is led by the Chairman (being the Chairman or Vice Chairman of the Provincial PC) with assistance from the related departments: DPI, DoF, DoNRE, DoC, DoE and the City PC. The service providers will have representatives in the PSC to help the PMU implement the project components relating to their technical expertise. PSC is generally in charge of solving problems in project implementation.

The more specific roles of the various agencies are summarized as follows:

Provincial People’s Committee (PPC) approves the project documents after consulting relevant departments including the investment project, resettlement plan, technical design file and total estimate, bidding plan, bidding documents and bid results.

Department of Planning and Investment (DPI) cooperates with the departments concerned to advise the PPC on the implementation plan, project funding structure, and plan for annual funding requirements according to project progress. It also supports the PMU in assessing technical reports, bidding documents, bid results and submissions to PPC for approval.

Department of Construction (DoC) supports the PMU and evaluates the technical design file, construction estimate and total estimate to be submitted to PPC. It also supports the PMU in managing the construction quality.

Department of Finance (DoF) cooperates with DPI to balance and allocate annual budget to the project for PPC approval. It also assesses the compensation price for site clearance and submits to PPC for approval.

Page 47: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

42

Department of Natural Resources and Environment (DoNRE) support the PMU on legal procedures and the processes of evaluating and approving environmental impact assessment, and managing environmental impacts. They also advise PPC on granting land and clearing site for the project.

Department of Education (DoE) supports the PMU in the implementation of the school sanitation activities to ensure demand from the schools, and that the proposed facilities meet with DoE standards.

Municipal People’s Committee (MPC) advises PPC on allocating land, clearing site and resettlement for the project and directs the compensation, site clearance and resettlement activities of the project. Women’s Unions (WU) at the Province, City and Ward level will be active in the implementation of the household sanitation revolving fund. This is described below. Service providers provide information to the PMU on current technical and financial arrangements, and coordinate with the PMU and its consultants on all issues related to planning and implementation of the project. Project Management Unit (PMU): will manage all issues related to project implementation for activities for which they are responsible. Their activities will include, but not be limited to, the following:

• Financial management of the sub projects • Dealing with issues related to sub project planning and implementation • Preparation for land acquisition • Reporting on progress on all aspects of project implementation – physical progress, financial,

environmental, social, and institutional • Co-ordination with other sectors and departments of the Province or City • Management of the bidding process and selection of contractors or consultants, including bid

invitation, bid evaluation and contract d rafting • Organizing annual financial audits of the special accounts and service providers, as appropriate • Organizing the monitoring of implementation of EMPs and RAPs

These overall implementation arrangements are illustrated below:

Page 48: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

43

Service Providers:

a) Water Supply and Sanitation Companies (WSSC)

In Dong Hoi and Quy Nhon the URENCO/UWC currently have responsibility for drainage and septage management. In Nha Trang the URENCO is responsible for septage management, but drainage is the responsibility of the Water Supply and Drainage Company.

Under the project it has been agreed that all wastewater, drainage and septage functions in each city will be consolidated with the existing water services company to form an integrated water supply and sanitation company (WSSC).

The water supply activities in each city are commercially sound and each company has revenues which are at least 50% higher than operating costs. They are reasonably well run entities.

The expansion of drainage services and the construction of piped sewer networks and wastewater treatment plants will result in a significant increase in the activities of the new, combined, WSSC companies. To support this transition a major program of capacity building is being funded under component 6 of the project, with the support of the PHRD capacity building grant.

b) City Urban Environment Companies (URENCO) or Urban Works Company (UWC)

National Agencies - MPI - MoF - State Bank - MoFA - MoJ - MoC

Project Steering Committee - Chairman/VC of Provincial PC - DPI representative - DoC representative - DoF representative - DoNRE representative - WU representative - DoT representative - Municipal PC representative - WSSC representative - URENCO representative - Dept. of Tax representative - Provincial development &

exploitation Center Land Fund

Project Owner

Provincial PC

World Bank (WB)

Note: Direct relationship

Indirect relationship

Project Support - Key departments at municipal and

provincial level - Women’s Union

PMU - Director - Deputy Directors - Technical Officers - Support Staff

External Consultants

Page 49: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

44

Like the WSSC the URENCOs (Quy Nhon and Nha Trang) and the UWC (Dong Hoi) will see a significant increase in their responsibilities as a result of the project. These companies are not as well developed, commercially or technically, as the existing water supply companies. Building their capacity is an important part of the project. The URENCOs and UWC will therefore be subject to the capacity building activities under component 6 of the project. c) Collection of user fees Wastewater charges are presently incorporated into the water bill in a separate line. Each water supply and drainage company will manage billing and collection of wastewater charges directly. This arrangement has advantages since the water companies already have effective collection systems and adequate administrative mechanisms. At present the wastewater fee collected by the WSDC is transferred to the provincial budget. The WSDCs subsequently receives budget funding for its drainage operations. With the project, the WSDC will retain the wastewater revenue, similarly as for the water revenue. The wastewater revenue will be used for scheduled septic tank emptying and to finance the O&M of the combined drainage/sewerage system including the new wastewater facilities. Solid waste charges will be collected by URENCO/UWC and retained by URENCO to fund operations and maintenance of the solid waste facilities. Subsidies from the City will be properly identified and recorded and the URENCO/UWC will maintain a separate book of accounts for solid waste management activities.

Implementation of Physical Investments:

a) Overall project preparation The physical investments will be implemented in two Phases. Phase 1 comprises those investments for which FS have been prepared during preparation for World Bank appraisal. Phase 2 comprise the remainder of the investments. The amounts of investment for each Phase are approximately 30% in Phase 1 and 70% in Phase 2. b) Phase 2 Preparation Preparation of Phase 2 sub projects will be by international and national consultants hired by PMU. National consultants will be selected by each PMU individually. Selection of international consultants will be managed by one of the PMUs on behalf of, and in consultation with, all the PMUs. Once selected, the international consultant will enter into individual contracts with each PMU.

The main work items will be allocated between the national and international firms. National firms will undertake engineering aspects of drainage, sewerage and flood control activities. The international firm will undertake engineering aspects of solid waste management and wastewater treatment activities, all financial and economic analyses, and safeguards issues.

c) Supervision of Construction Each PMU will hire a Construction Management Consultant (CMC) for supervision of construction of the facilities in each City. The CMC will be an international firm in association with a national company. The CMCs will provide overall quality assurance related to construction activities.

Implementation of Household Sanitation Program Implementation of the sanitation fund will be managed by each PMU. The money for establishing the sanitation fund, and set up costs for its management, will be passed to the Province as a grant from MoF. The PMU will delegate operation of the sanitation fund to the Women’s Union (at either the City level (Quy Nhon and Dong Hoi) or the Province level (Nha Trang)) whose incremental operating costs will be included in the grant and the spread on interest rates.

Page 50: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

45

A management board chaired by the chairwomen of city/province WU and comprising representatives of city authorities and PMU will oversee management of the household sanitation revolving funds. In each ward (Phuong), the saving and credit groups will be formed. The saving and credit groups are a fundamental part of this component. A household revolving fund manual has been developed setting out clearly the target beneficiaries, responsibilities of all parties especially between PMU and WU, monitoring and evaluation activities, financial management and reporting system. The Women's Union was selected based on their experience in administering credit facilities of this nature, and their presence on the ground at the National, Province, City and Ward level. Under the on-going Three Cities Sanitation Project the WU have made approximately 20,000 small loans for household sanitation, with a repayment rate of just less than 100%. The new project will follow the experience gained under the Three Cities project and a similar level of performance is expected. The final borrowers are individual households and no collateral is required. However, borrowers from the fund must also be participants in ward level savings and credit groups (see above). These savings and credit groups not only provide lending for income generating activities but importantly also provide a source of repayment to the sanitation fund in case a householder is unable to make repayments due to illness or unemployment. Being ward level scheme individual householders are subject to peer pressure and can't abuse this "safety net" feature of the scheme. Implementation of the Healthy City Partnerships (HCP). The HCPs, including their detailed implementation arrangements, will be designed in Phase 1 of the project. In Phase 1 the Cities will prepare and put into effect a Healthy City Partnership Manual, satisfactory to the Association. The Manual will set out the principles and procedures for mobilizing stakeholders in the Cities to build the Health City Partnership and formulate the common vision, the criteria for actions and programs to improve the environmental and hygiene conditions of the respective Project City, the procedures for review and approval of small grants for innovative proposals, procurement arrangements, and monitoring and evaluation mechanisms. The Phase 1 activities will be undertaken by a single consultant that will work across all cities. The HCP will be implemented in Phase 2 using the arrangements agreed in Phase 1. Capacity Building, Technical Assistance and Project Implementation – Component 6 Component 6 comprises a number of activities, all of which will be contracted separately by each PMU. A number of Component 6 activities will provide support to all three cities and for each of these one PMU will take responsibility for consultant selection on behalf of, and in consultation with, all PMUs. For the remaining Component 6 activities, each PMU will be responsible for their own consultant selection. Implementation Schedule The total implementation period for the project is seven years. This is divided into two phases. Phase 1 comprises investments for which FS have been prepared for project appraisal by the World Bank. This amounts to approximately 30% of the project cost and will take place over the first four years of the project. Phase 2 comprises the remaining 70% of the investments and will take place over a five year period leading up to the end of the project. There will be a two year implementation overlap between the two phases. The overall implementation schedule for the project is provided below.

Page 51: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

46

PR

OJ

EC

T I

MP

LE

ME

NT

AT

ION

SC

HE

DU

LE

Fin

anci

al Y

ear

SD

MJ

SD

MJ

SD

MJ

SD

MJ

SD

MJ

SD

MJ

SD

MJ

SD

MJ

Cre

dit

Sig

n J

an

18, 20

06

Cre

dit

Eff

ect

ive

ness

May

31, 200

7

Co

mp

on

en

t 1 -

Flo

od

Co

ntr

ol W

aste

wate

r C

ollec

tio

n

Flo

od C

ontr

ol D

rain

age -

Phase

1

Wast

ew

ate

r co

llect

ion -

Ph

ase

1

Flo

od C

ontr

ol D

rain

age -

Phase

2

Wast

ew

ate

r co

llect

ion -

Ph

ase

2

Co

mp

on

en

t 2 -

Was

tew

ate

r T

reatm

en

t P

lan

t

Wast

ew

ate

r T

reatm

ent P

lant (P

hase

2)

Co

mp

on

en

t 3 -

S

olid

Waste

Man

ag

em

en

t

Solid

wast

e m

an

agem

ent -

Phase

1

Solid

wast

e m

an

agem

ent -

Phase

2

Co

mp

on

en

t 4 -

Re

sett

lem

en

t

Rese

ttle

ment -

Phase

1

Rese

ttle

ment -

Phase

2

Co

mp

on

en

t 5 -

Ho

useh

old

an

d S

ch

oo

l S

an

itati

on

HH

san

itatio

n f

und

Sch

oo

l San

itatio

n -

Phase

1

Sch

oo

l San

itatio

n -

Phase

2

Co

mp

on

en

t 6 -

Ca

pac

ity B

uil

din

g a

nd

Im

ple

men

tati

on

Su

pp

ort

Capaci

ty b

uild

ing -

Phase

1

Capaci

ty b

uild

ing -

Phase

2

Pro

ject

imple

men

tatio

n -

Phase

1

Pro

ject

imple

men

tatio

n -

Phase

2

LE

GE

ND

S

Pre

para

tion

Bid

din

gIm

ple

menta

tion

AC

TIV

ITY

2010

2011

FY

2008

FY

2009

FY

2010

FY

2011

2006

2007

2008

FY

2007

FY

2014

2014

Cale

ndar

Year

2009

2012

2013

FY

2012

FY

2013

Page 52: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

47

Annex 7: Financial Management and Disbursement Arrangements

VIETNAM: Coastal Cities Environmental Sanitation Project

Country Issues Since the 2001 Country Financial Accountability Assessment (CFAA) was undertaken a large number of its recommendations have been implemented, or are in the process of being implemented. The most recent changes include: (i) The new audit law on State Audit passed by the National Assembly in May 2005; (ii) The new decree on independent audit issued March 2004; and (iii) The accounting law approved by National Assembly in 2003 establishing legal framework for setting Vietnamese Accounting Standards. The recent PER-IFA recognized the recent changes to improve transparency and accountability in the country and identified further challenges including: (i) Implementation of the legislative frameworks which are largely in place after recent changes; (ii) Strengthening the effectiveness of the State Audit of Vietnam; (iii) Streamlining the internal control framework; (iv) building capacity on financial management, particularly at the sub-national level; and (v) adopting international public sector accounting standards. The implementation of the PER-IFA recommendations is being supported by the PRSC program and grant funds. Considering the actions that have been taken and the progress being made in furthering government's PFM program, the level of fiduciary risk for financial management is considered manageable. Implementation Arrangement. The project would be implemented by Project Management Units (PMUs) established in each of the three participating Provinces with financial staff having qualifications acceptable to IDA. Training of these staff and establishment of financial management systems acceptable to IDA are conditions of effectiveness. Each PMU has its own project implementation plan and would maintain its own Special Account for making payments under the project. The PMUs will handle the procurement, construction oversight and acceptance of all goods, works and services under the project. Works, goods and services, once accepted by the PMU, will be transferred to the relevant service providers. Strengths, weaknesses and risks. All PMUs are established under the Provincial People’s Committee so that they have a strong voice to influence related authorities during project implementation especially when dealing with Treasury and commercial banks in their areas. There is an inherent risk because each PMU will implement the project independently and all are new with limited experiences in project management, project accounting and especially in IDA requirements in FM and disbursement. Control risk also exists whilst the staff becomes more experienced and the financial system becomes established. However the PMUs are being assisted by consultants on all these issues and the agreed Action Plan on Financial Management (below) significantly mitigates these weaknesses and risk. In addition, in advance of project effectiveness, IDA will enhance its own training provided to the PMUs to cover in more depth issues of project documentation, integration of financial accounting & procurement activities, and clarification of PMU staff roles & responsibilities. During early supervision missions IDA, in coordination with the PMUs, will build on this training paying particular attention to the effective implementation and integration of the FM systems. Overall, the financial management risk from this project is considered as medium.

Page 53: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

48

Action Responsibility To be completed

before 1- Financial staffs PMU to appoint officially financial staffs with adequate skills and experiences acceptable to IDA.

PMUs

Effectiveness

2-Comprehensive guidance on financial management PMUs to adopt a project FM manual acceptable to IDA.

PMUs Effectiveness

3- General training on project accounting PMUs to obtain practical trainings on financial management and disbursement to strengthen the capacity of accounting people.

PMUs/Consult

ants

Effectiveness

4- Elements of accounting system PMUs to establish all relevant accounting books, including voucher system, financial filing mechanism, clear TORs for accounting units and division of responsibilities for each PMU and each accountant acceptable to IDA.

PMUs

Effectiveness

5- Accounting software PMUs to establish appropriate accounting software acceptable to IDA.

PMUs

Effectiveness

Accounting Policies and Procedures. PMUs will use the accounting system promulgated under Decision #214 allowing sub-accounts to flexibly record project expenditures by expenditure category or by project component. The chart of accounts will be developed to accommodate the functions of the selected accounting software in order to capture the expenditure data classified by project components and expenditure categories. Project funds spent by the Women’s Union will be included in the PMU’s financial statements. Reporting and Monitoring. For periodic project monitoring purposes, the project will use the Financial Monitoring Reports (FMRs) developed by the World Bank and will be tailored to meet practical monitoring requirement of the project. A set of FMRs formats were agreed upon during negotiations. Each PMU will submit to the World Bank the FMRs on a quarterly basis within 45 days after quarter end. The FMRs will comprise of the following reports:

• Sources and Uses of Funds by expenditure categories; • Uses of Funds by Project by project activities/components; • Special Account Statement; • Implementation Progress by contract (combined for Implementation Progress & Contract

Monitoring) • Procurement Process Monitoring.

