Tier 1Tier 1
Luca dell’AgnelloINFN – CNAF, BolognaWorkshop CCRPaestum, 9-12 Giugno 2003
INFN – Tier1
INFN computing facility for HNEP community Location: INFN-CNAF, Bologna (Italy)
o One of the main nodes on GARR network Ending prototype phase this year Fully operational next year Personnel: ~ 10 FTE’s
Multi-experiment LHC experiments, Virgo, CDF BABAR (3rd quarter 2003) Resources dynamically assigned to experiments according
to their needs Main (~50%) Italian resource for LCG
Coordination with Tier0 and other Tier1 (management, security etc..)
Coordination with Italian tier2s, tier3s Participation to grid test-beds (EDG,EDT,GLUE) Participation to CMS, ATLAS, LHCb , Alice data challenge GOC (deployment in progress)
Networking
CNAF interconnected to GARR-B backbone at 1 Gbps.
Giga-PoP co-located GARR-B backbone at 2.5 Gbps.
LAN: star topology Computing elements connected via FE to rack switch
o 3 Extreme Summit 48 FE + 2 GE portso 3 3550 Cisco 48 FE + 2 GE portso 8 Enterasys 48 FE 2GE ports
Servers connected to GE switcho 1 3Com L2 24 GE ports
Uplink via GE to core switch o Extreme 7i with 32 GE portso ER16 Gigabit switch router Enterasys
Disk servers connected via GE to core switch.
LAN TIER1
FarmSW1 (*)
FarmSW2(*)
FarmSWG1 (*)
FarmSW3(*)
Switch-lanCNAF (*)
SSR2000
Catalyst6500
Fcds1 Fcds2
8TF.C.
2TSCSI
NA
S2
131.154.99.192
NA
S3
131.154.99.193
Fcds3
LHCBSW1 (*)
LAN CNAF 1 Gbps
GARR
1 Gbps link
(*) vlan tagging enabled
Vlan Tagging
Define VLAN’s across switches Independent from switch brand (Standard 802.1q)
Adopted solution for complete granularity To each switch port is associated one VLAN identifier Each rack switch uplink propagates VLAN information VLAN identifiers are propagated across switches Each farm has its own VLAN Avoid recabling (or physical moving) of hw to change
the topology Level 2 isolation of farms
Aid for enforcement of security measures Possible to define multi-tag ports (for servers)
Computing units (1)
160 1U rack-mountable Intel dual processor servers 800 MHz – 2.2 GHz
160 1U bi-processors Pentium IV 2.4 GHz to be shipped this month
1 switch per rack 48 FastEthernet ports 2 Gigabit uplinks Interconnected to core switch via 2 couples of optical fibers
o Also 4 UTP cables available 1 network power control per rack
380 V three-phase power as input Outputs 3 independent 220 V lines Completely programmable (permits gradual servers
switching on). Remotely manageable via web
Computing units (2)
OS: Linux RedHat (6.2, 7.2, 7.3, 7.3.2) Experiment specific library software Goal: have generic computing units
o Experiment specific library software in standard position (e.g. /opt/cms)
Centralized installation system LCFG (EDG WP4) Integration with central Tier1 db (see below) Each farm on a distinct VLAN
o Moving from a farm to another a server changes IP address (not name)
Unique dhcp server on all VLAN’s Support for DDNS (cr.cnaf.infn.it) in progress
Queue manages: PBS Not possible to have version “Pro” (only for edu) Free version not flexible enough Tests of integration with MAUI in progress
Tier1 Database
Resource database and management interface Hw servers characteristics Sw servers configuration Servers allocation Postgres database as back end Web interface (apache+mod_ssl+php)
Possible direct access to db for some applications
Monitoring system nagios
Interface to configure switches and interoperate with LCFG
Monitoring/Alarms
Monitoring system developed at CNAF Socket server on each computer Centralized collector ~100 variables collected every 5 minutes
o Data archived on flat file – In progress: XML structure for data archives
User interface: http://tier1.cnaf.infn.it/monitor/o Next release: JAVA interface (collaboration with D. Galli,
LHCb)
Critical parameters periodically checked by nagios Connectivity (i.e. ping), system load, bandwidth use, ssh
daemon, pbs etc… User interface: http://tier1.cnaf.infn.it/nagios/ In progress: configuration interface
Remote control
KVM switches permit remote control of servers console 2 models under test
Paragon UTM8 (Raritan) 8 Analog (UTP/Fiber) output connections Supports up to 32 daisy chains of 40 servers (UKVMSPD
modules needed) Costs: 6 KEuro + 125 Euro/server (UKVMSPD module) IP-reach (expansion to support IP transport): 8 KEuro
Autoview 2000R (Avocent) 1 Analog + 2 Digital (IP transport) output connections Supports connections up to 16 servers
o 3 switches needed for a standard rack Costs: 4.5 KEuro
NPC’s (Network Power Control) permit remote and scheduled power cycling via snmp calls or web
Bid under evaluation
Raritan
Avocent
Storage
Access to on-line data: DAS, NAS, SAN 32 TB (> 70 TB this month) Data served via NFS v3
Test of several hw technologies (EIDE, SCSI, FC) Bid for FC switch
Study of large file system solutions (>2TB) and load balancing/failover architectures
GFS (load balancing)o Problems with lock server (better in hw?)
