YOUR REF: MLP2939 OUR REF: DA-2014-94
12 June 2014 Sandsky Developments C/- McLynskey Planners Pty Ltd PO Box 257 WEST BURLEIGH QLD 4219 Dear Sir/Madam DEVELOPMENT APPLICATION Proposal: Material Change of Use - Dual Occupancy Application Number: DA-2014-94 Address: 15 Benarid Drive, OORALEA QLD 4740 Property Description: Lot 83 on SP261513
Council acknowledges receipt of the revised plan of development for the above proposal received 4 June 2014. The approved plans are attached herein and satisfy Condition 2 of the Decision Notice DA-2014-94. Would you please update your records accordingly, if you require further information please email Kathryn Goodman at [email protected] . Yours faithfully Leah Harris Principal Planner
This is a Mackay Regional Council Digitally Signed Document
□□
□
□ ²□ ² □ ²□ ²□ ²
□ ²
□□
□□
SS
SS
SS
SS
SS
S SS S S S S S S S S S S S S S S S S S
□ ²
□ ²
□ ²
□ ²
□ □□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □□
□□
□□
□□
□□
□□ □□□□□□□□□□□□□□□□ ²□ ² □ ²□ ²
8.8
0
8.9
0
9.0
0
9.1
0
9.2
0 9
.30 9
.40 9
.50 9
.60
9.7
0
□ □□ □
□ ² □ ²□ ² □ ²
entry1.1m x 0.5m slab forac unit
1.1m x 0.5m slab forac unit
unit 2unit 1
Ben
arid
S
tree
t
1.5m x 2.4m slab forwall hung clothesline
1.5m x 2.4m slab forwall hung clothesline
18
00
hig
h 5
0%
ope
ntim
ber
palin
g fe
nce
entry
45
00
9665 24055 5000
car
spac
e
5000
20
00
11
57
06
43
2
car
spac
e
30
00
cutfill
cutfill
existing concretecrossover
HC
approx. pad level 9.500
approx. pad level 9.500
private open spacecovered 9.5sqmuncovered 83.5sqmtotal 93sqm
private open spacecovered 9.5sqmuncovered 144.5sqmtotal 154sqm
landscapinglandscaping
2000
fencing to taper to1.2m high withingthe front 6m setback
• site works, including retaining walls, may be subject tochange to suit final site conditions.
• all site works are currently based on disclosure plansfrom developer and must be confirmed by certifiedsurveyor prior to final construction plans beingcompleted.
• location of services may change once final connectionpoints are obtained.
"Preliminary"
LANDSCAPING/FENCING LEGENDpaved garden edging (front yard),timber edging (back yard)
new 1800 high timber fencing
new 1800 high 50% open timber fencing
PLAN
DRAWN
DATE DRAWNSCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 566 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
As indicated on A3B 04.06.14
LOT 83 BENARID DRIVE, SUGARFIELDS ESTATEOORALEA
COPPABELLA
12.12.13
MJH 02
RENDERED BRICK "URBAN"
V2012.1
LOT 834782
MJH
1 : 150
Site Plan
Site Coverage Schedule
Site Area Total House Area Site Coverage
797 m² 235.11 29.50%
Area Schedule (Total)
Area Squares235.11 m² 25.30
This is a Mackay Regional Council Digitally Signed Document
approx. pad level 9.500
existing concretecrossover
car space
car space
9.70
9.60
9.50
9.40
9 . 30
9.20
9.10
9.00
8.90
8.80
entry
porch
storage
storage
tub
unit 2
bath
bed 1
kit
dining
living
alfresco
bed 2
garage
bath
bed 2
porch
alfresco
living
dining
kit
entry
ens
bed 1
tub
garage
unit 1
approx. pad level 9.500
B e n a r i d S t r e e t
sewer line
DETAILED LANDSCAPE
PLAN
Drawing:
App
MCU
PN
PROPOSED DUAL OCCUPANCY
Project:
Development References:
Lot 83 on SP261513
15 Benarid Street, Ooralea.
Client: Sandsky Developments P/L
Client Address: McLynskey
Planners P/L
File No. MLP2939
Sheet 1 of 3
0 1 2 4 6 8 10
A
Scale:
Date: JUNE 2014
Issue:
1:200 metres @ A3
Town Planners andLandscape Architects
PLANNERS PTY LTD
MC LYNSKEY
Suite 8/29 Commerce Dr. Robina
PO Box 257 West Burleigh Q 4219
T (07) 5562 2166 F (07) 5562 2155
Planting In Prepared Beds - Typical DetailStake with two 25 x 25 x 1800 mm hardwoodstakes driven 600 mm into the ground.
Two hessian ties fitted inopposite directions.
Form watering ring.
Keep mulch back from plant stem.
Imported or spread topsoil.
Locate controlled releasefertiliser in this zone.Locate controlled releasefertiliser in this zone.
Back-filled planting hole.Back-filled planting hole.
Cultivated insitu soil.Cultivated insitu soil.
d2d
2 x
de
pth
ro
ot
ba
ll
NOTE - UNDERGROUND SERVICESLocation and extent of underground services shown on plan is approximate only.Contractor is to establish locations of all under-ground services prior to commencement of works.
KEY
Area to be turfed
Washed gravel as specified (Sheet 3)spread 75mm deep on compactedcrusher dust base
Exposed aggregate / concrete surface finish
Construct unit-paver / concrete / timber garden edging as specified to all garden bed/turf interfaces, gravel/turf interfaces, garden bed/gravel interfaces and garden beds abutting property boundaries.NOTE: Where fencing runs through grassedarea, construct minimum 150mm wide mowing edge (as specified) so that fence alignment is on centreline of mowing edge.
Driveway / car-parking area
1800mm high timber fencing
1800mm high 50% open timber fence
An irrigation system is required by Council to be installed to assist in the establishment and ongoing
maintenance of all planted areas within the development.
4300
8 x Syz Ele
3 x Syz Ele
1 x Xan chr
6 x Cal M.F.
1 x Ple ref var2 x Alp zer var
2 x Gar aug Flo
4 x Phi Xan
4 x Cal M.F.
3 x Gar rad1 x Gar aug Flo
5 x Lir gig E.G.
1 x Syz Cas1 x Alp zer var3 x Lir gig E.G.
2 x Lir S.W.
1 x Ela eum6 x Lir gig E.G.
3 x Hib ros sin Ros
5 x Bar P.D.1 x Lir S.W.
6 x Cal G.B.F.
1 x Har pen
1 x Cal P.S.1 x Mic fig
1 x Mic fig
3 x Aca wil G.G.
3 x Hib ros sin Ros4 x Lir S.W.
6 x Cal M.F.
bin storage
bin storage
single storeydwelling
single storeydwellings to rear
se
we
r lin
e
3000
3000
800
800
900
1000
1000
3000
3000
R4000
centre point for set outof 4.0 metre radiusgarden edge
Install concrete surround and path to letterboxes (as specified)
1 x Aca wil G.G.
3 x Cal G.B.F.
Taper fence to 1.2 m height within 6.0 metres of front alignment
1.8 m high timberscreen fence
1.8 m high timberscreen fence
1.8 m high timberscreen fence
05/14
B
This is a Mackay Regional Council Digitally Signed Document
PLANTING SCHEDULE
Drawing:
App
MCU
PN
Project:
Development References:
A
MC LYNSKEY
Suite 8/29 Commerce Dr. Robina
PO Box 257 West Burleigh Q 4219
T (07) 5562 2166 F (07) 5562 2155
PLANTING SCHEDULE
Code Botanical Name Common Name Quantity ContainerSize
Staking
Trees:
Shrubs:
cultivatedsubgrade
topsoil
mulch
500 x 50 x 50mm stake
90 x 35mm CCA treated pine edge fixed to stake with 2 x gal. M10 screws
Turf / grass
Timber Garden Edge - Detail
Brick / Unit Paver Edging DetailBrick / paver edge. Bricks/pavers to be butt jointedand mortared in. Ensureexposed surface is cleanof mortar.