Disbursement Arrangements. The project will use traditional disbursement method. Allocation of Credit Proceeds (Table C)

Page 54: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

49

Nha Trang city (Khanh Hoa)

Expenditure Category Amount In USD millions Financing Percentage Works 48.844 90% of expenditures Goods 3.095 100% of foreign

expenditures, 100% of local expenditures (ex-factory cost); 75% of local expenditures

Consulting Services 5.224 100 % of expenditures Others (e.g. revolving fund) 0.622 100 % of expenditures Total Costs 57.785

Quy Nhon city (Binh Dinh)

Expenditure Category Amount In USD millions Financing Percentage Works 31.109 90% of expenditures Goods 2.977 100% of foreign

expenditures, 100% of local expenditures (ex-factory cost); 75% of local expenditures

Consulting Services 4.039 100% of expenditures Others (e.g. revolving fund) 0.624 100% of expenditures Total Costs 38.749

Dong Hoi city (Quang Binh) Expenditure Category Amount In USD millions Financing Percentage Works 22.801 90% of expenditures Goods 1.278 100% of foreign

expenditures, 100% of local expenditures (ex-factory cost); 75% of local expenditures

Consulting Services 3.606 100% of expenditures Others (e.g. revolving fund) 0.491 100% of expenditures Total Costs 28.176 Use of statements of expenditures (SOEs) For works costing less than US$300,000 equivalent per contract; goods costing less than US$100,000 equivalent per contract; services provided by consulting firms costing less than US$100,000 equivalent per contract; services provided by individual consultants costing less than US$50,000 equivalent per contract; withdrawals from the Credit Agreement would be made on the basis of statements of expenditures. These documents will be made available for the required audits, as well as to the Bank supervision missions upon request. All other expenditures above the SOE thresholds will be submitted on the basis of full documentation. Special Accounts Three Special Accounts will be opened, one for each PMU. Each of these Special Accounts will be held in US dollar currency at commercial bank specified by the Government in terms and conditions acceptable to IDA. Payments out of the Special Accounts are to be made for eligible expenditures in

Page 55: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

50

accordance with the Credit Agreement and Bank guidelines. The authorized allocations for Special Accounts would be: (i) US$1,350,000 for SA in Nha Trang (ii) US$900,000for SA in Quy Nhon; and (iii) US$650,000for SA in Dong Hoi. Replenishment applications from each PMU would be submitted monthly or when amounts withdrawn equal 50% of the initial deposit, or when the account is drawn by 30% of the authorized allocation, whichever comes first. Retroactive financing in the aggregate amount of US$600,000 would be provided for expenditures made prior to the date of the Credit Agreement but after appraisal date, for urgently required training, goods and consulting services. The procurement procedures shall be in accordance with IDA Procurement Guidelines.

External Audit. Each PMU will appoint independent auditors acceptable to IDA. Project accounts of each PMU, including the revolving fund activities of the Women’s Union, will be audited on an annual basis in accordance with international auditing standards and in compliance with the independent auditing regulations of Vietnam. The three auditor’s reports will be made available to IDA within six months from the close of the fiscal year. The audits will include a single opinion covering project account, the SOEs and the Special Accounts. A management letter addressing internal control weaknesses of implementing agencies will also be provided by the auditor together with the audit report.

Page 56: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

51

Annex 8: Procurement Arrangements

VIETNAM: Coastal Cities Environmental Sanitation Project A) General

Procurement for the proposed project would be carried out in accordance with the World Bank’s “Guidelines: Procurement Under IBRD Loans and IDA Credits” dated May 2004; and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated May 2004, and the provisions stipulated in the Development Credit Agreement. The general description of various items under different expenditure category is described below. For each contract to be financed by the Credit and the co-financing PHRD Grant, the different procurement methods or consultant selection methods, the need for prequalification, estimated costs, prior review requirements, and time frame are agreed between the Borrower and the Bank project team in the Procurement Plan. The Procurement Plan will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity.

Procurement of Works: Works procured under this project include construction and rehabilitation of sewage and drainage systems, pumping stations, public toilets, wastewater treatment plants, solid waste management systems, resettlement site’s infrastructure, etc. Works estimated to cost US$2 million equivalent or more per contract shall be procured through International Competitive Bidding (ICB) procedures. These ICB contracts shall use the Bank’s Standard Bidding Documents (SBD) for Procurement of Works dated May 2005 and/or SBD for Procurement of Works – Smaller Contract dated May 2004. ICB contracts for wastewater treatment plants or similar complex works may use the SBD for Supply and Installation of Plant and Equipment dated May 2005. Works estimated to cost less than US$2 million per contract may be procured using National Competitive Bidding (NCB). The procedures to be followed for National Competitive Bidding shall be those set forth in the Decree 88/99, as modified by Decree 14/2000 and Decree 66/2003 and subject further to the provisions stipulated in the Annex to the Development Credit Agreement. A sample of the NCB Annex to be included in the DCA is provided in Attachment 2. Bidding documents for these NCB contracts shall follow the Model NCB Documents prepared by the World Bank Vietnam Office which are also being used on other World Bank financed projects in Vietnam. Simple works of small value of less than $50,000 per contract may be procured following shopping procedures.

Procurement of Goods: Goods to be procured under this project would include solid waste collection equipment, heavy equipment for landfill, equipment for hazardous health care waste collection and treatment, goods/equipment for capacity building and project implementation. Goods estimated to cost equivalent or more than US$150,000 per contract shall be procured through International Competitive Bidding (ICB) using the Bank's Standard Bidding Documents for Procurement of Goods dated May 2004. Contracts for goods estimated to cost less than US$150,000 each may be procured through National Competitive Bidding (NCB). The NCB procedures to be followed shall be those stated in Decree 88/99, as modified by Decree 14/2000 and Decree 66/2003 and subject further to the provisions stipulated in the Annex to the Development Credit Agreement (see the sample NCB Annex in Attachment 2). Bidding documents for these NCB contracts will use the Model NCB documents for procurement of goods prepared by the WB Vietnam Office which are also being used on other World Bank financed projects in Vietnam. Small goods items (other than office cars) estimated to cost less than US$30,000 per contract and office cars for the PMU’s operation startup estimated to cost less than US$50,000 per contract (but in aggregate not more than US$100,000 for each PMU) may be procured using Shopping procedures.

Page 57: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

52

Procurement of non-consulting services: Training, study tours (both national and international) if self-organized by the PMUs would be carried out on the basis of actual reasonable expenses following the Government’s procedures and cost norms.

Selection of Consultants: Consulting services to be procured under the proposed project would include preparation of feasibility studies and engineering designs, contract management and supervision, financial management, procurement support and other technical assistance for capacity building and project implementation, resettlement/environmental monitoring, financial audit, etc. These consulting services shall be mainly procured through Quality and Cost Based Selection (QCBS) procedures. Other selection methods such as Quality Based Selection (QBS), Least Cost Selection (LCS), Fixed Budget Selection (FBS), Selection Based on Consultants' Qualifications (CQ), Individual Consultants (IC) may also be used depending on value, nature and complexity of each assignment. However, CQ procedures shall only be allowed for consulting assignments estimated to cost less than $100,000 per contract. Services for preparation of engineering designs for Phase 2 may be procured through Single Source Selection (SSS) method on the grounds that they are a natural continuation of the previous Phase I design preparation assignments which were already competitively procured through QCBS with due consideration to this continuation. Short lists of consultants for services estimated to cost less than US$200,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Operational Costs: Incremental operating costs for the Provincial/City Women’s Union (Component 5), to be financed by the project, will be carried out using the Government's administrative procedures (based on cost norms of the Ministry of Finance and supporting documentation).

Others: Procurement under small sub-loans (which have a ceiling about US$850,000) to low income households under household sanitation programs (Component 5) and sub-grants for implementation of the Healthy City Partnership (Component 6) would be procured by the sub-loan or sub- grant beneficiaries using established commercial practices acceptable to the Bank. These practices shall be reflected in the Operational Manuals for these components.

B. Assessment of the agency’s capacity to implement procurement

An assessment of the procurement capacity was carried out during project preparation. This revealed that the PMU will only be established, and procurement staff will be assigned just before negotiations, so their qualifications are not yet known. Some of the PPU staff who are currently working on Project preparation may continue in the implementation phase of the Project, but these staff also do not have adequate knowledge and experience of the Bank’s procurement procedures. Consequently the PMU and procurement staff will not have sufficient capacity to carry out the Project procurement. As a result, the procurement risk of the Project is rated as high.

To mitigate this high procurement risk and to build up the project procurement implementation capacity, a detailed capacity strengthening plan has been developed and agreed with the Borrower and will be followed up by the Bank team throughout project implementation. Key measures include:

(i) Assigning at least two procurement staff, with qualifications acceptable to the Bank, in each PMU.

(ii) training PMU procurement staff and procurement review/clearance staff on Bank procurement and on using UNDB and Client Connection webs.

Page 58: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

53

(iii) Raising PMU awareness on the priority of the GOV and Bank to improved transparency and fairness, enforcing expanded disclosure of project information and enhanced transparency of procurement information, establishing proper procurement filing systems;

(iv) hiring consultants to assist PMUs in handling procurement and contract management.

(v) adding an Annex to the Development Credit Agreement clarifying NCB procedures applicable to the Project;

(vi) setting up a project-specific mechanism to receive and handle bidder’s complaints;

(vii) preparing the Project’s overall Procurement Plan including a detailed plan for Phase I;

(viii) preparing and enforcing a Project Implementation Plan including detailed procurement guidance; and

(ix) carrying out enhanced project implementation supervision, particularly during early implementation, to ensure that the procurement filing system is functioning as required, and that procedures are being correctly followed.

C. Procurement Plan

The Borrower developed a Procurement Plan for project implementation which provides the basis for the procurement methods. This plan (Attachment 3) was agreed between the borrower and IDA during negotiations. The Procurement Plan will be made available in the Project’s database and in the Bank’s external website. It will be updated in agreement with the Project Team at least annually or sooner if required to reflect the actual project implementation needs and improvements in institutional capacity.

D. Bank Prior-Review and Frequency of Procurement Supervision

The following prior-review thresholds will be adopted:

(i) first two NCB contracts for works and goods in each PMU regardless of value;

(ii) each contract for works estimated to cost US$300,000 equivalent or more;

(iii) each contract for goods estimated to cost US$100,000 or more and the first two shopping contract for goods in each PMU;

(iv) each contract with consulting firms estimated to cost $100,000 equivalent or more;

(v) each contract with individual consultants estimated to cost $50,000 equivalent or more; and

(vi) each consultant’s contract procured through Single Source Selection method.

These actions lead to prior review of some 96% of contracts (by value).

In addition, procurement supervision to be carried out every six (6) months including a procurement post-review of at least 20% of the post-reviewed contracts.

Attachment 1

Page 59: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

54

Details of the procurement arrangements involving international competition.

1. Goods and Works and non consulting services.

(a) List of contract Packages which will be procured following ICB method and direct contracting:

1 2 3 4 5 6 7 8 9

Contr. Ref. No.

Contract

(Description)

Est. Cost ($ m)

Proc

Method

P-Q

Domestic

Pref. (yes/no)

Review by Bank (Prior / Post)

Expected

Bid-Opening

Date

Comments

ALL CITIES

CB-4 GIS/MIS Equipment & Installation 0.210 ICB No Yes Prior Jul 09 Phase 1/Equipt

NHA TRANG Component 1

NT-1.1 Primary and Secondary and Tertiary Drains and Sewers

5.460 ICB No Yes Prior Aug 07 Phase 1/Works

NT-1.2 Vacuum trucks for drain/gully cleaning

0.189 ICB No Yes Prior Aug 07 Phase 1/Goods

NT-1.4 Primary and Secondary Combined Sewers

5.130 ICB No Yes Prior TBD Phase 2/Works

NT-1.5 Wastewater Collection Primary and Secondary - Center & South inc P Stns

7.745 ICB No Yes Prior TBD Phase 2/Works

NT-1.6 Wastewater Collection Primary and Secondary - North inc P. Stns

3.25 ICB No Yes Prior TBD Phase 2/Works

NT-1.7 Tertiary Sewers (Center, South, North)

2.250 ICB No Yes Prior TBD Phase 2/Goods

NT-1.8 Trucks for WSDC (mobile workshop, street washing, crane truck, dump truck and CCTV)

0.515 ICB No Yes Prior TBD Phase 2/Goods

Component 2 NT-2.1 WWTP – South 14.573 ICB No Yes Prior TBD Phase 2/Works NT-2.2 WWTP - North 4.693 ICB No Yes Prior TBD Phase 2/Works Component 3

NT-3.1 Supply of Solid Waste Equipment and Vehicles

0.387 ICB No Yes Prior Aug 07 Phase 1/Goods

NT-3.2 Develop Luong Hoa Landfill Site (Ph1); closure of Ru Ri

5.053 ICB No Yes Prior Aug 07 Phase 1/Works

NT-3.3 Supply of Solid Waste Vehicle and Equipment

0.580 ICB No Yes Prior TBD Phase 2/Goods

QUY NHON Component 1

QN-1.1 Drains and Sewers - City including Secondary and Tertiary lines

7.154 ICB No Yes Prior Aug 07 Phase 1/Works

QN-1.3 Flood Control Drainage Sewer Rehab. 4.612 ICB No Yes Prior TBD Phase 2/Works

QN-1.5 Wastewater Collection including Tertiary

7.887 ICB No Yes Prior TBD Phase 2/Works

Component 2 QN-2.1 WWTP- Nhon Binh (CEPT) 5.000 ICB No Yes Prior TBD Phase 2/Works QN-2.2 WWTP -Phu Hoa 3.776 ICB No Yes Prior TBD Phase 2/Works QN-2.3 WWTP Bau Lac 2.162 ICB No Yes Prior TBD Phase 2/Works Component 3 QN-3.1 Supply of Solid Waste Vehicles 0.120 ICB No Yes Prior Aug 07 Phase 1/Goods

QN-3.2 Equipment for SWM (handcarts, bins, etc.)

0.205 ICB No Yes Prior Aug 07 Phase 1/Goods

QN-3.3 Supply of Solid Waste Vehicles and Equipment

0.968 ICB No Yes Prior TBD Phase 2/Goods

QN-3.4 Develop Long My Landfill Site 3.312 ICB No Yes Prior TBD Phase 2/Works QN-3.5 Equipment for Landfill Site 0.515 ICB No Yes Prior TBD Phase 2/Goods QN-3-7 Miscellaneous equipment 0.112 ICB No Yes Prior TBD Phase 2/Goods DONG HOI Component 1

DH-1.1 Drains and Sewers – Dong Phu & Bac Ly wards/house connection

2.100 ICB No Yes Prior Aug 07 Phase 1/Works

DH-1.2 Drains and Sewers – Hai Dinh & Dong My wards/house connection

2.174 ICB No Yes Prior Aug 07 Phase 1/Works

DH-1.3 Rehabilitate Embankment and Dredging

2.854 ICB No Yes Prior Aug 07 Phase 1/Works

DH-1.4 Sewers and Storm Water Collection System North

6.100 ICB No Yes Prior TBD Phase 2/Works

Page 60: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

55

DH-1.5 Sewers and Storm Water Collection System South

6.200 ICB No Yes Prior TBD Phase 2/Works

DH-1.6 Operation Maintenance Equipment 0.350 ICB No Yes Prior TBD Phase 2/Works Component 2 DH-2.1 Wastewater Treatment Plant 2.800 ICB No Yes Prior TBD Phase 2/Works Component 3 DH-3.1 Supply of Solid Waste Equipment 0.129 ICB No Yes Prior Aug 07 Phase 1/Goods DH-3.2 Supply of Solid Waste Equipment 0.307 ICB No Yes Prior TBD Phase 2/Goods

DH-3.4 Hazardous Waste Incinerator and Solid Waste Collection Equipment

0.302 ICB No Yes Prior TBD Phase 2/Goods

DH-3.5 Ly Trach Landfill equipment 0.076 ICB No Yes Prior TBD Phase 2/Goods

(b) All ICB Contracts will be subject to prior review by the Bank.

2. Consulting Services.

(a) List of Consulting Assignments with short-list of international firms.

1 2 3 4 5 6 7 Ref. No.

Description of Assignment

Est. Cost

($ m)

Selection Method

Review by Bank (Prior / Post)

Expected Proposals Submission Date

Comments

ALL CITIES

CB-2

TA for Needs Assessment,

Development & Provision of Training

Program, & Implementation Support

for PMUs

1.000 QCBS Prior Feb 08 Phase 1

CB-3

TA for Institutional Analysis,

Development & Provision of Training

Courses, Capacity Building, &

GIS/MIS Design for Service Providers

2.037 QCBS Prior Jan 08 Phase 1

CB-6

Preparation of Feasibility Study,

Detailed Design, & Bid Documents

for Phase 2

3.780

QCBS/SSS

Prior

TBD

TBD

CB-9 TA for Landfill Operation

0.525

QCBS

Prior

TBD Phase 2

CB-10 TA for WWTP Operation

0.592

QCBS

Prior

TBD Phase 2

NHA TRANG

NT-6.3 Construction Supervision Phase 1 (Component 1-3)

0.551 QCBS Prior Aug 07 Phase 1

NT-6.11 Construction Supervision Phase 2 2.420 QCBS/SSS Prior TBD Phase 2 QUY NHON

QN-6.2 Construction Supervision Phase 1 (Component 1-3)

0.603 QCBS Prior Aug 07 Phase 1

QN-6.10

Construction Supervision Phase 2

2.034

QCBS/SSS

Prior

TBD Phase 2

DONG HOI

DH-6.2 Construction Supervision Phase 1 (Component 1-3)

0.682 QCBS Prior Aug 07 Phase 1

DH-6.10

Construction Supervision Phase 2 1.755 QCBS/SSS Prior TBD Phase 2

Page 61: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

56

Attachment 2:

NCB ANNEX FOR DCA

National Competitive Bidding Procedures

The Borrower represents that the procedures to be followed for National Competitive Bidding shall be those set forth in the Decree 88/99, as modified by Decree 14/2000 and Decree 66/2003 and, in order to ensure economy, efficiency and transparency and broad consistency with the provision of Section I of the Guidelines (as required by Para 3.3 of the Guidelines), goods and works for which this Schedule allows procurement shall be procured in accordance with paragraphs 3.3 and 3.4 of the Guidelines and the following paragraphs.

