+ All Categories
Home > Art & Photos > Time planning for our final music video

Time planning for our final music video

Date post: 22-Jan-2018
Category:
Upload: millieiron
View: 186 times
Download: 2 times
Share this document with a friend
14
Time Planning for our final film Time Planning: Shoot day 1: December 12 th Saturday 2015 13:00 – 17:00 Shoot day 2: December 15 th Tuesday 2015 9:00 – 16:00 Shoot day 3: December 18 th Friday 2015 13:00 – 17:00 Shoot day 4: December 22 nd Tuesday 2015 9:00 – 16:00 Shoot day 5: January 2 nd Saturday 2016 9:00 onwards Shoot day 6: January 6 th Tuesday 2016 9:00 onwards Shoot day 7: January 9 th Friday 2016 9:00 onwards (Additional shots needed) Weather Shoot day 1: H: 12° L: 8° Cloudy Weather Shoot day 2: H: 9° L: 4° Cloudy Weather Shoot day 3: H: 9° L: 4° Cloudy with a chance of rain at 3 Pm Weather Shoot day 4: H: 13° L: 11° Light clouds with sunny intervals Weather Shoot day 5: H: 13° L: 11° Sunny with minimal clouds Weather Shoot day 6: H: 11° L: 9°
Transcript
Page 1: Time planning for our final music video

Time Planning for our final film Time Planning: Shoot day 1: December 12th Saturday 2015 13:00 – 17:00 Shoot day 2: December 15th Tuesday 2015 9:00 – 16:00 Shoot day 3: December 18th Friday 2015 13:00 – 17:00 Shoot day 4: December 22nd Tuesday 2015 9:00 – 16:00 Shoot day 5: January 2nd Saturday 2016 9:00 onwards Shoot day 6: January 6th Tuesday 2016 9:00 onwards Shoot day 7: January 9th Friday 2016 9:00 onwards (Additional shots needed) Weather Shoot day 1: H: 12° L: 8° Cloudy Weather Shoot day 2: H: 9° L: 4° Cloudy Weather Shoot day 3: H: 9° L: 4° Cloudy with a chance of rain at 3 Pm Weather Shoot day 4: H: 13° L: 11° Light clouds with sunny intervals Weather Shoot day 5: H: 13° L: 11° Sunny with minimal clouds Weather Shoot day 6: H: 11° L: 9°

Page 2: Time planning for our final music video

Cloudy

Technical Equipment Requirements

Supplier/Contact Equipment needed. Russ Bennett/ Daisy Hopkins Media Samuel ward

SLR Canon EOS 500 D Camera, Tripod, Crane. Track.

Hazard list No. 1) Access / Egress 2) Heavy loads 3) First aid 4) Fire 5) Heat / cold / extreme weather 6) Water / proximity to water / tanks

Name Position Contact Information Matthew Rose Lead Male Actor and

Editor [email protected] 07841538498

Millie Iron Camera Woman and Editor

[email protected] 07772090285

Olivia Halpin Actress and Editor [email protected] 07528186092

Niamh Mitchell Director and Editor [email protected] 07734589888

Page 3: Time planning for our final music video

7) Camera work – technical facilities (handheld, camera cables, camera movement) 8) Food

Hazard Number & level of risk

Mains risks Identified Controls to Minimise risk

1 low Access / Egress

The majority of filming is taking place on 15 Chivers road when we are filming here we are going to leave any spare equipment that will not be used during shots in a separate room to minimalize hazards and ensure that entry points are clear to walk in and out of. Also for the shots that are outside we will make sure that we are not obstructing members of the public and leave spare equipment and luggage to a separate team member at the side. On the shooting days we will carry out a separate risk assessment to ensure that it is a safe location for pedestrians.

2 low Heavy / Fragile loads To exclude the risk of damage to any of the equipment we have decided to drive to all of the filming locations this gets rid of any risks due to carrying heavy equipment.

3 low First aid In case of an emergency and anybody getting hurt we have a medical kit near by and all members have been informed of the hospital and medical centres local to the locations.

4 Medium Fire safety

In case of any fires we can ensure the safety by maintaining a clear entry/ exit point to get out in emergencies. There is a key scene we need to be aware of when we film fire, we will ensure to maintain a safe environment for every member of the group by making sure flammable objects are kept away from the fire.

5 low Heat / cold / extreme weather

When in the House location we will keep the heating on to ensure that we don’t get to hot or cold and will be able to change it for our personal preference. For the outside location we have planned to all wear the appropriate clothing materials suitable for the weather that day.

Page 4: Time planning for our final music video

7 low

Technical facilities (Handhelds / camera cables / camera movement etc.)

All the equipment used for the shots will be handled carefully and evenly distributed to each team member when having to walk it to the location this will lower the risk of dropping it and will make it more efficient.

8 low Food Having breaks half way through filming when in the House we can be provided with the food and also when filming outside we can go to a nearby shop and also provide our own lunch.