Compactedsubgrade
Mortar bedding
Adjacent finishedsurface level
150mm cultivatedsubgrade
300mm deep topsoil
100mm deep mulch
Mulch to finish 10mmbelow top of edging
180
FORMED CONCRETE EDGING DETAIL
Concrete edge as specified(Sheet 3)
Compactedsubgrade
Adjacent finishedsurface level
150mm cultivatedsubgrade
300mm deep topsoil
100mm deep mulch
Mulch to finish 10mmbelow top of edging
150
150
Town Planners andLandscape Architects
PLANNERS PTY LTD
SCHEDULE OF QUANTITIESlineal
metressquaremetres
cubicmetres
Garden Beds:
Turfed Area:
Garden Edging:
Gravelled Areas:
Garden soil as specified spread @ 100mm depth(& mixed with cultivated soil to 300mm depth)
Mulch as specified spread @ 100mm depth
Underturf mix spread @ 100mm depth
Turf as specified
Frontage (forward of fence lines)
Rear
Gravel as specified spread @ 75mm depth
Crusher dust (compacted subgrade) spread @ 100mm depth
8.0
8.0
21.0
210.0
29.8
19.3
4.4
3.3
NOTE:
yes
200 mm16
Elaeocarpus eumundii 45 litre yes1Ela eum Eumundi quandong
lilly pilly 11 200 mm
yes1
200 mm5Bar P.D. Barleria 'Purple Dazzler' Barleria
bottlebrushCallistemon 'Great Balls of Fire'Cal G.B.F. 200 mm9bottlebrush
200 mmchinese hibiscusHib ros sin Ros Hibiscus rosa sinensis 'Roseflake' 6
1golden pendaXanthostemon chrysanthusXan chr
45 litre25 litre
Har pen Harpullia pendula Queensland tulipwood
Syz Cas Syzygium 'Cascade' lilly pilly 1 200 mm
Groundcovers:
Callistemon 'Matthew Flinders'Cal M.F.
Quantities are measured from plan only and do not allow for wastage.
These quantities are for indicative purposes and are not intended to form the basis of any works contract.
140 mm7Lir S.W. Liriope 'Stripey White' variegated turf lily
200 mm3Alp zer var Alpinia zerumbet variegata variegated shell ginger200 mm4Aca wil G.G. Acalypha wilkesiana 'Green & Gold' Acalypha
200 mm1bottlebrushCallistemon 'Purple Splendour'Cal P.S.200 mm3GardeniaGardenia augusta 'Florida'Gar aug Flo
200 mmport wine magnoliaMic fig Michelia figo 2200 mmdwarf PhilodendronPhi Xan Philodendron 'Xanadu' 4200 mmsong of IndiaPle ref var Pleomele reflexa variegata 1 PROPOSED DUAL OCCUPANCY
IRRIGATION SYSTEM
An irrigation system is required by Council to be installedto assist in the establishment and on-going maintenanceof all planted areas within the development.The system must include, but not be limited to, the following:- Dual check valves (such as HR Product 810-FF-25mm)installed in pipework after the mains water meter to preventbackflow / contamination of the potable water supply;- ALL irrigation must comply with AS2845-1 including dualcheck valve, isolating valve and poly pipe.- Poly pipe with a rating of PN16 (16 Bar / 232 psi) must beused for the water lines.