Participation in bidding and preferences

(i) For clarification purposes, it is understood that the last sentence of the amended Paragraph (c), Section 2, Article 2 of Decree 88/ND-CP which states that "All the procedures for submission, appraisal and approval of bidding results and bidder selection results shall follow the Procurement Regulation" means "Approvals of draft bidding documents, bid evaluation reports and proposals for award shall be obtained in accordance with the relevant rules and procedures of the Procurement Regulation”.

(ii) Government-owned enterprises in Vietnam shall be eligible to participate in bidding only if they can establish that they are legally and financially autonomous, operate under commercial law, and are not a dependent agency of the Borrower or the procuring entity. Military or security units or, enterprises which belong to the Ministry of Defense or the Ministry of Public Security shall not be permitted to bid.

(iii) Foreign bidders shall be eligible to participate in bidding under the same conditions as local bidders, and local bidders shall be given no preference (either in the bidding process or in bid evaluation) over foreign bidders, nor shall bidders located in the same province or city as the procuring entity be given any such preference over bidders located outside that city or province.

(iv) Bidders shall be allowed to participate in bidding without being listed in the Government Database on Bidder Information or in any other registration system.

(v) Prospective bidders shall be permitted to request bidding documents either in person or through the mail upon submission of a written application. Bidding documents shall be sold to anyone who is willing to pay the required fee of the bidding documents, and no other conditions shall be imposed on the sale of the bidding documents. The fee for the bidding documents should be reasonable and consist only of the cost of printing (or photocopying) the documents and their delivery to the purchaser. The bidding documents shall be delivered, at the prospective bidders' preference, either by hand or by mail/courier provided that the bidder is willing to pay the mail/courier delivery charges which should be specified in the Invitation for Bids. Each bidder shall be allowed to purchase only one set of the bidding documents.

(vi) Foreign bidders shall not be required, in order to participate in bidding or as a condition of award of the contract or during execution of the contract, to enter into a joint venture with a local bidder, or to subcontract part of their contract to a local bidder.

(vii) If there is prequalification, all pre-qualified bidders shall be invited to bid.

(viii) If there is limited bidding because there are only a limited number of bidders who can meet the requirements of the bidding documents, all of these bidders shall be invited to bid.

Page 62: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

57

(ix) Bidders shall not be required, as a condition of participation in the bidding, to provide suppliers’ credits.

Advertising; time for bid preparation

(x) Invitations to bid shall be advertised in at least one widely circulated national newspaper. In addition, the Borrower is encouraged to advertise in the Government Public Procurement Bulletin when established and on a free and open access website. A minimum of 30 days for the preparation and submission of bids shall be provided, and potential bidders shall be allowed to purchase bidding documents up to 24 hours prior to the deadline for the submission of bids.

Standard Bidding Documents

(xi) The Borrower’s standard bidding documents, acceptable to IDA, shall be used. The bidding documents shall provide clear instructions on how bids should be submitted, how prices should be offered, and the place and time for submission and opening of bids. Bidders shall be allowed to submit bids by hand or by mail.

Qualification criteria and evaluation criteria

(xii) Qualification criteria shall be clearly specified in the bidding documents, and all criteria so specified, and only criteria so specified, shall be used to determine whether a bidder is qualified. The evaluation of the bidder’s qualifications should be conducted separately from the technical and commercial evaluation of the bid. When post qualification is applied, the assessment of bidders' qualifications shall be carried out only after the preliminary and detailed evaluation of bids has been completed by the Purchaser/Employer and, in doing so, the qualifications of the bidder who has submitted the lowest evaluated substantially responsive bid shall be assessed first. In carrying out the post-qualification assessment, the Employer/Purchaser shall exercise reasonable judgment in requesting, in writing, from a bidder only missing factual or historical supporting information related to the bidder's qualifications and shall provide a reasonable time period (that is, a minimum of 7 days) to the bidder to provide his response.

(xiii) Evaluation criteria shall be clearly specified in the bidding documents, and evaluation criteria other than price shall be quantified in monetary terms. All evaluation criteria so specified, and only evaluation criteria so specified, shall be taken into account in bid evaluation. Merit points shall not be used in bid evaluation.

Bid opening, evaluation and award of contract

(xiv) Bids shall be opened in public, immediately after the stipulated deadline for submission of bids. Bidders or their representatives shall be allowed to be present. The name of the bidder and total amount of each bid, including discounts, shall be read aloud and recorded. Immediately after completion of the bid opening proceedings, a copy of the bid opening record shall be posted at a prominent location, accessible to the public, outside the office of the concerned procuring entity and shall be retained at the same location until the award of contract has been notified. A copy of the bid opening record shall be promptly provided to all bidders who submitted bids.

(xv) Bids received after the deadline for bid submission shall be returned to the bidders unopened.

Page 63: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

58

(xvi) All bids shall not be rejected or new bids solicited without IDA’s prior concurrence.

(xvii) No bidder shall be rejected merely on the basis of a comparison with the owner’s estimate and budget ceiling without IDA’s prior concurrence.

(xviii) A bid containing material deviations from, or reservations to, the terms, conditions or specifications of the bidding documents shall be rejected as not substantially responsive. A bidder shall not be permitted to withdraw material deviations or reservations once bids have been opened. Bidders shall not be eliminated from detailed evaluation on the basis of non-material, minor deviations or reservations.

(xix) Evaluation of bids shall be made in strict adherence to the criteria specified in the bidding documents, and contracts shall be awarded to the qualified bidder offering the lowest evaluated and responsive bid.

(xx) A bidder shall not be required, as a condition for award, to undertake obligations not specified in the bidding documents or otherwise to modify the bid as originally submitted.

(xxi) There shall be no post-bidding negotiations with the lowest or any other bidder.

(xxii) The Borrower shall declare a firm ineligible, either indefinitely or for a stated period, to be awarded a contract financed by the Bank and the Government, if it at any time determines that the firm has, directly or through an agent, engaged in corrupt, fraudulent, collusive, or coercive practices in competing for , or in executing, a Bank-financed contract.

Suppliers and Contractors

(xxiii) Bidding documents and contracts under national competitive bidding procedures financed by the Association shall include a provision requiring suppliers and contractors to permit the Association to inspect their accounts and records relating to the bid submission and the performance of the supplier and/or contractor, as the case may be, and to have them audited by auditors appointed by the Association, if so required by the Association.

(xiv) License for foreign contractors operation in Vietnam would be provided in a timely manner and will not be arbitrarily withheld.

Publication of the Award of Contract

(xxv) The Borrower shall publish the following information on contract award in Government Public Procurement Bulletin when established or on a free and open access website or on another means of publication acceptable to the IDA: (a) name of each bidder who submitted a bid; (b) bid prices as read out at bid opening; (c) name and evaluated price of each bid that was evaluated; (d) name of bidders whose bids were rejected and the reasons for their rejection; and (e) name of the winning bidder, price it offered as well as the duration and summary scope of the contract awarded. This publication shall be updated quarterly.

Complaints by Bidders and Handling of Complaints

(xxvi) The national competitive bidding procedures for contracts financed by the Association shall include provisions, acceptable to the Association, for bidders to protest.

Page 64: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

59

Att

ach

men

t 3

: P

RO

JEC

T P

RO

CU

RE

ME

NT

PL

AN

S

Proc

urem

ent P

lan

Phas

e 1

C

ontr

No

Des

crip

tion

Type

of

C

ontra

ct

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

NH

A TR

ANG

Com

pone

nt 1

- Fl

ood

Con

trol,

Dra

inag

e, W

aste

wat

er C

olle

ctio

n

NT-

1.1

Prim

ary

and

Seco

ndar

y

and

Terti

ary

Dra

ins

and

Sew

ers

Civ

il w

orks

IC

B 5,

460

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

Fe

b 11

Ph

1/ID

A

NT-

1.2

Vacu

um tr

ucks

for

drai

n/gu

lly c

lean

ing

(2no

) G

oods

IC

B 18

9 Pr

ior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Feb

09

Ph1/

IDA

NT-

1.3

Dra

in C

lean

ing

Equi

pmen

t G

oods

Sh

oppi

ng

9 Po

st

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Oct

08

Ph1/

IDA

Com

pone

nt 3

- So

lid W

aste

Man

agem

ent

NT

- 3.1

Su

pply

of S

olid

Was

te

Equi

pmen

t, Ve

hicl

es

Goo

ds

ICB

387

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

Fe

b 09

Ph

1/ID

A

NT-

3.2

Dev

elop

Luo

ng H

oa

Land

fill S

ite (P

h1);

clos

ure

of R

u R

i C

ivil

wor

ks

ICB

5,05

3 Pr

ior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Feb

10

Ph1/

IDA

Com

pone

nt 4

- R

eset

tlem

ent S

ite

NT-

4.1

Res

ettle

men

t Site

In

frast

ruct

ure

Civ

il w

orks

N

CB

1,21

5 Pr

ior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

May

09

Ph1/

IDA

Com

pone

nt 5

- H

ouse

hold

and

Sch

ool S

anita

tion

NT-

5.1

Scho

ol S

anita

tion

Ph1

Civ

il w

orks

N

CB

129

Post

Se

p 06

N

ov 0

6 O

ct 0

7 Ja

n 08

M

ar 0

8 Ap

r 08

May

08

Aug

08

Ph1/

IDA

NT-

5.2

Hou

seho

ld S

anita

tion

Sub-

loan

s

Com

mer

cial

Pr

actic

es

100

Post

N

A N

A N

A N

A N

A N

A Ju

l 07

Dec

10

Ph1/

IDA

Page 65: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

60

C

ontr

No

Des

crip

tion

Type

of

C

ontra

ct

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

Com

pone

nt 6

: Cap

acity

Bui

ldin

g an

d Im

plem

enta

tion

Supp

ort

NT-

6.1

TA fo

r Car

bon

Fina

nce

Prop

osal

C

onsu

lting

IC

65

Prio

r N

ov 0

7 Ja

n 08

M

ar 0

8 M

ay 0

8 Ju

ly 0

8 Au

g 08

Se

p 08

M

ar 0

9 Ph

1/PH

RD

NT-

6.2

Con

st. S

uper

visi

on fo

r C

ompo

nent

4 a

nd 5

. C

onsu

lting

Q

CBS

49

Pr

ior

Jan

07

Jun

07

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

May

09

Ph1/

IDA

NT-

6.3

Const

ruct

ion S

uperv

isio

n

Phase

1(C

om

ponent

1-3

) C

onsu

lting

Q

CB

S

551

P

rior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Jan

08

Feb

11

Ph1/

IDA

NT-

6.4

Vehic

les

and E

quip

t. f

or

PM

U *

* G

oods

ICB

/NC

B/

Shoppin

g

180

P

rior

Sep

06

Oct

06

Nov

06

Dec

06

Feb

07

Mar

07

Apr 0

7 M

ay 0

7 P

hase

1

/ID

A

NT-

6.5

Equip

t. f

or

Qualit

y C

ontr

ol

Goods

NC

B

55

P

ost

Se

pt 0

7 Ja

n 08

M

ar 0

8 Ap

r 08

May

08

Jun

08

Jul 0

8 Se

p 08

P

hase

1

/ID

A

NT-

6.6

Indepe

nde

nt

Auditi

ng –

P

hase

1

Consu

lting

Q

CB

S/L

CS

50

P

ost

Au

g 07

Se

pt 0

7 N

ov 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

M

ar 0

8 Se

pt 1

0 P

hase

1

/ID

A

NT-

6.7

T

A f

or

Rela

ted

Depa

rtm

ents

DO

NR

E,

DO

C,

DA

RD

– P

hase

1

Consu

lting

QC

BS

/CQ

S/I

C

45

Post

Fe

b 08

M

ar 0

8 M

ay 0

8 M

ay 0

8 Ju

n 08

Ju

l 08

Aug

08

Sept

10

Phase

1

/ID

A

PH

RD

QU

Y N

HO

N

Com

pone

nt 1

- Fl

ood

Con

trol,

Dra

inag

e, W

aste

wat

er C

olle

ctio

n

QN

- 1.

1

Dra

ins

and

Sew

ers

- City

in

clud

ing

Seco

ndar

y an

d Te

rtiar

y lin

es

Civ

il W

orks

IC

B 7,

154

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

Fe

b 11

Ph

1/ID

A

QN

- 1.

2

O&M

Dra

inag

e Eq

uipm

ent

Goo

ds

NC

B 10

3 Pr

ior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Feb

09

Ph1/

IDA

Page 66: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

61

C

ontr

No

Des

crip

tion

Type

of

C

ontra

ct

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

Com

pone

nt 3

- So

lid W

aste

Man

agem

ent

QN

- 3.

1 Su

pply

of S

olid

Was

te

Vehi

cles

G

oods

IC

B 12

0 Pr

ior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Feb

09

Ph1/

IDA

QN

- 3.

2

Equi

pmen

t for

SW

M

(han

dcar

ts, b

ins,

etc

)

Goo

ds

ICB

205

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

D

ec 0

8 Ph

1/ID

A

Com

pone

nt 4

- R

eset

tlem

ent S

ite

QN

- 4.

1

Res

ettle

men

t Site

In

frast

ruct

ure

C

ivil

wor

ks

NC

B 1,

380

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

M

ay 0

9 Ph

1/ID

A

Com

pone

nt 5

- H

ouse

hold

and

Sch

ool S

anita

tion

QN

- 5.

1 Sc

hool

San

itatio

n Ph

1 C

ivil

wor

ks

NC

B 97

Po

st

Sep

06

Nov

06

Oct

07

Jan

08

Mar

08

Apr 0

8 M

ay 0

8 Au

g 08

Ph

1/ID

A

QN

-5.2

H

ouse

hold

san

itatio

n Su

b lo

ans

Com

mer

cial

Pr

actic

es

170

Post

N

A N

A N

A N

A N

A N

A Ju

l 07

Dec

10

Ph1/

IDA

Com

pone

nt 6

: Cap

acity

Bui

ldin

g an

d Im

plem

enta

tion

Supp

ort

QN

-6.1

Con

st. S

uper

visi

on fo

r C

ompo

nent

4 a

nd 5

C

onsu

lting

QC

BS

49

Prio

r Ja

n 07

Ju

n 07

Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

M

ay 0

9 Ph

1/ID

A

QN

-6.2

C

onst

ruct

ion

Supe

rvis

ion

Phas

e 1

(Com

pone

nt 1

-3)

