THYSSENKRUPP ELEVATORELEVATOR MODERNIZATION PROJECT
450 N STREET
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
THYSSENKRUPP ELEVATOR• 3RD LARGEST ELEVATOR
COMPANY IN WORLD - LARGEST IN NORTH AMERICA
• DIVISION OF THYSSENKRUPP AG – FORTUNE “GLOBAL 100” COMPANY
• LARGEST ELEVATOR SERVICE COMPANY IN SACRAMENTO
• SOLD MORE MODERNIZATION IN SAC THAN ANY OTHER COMPANY
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
MODERNIZATION PROJECTS – STATE BUILDINGS DOWNTOWN
1) State Capitol2) Office Building 8 (714 P St.)3) Office Building 10 (721 Capitol Mall)4) Legislative Office Building (1020 N St.)5) Resources Building (1416 9th St.)6) Office Building 9 (744 P St. - Finishing
now)7) EDD Building (722/800 C.M. - In
progress now)
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
Resources Building
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
NEW CONTROL SYSTEM
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
NEW CONTROL SYSTEM
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
SCOPE OF WORK• New, state-of-the-art, microprocessor controls.• Generators will be removed and new AC hoist motors installed• New digital tape landing system• Rope-Gripper (ascending safety device), per 2004 Code• All new hoistway and machine room wiring• New, closed loop door operators• New seismic switch• New car and hall stations to comply with ADA and current F.S.
Code• New hall lanterns, hall position indicators, and lobby panel• New electronic door edges• Load weighing• Voice annunciators
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
BENEFITS OF MODERNIZATION• New controls/system good for the next thirty (30) years• Leveling accuracy exact – under all load conditions (digital
feedback)• Less wait time for elevators (dispatching & positioning)• Power savings (elimination of generator)• Enhanced safety (digital feedback and back-up safety
circuitry)• Less equipment downtime for repairs (all new equipment)• Updated to current ADA and Fire Service Code• Added door safety (electronic door edge)• More efficient trips (load weighing)• Modern look and feel (new fixtures and voice floor
announcements)
ThyssenKrupp ElevatorAmericas Business Unit T
hyss
en
Kru
pp
SCHEDULE• START = EARLY APRIL, 2010• One low rise and one high rise at
same time• Once complete: inspect, turn on,
begin next pair • Approximately 12 - 14 weeks per pair• Overall Project Duration = 18 – 24
months