GPFS (load balancing, large file systems)o Not that easy to install and configure….
HA (failover) “SAN on WAN” tests (collaboration with
CASPUR) Tests with PVFS (LHCb, Alice)
STORAGE CONFIGURATION
CLIENT SIDE(Gateway or all Farm must access Storage)
WAN or TIER1 LAN
PROCOM NAS2Nas2.cnaf.infn.it8100 GbyteVIRGO ATLAS
Fileserver CMS (or more in cluster or HA)diskserv-cms-1.cnaf.infn.it
PROCOM NAS3Nas3.cnaf.infn.it4700 GbyteALICE ATLAS
IDE NAS4Nas4.cnaf.infn.it1800GbyteCDF LHCB
AXUS BROWIECirca 2200 Gbyte 2 FC interface
DELL POWERVAULT7100 Gbyte2 FC interface
FAIL-OVERsupport
FC SwitchIn order
RAIDTEC1800 Gbyte2 SCSI interfaces
CASTORServer+staging
STK180 with 100 LTO (10Tbyte Native)
Fileserver Fcds3.cnaf.infn.it
Mass Storage Resources
StorageTek library with 9840 and LTO drives 180 tapes (100/200 GB each)
StorageTek L5500 with 2000-5000 slots in order LTOv2 (200/400 GB each) 6 I/O drives 500 tapes ordered
CASTOR as front-end software for archiving Direct access for end-users Oracle as back-end
TAPE HARDWARE
2 internal tape drive 9840 HVD 8MB/s
2 internal tape drive IBM ultrium LTO 15 MB/s
Data access via connessione diretta SCSI 3 LVD 80MB/s
Data access connessione diretta SCSI HVD
- WIN 2000 Dell 1650 raid 1 server - LEGATO NSR -Adaptec 2944 UW 32 bit 40 MB/s
- CASTOR SERVER -LINUX 7.2 Compaq 360 raid 1 server -CASTOR -Adaptec SCSI 3 39160 LVD 64 bit 160 MB/s dual port
Robot access via connessione diretta SCSI HVD
-SOLARIS 8 Ultra 10 Sparc -ACSLS soft. -Antares SCSI-HVD 32 bit
TCP/IPGigabit Ethernet
2 internal tape drive IBM ultrium LTO 15 MB/s
TAPE LIBRARY STK180 (10 TB uncompressed using LTO tapes)
- TAPESERVER -LINUX 7.2 Dell 1650 raid 1 server -CASTOR TAPE soft. -Adaptec SCSI 3 LVDport
TCP/IPGigabit Ethernet
TCP/IPGigabit Ethernet
TCP/IP100M/s Ethernet
Data access connessione diretta SCSI 3 LVD 80MB/s
2 TB STAGING AREA
CASTOR
Developed and maintained at CERN Chosen as front-end for archiving Features
Needs a staging area on disk (~ 20% of tape) ORACLE database as back-end for full capability (a MySQL
interface is also included)o ORACLE database is under day-policy backup
Every client needs to install the CASTOR client packet (works on almost major OS’s including Windows)
o Access via rfio command
CNAF setup Experiment access from TIER1 farms via rfio with
UID/GID protection from single server National Archive support via rfio with UID/GID
protection from single server Grid SE tested and working
CASTOR at CNAF2 drive 9840
4 drives LTO Ultrium
SCSI
SCSI
LEGATO NSR(Backup)
Robot access via SCSI
ACSLS
CASTOR
STK L180
LAN
2 TB Staging Disk
New Location
The present location (at CNAF office level) is not suitable, mainly due to:
Insufficient space. Weight (~ 700 kg./0.5 m2 for a standard rack with 40
1U servers). Moving to the final location (early) this summer.
New hall in the basement (-2nd floor) almost ready. ~ 1000 m2 of total space
o Computerso Electric Power System (UPS, MPU)o Air conditioning system
Easily accessible with lorries from the road Not suitable for office use (remote control)
Electric Power
220 V mono-phase needed for computers. 4 – 8 KW per standard rack (with 40 bi-processors)
16-32 A. 380 V three-phase for other devices (tape
libraries, air conditioning etc..). To avoid black-outs, Tier1 has standard
protection systems. Installed in the new location:
UPS (Uninterruptible Power Supply).o Located in a separate room (conditioned and
ventilated).o 800 KVA (~ 640 KW).
Electric Generator.o 1250 KVA (~ 1000 KW).
up to 80-160 racks.
Summary & conclusions
INFN-TIER1 is closing the prototype phase But still testing new technological solutions
Going to move the resources to the final location Interoperation with grid projects (EDG,EDT,LCG) Starting integration with LCG Participating to CMS DC04
~ 70 computing servers ~ 4M events (40% of Italian commitment) 15+60(Tier0)
TB of data (July to December 03) Analysis of simulated events (January to February 04) Interoperation with Tier0 (CERN) and Tier2 (LNL)