C

onsu

lting

Q

CBS

60

3 Pr

ior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Feb

11

Ph1/

PHR

D

QN

-6.3

V

ehic

les

and E

quip

t. f

or

PM

U

Goods

ICB

/NC

B/

Shoppin

g

180

P

rior

Sep

06

Oct

06

Nov

06

Dec

06

Feb

07

Mar

07

Apr 0

7 M

ay 0

7 P

hase

1

/ID

A

QN

-6.4

E

quip

t. f

or

Qualit

y C

ontr

ol

Goods

NC

B

55

P

ost

Se

pt 0

7 Ja

n 08

M

ar 0

8 Ap

r 08

May

08

Jun

08

Jul 0

8 Se

p 08

P

hase

1

/ID

A

Page 67: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

62

C

ontr

No

Des

crip

tion

Type

of

C

ontra

ct

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

QN

-6.5

In

depe

nde

nt

Auditi

ng –

P

hase

1

Consu

lting

Q

CB

S/L

CS

49

P

ost

Au

g 07

Se

pt 0

7 N

ov 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

M

ar 0

8 Se

pt 1

0 P

hase

1

/ID

A

QN

-6.6

T

A f

or

Rela

ted

Depa

rtm

ents

DO

NR

E,

DO

C,

DA

RD

– P

hase

1

Consu

lting

Q

CB

S/C

QS

/IC

40

P

ost

Fe

b 08

M

ar 0

8 M

ay 0

8 M

ay 0

8 Ju

n 08

Ju

l 08

Aug

08

Sept

10

Phase

1

/ID

A

DO

NG

HO

I

Com

pone

nt 1

- Fl

ood

Con

trol,

Dra

inag

e, W

aste

wat

er C

olle

ctio

n

DH

-1.1

D

rain

s an

d Se

wer

s –

Don

g Ph

u &

Bac

Ly

war

ds/ H

ouse

con

nect

ion

Civ

il W

orks

IC

B 2,

100

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

Fe

b 11

Ph

1/ID

A

DH

-1.2

D

rain

s an

d Se

wer

s –

Hai

D

inh

& D

ong

My

war

ds/

Hou

se c

onne

ctio

n

Civ

il W

orks

IC

B 2,

174

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

Fe

b 11

Ph

1/ID

A

DH

-1.3

R

ehab

ilitat

e Em

bank

men

t and

D

redg

ing

Civ

il W

orks

IC

B 2,

854

Prio

r Se

p 06

N

ov 0

6 Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

Fe

b 11

Ph

1/ID

A

Com

pone

nt 3

- So

lid W

aste

Man

agem

ent

DH

-3.1

Su

pply

of S

olid

Was

te

Equi

pmen

t G

oods

IC

B 12

9 Pr

ior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Dec

08

Ph1/

IDA

Com

pone

nt 5

- H

ouse

hold

and

Sch

ool S

anita

tion

DH

-5.1

Sc

hool

San

itatio

n Ph

1 C

ivil

wor

ks

NC

B 90

Po

st

Sep

06

Nov

06

Oct

07

Jan

08

Mar

08

Apr 0

8 M

ay 0

8 Au

g 08

Ph

1/ID

A

DH

-5.2

H

ouse

hold

San

itatio

n Su

b lo

ans

Com

mer

cial

Pr

actic

es

70

Post

N

A N

A N

A N

A N

A N

A Ju

l 07

Dec

10

Ph1/

IDA

Com

pone

nt 6

: Cap

acity

Bui

ldin

g an

d Im

plem

enta

tion

Supp

ort

DH

-6.1

C

onst

. Sup

ervi

sion

for

Com

pone

nts

4 an

d 5

Con

sulti

ng

QC

BS

49

Prio

r Ja

n 07

Ju

n 07

Au

g 07

O

ct 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

M

ay 0

9 Ph

1/ID

A

Page 68: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

63

C

ontr

No

Des

crip

tion

Type

of

C

ontra

ct

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

DH

-6.2

C

onst

ruct

ion S

uperv

isio

n

Phase

1 (

Co

mponent

1-

3)

Consu

lting

Q

CB

S

682.4

P

rior

Sep

06

Nov

06

Aug

07

Oct

07

Dec

07

Jan

08

Feb

08

Feb

11

Ph1/

PRH

D

DH

-6.3

Vehic

les

and E

quip

t. f

or

PM

U

Goods

ICB

/NC

B/

Shoppin

g

180

P

rior

Sep

06

Oct

06

Nov

06

Dec

06

Feb

07

Mar

07

Apr 0

7 M

ay 0

7 P

hase

1

/ID

A

DH

-6.4

Equip

t. f

or

Qualit

y C

ontr

ol

Goods

NC

B

50

P

ost

Se

pt 0

7 Ja

n 08

M

ar 0

8 Ap

r 08

May

08

Jun

08

Jul 0

8 Se

p 08

P

hase

1

/ID

A

DH

-6.5

Indepe

nde

nt

Auditi

ng –

P

hase

1

Consu

lting

Q

CB

S/L

CS

47.5

P

ost

Au

g 07

Se

pt 0

7 N

ov 0

7 D

ec 0

7 Ja

n 08

Fe

b 08

M

ar 0

8 Se

pt 1

0 P

hase

1

/ID

A

DH

-6.6

TA

for

Rela

ted

Depa

rtm

ents

DO

NR

E,

DO

C,

DA

RD

– P

hase

1

Consu

lting

Q

CB

S/C

QS

/IC

35

P

ost

Fe

b 08

M

ar 0

8 M

ay 0

8 M

ay 0

8 Ju

n 08

Ju

l 08

Aug

08

Sept

10

Phase

1

/ID

A

Page 69: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

64

Phas

e 1

- Com

pone

nt 6

Mul

ti –

City

Pac

kage

s

Co

ntr

.

No

D

escri

pti

on

T

yp

e o

f

Co

ntr

act

Pro

cu

re.

Meth

od

Es

t.

Base C

ost

US

Dx10

00

Ban

k

Revie

w

Bid

Do

c

/TO

R

/RF

P

Pre

p.

Bid

Do

c

/TO

R

/RF

P

ap

pro

val

Bid

/

Pro

po

sa

l

Su

bm

isn

Bid

do

c o

r

Pro

po

sa

l

Ev

alu

ati

on

Ev

al.

Rep

ort

Ap

pro

val

Co

ntr

.

Sig

n

Co

ntr

.

Sta

rt

Co

ntr

.

Fin

ish

Lead

PM

U

Ph

asin

g &

Fu

nd

ing

CB

-1

TA

fo

r A

ssis

ting

PM

Us

in D

raft

ing

TO

Rs

& R

FP

s**

Consu

lting

IC

149

Prior

Sep

06

Dec

06

Feb

07

Mar

07

Apr 0

7 M

ay 0

7 M

ay 0

7 M

ar 0

8 N

ha T

ran

g

Ph1/P

HR

D

CB

-2

TA

fo

r N

ee

ds

Ass

ess

men

t,

Deve

lopm

en

t &

Pro

visi

on o

f

Tra

inin

g P

rogra

m,

&

Imple

menta

tion S

uppo

rt f

or

PM

Us

Consu

lting

QC

BS

1,0

00

* P

rior

Sep

07

Nov

07

Feb

08

Mar

08

Apr 0

8 M

ay 0

8 Ju

n 08

M

ay 1

1 D

ong H

oi

Ph1/P

HR

D

CB

-3

TA

fo

r In

stitu

tion

al A

na

lysi

s,

Deve

lopm

en

t &

Pro

visi

on o

f

Tra

inin

g C

ou

rses,

Capaci

ty

Bu

ildin

g,

& G

IS/M

IS D

esi

gn f

or

Serv

ice P

rovi

ders

Consu

lting

QC

BS

2,0

37

* P

rior

Aug

07

Sep

07

Jan

08

Feb

08

Mar

08

Apr 0

8 Ju

l 08

May

11

Quy

Nhon

Ph1/P

HR

D

CB

-4

GIS

/MIS

Equip

ment

& I

nst

alla

tion

Goods

ICB

210

Prior

Feb

09

May

09

Jul 0

9 Au

g 09

Se

p 09

O

ct 0

9 N

ov 0

9 M

ay 1

0 Q

uy

Nhon

Ph

1/I

DA

CB

-5

TA

for

Cle

an H

ealth

y C

ity

Part

ners

hip

– P

rogra

m D

esi

gn &

M&

E

Consu

lting

QC

BS

123

Prior

Jul 0

7 Se

p 07

O

ct 0

7 N

ov 0

7 D

ec 0

7 M

ar 0

8 Ju

n 08

M

ay 0

9 D

ong H

oi

Ph1/P

HR

D

CB

-6

Pre

para

tion o

f F

easi

bili

ty S

tudy,

Deta

iled D

esi

gn,

& B

id D

ocu

ments

for

Phase

2

Consu

lting

QC

BS

/SS

S

3,7

80

Prior

NA

N

A

NA

N

A

NA

Ja

n 07

Fe

b 07

Au

g 08

N

ha T

ran

g

Ph

1/I

DA

CB

-7

Indepe

nde

nt

Safe

guard

ing

Monito

ring –

Envi

ronm

ent

Consu

lting

QC

BS

56

Post

Ju

l 07

Sep

07

Oct

07

Nov

07

Dec

07

Jan

08

Feb

08

Feb

11

Nha T

ran

g

Ph

1/I

DA

CB

-8

Indepe

nde

nt

Safe

guard

ing

Monito

ring –

Rese

ttle

ment

Consu

lting

QC

BS

80

Post

Ju

l 07

Sep

07

Oct

07

Nov

07

Dec

07

Jan

08

Feb

08

Feb

11

Dong H

oi

Ph

1/I

DA

* Inc

lude

s co

st o

f tra

inin

g. E

stim

ates

cos

t of T

rain

ing

for C

B-2P

1 $1

50,0

00 a

nd fo

r CB-

3A-P

1 $2

40,0

00

** F

inan

ced

with

retro

activ

e fin

anci

ng

Page 70: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

65

Indi

cativ

e Pr

ocur

emen

t Pla

n Ph

ase

2

Con

tr N

o D

escr

iptio

n Ty

pe

of

Con

tract

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

NH

A TR

ANG

Com

pone

nt 1

- Fl

ood

Con

trol,

Dra

inag

e, W

aste

wat

er C

olle

ctio

n

NT-

1.4

Prim

ary

and

Seco

ndar

y C

ombi

ned

Sew

ers

Civ

il w

orks

IC

B 5,

130

Prio

r TB

D

Ph

2/ID

A

NT-

1.5

Was

tew

ater

Col

lect

ion

Prim

ary

and

Seco

ndar

y - C

ente

r &

Sout

h in

c P

Stns

C

ivil

wor

ks

ICB

7,74

5 Pr

ior

TBD

Ph2/

IDA

NT-

1.6

Was

tew

ater

Col

lect

ion

Prim

ary

and

Seco

ndar

y - N

orth

inc

P.

Stns

C

ivil

wor

ks

ICB

3,25

0 Pr

ior

TBD

Ph2/

IDA

NT-

1.7

Terti

ary

Sew

ers

(Cen

ter,

Sout

h, N

orth

) C

ivil

wor

ks

ICB

2,25

0 Pr

ior

TBD

Ph2/

IDA

NT-

1.8

Truc

ks fo

r WSD

C (m

obile

w

orks

hop,

stre

et w

ashi

ng,

cran

e tru

ck, d

ump

truck

and

C

CTV

)

Goo

ds

ICB

515

Prio

r TB

D

Ph

2/ID

A

Com

pone

nt 2

- W

aste

wat

er T

reat

men

t

NT-

2.1

WW

TP -

Sout

h C

ivil

wor

ks

ICB

14,5

73

Prio

r TB

D

Ph

2/ID

A

NT

- 2.2

W

WTP

- N

orth

C

ivil

wor

ks

ICB

4,69

3 Pr

ior

TBD

Ph2/

IDA

Com

pone

nt 3

- So

lid W

aste

Man

agem

ent

NT-

3.3

Supp

ly o

f Sol

id W

aste

Veh

icle

s an

d Eq

uipm

ent

Goo

ds

ICB

580

Prio

r TB

D

Ph

2/ID

A

Page 71: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

66

Con

tr N

o D

escr

iptio

n Ty

pe

of

Con

tract

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

NT-

3.4

Dev

elop

Luo

ng H

oa L

andf

ill Si

te (P

h2)

Civ

il w

orks

N

CB

278

Prio

r TB

D

Ph

2/ID

A

NT-

3.5

Tran

sfer

Sta

tion

Civ

il w

orks

N

CB

100

Prio

r TB

D

Ph

2/ID

A

Com

pone

nt 5

- H

ouse

hold

and

Sch

ool S

anita

tion

NT-

5.3

Scho

ol S

anita

tion

Ph2

Civ

il w

orks

N

CB

245

Post

TB

D

Ph

2/ID

A

NT-

5.4

Hou

seho

ld S

anita

tion

Sub-

loan

s C

omm

erc

ial

Prac

tices

18

0 Po

st

TBD

Ph2/

IDA

Com

pone

nt 6

: Cap

acity

Bui

ldin

g an

d Im

plem

enta

tion

Supp

ort

NT-

6.8

Con

st. S

uper

visi

on fo

r C

ompo

nent

4 a

nd 5

. C

onsu

lting

Se

rvic

es

QC

BS

59

Prio

r TB

D

Ph

2/ID

A

NT-

6.9

Post

-pro

ject

Eva

luat

ion

(Pha

se

2)

Con

sulti

ng

Serv

ices

IC

6

Prio

r TB

D

Ph

2/ID

A

NT-

6.10

T

A C

lean H

ealth

y C

ity

Part

ners

hip

– I

mple

menta

tion

S

erv

ice

Q

CB

S/C

QS

/IC

300

P

ost

T

BD

Ph2/

IDA

PHR

D

NT-

6.11

C

onst

ruct

ion S

uperv

isio

n

Phase

2

Consu

lting

Q

CB

S/S

SS

2,4

20

P

rior

TB

D

Ph

2/ID

A

NT-

6.12

In

depe

nde

nt

Auditi

ng –

Phase

2

Consu

lting

Q

CB

S/L

CS

50

P

ost

TB

D

P

hase

2

/ID

A

NT-

6.1

3 T

A f

or

Rela

ted D

ep

art

me

nts

D

ON

RE

, D

OC

, D

AR

D –

Phase

2

Consu

lting

QC

BS

/CQ

S/I

C

45

Post

T

BD

Phase

2

/ID

A

PH

RD

QU

Y N

HO

N

Com

pone

nt 1

- Fl

ood

Con

trol,

Dra

inag

e, W

aste

wat

er C

olle

ctio

n

Page 72: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

67

Con

tr N

o D

escr

iptio

n Ty

pe

of

Con

tract

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

QN

- 1.

3 Fl

ood

Con

trol D

rain

age

Sew

er

Reh

ab.

Civ

il w

orks

IC

B 4,

612

Prio

r TB

D

Ph

2/ID

A

QN

- 1.

4 La

ke E

xcav

atio

n C

ivil

wor

ks

NC

B 64

9 Pr

ior

TBD

Ph2/

IDA

QN

- 1.

5 W

aste

wat

er C

olle

ctio

n in

clud

ing

Terti

ary

Civ

il w

orks

IC

B 7,

887

Prio

r TB

D

Ph

2/ID

A

QN

-1.6

O

&M D

rain

age

Equi

pmen

t G

oods

N

CB

380

Prio

r TB

D

Ph

2/ID

A

Com

pone

nt 2

- W

aste

wat

er T

reat

men

t

QN

- 2.

1 W

WTP

- Nho

n Bi

nh (C

EPT)

C

ivil

Wor

ks

ICB

5,00

0 Pr

ior

TBD

Ph2/

GEF

QN

- 2.

2 W

WTP

- Ph

u H

oa

Civ

il W

orks

IC

B 3,

776

Prio

r TB

D

Ph

2/ID

A

QN

- 2.

3 W

WTP

- B

au L

ac

Civ

il W

orks

IC

B 2,

162

Prio

r TB

D

Ph

2/ID

A

Com

pone

nt 3

- So

lid W

aste

Man

agem

ent

QN

- 3.

3 Su

pply

of S

olid

Was

te V

ehic

les

and

Equi

pmen

t G

oods

IC

B 96

8 Pr

ior

TBD

Ph2/

IDA

QN

- 3.

4 D

evel

op L

ong

My

Land

fill S

ite

Civ

il W

orks

IC

B 3,

312

Prio

r TB

D

Ph

2/ID

A

QN

- 3.

5 Eq

uipm

ent f

or L

andf

ill Si

te

Goo

ds

ICB

515

Prio

r TB

D

Ph

2/ID

A

QN

- 3.

6 Tr

ansf

er S

tatio

ns a

nd P

ublic

To

ilets

C

ivil

Wor

ks

NC

B 20

0 Pr

ior

TBD

Ph2/

IDA

QN

- 3.

7 M

isce

llane

ous

Equi

pmen

t G

oods

IC

B 11

2 Pr

ior

TBD

Ph2/

IDA

Com

pone

nt 5

- H

ouse

hold

and

Sch

ool S

anita

tion

QN

- 5.

