21
Timber Construction Why Innovative Developers are Making the Move Lendlease DesignMake WoodSolutions September 2017
Transcript
Page 1: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

Timber Construction –

Why Innovative

Developers

are Making the Move

Lendlease DesignMake

WoodSolutionsSeptember 2017

Page 2: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

2WOODSOLUTIONS SEP 2017

• LendLease DesignMake are a dedicated team of specialist designers, technicians and manufacturers.

• Our aim is to make better places by driving efficiencies and quality throughout the design and construction processes which maximise the value to our clients.

• We achieve this through combining digital design and advanced manufacturing processes from our state of the art 15,000 m2 production facility in Western Sydney, NSW.

• Our customised building components can be easily assembled onsite across a vast number of building types.

• The result is a design and delivery approach that improves safety, sustainability, quality, productivity and commercial outcomes.

Introducing Lendlease DesignMake

Page 3: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

3

• Better working environment for occupants

to provide productivity gains

• High profile innovative commercial

buildings

• Next generation of sustainability

performance

• Market differentiator

Key advantages

• As durable as traditional construction

forms – same design life, warranties and

performance criteria of building code

• No additional outgoings

Building Performance

WOODSOLUTIONS SEP 2017

Page 4: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

4

• Carbon neutral structure

• Better thermal performance

• Zero water consumption during construction

• Indoor Environment Quality – Low VOC

• Previously awarded credit under Greenstar

• Generates virtually zero construction waste

• Enhances IEQ (dust, noise, vibration)

• Reduction in transport based emissions

• Production Waste = Fuel

Sustainability“Multiple physiological, psychological

and environmental benefits were

identified for wooden interiors:

• Improvements to a person’s emotional

state and level of self-expression.

• Reduced blood pressure, heart rate

and stress levels.

• Improved air quality through humidity

moderation.” -- Wood, Housing, Health,

Humanity Planet Ark

Better for Human Health

WOODSOLUTIONS SEP 2017

Page 5: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

5

• Reduced high risk work (e.g. work at

heights).

• Reduction in dust, less vibration, noise

and obstructions

• Reduced disruption on local communities

• Elimination of hotworks

• Light weight tools for connecting elements

• Minimal back propping

Engineered Timber is safer

• Simple cranage

• Hand-held tooling (cordless drills and

nail guns)

• Small carpentry and rigging crews

• Structural time savings have been up to

30%

• Services rough-in sooner

• Minimal establishment period

Speed of Construction

WOODSOLUTIONS SEP 2017

Page 6: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

6

• Predictable performance

• 0.7mm / min.

• Sacrificial layers and / or

traditional supplementary

materials (encapsulation) can

be used.

• BCA DTS or Alternative

Solutions based design

• Controlled “by design”

• Weather separation

• Ventilation cavities

• Membrane

• Code requires timber to be

protected from termites.

• Separation.

Physical termite barriers

(chemical free)

• Annual inspection regime.

Fire Durability Termites

WOODSOLUTIONS SEP 2017

Page 7: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

7

Architectural

Structural

Electrical

Product Library data

Hydraulics

Mechanical

Digital design

Manufacturing

WOODSOLUTIONS SEP 2017

Page 8: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

8

• Primarily used for commercial

floor plates

• Braced frame – central structural

core not essential

• Posts and beams in glulam, floors

in CLT

• Larger span grids (up to 9m x 9m)

• Example: Library at the Dock

Post / Beam• Refers to whole units, rooms

or pods

• Pre-constructed and fitted

out in the factory and

trucked to site for installation

• Accelerates on-site program

VolumetricPanelised• Primarily used for apartments

• Panelised platform structure

where every wall is structural

loadbearing

• All panels are CLT with very

little glulam

• Example: Forté

WOODSOLUTIONS SEP 2017

Page 9: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

• Australia’s first engineered timber building

• 10 levels – 24 apartments• Clean & safe – zero lost time injuries• Robust, high quality result• Programme savings – structure

completed in 40 days• GBCA – As Built rating 5 stars.

Forte Apartments 2012Victoria Harbour, Melbourne

Page 10: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

• Australia’s first engineered timber civic building• Column and beam construction• Three-storey building, 55m long x 18m wide• CLT Volume: 574m3• Glulam beams: 140m3• Clean and safe – zero lost time injuries• Light-weight – re-used wharf structure• Programme savings – 2m structure programme• GBCA – 6 star Public Buildings Pilot

Library at The Dock 2013Victoria Harbour, Melbourne

Page 11: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

• Modular sales suite project – LendleaseCommunities

• Prefabrication of all components in a controlled environment.

• Re-usable / relocatable.• Reduced on site installation time.

Modular Sales Suite 2014

Page 12: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

• Australia’s first engineered timber commercial building• Column and beam construction – 9m x 9m grid• Clean and safe – zero lost time injuries• Programme savings – 4m structure programme• GBCA – 6 star (targeted)• 8,000 m2 GFA

International House 2017Barangaroo, Sydney

Page 13: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

13International House

Page 14: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

14DesignMake offsite manufacture facility 2017

14

• 15,000m2 new build facility in Eastern

Creek.

• CLT, timber frame and other materials

will be used to pre-fabricate walls, floors

and other building components.

• Supported by an experienced design &

engineering team driving efficient DfMA

(design for manufacture & assembly)

Page 15: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

15

• The worlds largest engineered timber commercial building• Column and beam construction – 6m x 9m grid• GBCA – 6 star (targeted)• 14,000 m2 GFA

K5 Building Brisbane, Queensland

Page 16: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

16K5 BUILDING INTERIOR

Page 17: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

17Australian National University Canberra, ACT.

• Lendlease Building and DesignMake joint projectLLDM• 450 student accommodation / 4,000 sqm GFA teaching building• Flat packed CLT + frame facade SA and CLT rib deck + column beam structure TB

Page 18: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

18Lexington GardensSpringvale, Victoria

• Lendlease RL first internal development• 40 units / 4 levels• Flat packed frame, CLT and volumetric

Page 19: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

19

• Companion building to International House• Column and beam construction –• Rib deck floor 9m x 9m grid• 11,700 m2 GFA

C1 BuildingSydney, NSW

Page 20: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

20Collins WharfMelbourne, Victoria

Page 21: Timber Construction Why Innovative Developers are …...engineering team driving efficient DfMA (design for manufacture & assembly) 15 • The worlds largest engineered timber commercial

Recommended