Transport by Car 19th November 2015 (Thursday)

Niamh Arrange Transport with Matt, Olivia and Millie to arrive at east town park by 3:00pm Millie Wait for transport to arrive then get a lift with Niamh Matt Wait for transport to arrive then get a lift with Niamh Olivia Wait for transport to arrive then get a lift with Niamh Everyone will arrive at the location together and leave around 4:30, as it will be getting dark around this time. Please see attached map for any additional information.

Transport by Foot 24th November 2015 (Tuesday)

Niamh Leave school at 11:00am with Matt, Olivia and Millie to walk to location. Millie Leave school with rest of the group at 11:00am. Matt Leave school with rest of the group at 11:00am. Olivia Leave school with rest of the group at 11:00am. Make sure to arrive at the location at 11:00 as a group to ensure plenty of time to get all of our shots done.

Page 5: Time planning for our final music video

Transport by Car 9th December 2015 (Tuesday)

Niamh Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm Millie Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm Matt Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm

Transport by Car 26th November 2015 (Thursday)

Niamh Leave from school at 9:00am to get a lift to location with group. Do a short walk along a path to get to the location. Millie Get in the arranged lift with the rest of the group. Matt Get in the arranged lift with the rest of the group. Olivia Get in the arranged lift with the rest of the group. Make sure to leave by 9:00am to ensure we can have room to do all the shots planned with leftover time to edit.

Transport by Car 1st December 2015 (Tuesday)

Niamh Arrange a lift to school alone to get needed equipment and wait for transport to Matts house. Millie Arrange a lift to school alone to get needed equipment and wait for transport to Matts house. Matt Stay at home and prepare the set for filming by getting props needed. Olivia Arrange a lift to school alone to get needed equipment and wait for transport to Matts house. Get to Matts house at 9:00am to be able to film for 2 hours and ensure that they can get back to school in time for lessons.

Transport by Car 6th December 2015 (Saturday)

Niamh Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. Millie Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. Matt Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. Olivia Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. As it will be getting dark we will walking along the main road, see added map for any additional details.

Page 6: Time planning for our final music video

Olivia Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm Arrive together and address the map before hand to know the directions to get to our locations.

Page 7: Time planning for our final music video

1. Head west towards Chalkstone Way

2. Turn left onto Chalkstone Way

3. At the roundabout take the 2nd exit onto Millfields way

4. Turn left to stay on Millfields Way

5. Turn right onto Chalkstone Way

6. At the roundabout, take the 1st exit onto coupals Rd and the destination will be on the left.

Shoot Day 1:

From: Samuel Ward Academy, Chalkstone Way,

Haverhill CB9 0LD, United Kingdom

To: East Town Park Centre, Coupals Road, Haverhill

CB9

Page 8: Time planning for our final music video

Shoot Day 2: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: Chalkstone Way, Haverhill CB9 0AQ, UK

1. Head west towards Chalkstone Way

2. Turn left onto Chalkstone Way

Page 9: Time planning for our final music video

Shoot Day 3: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: Chalkstone Way, Haverhill CB9 0AT, UK

1. Head west towards Chalkstone Way

2. Turn left onto Chalkstone Way

Page 10: Time planning for our final music video

Shoot Day 4: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: 15 Chivers Rd, Haverhill CB9 9DS, UK

1. Continue to Wratting RD/A143

2. Continue on Wratting Rd/A143 to Crowland Rd

3. Turn left onto Crowland Rd

4. At the roundabout, take the 3rd exit onto Burton End

5. Turn right onto Chivers Rd

Page 11: Time planning for our final music video

Shoot Day 5: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: 8 Chelmer Rd, Haverhill CB9 0AN, UK

1. Head west towards Chalkstone Way

2. Turn left onto Chalkstone way

3. Turn right onto Chelmer Rd

Page 12: Time planning for our final music video

Shoot Day 6: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: 31 Wratting Rd, Haverhill CB9 0DA, UK

1. Head west towards Chalkstone Way

2. Turn right onto Chalkstone Way

3. Turn left onto Wratting Rd/A143

Page 13: Time planning for our final music video

Date Arrive Time: Ending Time: Props & Camera

equipment: Actors required Shots: (See Shot

list) Personnel

12/12/15 3:00pm 4:30pm SLR Canon E0S, Crane, Tripod.

Matt Rose Millie Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor)

15/12/15 11:10am 1:00pm SLR Canon E0S Matt Rose Millie Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor)

18/12/15 9:10am 11:00am SLR Canon E0S Matt Rose Millie Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor)

Page 14: Time planning for our final music video

22/12/15 9:00am 3:00pm Alcohol, Fake Drugs, Tea Towel, Car. SLR Canon E0S.

Matt Rose, Olivia Halpin

Millie Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Actress) Matt Rose (Actor)

2/1/16 4:30am 6:00pm Garden Chimney Burner, Photos of actors. SLR Canon E0S

Matt Rose Millie Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor)

6/1/16 3:00pm 4:30pm SLR Canon E0S Matt Rose Millie Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor)


Recommended