3 Sc

hool

San

itatio

n Ph

2 C

ivil

wor

ks

NC

B 16

5 Po

st

TBD

Ph2/

IDA

Page 73: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

68

Con

tr N

o D

escr

iptio

n Ty

pe

of

Con

tract

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

QN

-5.4

H

ouse

hold

san

itatio

n Su

b lo

ans

Com

mer

cia

l Pr

actic

es

170

Post

TB

D

Ph

2/ ID

A

Com

pone

nt 6

: Cap

acity

Bui

ldin

g an

d Im

plem

enta

tion

Supp

ort

QN

-6.7

Con

st. S

uper

visi

on fo

r C

ompo

nent

4 a

nd 5

C

onsu

lting

Se

rvic

es

QC

BS

59

Prio

r TB

D

Ph

2/ID

A

QN

-6.8

Post

-pro

ject

Eva

luat

ion

(Pha

se

2)

Con

sulti

ng

Serv

ices

IC

6 Pr

ior

TBD

Ph2/

IDA

QN

-6.9

T

A C

lean H

ealth

y C

ity

Part

ners

hip

– I

mple

menta

tion

S

erv

ice

Q

CB

S/C

QS

/IC

245

P

ost

T

BD

Ph2/

IDA

PHR

D

QN

-6.1

0 C

onst

ruct

ion S

uperv

isio

n

Phase

2

Consu

lting

Q

CB

S/S

SS

2,0

34

P

rior

TB

D

Ph2/

PHR

D

QN

-6.1

1 In

depe

nde

nt

Auditi

ng –

Phase

2

Consu

lting

Q

CB

S/L

CS

49

P

ost

TB

D

P

hase

2

/ID

A

QN

-6.1

2 T

A f

or

Rela

ted D

ep

art

me

nts

D

ON

RE

, D

OC

, D

AR

D –

Phase

2

Consu

lting

QC

BS

/CQ

S/I

C

40

Post

T

BD

Phase

2

/ID

A

DO

NG

HO

I

Com

pone

nt 1

- Fl

ood

Con

trol,

Dra

inag

e, W

aste

wat

er C

olle

ctio

n

DH

-1.4

Se

wer

s an

d St

orm

Wat

er

Col

lect

ion

Syst

em N

orth

C

ivil

Wor

ks

ICB

6,10

0 Pr

ior

TBD

Ph2/

IDA

DH

-1.5

Se

wer

s an

d St

orm

Wat

er

Col

lect

ion

Syst

em S

outh

C

ivil

Wor

ks

ICB

6,20

0 Pr

ior

TBD

Ph2/

IDA

DH

-1.6

O

pera

tion

Mai

nten

ance

Equ

ipt

Goo

ds

ICB

350

Prio

r TB

D

Ph

2/ID

A

Page 74: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

69

Con

tr N

o D

escr

iptio

n Ty

pe

of

Con

tract

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

DH

-1.7

Pu

blic

Toi

lets

C

ivil

wor

ks

Shop

ping

31

.6

Post

TB

D

Ph

2/ID

A

Com

pone

nt 2

- W

aste

wat

er T

reat

men

t

DH

-2.1

W

aste

wat

er T

reat

men

t Pla

nt

Civ

il W

orks

IC

B 2,

800

Prio

r TB

D

Ph

2/ID

A

DH

-2.2

R

ehab

. Cub

a H

ospi

tal W

WTP

Civ

il w

orks

N

CB

95

Prio

r TB

D

Ph

ase2

/IDA

Com

pone

nt 3

- So

lid W

aste

Man

agem

ent

DH

-3.2

Su

pply

of S

olid

Was

te

Equi

pmen

t G

oods

IC

B 30

7 Pr

ior

TBD

Ph2/

IDA

DH

-3.3

D

evel

op L

y Tr

ach

Land

fill –

le

acha

te s

yste

m/c

losu

re o

f Loc

N

inh

Civ

il W

orks

N

CB

200

Prio

r TB

D

Ph

2/ID

A

DH

-3.4

H

azar

dous

Was

te In

cine

rato

r an

d So

lid W

aste

Col

lect

ion

Equi

pmen

t G

oods

IC

B 30

2 Pr

ior

TBD

Ph2/

IDA

DH

-3.5

Ly

Tra

ch L

andf

ill eq

uipm

ent

Goo

ds

ICB

76

Prio

r TB

D

Ph

2/ID

A

Com

pone

nt 5

- H

ouse

hold

and

Sch

ool S

anita

tion

DH

-5.3

Sc

hool

San

itatio

n Ph

2 C

ivil

wor

ks

NC

B 21

0 Po

st

TBD

Ph2/

IDA

DH

-5.4

H

ouse

hold

San

itatio

n Su

b lo

ans

Com

mer

cia

l Pr

actic

es

160

Post

TB

D

Ph

2/ ID

A

Com

pone

nt 6

: Cap

acity

Bui

ldin

g an

d Im

plem

enta

tion

Supp

ort

DH

-6.7

C

onst

. Sup

ervi

sion

for

Com

pone

nts

4 an

d 5

Con

sulti

ng

Serv

ices

Q

CBS

59

Pr

ior

TBD

Ph2/

IDA

Page 75: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

70

Con

tr N

o D

escr

iptio

n Ty

pe

of

Con

tract

Proc

ure.

M

etho

d

Est.

Base

C

ost

USD

x100

0

Bank

R

evie

w

Bid

Doc

/ TO

R/

RFP

Pre

p.

Bid

Doc

/T

OR

/R

FP

appr

oval

Bid/

Pr

opos

al

Subm

isn

Bid

doc

or

Prop

osal

Ev

alua

tion

Eval

. Rep

ort

Appr

oval

C

ontr.

Si

gn

Con

tr.

Star

t C

ontr

Fini

sh

Phas

ing

& Fu

ndin

g

DH

-6.8

Post

-pro

ject

Eva

luat

ion

(Pha

se

2)

Con

sulti

ng

Serv

ices

IC

5

Prio

r TB

D

Ph

2/ID

A

DH

-6.9

TA

Cle

an H

ealth

y C

ity

Part

ners

hip

– I

mple

menta

tion

S

erv

ice

Q

CB

S/C

QS

/IC

235

P

ost

T

BD

Ph2/

IDA

PHR

D

DH

-6.1

0

Const

ruct

ion S

uperv

isio

n

Phase

2

Consu

lting

Q

CB

S/S

SS

1755

P

rior

TB

D

Ph

2/

PHR

D

DH

-6.1

1

Indepe

nde

nt

Auditi

ng –

Phase

2

Consu

lting

Q

CB

S/L

CS

47.5

P

ost

T

BD

Phase

2

/ID

A

DH

-6.1

2

TA

for

Rela

ted D

ep

art

me

nts

D

ON

RE

, D

OC

, D

AR

D –

Phase

2

Consu

lting

QC

BS

/CQ

S/I

C

35

Post

T

BD

Phase

2

/ID

A

Page 76: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

71

Ind

ica

tiv

e P

roc

ure

me

nt

Pla

n P

ha

se

2 –

Co

mp

on

en

t 6

Mu

lti –

Cit

y P

ac

ka

ge

s

Co

ntr

.

No

D

escri

pti

on

T

yp

e o

f

Co

ntr

act

Pro

cu

re.

Meth

od

Es

t.

Base

Co

st

US

Dx10

00

Ban

k

Revie

w

Bid

Do

c

/TO

R

/RF

P

Pre

p.

Bid

Do

c

/TO

R

/RF

P

ap

pro

val

Bid

/

Pro

po

sa

l

Su

bm

isn

Bid

do

c o

r

Pro

po

sa

l

Ev

alu

ati

on

Ev

al.

Rep

ort

Ap

pro

val

Co

ntr

.

Sig

n

Co

ntr

.

Sta

rt

Co

ntr

.

Fin

ish

Lead

PM

U

Ph

asin

g &

Fu

nd

ing

CB

-9

TA

for

Landfil

l Opera

tion

Consu

lting

QC

BS

525*

Prior

TB

D

Nha T

ran

g

Ph

2/

PH

RD

CB

-10

TA

for

WW

TP

Opera

tion

C

onsu

lting

QC

BS

592*

Prior

TB

D

Quy

Nhon

Ph

2/

PH

RD

CB

-11

Indepe

nde

nt

Safe

guard

ing

Monito

ring –

Envi

ronm

ent

Consu

lting

QC

BS

66

Post

T

BD

Nha T

ran

g

Ph

2/I

DA

CB

-12

Indepe

nde

nt

Safe

guard

ing

Monito

ring –

Rese

ttle

ment

Consu

lting

QC

BS

92

Post

T

BD

Dong H

oi

Ph

2/I

DA

* P

lus

$60,0

00 (

CB

-4)

and $

80,0

00 (

CB

-5)

for

inte

rnat

ion

al s

tud

y t

ou

rs

Page 77: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

72

Annex 9: Economic and Financial Analysis

VIETNAM: Coastal Cities Environmental Sanitation Project

Financial Analysis: The financial analysis assumes that wastewater and solid waste tariffs will recover operating and maintenance costs, depreciation of short lived assets, such as vehicles and equipment, and any loan interest charges, by the end of the project. Currently tariffs do not cover these costs and they will therefore be increased gradually, starting from 2007, to allow the service providers to achieve the required levels of cost recovery before project implementation completion in 2014. The cost recovery schedules for the service providers have been agreed with local governments and their implementation is a project covenant. Financing Arrangement and Fiscal Impacts: The total counterpart funding requirements for the project is estimated at USD 38 million representing 22% of the total project cost. The counterpart funding requirements for Donghoi, Nhatrang and Quynhon subprojects are USD 8 million, USD 18 million , and USD 12 million respectively. The counterpart financing will be provided by the Provincial budget although Donghoi will receive significant support from the Central Government. Assessment of the financial performance of the provincial budgets showed that they have the necessary counterpart funds for their respective sub-projects. The average annual counterpart fund required will be about VND 40 billion for Nhatrang and VND 30 billion for Quynhon or about 5-6% of the current provincial total annual capital expenditure. During peak implementation periods counterpart funds will not exceed a manageable level 9% of the provincial capital expenditure budget. The credit will be on-lent or on-granted to the relevant service providers with the exception for investment in resettlement sites which will be on-lent to the provinces. The terms of the financing are as follows: Component On-lending arrangements 1. Flood control, drainage and wastewater collection Grant to Province 2. Wastewater treatment plant Grant to Province 3. Solid waste management – landfill Grant to Province 3. Solid waste management – collection equipment Loan to URENCO/UWC at 6.6% interest

over 20 years, with 5 years grace period 4. Resettlement Loan to Province at 0% interest over 20

years, with 3 years grace period 5. Household and Public Sanitation program Grant to Province 6. Institutional strengthening and capacity building Grant to Province

During the grace period the borrower will be exempt from making interest payments or repayments on the principal. No interest will be accrued on the loan amounts during the grace period.

Page 78: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

73

Cost Recovery and Tariffs The project, in line with government policy, will recover from user charges the O&M costs of the wastewater, drainage and solid waste facilities, depreciation of short lived assets, such as vehicles and equipment, and any loan interest charges. This allows for affordable tariffs and gives sufficient revenue to the service provider to operate the system and finance replacement of short lived assets. The wastewater tariffs will be levied as an amount for each cubic meter of water consumed. The wastewater and solid waste tariffs will be increased annually during the implementation period so that subsidies to the WSDCs and URENCOs can be eliminated before the project completion. In addition the service coverage and tariff collection efficiency will be gradually improved to increase revenues to the service providers. The sanitation charges are set higher for commercial and industrial consumers to help ensuring affordability for domestic users, especially for low-income households. The detailed financial projections demonstrate the possibility of eliminating subsidies during the project implementation period while keeping the charges affordable to households including poor families. The following table shows the proposed cost recovery tariffs for sanitation services for the three cities. Wastewater Cost Recovery and Tariffs

Calendar Year 2006 2007 2008 2009 2010 2011 2012 2013 Nhatrang: average ww tariff

VND/m3 196 325 512 762 975 1347 1737 1916

Nhatrang cost recovery (%) NA 74 76 87 92 96 99 100 Quynhon: average ww tariff

VND/m3 126 258 462 776 1128 1514 1966 2260

Quynhon cost recovery (%) NA 41 45 59 71 81 92 100 Donghoi: average ww tariff

VND/m3 170 365 627 1032 1507 2067 2597 3111

Donghoi cost recovery (%) 28 33 44 56 66 75 88 100 Solid Waste Cost Recovery and Charges

Calendar Year 2006 2007 2008 2009 2010 2011 2012 2013 Nha Trang average Tariff (VND/HH)

8,000 8,558 9,565 12,585

14,095 16,612 18,122 18,626

Nhatrang cost recovery (%) 59 66 71 75 81 94 98 100 Quy Nhon average Tariff (VND/HH)

7,000 7,695 8,699 10,037

13,383 16,729 18,737 20,744

Quynhon cost recovery (%) 42 52 62 73 79 83 94 100 Dong Hoi average Tariff (VND/HH)

7,000 7,780 8,818 10,114

14,004 16,857 18,932 21,007

Donghoi cost recovery (%) 51 56 60 71 77 83 94 100

Affordability The assessment of affordability is based on the combined costs of water supply, wastewater and solid waste charges using the above cost recovering tariffs. The monthly water and sanitation cost to households, including for low income families, still remain around the affordability level of 5% of household income. The table below shows the affordability assessment (for combined water supply and sanitation services) for low income households.

Page 79: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

74

Affordability Analysis

Water and Sanitation cost as % monthly income of low-income households

2006 2007 2008 2009 2010 2011 2012 2013

Nhatrang 1.8 1.9 1.9 2.1 2.1 2.6 2.6 2.5

Quynhon 2.3 2.4 2.4 2.5 3.1 3.2 3.2 3.1

Donghoi 2.1 2.1 2.2 2.4 3.0 3.1 3.2 3.2

Financial Internal Rates of Return (FIRR) The FIRR for each sub project is summarized below. The rates of return vary between 18.6% and 28.2% (wastewater) and between 25.9% and 32.6% (solid waste) and are higher than the weighted average cost of capital of between 10-12%. Financial Internal Rates of Return

Financial Internal Rate of Return (%) City Wastewater Solid Waste

Nha Trang 27.6 32.6 Quy Nhon 28.2 29.5 Dong Hoi 18.6 25.9

FIRR Sensitivity Analysis The sensitivity analysis shows the FIRR of the participating cities are sensitive to an increase in both O&M and capital costs and decrease in water demand. The impact of an increase in both O&M and capital costs for the solid waste management sub projects, and for the wastewater subprojects, reduces the FIRR to a value close to the weighted-average cost of capital (WACC). The service providers need to strictly monitor construction and keep tight control of operating expenses during project implementation. The Table below shows the results of the sensitivity analysis.

Nhatrang Quynhon Donghoi

Scenario Solid Waste

Wastewater Solid Waste Wastewater Solid Waste Wastewater

Base Case 32.6 27.6 29.5 28.2 25.9 18.6

10% increase in O&M cost 20.2 23.2 18.0 23.4 15.1 16.0

10% decrease in water consumption 22.3 18.5 15.3

10% increase in capital cost 30.3 23.5 27.3 23.8 24.2 16.2

10% increase in both O&M and capital cost 18.9 16.1 16.7 21.2 14.1 14.9

10% decrease in O&M cost 48.5 32.9 45.5 35.3 39.1 21.5

10% increase in water demand 30.6 32.8 19.4

Page 80: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

75

Economic Analysis: The economic analysis of the project is based both on cost-benefit analysis (CBA) and least-cost analysis (LCA). A combination of these two approaches is necessary because of the uncertainties with CBA, particularly the difficulties with quantifying accurately some of the environmental benefits and local economic development benefits. These uncertainties arise either because of a lack of empirical data or because of immature methodologies. As is the case in many environmental projects, it is very difficult, if not impossible, to place a monetary value on environmental improvement, the general improvement in public amenity and the impact on local development. LCA has therefore been conducted throughout component selection and preliminary design, to ensure that the selected investments are the most economical interventions. Least Cost Analysis: The proposed investments are the least cost solutions to achieve the project development objectives, whilst keeping tariffs affordable. Flood control, drainage and wastewater collection network. To mitigate flooding, priority was given to (a) the rehabilitation of the rivers and lakes that have a buffer function for the floodplains and serve as the main drainage channels for the city core area and new development areas, (b) the construction of drains at the base of the mountains to capture run-off, and (c) the construction of tide gates to prevent backflow in the drainage system during high tides and salt intrusion from the rivers. This approach addresses the major sources of flooding in the cities which arise from the mountain run-off during heavy rainfall and ocean or sea backflow into the drainage systems during periods of high tide. In the drainage network, existing combined sewers will be rehabilitated and expanded to ensure sufficient capacities to service the catchment areas and design rainfall values, while utilizing ponds and lakes wherever possible to buffer the flow. Using combined sewers in the city core and in the highly dense areas, maximizes efficiency of investments and addresses constraints on land availability. In less dense areas, and where a drainage system is not yet in place, separate storm water drains and wastewater sewers will be considered. Priority catchment areas are the city core and major flooding areas of the cities. In line with good engineering practice the combined sewers will include the installation of combined sewer overflows to spill excess storm flows to nearby water courses. This ensures that the interceptor pipes and pump stations, which transfer sewage to the wastewater plants, can be designed for cost effective operations. Wastewater treatment plants (WWTPs). The number, location and size of the WWTPs were based on considerations of (a) proximity and convenience of effluent discharge points to a sea or river outfall, (b) the absence of any planned settlement in the future, including minimal resettlement, and (c) land availability including provision of land for possible expansion in the future. WWTPs were designed to meet government standards on effluent discharge. Of five treatment technologies that were initially considered as appropriate for Vietnam, oxidation ditches is the preferred technology given its low cost, simplicity of operation, and limited land requirements. Chemically enhanced primary treatment (CEPT) is being piloted in Quy Nhon and is expected to use GEF grant financing. Solid Waste Management (SWM): Project interventions in solid waste management considered a) synergies with other SWM projects planned or underway in Dong Hoi and Quy Nhon, b) the status of the existing dumpsite in Quy Nhon and the lack of a sanitary landfill in Nha Trang, and c) maximizing cost efficiency of investments and operations. These interventions were based on a Solid Waste Management Study and an assessment of options for private sector participation in the participating cities. The studies included assessments of options for resource recovery, waste collection, solid waste transfer stations, landfill sites, and service delivery models involving both public and private service providers.