Lot 83 on SP261513
15 Benarid Street, Ooralea.
Client: Sandsky Developments P/L
Client Address: McLynskey
Planners P/L
File No. MLP2939
Sheet 2 of 3
Syz Ele Syzygium 'Elegance'
140 mm14Lir gig E.G. Liriope giganteum 'Evergreen Giant' giant turf lily140 mm3Gar rad Gardenia radicans prostrate Gardenia
Date: JUNE 2014
Issue:05/14
B
This is a Mackay Regional Council Digitally Signed Document
SOFT LANDSCAPE
SPECIFICATION
Drawing:
App
MCU
PN
Project:
Development References:
A
Suite 8/29 Commerce Dr. Robina
PO Box 257 West Burleigh Q 4219
T (07) 5562 2166 F (07) 5562 2155
RECURRENT WORKS: Throughout the establishment period continue to carry out recurrent works of amaintenance nature specified elsewhere in this Section, including but not limited to watering, mowing, weeding,fertilising, pest and disease control, reseeding, returfing, staking and tying, replanting, cultivating, pruning, hedge clipping, aerating, renovating, top dressing, keeping the site neat and tidy, and the like.REPLACEMENTS: Continue to replace failed, damaged or stolen plants as specified in PLANTS - EXTERNALWORKS.MULCHED SURFACES: Maintain in a clean and tidy condition and reinstate the mulch as necessary.STAKES AND TIES: Adjust and/or replace as required. Remove at the end of the planting establishment periodif directed.MAINTENANCE PROGRAM: Furnish a proposed planting maintenance program, and amend it as required untilapproved. Comply with the approved progam.MAINTENANCE LOG BOOK: Keep a log book recording when and what maintenance work has been done andwhat materials, including toxic materials, have been used. Make the log book available for inspection on request.
PLANTING ESTABLISHMENT - EXTERNAL WORKS
The planting establishment period shall commence from the Date of Practical Completion of the Works.PRACTICAL COMPLETION OF PLANTING: Practical Completion of the planting works shall include but not belimited to the germination of grassed areas, establishment of turfed areas, and replacement of plants which havefailed or been damaged or stolen during the work under the Contract.
PLANTING ESTABLISHMENT PERIOD - 12 WEEKS
Plant containers remain the property of the Plant Supplier and shall not be damaged during planting operations.Collect empty plant containers daily during planting operations and remove or store on site for later return to thepoint of plant supply, but ensure they are not able to be scattered by wind or other causes.Regularly remove, by hand, rubbish and weed growth that may occur or recur throughout grassed, planted andmulched areas.
PLANT CONTAINERS, WEEDING AND RUBBISH REMOVAL - EXTERNAL WORKS
STAKES: Shall be durable hardwood, straight, free from knots or twists, and pointed at one end. Size: 25mm x 25mm x 2500mm long.TIES: Shall be 50mm wide hessian tie.STAKING AND TYING: Provide stakes and ties to plants as shown on the Drawings.Drive stakes minimum 600mm into the ground or to the depth indicated on the drawings and clear of the rootballof the plant. For single staked plants, stake on the windward side.Fix ties in a figure of eight pattern and staple to stake at least 300mm above ground level. Fix additional ties as required to stablilise the plant.
STAKES - EXTERNAL WORKS
GENERALLY: Spread mulch to a minimum depth of 100mm and rake smooth to finish 25mm below surrounding finished levels unless otherwise specified.
MULCH SPREADING - EXTERNAL WORKS
LOCATIONS: Do not vary the plant locations from those generally as shown on the Drawings unless otherwisedirected. If it appears necessary to vary the locations and spacings to avoid service lines, or to cover the areauniformly, or for similar reasons, apply to the Superintendent for directions.PLANTING CONDITIONS: Do not plant in unsuitable weather conditions such as extreme heat, cold, wind orrain. Suspend excavation in other than sandy soils when the soil is wet, or during frost periods.WATERING: Thoroughly water the plants before planting begins, immediately after planting, and thereafter asrequired to maintain growth rates free of stress.FERTILISING: Specified in FERTILISER - EXTERNAL WORKS.DEPTH OF PLANTING: When the plant is in its final position in its hole or bed the top soil level of the plant root ball shall be level with the finished surface of the soil surrounding the hole or bed. Test the depth by measuringthe sides of containers. If backfilling is required to correct the depth, use topsoil mixture.WATERING BASINS: Construct a watering basin around the base of each individually planted tree, consisting ofa raised ring of soil capable of holding a minimum of 10 litres.
