Thurston CountyShoreline Master Program Update
November 1, 2017 Planning Commission Meeting
Allowances for remodels , and reconstruction of structures destroyed by fire or other natural disaster .
Typically allow reconstructionwithin existing building footprint.
Local policy decision: Some SMPs allow a small or one-time increase if the modification doesn’t increase nonconformity (intrusion into a buffer or go over impervious surface limits).
Allowances togo either up…
...or back
Ecology “default” for non-conforming uses: WAC 173-27-080
“No Net Loss”
“No Net Loss”
“No Net Loss”
DR
AFTI
NG
OF
FIN
AL
DR
AFT
CH
APTE
RS
This is an adaptive process and can change as a result of stakeholder feedback, community engagement, and other conditions.
September
Community StakeholderMeeting
Planning Commission(Meets on the 1st and 3rd Wednesday of
the month or as scheduled)
Regulatory Group
January Febuary March April June
Start discussions on topics in Chapters 400 &500
Finalize comments on topics in
Chapters 400Specific Interest Group
Overview Meetings(Meetings between October and
May)
Thurston County Team(Work Products and timelines)
Apr4
Draft SMP Chapters
Chapters 400 & 500 Chapters 600 & 700
LegendPlanning Commission Meetings
Regulatory Group Meeting
Interest Group Meetings
SMP review milestone
Initial Approach Discussion and Feedback
“Second Touch” Review and Discussion
Input dueMarch
Briefings from stakeholder meetings
&hapter Review
Briefings fromstakeholder meetings
Input dueJan
Chapters 400 & 500
Jan
Start discussions on topics in Chapters 600 & 700Discuss any remaining topics
Finalize comments on topics in
Chapters 600
TC BoCC Review
Draft SMP chapters toPlanning Commissionfor review/comment
Set public hearing
Feb
Chapters 600 & 700
Plan for Update Chapter Review
March
December
Start discussions on topics in Chapters 400 &500
Finalize comments on topics in Chapters 300
Chapters 400 & 500
Input dueDec
Chapters 400 & 500
Dec
November
Start discussions on topics in Chapters 300 &400
Finalize comments on topics in Chapters 100 & 200
Chapters 300 & 400
Input dueNov
Chapters 300 & 400
Nov
October
Present Chapters 100 & 200 ofSMP
Introduceteam and roles forreview of SMP
Discuss topics in Chapters100 & 200
Chapters 100 & 200
&KDSWHUReview
Briefings from stakeholder meetings
Input due Oct
Chapters 100 & 200
Present process forSMP document
review Discuss public
participation Discuss
components of SMP chapters
Meetings with stakeholder interest groups on overview of the proposed Shoreline Master Program update
Prepare for Planning Commission Public Hearing on SMP Chapters
Review and evaluate any documents or papers needed for possible inclusion in SMP
Make updates to SMP chapters based on comments
Review SMP Chapters and decission points/topics with STAG, Public, and Planning Commission
Develop SMP Chapters for review/discussions
Notes:
Briefings from stakeholder meetings
Briefings from stakeholdermeetings
&KDSWHU Review&KDSWHU Review
Draft SMP Chapters to Technical Committee for review/comment
Comments due
Chapters 100 - 700
Updates on process of review of Shoreline Master Program
Mar7
Jan10
Sept6 & 20
Dec6
Oct Nov1
AprMarJanDecNovOct
Jan 23 Mar 20Dec 20Nov 30Oct 17
Prepare DRAFT SMP and prep for Board of County Commissioners process
Thurston County Shoreline Master Program Review Timeline/Process
Thurston County, Washington
DRAFT Figure 1SMP Review Process and Schedule
Updated October 2017
May
Apr 17
Chapters 100 - 700
Feb7
Chapter Review
Chp 500 & 600
Feb 20
Input dueFeb
Feb
Input dueApril
Briefings from stakeholder meetings
Chp 500 & 600
Start discussions on topics inChapters 500 &600
Finalizecomments on topics inChapters 500
Meeting materials will available online at:
Meetings will be conducted as open publicmeetings
Regulatory Group meetings will include aninitial review topic(s) with new material and a"second touch" of material previous discussedat the earlier meeting
Community Stakeholder Group Meeting
http://www.co.thurston.wa.us/planning/shoreline/shoreline_status.htm
•http://www.co.thurston.wa.us/planning/shoreline/documents/smp-draft-chapters-19-100-700.pdf
http://www.co.thurston.wa.us/planning/shoreline/shoreline-inventory.html
http://www.co.thurston.wa.us/planning/shoreline/shoreline-designation.html
• Project Contacts:
• Thurston County• Brad Murphy, [email protected]
• Ecology• Sarah Cassal, [email protected]
• Register for e-mail updates: www.thurstonplanning.org
Websites:http://www.co.thurston.wa.us/planning/shoreline/shoreline_home.htmhttp://www.ecy.wa.gov/programs/sea/shorelines/smp/index.htmlhttp://www.co.thurston.wa.us/planning/shoreline/shoreline_status.htm
Questions?