Page 81: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

76

Cost-Benefit Analysis The project is expected to benefit about 840,000 people by 2013. The benefits of the project include: (a) reduced flood damage, (b) health benefits, (c) savings in installation and desludging of septic tanks, (d) savings in drainage maintenance, (e) increased tourism due to an improved environment for tourists and potential investors, (f) improved financial positions of the Water Supply and Drainage Company (WSDC) and URENCO as tariffs are increased resulting in better management in the provision of services. This will eventually eliminate subsidies from the provincial governments; (g) enhancement of the development potential of the cities especially the areas along canals and previously flooded areas; (h) creation of new business opportunities such as restaurants, retail stores, and other entertainment activities; and (i) land value appreciation in the area, the extent of which will largely depend on the new economic activities that will be created arising from the proposed investments. It is not feasible to quantify all the above benefits, or to evaluate accurately those that are quantifiable. In this analysis, only the first five benefits were assessed. Reduced flood damages. Damages due to floods include direct and indirect damages. Direct damages result when houses, buildings and other structures, household goods, shop merchandise, roads and vehicles get in contact with floodwaters. Indirect damages are the consequential losses including loss of trade, loss of income for employers and employees, restrictions on traveling, costs of evacuation and reinstatement and costs of cleaning-up operations. Flood control and drainage improvement projects primarily stabilize land and infrastructure, which otherwise are at risk of destruction and loss from floods. Benefits have been measured as the avoided costs of damaged structures and the additional maintenance costs that would have been incurred on inundated major roads. Although in principle the costs of delays in economic activities and disruption to traffic should be included among the benefits, these costs are difficult to estimate and therefore were not accounted for. Reduced flood damages have been estimated at VND 193 billion annually. Health benefits. An improved hygienic environment will directly benefit the populace of each of the cities. It is anticipated that the construction of new wastewater treatment plants will improve the quality of receiving waters by reducing the pollution load to rivers, beaches and seashores. Drainage improvement will also significantly reduce stagnant water, thereby reducing the breeding grounds of mosquitoes and other disease-bearing insect vectors. Construction of new sewers will decrease the amount of wastewater discharged into open drainage channels, thereby reducing the risk of water related health problems. The solid waste subprojects will promote safe and hygienic disposal of solid waste, reduce blockages of sewers and drains and also reduce air-borne particulate concentration arising from burning garbage and wind-blown dust. Also, garbage piles will be reduced and hence improve the environmental condition of the cities. All these are expected to translate into a reduction in risks of diseases and illnesses associated with an unhygienic environment as well as water related diseases such as diarrhea, dysentery, cholera, typhoid, etc. Health benefits were measured from expected savings in medical care and loss in income due to illness and death, estimated at VND 32 billion annually. Savings in installation and desludging of septic tanks. All new construction in the participating cities are required to have a septic tank to avoid direct discharge of wastewater into the drainage system and for these tanks to be desludged at least once a year. Constructing interceptor sewers means that the septic tanks will no longer be necessary resulting in savings in construction of septic tanks and desludging costs, estimated at VND 36 billion annually. Savings in drainage maintenance. The drainage operating costs are expected to be reduced with the improvement of the solid waste management system, due to a reduction in need to clean waste from open drains. The benefits from savings in drainage maintenance are estimated at VND 3 billion annually.

Page 82: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

77

Increase in Tourism Income. Tourism is an emerging industry in the participating cities. The project will play an important role in accelerating the development of tourism in these cities. For the analysis, the benefits are measured by the increase in tourist arrivals due to an improved environment for the tourists and an increase in expenditures per tourist primarily because of longer duration of visits. The current annual growth rate of 5% in tourism arrival for the participating cities was adopted in the “without” project case. Implementation of the project is assumed to increase the growth rate to 5.5%. It is projected that with the implementation of the project about 26,821 additional tourists would arrive in the area annually. Income from tourism of the participating cities amounted to VND 503 billion in 2005, of which VND 315 billion is for Nhatrang, VND 175 billion for Quynhon and VND 13 billion for Donghoi. Average expenditure per tourist for the participating cities would be expected to increase from VND 0.70 million to VND 0.74 million primarily because of the longer duration of visits. This is estimated at VND 59 billion annually. For the whole project, the benefits mainly arise from economic growth through reduced flood damage (60% of total annual benefits) and increases in tourism income (18%). Savings from installation costs of septic tanks and desludging account for 11% and health benefits, 10%. The health benefit is underestimated as it excludes benefits from the likely reduction in mortality and morbidity, especially for infants and the elderly, a reduction in the probability of a major outbreak of epidemic disease, and individual willingness to pay more than the medical expense to avoid being sick. Further benefits that could not be readily quantified include: the financial sustainability of the service providers, enhancement of the development potential of the cities in general, creation of new economic opportunities, and land value appreciation in the area. Summary of the CBA: The project has an economic rate of return of 18.5 percent, which is higher than the 12 percent discount rate that was assumed. This is notwithstanding the fact that other benefits relating to health, environment and local economic development could not be realistically quantified and therefore have not been accounted for. The analysis highlights the robustness of the project in terms of its contribution to economic growth in the participating cities.

Summary of Project Cost-Benefit Analysis

(in VND millions) Nha Trang Quy Nhon Dong Hoi Overall Annual Benefits: Reduced flood damage 90,300 53,745 49,041 193,086 Health benefits 17,144 10,398 4,094 31,636 Savings in installation and desludging of septic tanks 16,822 14,754 4,602 36,179 Savings in drainage maintenance 1,020 976 810 2,806 Increase in Income from Tourism 36,767 20,426 1,574 58,767 Total Benefits 1,006,206 643,393 482,978 2,233,343 Total Costs 696,059 535,999 343,566 1,575,625 Net Present Value 320,294 94,587 41,461 456,243 EIRR (%) 22.7 16.0 14.6 18.5

Sensitivity Analysis: The sensitivity analysis shows the EIRR of the three cities to be more sensitive to a decrease in benefits rather than to an increase in costs, noting however that not all benefits have been fully accounted for. The economic rate of return is most sensitive to a combined scenario of an increase in costs and a decrease in benefits.

Page 83: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

78

Results of Sensitivity Analysis

Scenario Nha Trang Quy Nhon Dong Hoi Overall Net Present

Value (VND mil)

EIRR (%)

Net Present Value

(VND mil)

EIRR (%)

Net Present Value

(VND mil)

EIRR (%)

Net Present Value

(VND mil)

EIRR (%)

Scenario 1: 10% Increase in Costs

224,078

18.8 26,204 13.0

7,104 12.4 298,787 15.8

Scenario 2: 10% Decrease in Benefits

194,710 18.4 18,224 12.8 2,958 12.2 253,146 15.5

Scenario 3: Combination of Scenarios 1 and 2

125,104

15.6 (35,376) 10.7 (31,398) 10.3 95,583 13.2

Page 84: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

79

Annex 10: Safeguard Policy Issues

VIETNAM: Coastal Cities Environmental Sanitation Project Social Issues The project will improve environmental services (wastewater, solid waste management, and protection from flooding), which will bring substantial social benefits to the residents of the participating cities. Adverse social impacts involve permanent and temporary land acquisition for the construction of WWTPs, landfills, drains and pipelines. A Resettlement Policy Framework (RPF) has been approved by the Prime Minister and adopted by the participating Provinces. RAPs have been prepared for Phase 1 activities, which would affect about 161 HHs, of which 77 HHs would be relocated and 78 would be severely affected by losing income sources. Land acquisition for the whole project would affect 912 households, of which 356 households would be relocated and 172 households would be severely affected by the loss of income sources as in the table below: Nha Trang Quy Nhon Dong Hoi Land acquisition (ha) 76.9 57.3 14.5 DPs number (HHs) 418 225 269 Relocated DPs (HHs) 200 137 19 DPs severely affected by income sources losses (HHs)

37 40 95

Estimated resettlement cost (USD mil.)

4.54 2.94 1.7

Proposed resettlement site (ha)

5 5 From existing City site

For Phase 2 investments, RAPs will be prepared during project implementation. Benefits and target population: An estimated 700,000 residents of the three cities will benefit from reduced flooding, removal of liquid and solid wastes for safe disposal and provision of on-site sanitation. Of these beneficiaries, the government classifies about 1.8% (Nha Trang), 4.3% (Quy Nhon) and 7.6% (Dong Hoi) as poor. Stakeholder participation. Household surveys confirmed that the project responds to beneficiary demand. The two most serious problems identified by residents in the three cities was flooding and the lack of a proper drainage and sewer system. Improving sanitation outcomes requires continued interaction with a range of stakeholders during implementation. A PHRD grant will support capacity building of mass organizations to improve stakeholder understanding of the issues. Implementation of Component 5 will require working with the Women’s Union (for the sanitation fund) and the Department of Education (for school sanitation). Ethnic minorities. The socio-economic survey shows no ethnic minority groups living in the project areas. Collaboration with NGOs. The sanitation fund will be implemented on behalf of the PMUs by the city/provincial Women’s Unions (WU), which have significant experience working with communities in

Page 85: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

80

micro-finance. Implementing the Healthy City Partnership (component 6) will require collaboration with other NGOs, the public and private sectors. Monitoring social impacts. The PMUs, supported by independent monitoring consultants, will be responsible for monitoring social outcomes and managing the RAPs. Environmental Issues The Borrower prepared Environmental Assessments (EAs) and Environmental Management Plans (EMPs) acceptable to IDA for the Phase 1 investments in each city. Approximately 70% of the project investments are planned for Phase 2 activities. Environmental Guidelines have been developed to be used in preparation of Phase 2 sub-projects, and will be used by the Borrower to ensure compliance with the Bank’s safeguards requirements. These guidelines have been adopted by the participating Provinces. The project is expected to have significant positive benefits for the environment, public health and the tourism-based economy due to reduced frequency and level of flooding in the cities, improved collection and handling of liquid and solid wastes, and improvements in sanitation service and capacity. Wastewater treatment (WWT) is new for these cities, but appropriate WWT technology has been chosen to meet the national environmental standards at acceptable costs. In order to better understand the issues associated with making connections to the new sewers, a limited house connection program will be implemented prior to completion of wastewater treatment plants. This will result in the temporary discharge of some household liquid wastes (from gray water and septic tank outlets) into rivers and lakes, until the wastewater treatment plant are built. These house connections will only be made where studies have shown that the impact of the temporary discharges is within national standards. Specific mitigation measures will be adopted to reduce pollution discharge at each of the outlets, and water quality of the receiving waters will be carefully monitored. Poorly designed or operated septic tanks limits their effectiveness in reducing pollution loads on groundwater. The project will connect septic tanks to the new sewers, and then to the WWTPs, thus reducing pollution in the receiving waters or groundwater. Septage from the tanks will be disposed to landfills or WWTPs, based on detailed assessments to be made in Phase 2. Cultural property exists in the project cities but identified impacts are limited. A new temple in Quy Nhon will be relocated as decided by the city’s People Committee. The Citadel in Dong Hoi is 150 meters away from the drainage works and thus careful construction methods are required. Proper construction supervision will be needed during project implementation to check for possible buried artifacts. Safeguard screening will be made during the implementation to determine whether this policy is triggered in Phase 2 subprojects. The environmental impacts from Phase 1 activities are summarized below: City Project activities Potential impacts

Construction and rehabilitation of 14 km of the existing combined sewer systems

Temporary pollution and traffic congestion during construction. Discovery of cultural and historic remains

Nha Trang

Temporary discharge of combined storm overflows and wastewater drains to 4 outlets at Cai river, the Nha Trang Bay, the Quan Truong and the Tac

Increased pollution load. BOD and COD pollution would, however, be diluted by receiving waters to an acceptable level. At the outlets to Cai river, where the baseline

Page 86: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

81

rivers. Connection of new 2000 households to the sewers.

pollution is already heavy, level of Coliforms and suspended solid (SS) would be higher than the national standards.

Transportation and disposal of 12000 m3 dredged sediment.

Spillover and odor, dust and noise pollution. Contaminated mainly by organic pollutants so can be used for agriculture land.

The closure of Ru Ri dump site and the construction and operation of the first cell at the new Luong Hoa landfill. Rehabilitation of an access road near a temple and cemetery.

Dust and noise pollution from construction work, leachate and landfill gas release Land has no biodiversity value and far from residential areas. Households within the buffer zone will be relocated.

The construction of the 5 ha resettlement site at Dat lanh.

Dust and noise pollution from construction and land-filling work. Wastewater and solid waste generation from resettled households. Only agriculture land and no natural habitats involved

Construction of 30 km of drains, channels and sewers.

Temporary pollution and traffic congestion during construction. Discovery of cultural and historic remains.

Discharge from 3 temporary outlets at (1) Phu Hoa lake, (2) the canal connecting the Bau Sen lake to the Ha Thanh river, and (3) Dong Da lake connecting with Thi Nai lagoon. Connection of 3000 new households to the sewers.

Increased pollution load. BOD and COD pollution would, however, be diluted by receiving waters to an acceptable level. Pollution from Coliforms and suspended solid (SS) would slightly increase but the baseline level at outlets 1 and 3 is already higher than the national standards.

Transportation and disposal of 22,500 m3 dredged sediment.

Spillover and odor, dust and noise pollution Contaminated mainly by organic pollutants so that can be used for agriculture land.

The construction and operation of transfer stations.

Odor, noise and garbage littering within the neighborhoods

The construction of the 3.5 ha resettlement site at Nhon Binh.

Dust and noise pollution from construction and land-filling work. Wastewater and solid waste generation from resettled households Only aquaculture land and no natural habitats involved.

Quy Nhon

Construction of sewer close to a small temple in Nhon Binh ward which was constructed in 2002.

No impacts as the CPC agreed to move the temple.

Rehabilitation and replacement of 3 km of the existing drainage and combined sewer system in 3 wards of the city center. Dredging and building of embankment for main water courses including the Cau Rao River, Phong Thuy Canal, and Nam Ly Lake.

Temporary pollution and traffic congestion during construction. Discovery of cultural and historic remains. Change to find un-explosive mines.

Dong Hoi

Temporary discharge of combined storm overflows and wastewater drains to Nhat Le river and Phong Thuy canal.

Increased pollution load. BOD, COD, Coliform and Suspended solids pollution would, however, be diluted by receiving waters to an

Page 87: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

82

Connection of 1343 new households to the sewers.

acceptable level, except for the outlets discharging to Phong Thuy canal, in which the pollution level is already higher than the national standards.

Transportation and disposal of 210,000 m3 dredged sediment from the Cau Rao river, the Phong Thuy canal, the Nam Ly lake, and from the existing sewers and canals.

Spillover and odor, dust and noise pollution Contaminated mainly by organic pollutants so that can be used for agriculture land.

The collection and disposal of septage at the Loc Ninh dump site

Odor and other nuisances.

Environmental Management Plan (EMP): The potential negative impacts of the sub-projects will be mitigated and monitored through the implementation of environmental management plans (EMPs) prepared under the project in compliance with OP 4.01. The EMPs include mitigation measures both during construction and operation, monitoring plan with institutional responsibilities for the implementation, capacity building program for environmental management for PMU staff and other related stakeholders and the public, and identification of adequate funding for its implementation. Pilot house connections made prior to completion of the wastewater treatment plant will only be allowed where the impact of the temporary discharge is within national standards. This will be determined on a case by case basis during project implementation and subject to no objection by DONRE. Where the pilot house connection policy is implemented the affected outlets will be subject to generic mitigation measures including placement of coarse screens on the outlets, dredging and maintenance of open channels to improve water flows, and signage of potential health risk. In addition specific mitigation measures will be provided as required and careful monitoring of the receiving waters will be introduced. Institutional capacity assessment: Each PMU will arrange for EMP implementation and will report compliance as part of the semi-annual progress reports submitted to IDA, copied to DONRE. Construction management consultants (CMC) will supervise environmental compliance by the construction contractors. An independent environmental monitoring consultant (IEMC) will be hired for each city to provide guidance to CMC, monitoring of the overall project impacts, training of PMU staff, and to assist PMUs in implementing the EMPs. Ensuring environmental certificate: Environmental approval for the EA summary of whole project and for each city EIA of Phase 1 activities has been received from the provincial DONRE. Public consultation. The Borrower held initial consultations with local government agencies and communities about route alternatives, landfill sites, transfer stations, public toilets, WWTP locations and potential project impacts. The second public consultations with DPs and local NGO representatives discussed the main findings of the EAs. Additional public consultation with the DPs living around the drainage outlets was conducted on the possible impacts of temporary discharge of liquid wastes. No objections to the project or environmental and social concerns other than those addressed in the EAs and RAPs were raised during this process. Public disclosure (BP 17.50). The Bank’s disclosure requirements have been followed. The documents were disclosed in Washington DC, and the VDIC in Hanoi. Locally the documents were disclosed in Vietnamese in the city Peoples’ Committees, the DONREs, the Project Preparation Units, and the affected wards to be accessible to local NGOs and DPs.