PLANTING - EXTERNAL WORKS
MASS PLANTING AREAS: Excavate a hole for each plant large enought to provide not less than 100mm allround the root system of the plant, or as shown on the Drawings.
EXCAVATING FOR PLANTING - EXTERNAL WORKS
Turf shall be Queensland Couch or "Sir Walter" Buffalo and placed where indicated on the drawings.Deliver turf to the site within 24 hours of being cut. Lay it within 36 hours of being cut, if possible. Prevent it fromdrying out between cutting and laying.LAYING: Prepare the areas to be turfed as specified in TOPSOIL SPREADING. Lay the turf along the land contours with staggered, close-butted joints, and so that the finished turf surface is flush with adjacent finished surfaces of paving and the like. As soon as practicable after laying, roll the turf with a roller weighing not more than 90 kg per metre, of width.ESTABLISH WATERING: As soon as possible after rolling, irrigate thoroughly with a fine spray to a depth of150mm. Continue as necessary to maintain moisture to this depth and to maintain the grass in a healthy condition.PROTECTION: Protect newly turfed areas against traffic until grass is established.MAKING GOOD: Lift failed turf and relay with new turf.TOPDRESSING: When the turf is established, mow closely, remove cutting and lightly top dress to a depth of10mm with topsoil as specified in TOPSOIL SPREADING.MOWING: When the turf is established, mow at regular intervals to maintain an average height of 50mm.WEEDING: Remove weeds that emerge in the turfed areas, or where necessary spray with a selected weedicide for broad-leafed weeds, to manufacturer's recommendations.
TURF - EXTERNAL WORKS
GENERALLY: Plants shall be vigorous, well established, hardened off, of good form consistent with species or variety, not soft or forced, free from disease and insect pests, with large healthy root systems and no evidenceof having been restricted or damaged. Trees shall have a single leading shoot.SUBSTITUTIONS: Make no substitutions unless approved in writing. Substitutions will not be approved if theContractor has not complied with the Specification.REPLACEMENTS: Replace, with plants of the same specified type, quality and size, any plants which fail, arestolen or are damaged during the work under the Contract.STORAGE: Wherever possible, plants shall be planted immediately after delivery to the site. If this is not possible,keep them in good condition by appropriate storage methods, or as may be directed. Prevent theft, drying out or damage from any cause including frost, wind, sun, vermin, animals and the like.
PLANTS - EXTERNAL WORKS
Mulch shall be free from soil, weed growth, and green material or other matter. Place mulch so that it is not incontact with the stems of plants. Mulch shall be:LEAF LITTER MULCH: Small leaf chip mulch of tree loppings which have been passed through a brush chipping machine. The loppings used will consist predominantly of Coralypt or Tristania material and will excludePrivet, Coral Tree, Poplar, Willow, Camphor Laurel, Cocos Palm, Singapore Daisy and any other weed species.
MULCH - EXTERNAL WORKS
PLANTING BEDS: An approved prolonged release type having and NPK ratio of 6.3:1.8:2.8. Place around theroot ball of plants at the time of planting at the rate shown below: For plants to 5 litre size: 20g per plant For plants to 10 litre size: 40g per plant For plants 25 - 45 litre size: 60g per plant For larger plants: 90g per plant or as directed by manufacturer.
FERTILISER - EXTERNAL WORKS
Planting mix shall be three parts topsoil to one part compost, as specified in TOPSOIL and COMPOST, thoroughly mixed before placing.
PLANTING MIX - EXTERNAL WORKS
DESCRIPTION: Compost shall be spent mushroom compost typical of the compost used throughout themushroom growing industry, with a neutral pH value, or other approved material, free from harmful chemicals,grass and weed growth.
COMPOST - EXTERNAL WORKS
Topsoil: Organic garden soil according to AS 4419 "Soils For Landscaping and Garden Use".TOPSOIL TEXTURE: Coarse (light) to medium.