Page 88: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

83

Due Diligence Reviews. A due diligence review was undertaken by the Borrower for investments that were identified as linked with the Phase 1 activities. In Dong Hoi, two projects were identified as being linked to the Bank's investments: construction of Ly Trach landfill and closure of Loc Ninh dump site. Ly Trach landfill. This is a 7-hectare sanitary landfill financed by the Swiss Agency for Development and Cooperation to serve solid waste disposal needs for Dong Hoi and the surrounding area. The linkage to the IDA-financed investments arises from the financing of solid waste collection vehicles which will transfer waste to the landfill. With regard to social issues, clearance of the landfill site in April 2006 resulted in 10 DPs losing access to agricultural and forest land. One of these DPs will also lose a temporary house that was used for agricultural purposes. The due diligence review found that all compensation payments were made to the DPs in accordance with GoV regulations. The independent resettlement monitor that will be hired for the IDA project will check whether GoV’s assistance in restoring the livelihoods of these 10 DPs is sufficient. The reviews showed that there was either no risk to the Bank arising from the linked activities, or the risks can be mitigated by designing activities in Phase 2. With regard to environmental issues, an EA was prepared for the SDC project and approved by the Quang Binh DONRE. The due diligence review of the EA for the landfill found that the sanitary landfill is not designed to separate hazardous waste, even though disposal of hazardous waste is a serious issue in this area. To mitigate this risk, the IDA investment in Phase 2 is proposed to include construction of a hazardous cell with a primary treatment facility as part of the Ly Trach landfill. Loc Ninh landfill. This is an existing 3-5 hectare landfill that will be closed once Ly Trach is functioning, and which lacks a leachate treatment system. The EA prepared for the closure of Loc Ninh landfill (together with the new Ly Trach landfill) recommended that a leachate treatment system be put in place to protect downstream communities from pollution runoff from the closed landfill. The due diligence review raised concern that funds have not been secured to implement the monitoring and mitigation measures recommended by the EA to address the potential impacts of pollution from the leachate. The IDA investment in Phase 2 is planned to include safe closure of the landfill, including leachate collection and treatment as necessary. Due diligence reviews will be undertaken during project implementation to confirm that any DPs from linked activities have been able to restore their living and income sources.

Page 89: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

84

Annex 11: Project Preparation and Supervision

VIETNAM: Coastal Cities Environmental Sanitation Project

Planned Actual PCN review May 7, 2004 Initial PID to PIC June 3, 2004 Initial ISDS to PIC June 3, 2004 Appraisal January 20, 2006 Negotiations June 16, 2006 Board/RVP approval December 19, 2006 Planned date of effectiveness May 31, 2007 Planned date of mid-term review December 31, 2010 Planned closing date November 30, 2014

Key institutions responsible for preparation of the project: 1. Quy Nhon City, Project Preparation Unit of the Provincial People's Committee, Tel: (84-5) 682-5254, Fax: (84-

5) 682-6076, Contact: Mr. Thai Ngoc Bich, Vice Chairman; 2. Nha Trang City, Project Preparation Unit of the Provincial People's Committee, Tel: (84-5) 882-1129, Fax (84-

5) 882-9308, Contact: Mr. Nguyen Ngoc Minh, Chairman; 3. Dong Hoi, Project Preparation Unit of the Provincial People's Committee, Tel: (84-5) 282-2505, Contact: Mr.

Dang DucDuc, Acting Director

Bank staff and consultants who worked on the project included:

Name Title Unit William Kingdom Lead Water and Sanitation Specialist EASUR Alan Coulthart Infrastructure Coordinator EASIN Hung Duy Le Operations Officer EASUR Cuong Duc Dang Senior Operations Officer EASUR Hoa Thi Hoang Senior Operations Officer EASUR Hoa Thi Mong Pham Social Safeguard Specialist EASSD Phuong Tran Thi Thanh Environment Specialist EASEN Hung Viet Le Financial Management Specialist EACVF Kien Trung Tran Procurement Specialist EAPCO Hoi-Chan Nguyen Senior Counsel LEGEA John Morton Environmental Specialist EASEN Chaohua Zhang Senior Social Sector Specialist EASSD Chris Banes Municipal Engineer Consultant Vellet Fernandes Program Assistant & Document Processing EASUR Giang Thi Huong Nguyen Program Assistant EACVF Peer Reviewers: David Hanrahan Lead Environment Specialist SASES Jonathan Kamkwalala Lead Financial Analyst ECSIE Daniel Hoornweg Sr. Environmental Engineer LCSFW

Bank funds expended to date on project preparation: 1. Bank resources: $425,545 2. Trust funds: PHRD grant $1,210,300 3. Total: $1,635,845

Estimated Approval and Supervision costs: 1. Remaining costs to approval: $10,000 2. Estimated annual supervision cost: $65,000

Page 90: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

85

Annex 12: Documents in the Project File

VIETNAM: Coastal Cities Environmental Sanitation Project 1. Project Implementation Plan (PIP) Draft PIPs prepared by Louis Berger Group (LBG),

2. Bank Staff Assessments Procurement capacity assessment Financial management capacity assessment Detailed Financial Projections Detailed Economic Analysis

3. Other documents Project Pre-Feasibility Study for each City approved by the Prime Minister Feasibility Studies for Phase 1 Sub Projects

o Component 1 Nha Trang, Quy Nhon, Dong Hoi, VIWASE o Component 2 - None o Component 3 Nha Trang, Quy Nhon, Dong Hoi, LBG o Component 4 Nha Trang, Quy Nhon, Dong Hoi, VIWASE o Component 5 Nha Trang, Quy Nhon, Dong Hoi, VIWASE o Component 6 Nha Trang, Quy Nhon, Dong Hoi, LBG

Resettlement Action Plans for Phase 1 Sub Projects o Nha Trang, prepared by LBG o Quy Nhon, prepared by LBG o Dong Hoi, prepared by LBG

Environmental Management Plans for Phase 1 sub projects

o Project Summary EA, prepared by LBG o Nha Trang, prepared by LBG o Quy Nhon, prepared by LBG o Dong Hoi, prepared by LBG

Resettlement Policy Framework Framework Environmental Guidelines

Page 91: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

86

Annex 13: Statement of Loans and Credits

VIETNAM: Coastal Cities Environmental Sanitation Project

Original Amount in US$ Millions

Difference between expected and actual

disbursements

Project ID FY Purpose IBRD IDA SF GEF Cancel. Undisb. Orig. Frm. Rev’d

P073763 2005 VN-WATER SUPPLY DEV. 0.00 112.60 0.00 0.00 0.00 115.32 0.00 0.00

P066051 2005 VN - Forest Sector Development Project 0.00 39.50 0.00 0.00 0.00 40.21 0.17 0.00

P074688 2005 VN-2nd Rural Energy 0.00 220.00 0.00 0.00 0.00 228.31 0.00 0.00

P088362 2005 VN-Avian Influenza Emergency Recovery Pr

0.00 5.00 0.00 0.00 0.00 4.93 0.17 0.00

P065898 2004 VIETNAM WATER RESOURCES ASSISTANCE

0.00 157.80 0.00 0.00 0.00 155.60 -5.00 0.00

P059663 2004 VN-ROAD NETWORK IMPROVT 0.00 225.26 0.00 0.00 0.00 231.64 9.19 0.00

P070197 2004 VN-URBAN UPGRADING 0.00 222.47 0.00 0.00 0.00 221.95 -6.70 0.00

P075399 2003 Public Financial Management Reform Proj.

0.00 54.33 0.00 0.00 0.00 59.58 2.50 0.00

P044803 2003 VN-PRIMARY EDUC FOR DISADVANTAGED CHILRE

0.00 138.76 0.00 0.00 0.00 197.06 10.88 0.00

P071019 2003 VN-GEF Demand-Side Management & Energy

0.00 0.00 0.00 5.50 0.00 5.07 1.64 0.00

P059936 2002 VN -Northern Mountains Poverty Reduction

0.00 110.00 0.00 0.00 0.00 97.88 33.54 0.00

P066396 2002 VN-SYSTEM ENERGY, EQUITIZATION & RENEWAB

0.00 225.00 0.00 0.00 0.00 230.01 146.88 0.00

P051838 2002 VN-PRIMARY TEACHER DEVELOPMENT

0.00 19.84 0.00 0.00 0.00 19.86 11.26 0.00

P072601 2002 VN - Rural Finance II Project 0.00 200.00 0.00 0.00 0.00 99.27 -71.94 0.00

P073305 2002 VN-Regional Blood Transfusion Centers 0.00 38.20 0.00 0.00 0.00 45.34 19.62 0.00

P073778 2002 VN-GEF-System Energy Equitization-Renewa

0.00 0.00 0.00 4.50 0.00 4.13 1.80 0.00

P052037 2001 VN-HCMC ENVMTL SANIT. 0.00 166.34 0.00 0.00 0.00 174.18 43.36 29.22

P042927 2001 VN-MEKONG TRANSPORT/FLOOD PROT.

0.00 110.00 0.00 0.00 0.00 101.48 82.10 0.00

P062748 2001 VN - COMMUNITY BASED RURAL INFRA.

0.00 102.78 0.00 0.00 0.00 99.00 22.31 0.00

P059864 2000 VN-RURAL TRANSPORT 2 0.00 103.90 0.00 0.00 0.00 30.07 20.91 0.00

P056452 2000 VN-RURAL ENERGY 0.00 150.00 0.00 0.00 0.00 44.95 37.37 3.03

P042568 2000 VN - COASTAL Wetl/Prot Dev 0.00 31.80 0.00 0.00 0.00 28.39 23.28 0.00

P004828 1999 VN-HIGHER EDUC. 0.00 83.30 0.00 0.00 0.00 51.04 40.16 35.06

P004833 1999 VN-URBAN TRANSPT IMPRVT 0.00 42.70 0.00 0.00 8.19 13.91 19.96 5.55

P004845 1999 VN - MEKONG DELTA WATER 0.00 101.80 0.00 0.00 0.00 70.18 61.33 0.00

P051553 1999 VN-3 CITIES SANITATION 0.00 80.50 0.00 0.00 0.00 57.64 43.60 6.68

P004844 1998 VN-AGRIC. DIVERSIFICATION 0.00 66.90 0.00 0.00 0.00 24.81 22.33 -2.99

P004843 1998 VN-INLAND WATERWAYS 0.00 73.00 0.00 0.00 0.00 33.44 28.53 -2.83

P004839 1998 VN - FOREST PROT.& RUL DE 0.00 21.50 0.00 0.00 0.00 15.73 13.33 2.86

P045628 1998 VN-TRANSMISSION & DISTR 0.00 199.00 0.00 0.00 0.00 99.84 89.92 28.63

P004838 1996 VN-NATIONAL HEALTH SUPPORT 0.00 101.20 0.00 0.00 2.35 20.46 29.15 0.00

Total: 0.00 3,203.48 0.00 10.00 10.54 2,621.28 731.65 105.21

Page 92: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

87

VIETNAM STATEMENT OF IFC’s

Held and Disbursed Portfolio In Millions of US Dollars

Committed Disbursed

IFC IFC

FY Approval Company Loan Equity Quasi Partic. Loan Equity Quasi Partic.

2003 ACB-Vietnam 0.00 5.02 0.00 0.00 0.00 5.02 0.00 0.00

2002 AZ/AGF Vietnam 0.00 1.32 0.00 0.00 0.00 1.32 0.00 0.00

2002 CyberSoft 0.00 1.25 0.00 0.00 0.00 1.25 0.00 0.00

2002 Dragon Capital 0.00 0.00 1.84 0.00 0.00 0.00 1.84 0.00

2002 F-V Hospital 5.00 0.00 3.00 0.00 5.00 0.00 3.00 0.00

2003 Glass Egg 0.00 1.75 0.00 0.00 0.00 0.63 0.00 0.00

1998 MFL Vinh Phat 0.15 0.00 0.00 0.00 0.15 0.00 0.00 0.00

1997 Nghi Son Cement 13.81 0.00 0.00 7.50 13.81 0.00 0.00 7.50

2001 RMIT Vietnam 7.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00

1996 SMH Glass Co. 4.45 0.00 0.00 0.00 4.45 0.00 0.00 0.00

2003/04 Sacombank 0.00 2.31 0.00 0.00 0.00 2.31 0.00 0.00

2002/03 VEIL 0.00 8.00 0.00 0.00 0.00 8.00 0.00 0.00

Total portfolio: 30.66 19.65 4.84 7.50 26.91 18.53 4.84 7.50

Approvals Pending Commitment

FY Approval Company Loan Equity Quasi Partic.

2002 F-V Hospital 0.00 0.00 0.00 0.00

2000 Interflour 0.01 0.00 0.00 0.01

1999 MFL Chau Giang 0.00 0.00 0.00 0.00

1999 MFL Minh Minh 0.00 0.00 0.00 0.00

2000 MFL Mondial 0.00 0.00 0.00 0.00

2000 MFL-AA 0.00 0.00 0.00 0.00

Total pending commitment: 0.01 0.00 0.00 0.01

Page 93: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

88

Annex 14: Country at a Glance

VIETNAM: Coastal Cities Environmental Sanitation Project

East P OVER T Y and SOC IA L A sia & Lo w-

Vietnam P acif ic inco me2003Population, mid-year (millions) 81.3 1,855 2,310GNI per capita (Atlas method, US$) 480 1,080 450GNI (Atlas method, US$ billions) 38.8 2,011 1,038

A verage annual gro wth, 1997-03

Population (%) 1.2 1.0 1.9Labor force (%) 1.6 1.1 2.3

M o st recent est imate ( latest year available, 1997-03)

Poverty (% of population below national poverty line) 29 .. ..Urban population (% of to tal population) 26 40 30Life expectancy at birth (years) 70 69 58Infant mortality (per 1,000 live births) 20 32 82Child malnutrition (% of children under 5) 30 15 44Access to an improved water source (% of population) 77 76 75Illiteracy (% of population age 15+) 4.6 10 39Gross primary enro llment (% of school-age population) 115 111 92 M ale 117 112 99 Female 113 111 85

KEY EC ON OM IC R A T IOS and LON G-T ER M T R EN D S

1983 1993 2002 2003

GDP (US$ billions) .. 13.2 35.1 39.2

Gross domestic investment/GDP .. 24.3 32.1 35.1Exports o f goods and services/GDP .. 28.7 55.5 59.6Gross domestic savings/GDP .. 15.5 28.1 27.1Gross national savings/GDP .. 12.2 33.5 32.6

Current account balance/GDP .. -7.0 -1.0 -4.7Interest payments/GDP .. 0.4 0.8 0.9Total debt/GDP .. 183.4 38.1 37.8Total debt service/exports .. 11.0 5.5 5.1Present value of debt/GDP .. .. .. ..Present value of debt/exports .. .. .. ..

1983-93 1993-03 2002 2003 2003-07(average annual growth)GDP 5.6 7.2 7.0 7.2 7.5GDP per capita 3.2 5.7 5.8 6.1 6.4E t f d d i 18 8 110 20 8 15 4

ST R UC T UR E o f the EC ON OM Y

1983 1993 2002 2003(% of GDP)Agriculture .. 29.9 23.0 21.8Industry .. 28.9 38.5 40.0 M anufacturing .. 15.2 20.6 20.8Services .. 41.2 38.5 38.2

Private consumption .. 77.2 65.7 66.0General government consumption .. 7.3 6.2 6.9Imports o f goods and services .. 37.5 59.6 67.6

1983-93 1993-03 2002 2003(average annual growth)Agriculture 3.3 4.2 4.1 3.2Industry 5.8 10.8 9.4 11.2 M anufacturing 2.7 11.4 11.6 13.0Services 8.1 6.2 6.5 5.8

Private consumption .. 5.1 7.6 7.4General government consumption .. 3.6 5.4 6.2Gross domestic investment .. 11.7 10.6 16.2Imports o f goods and services .. 20.6 22.2 27.8

0

5

10

15

20

98 99 00 01 02 03

GDI GDP

Gro wth o f investment and GD P (%)

Vietnam

Low-income group

D evelo pment diamo nd*

Life expectancy

Access to improved water source

GNIpercapita

Grossprimary

enro llment

0

10

20

30

40

98 99 00 01 02 03

Exports Imports

Gro wth o f expo rts and impo rts (%)

Vietnam

Low-income group

Eco no mic rat io s*

Trade

Domesticsavings

Investment

Indebtedness

Vietnam

P R IC ES and GOVER N M EN T F IN A N C E1983 1993 2002 2003

D o mest ic prices(% change)Consumer prices .. 8.4 4.0 3.0Implicit GDP deflator .. 17.4 4.0 5.4

Go vernment f inance(% of GDP, includes current grants)Current revenue .. 21.7 22.0 22.9Current budget balance .. 2.2 6.2 6.2Overall surplus/deficit .. .. -1.9 -2.2

T R A D E1983 1993 2002 2003

(US$ millions)Total exports (fob) .. 2,850 16,706 20,176 Rice .. 363 726 721 Fuel .. 844 3,270 3,821 M anufactures .. .. 8,415 11,200Total imports (cif) .. 4,199 19,733 25,227 Food .. 84 .. .. Fuel and energy .. 650 2,017 2,433 Capital goods .. 1,441 5,880 7,500

Export price index (1995=100) .. .. .. ..Import price index (1995=100) .. .. .. ..Terms of trade (1995=100) .. .. .. ..

B A LA N C E o f P A YM EN T S1983 1993 2002 2003

(US$ millions)Exports o f goods and services .. 3,757 19,656 23,360Imports o f goods and services .. 4,199 21,179 26,490Resource balance -682 -442 -1,523 -3,130

Net income -73 -556 -741 -880Net current transfers 25 70 1,896 2,157

Current account balance -730 -928 -368 -1,853

Financing items (net) 556 524 832 3,753Changes in net reserves 174 404 -464 -1,900

M emo :Reserves including gold (US$ millions) .. .. .. ..Conversion rate (DEC, local/US$) 1.0 10,641.0 15,279.5 15,463.0

EXT ER N A L D EB T and R ESOUR C E F LOWS1983 1993 2002 2003

(US$ millions)Total debt outstanding and disbursed 53 24,168 13,349 14,794 IBRD 0 0 0 0 IDA 44 57 1,715 2,142

Total debt service 1 417 1,097 1,205 IBRD 0 0 0 0 IDA 0 1 13 10

Composition of net resource flows Official grants 44 145 242 245 Official creditors 10 -140 680 1,798 Private creditors 0 -37 -649 -638 Foreign direct investment 0 926 1,100 1,200 Portfo lio equity 0 0 0 0

World Bank program Commitments 0 229 463 518 Disbursements 9 0 261 574 Principal repayments 0 1 2 2

-10

-5

0

5

10

97 98 99 00 01 02 03

C urrent acco unt balance to GD P (%)

0

10,000

20,000

30,000

97 98 99 00 01 02 03

Exports Imports

Expo rt and impo rt levels (US$ mill.)

-5

0

5

10

98 99 00 01 02 03

GDP def lator CPI

Inf lat io n (%)

G: 786

D: 1,419

C: 310

B: 2,142F: 1,421

E: 8,716

C o mpo sit io n o f 2003 debt (US$ mill.)

A - IBRD

B - IDA

C - IM F

D - Other mult ilateral

E - Bilateral

F - Private

G - Short-term

Page 94: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

89

Annex 15: Maps

VIETNAM: Coastal Cities Environmental Sanitation Project

Page 95: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

Ngoc LinhNgoc Linh(3143 m) (3143 m)

CentralCentral

HighlandsHighlands

11

22

33

4455

66

77

8899

1010

11111212

13131414

151516161717

18181919 2020

212122222323 2424

2525 26262727

2828

2929

3030

3131

32323333

3434

3535

3636

3737

3838

3939

4040

4242

4343

4141

4444 4545

4646

4747 48484949

5050

51515252

5353

6464

5454

5555

5656

5757

58585959

6060

6161

62626363

BBllaacckk

RReedd

MMaa

LangLangSonSon

Ho Chi Minh CityHo Chi Minh City

Biên HòaBiên HòaThu DãuThu Dãu

MôtMôt

DôngDôngXoáiXoái

Tan AnTan An

Vi ThanhVi Thanh

My ThoMy Tho˜̃Long XuyênLong Xuyên

Hai PhongHai Phong

Ha LongHa Long

Phong ThaPhong Tha

DiênDiênBiên PhúBiên Phú

Lào CaiLào Cai

Play CuPlay Cu

Buôn MaBuôn MaThuôtThuôt

Gia NghiaGia NghiaDà LatDà Lat

VinhVinh

Vinh YenVinh Yen

Nam DinhNam DinhNinh BìnhNinh Bình

Kon TumKon Tum

Són LaSón La

Yên BáiYên Bái

HàHàGiangGiang

TuyênTuyênQuangQuang ThaiThai

NguyenNguyen

`̀Cao BangCao Bang

Bac CanBac Can`̀

Cân Tho'Cân Tho'

Cao LanhCao Lanh

Bên TreBên Tre,,Vinh LongVinh Long

Tây NinhTây Ninh

Thái BìnhThái Bình

Hung YenHung YenHà DôngHà Dông

Hà NamHà Nam

Viêt TrìViêt Trì

Haí DúóngHaí Dúóng

Bác GiangBác GiangBác NinhBác Ninh

Hòa BìnhHòa BìnhHANOIHANOI

CHINACHINA

C A M B O D I AC A M B O D I A

THAILANDTHAILAND

LAOLAOPEOPLE'SPEOPLE'SDEM. REP.DEM. REP.

To To NanningNanning

To To HepuHepu

To To TiandongTiandong

To To BabaoBabaoTo To

KunmingKunming To To KaiyuanKaiyuan

To To Muang XaiMuang Xai

To To LuangLuang

PrabangPrabang

To To KhammouanKhammouan

To To SavannakhetSavannakhet

To To Kampong ChamKampong Cham

To To KampongKampongChhnangChhnang

AAnn

nnaa

mm CC

oorr

ddii ll ll ee

rraa

Hainan I.Hainan I.(China)(China)

1

2

3

45

6

7

89

10

1112

1314

151617

1819 20

212223 24

25 2627

28

29

30

31

3233

34

35

36

37

38

39

40

42

43

41

44 45

46

47 4849

50

5152

53

64

54

55

56

57

5859

60

61

6263

Dông Hói

Quy Nhon

Nha Trang

For detail, seeFor detail, seeIBRD 34645IBRD 34645

For detail, seeFor detail, seeIBRD 34647IBRD 34647

For detail, seeFor detail, seeIBRD 34646IBRD 34646

For detail, seeIBRD 34645

For detail, seeIBRD 34647

For detail, seeIBRD 34646

LangSon

Ho Chi Minh City

Biên HòaThu Dãu

Môt

Phan Thiêt

DôngXoái

Tan An

Bac Liêu

Vi Thanh

Vung Tàu˜My Tho˜

Cà Mau

Rach Giá

Long Xuyên

Hai Phong

Ha Long

Phong Tha

DiênBiên Phú

Lào Cai

Play Cu

Buôn MaThuôt

Gia NghiaDà Lat

Vinh

Vinh Yen

Nam DinhNinh Bình

Dông Hà

Tam Ky

Tuy Hòa

Kon Tum

Són La

Yên Bái

HàGiang

TuyênQuang Thai

Nguyen

C̀ao Bang

Bac Can`

Sóc Trang

Trá VinhCân Tho'

Cao Lanh

Bên Tre,Vinh Long

Tây Ninh

Quàng Ngai

Dà Nang

Hà Tinh˜

Thanh Hóa

Thái Bình

Hung YenHà Dông

Hà Nam

Viêt Trì

Haí Dúóng

Bác GiangBác Ninh

Hòa Bình

Hué

Phan Rang-Tháp Chàm

HANOI

PhuQuoc

Hainan I.(China)

CHINA

C A M B O D I A

THAILAND

LAOPEOPLE'SDEM. REP.

Mekong

Black

Red

Ma

Gul fof

Tonkin

Gulfof

Thai land

M e k o n g De l

t a

To Nanning

To Hepu

To Tiandong

To BabaoTo

Kunming To Kaiyuan

To Muang Xai

To Luang

Prabang

To Khammouan

To Savannakhet

To Kampong Cham

To KampongChhnang

An

na

m C

or

di l l e

ra

Central

Highlands

Ngoc Linh(3143 m)

22°N

20°N

18°N

16°N

10°N

22°N

20°N

18°N

16°N

14°N

12°N

10°N

108°E106°E104°E

110°E108°E106°E104°E102°E

VIETNAM

12345678910111213141516171819202122232425262728293031

Lai ChauDien BienLao CaiHa GiangCao BangSon LaYen BaiTu Yen QuangBac CanLang SonPhu ThoVinh PhucThai NguyenBac GiangQuang NinhHa NoiBac NinhHa TayHung YenHai DuongHai PhongHoa BinhHa NamThai BinhNinh BinhNam DinhThanh HoaNghe AnHa TinhQuang BinhQuang Tri

323334353637383940414243444546474849505152535455565758596061626364

Thua Thien HueDa NangQuang NamQuang NgaiKon TumGia LaiBinh DinhPhu YenDac LacDac NongKhanh HoaBinh PhuocLam DongNinh ThuanTay NinhBinh DuongDong NaiBinh ThuanT.P. Ho Chi MinhBa Ria-Vung TauLong AnTien GiangDong ThapBen TreAn GiangVinh LongTra VinhKien GiangCan ThoHau GiangSoc TrangBac LieuCa Mau

PROVINCES:

0 50 100 150

0 50 100 150 Miles

200 Kilometers

IBRD 34418

APRIL 2006

VIETNAM

COASTAL CITIESENVIRONMENTAL

SANITATION PROJECT

PROVINCE CAPITALS

NATIONAL CAPITAL

RIVERS

MAIN ROADS

RAILROADS

PROVINCE BOUNDARIES

INTERNATIONAL BOUNDARIES

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, o r any endo r s emen t o r a c c e p t a n c e o f s u c h boundaries.

PROJECT CITIES

Page 96: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

PhuxaLake

Khe DuyenLake

Benh VienLake

Bautuan Lake

Bautro Lake

NamlyLake

Dong SonLake

Mout

Irrigation Canal

My Cuong River

Leky River

Nhat Le River

Phong Thuy Canal

Phong Thuy Canal

Caurao River

My Cuong River

Lytrach Landfill(new landfill)

Loc Ninh Landfill(old landfill)

LOC NINHCOMMUNE

Loc NinhLow Field

BAC LY WARD

HAI THANH WARD

DONG MYWARD

PHU HAIWARD

Bao NinhPeninsula

DUC NINHCOMMUNE

DONG PHUWARDTran Quang

Khair.a

NAMLYWARD

HAI DINHWARD

Fishing Village(Planned Tanks Phase 2)

Duc NinhWWTPNGHLA NINH

COMMUNE

DONG SONWARD

Railway

Railway

Benh VienBridge

Hau ThanhBridge

RaoBridge

Dai Bridge

Cong MuoiBridge

Nhat Le

Bridge

20°

10°10°

15°

20°

105°

CHINA

LAOP.D.R.

VIETNAM

CAMBODIA

THAILAND

HANOI

G u l f o f

T o n k i n

Gu l f o f

Tha i land

Dông Hói

Quy Nhon

Nha Trang

For detail, seeIBRD 34646

For detail, seeIBRD 34647

VIETNAM

COASTAL CITIES ENVIRONMENTALSANITATION PROJECT

DONG HOI

MAIN DRAIN/SEWERS IN PHASE 1

MAIN DRAIN/SEWERS IN PHASE 2

FLOW DIRECTION

WASTEWATER PUMPING STATIONS

OUTLETS

WASTEWATER TREATMENT PLANT(PLANNED PHASE 2)

LANDFILLS (PLANNED PHASE 2)

RESETTLEMENT SITE (UNDER CITY)

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, o r any endo r s emen t o r a c c e p t a n c e o f s u c h boundaries.

IBRD 34645

APRIL 2006

Page 97: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

HON KHOMOUNTAIN

HON NGHEMOUNTAIN

MOT MOUNTAIN

NHA THO MOUNTAIN

CHÔTMOUNTAIN

HON SANMOUNTAIN

EAST SEA

Qua

n Tr

uong

Riv

er

Quan Truong River

Quan Truong River

Ki

m Bång

Riv

er

Ha Ra Bridge

Tran Phu Bridge

Xom Bong Bridge

Luong Hoa/RuriLandfill

Dat Lanh

Bac Hon OngWWTP

Vinh NgocWWTP

Railw

ay

DA TUONG

SON THUY RESIDENTIALCLUSTER

LE HONG PHONG RESIDENTIALPROJECT 1

OLD AIRPORT

TRUONG PHUCRESIDENTIAL CLUSTER

VINH THAI RESIDENTIALAREA PROJECT

Park

Wes

t Le H

ong P

hong

road

RESIDENTIAL AREA PROJECT

Nhat Tri Bank

IN WEST OF LE HONG PHONG PARK

LE HONG PHONG RESIDENTIALPROJECT 2

SONG TACRESIDENTIAL

AREA PROJECT

DAT LANH RESIDENTIALAREA PROJECT

VINH HAI WARD

NGOC HIEP WARD

VAN THANGWARD XUONG HUAN

WARD

PHUONG SAIWARD

LOC THOWARD

PHUOC HAIWARD

TAN LAPWARD

PHUOC HOAWARD

PHUOC LONGWARD

VINH NGUYENWARD

20°

10°10°

15°

20°

105°

CHINA

LAOP.D.R.

VIETNAM

CAMBODIA

THAILAND

HANOI

G u l f o f

T o n k i n

Gu l f o f

Tha i land

Dông Hói

Quy Nhon

Nha Trang

For detail, seeIBRD 34646

For detail, seeIBRD 34645

VIETNAM

COASTAL CITIES ENVIRONMENTALSANITATION PROJECT

NHA TRANG

MAIN DRAIN/SEWERS IN PHASE 1

MAIN DRAIN/SEWERS IN PHASE 2

FLOW DIRECTION

WASTEWATER PUMPING STATIONS

OUTLETS

WASTEWATER TREATMENT PLANT(PLANNED PHASE 2)

LANDFILLS (PHASE 1)

RESETTLEMENT SITE (PHASE 1)

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, o r any endo r s emen t o r a c c e p t a n c e o f s u c h boundaries.

IBRD 34646

APRIL 2006

0 1 2

KILOMETERS

Page 98: This document has a restricted distribution and may be ...documents.worldbank.org/curated/en/258421468129621476/pdf/345… · WSDC Water Supply and Drainage Company WSS Water and

Dong Da road

An Duong Vuong street

Quy N

hon-

Nhon

Hoi

Dien

Bien

Phu

road

Tran Hung Dao road

1A hi

ghtw

ay

Hoang V

an Thu

street

To 1a highway

Quy N

hon S

ong C

au

Dong Da street

Future Bridge To Phuong Mai Peninsula

Bau LacLake

Phu Tai River

Bong HongLake

Phu HoaLake

Quy NhonBay

Bau SenLake

Dong DaLake

Thi Nai Lagoon

Ha Thanh River

VUNG CHUAMOUNTAIN

BA HOA

MOUNTAIN

Luong MyLandfill

To Ho ChiMinh City

QUANG TRUNGWARD

Phuong MaiNhon HoiPeninsula

CHENH RANGWARD

NGUYENVAN CUWARD

TRAN PHUWARD

LELOIWARD

HAI CANGWARD

TRAN HUNGDAO WARD

LEHONG PHONGWARD

TRAN QUANGDIEU WARD

NHON PHUWARD

BUI THI XUANWARD

PHU TAIINDUSTRIAL LY THUONG

KIET WARD

Nhon BinhResettlement Area

Bau LacWWTP

Phu HoaWWTP

Ha ThanhWWTP

Railway

20°

10°10°

15°

20°

105°

CHINA

LAOP.D.R.

VIETNAM

CAMBODIA

THAILAND

HANOI

G u l f o f

T o n k i n

Gu l f o f

Tha i land

Dông Hói

Quy Nhon

Nha Trang

For detail, seeIBRD 34646

For detail, seeIBRD 34645

VIETNAM

COASTAL CITIES ENVIRONMENTALSANITATION PROJECT

QUY NHON

MAIN DRAIN/SEWERS IN PHASE 1

MAIN DRAIN/SEWERS IN PHASE 2

FLOW DIRECTION

WASTEWATER PUMPING STATIONS

OUTLETS

WASTEWATER TREATMENT PLANT(PLANNED PHASE 2)

LANDFILLS (PLANNED PHASE 2)

RESETTLEMENT SITE

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, o r any endo r s emen t o r a c c e p t a n c e o f s u c h boundaries.

IBRD 34647

APRIL 2006


Recommended