TOPSOIL - EXTERNAL WORKS
Prepare sub-grade as ncessary to receive topsoil, including cultivation, as specifried in Cultivation.TURFED AREAS: Spread approved topsoil to a depth of 100 mm. Levels shall be graded to provide adequatedrainage.MASS PLANTING BEDS: Spread planting mix to an even depth of 300mm over cultivated sub-grade. Cultivateplanting mix into subgrade. Thoroughly water to prevent voids. Rake over lightly to attain finished profiles. Thefinished surface of the soil shall be at a level which allows the surface of the mulching material to finish flush withfinished surface levels.
TOPSOIL SPREADING - EXTERNAL WORKS
PREPARATION: Prepare the sub-grade to receive topsoil by cultivation, and where directed treat the area to betopsoiled with herbicide. Remove existing weeds as specified in WEED ERADICATION - EXTERNAL WORKS.Herbicide types: Non-residual.CULTIVATION: Cultivate by ripping to the depths specified below, to loosen the compacted ground. Do notdisturb services or tree roots; if necessary cultivate these areas by hand. During cultivation, thoroughly mix in any materials specified to be incorporated into the sub-grade.Deleterious material: Remove stones exceeding 50mm, and any other deleterious material brought to thesurface during cultivation, including roots, sticks, weeds and the like.> TURFED AREAS: Excavate to 100 mm below required finished surface and cultivate along the contours to adepth of 150mm.> MASS PLANTED AREAS: Excavate to 300 mm below required finished surface and break up base to a further depth of 150mm.
CULTIVATION - EXTERNAL WORKS
GENERALLY: Eradicate weeds by environmentally acceptable methods as approved by the Superintendent.Continue eradication throughout the course of the works and the Planting Establishment Period.
WEED ERADICATION - EXTERNAL WORKS
OUTLINE DESCRIPTION: Provide the labour, materials, plant and services, to carry out the operationsnecessary for the proper performance of the landscape works as shown on the drawings and as specified herein. All works within this section shall be carried out by an approved landscape contractor and shall include but not be limited to the following:> Final trimming, cultivation and incorporation of additives into subgrades.> Supply and installation of garden edging.> Preparation, supply and installation of plants and turf.> Supply and installation of stakes and ties.> 12 week plant establishment period.AUSTRALIAN STANDARDS: Where applicable, materials and workmanship shall be in accordance with therelevant standards of the Standards Association of Australia.
SCOPE - EXTERNAL WORKS
TIMBER EDGING - EXTERNAL WORKSCCA treated pine edge treated in accordance with AS1604:2000Size: 90 x 35mm. Square stakes 500 x 50 x 50mm.Set edgings flush with adjoining surfaces in locations as shown on the Drawings. Fix to pegs with galvanised nails, 2 per fixing. Drive stakes firmly into the ground at 1200mm centres on the planting side of the edging and with the top of pegs set 15mm below top of edging.
TRIM
GRAVEL FINISH - EXTERNAL WORKSGravel to be washed stone in colours to suit proposed building finishes.Diameter in range of 15mm - 40mm.
MC LYNSKEY
UNIT PAVER / CONCRETE EDGING - EXTERNAL WORKSUnit paver (in colour to match finished building colours) as per Detail Sheet 2 to apply to curved garden edging as shown on plans. Top of paver to finish flush with finished surface level. Units to be butt-jointed and mortared in. Ensure exposed surface is clean of mortar.Alternative: 150 x 150mm concrete edge with wood float finish, 20MPa to approved LCC standards.Control joints on 5 metre centres and at apex of curves. Edges to be trowel finished to approvedprofile. Set on compacted subgrade.
Town Planners andLandscape Architects
PLANNERS PTY LTD
PROPOSED DUAL OCCUPANCY
Lot 83 on SP261513
15 Benarid Street, Ooralea.
Client: Sandsky Developments P/L
Client Address: McLynskey
Planners P/L
File No. MLP2939
Sheet 3 of 3
Date: JUNE 2014
Issue:05/14
B
This is a Mackay Regional Council Digitally Signed Document