Page 1: Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted 2007-2008Recovery Plan Adaptive Management Framework developed and adopted.
Page 2: Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted 2007-2008Recovery Plan Adaptive Management Framework developed and adopted.

Timeline and Product Development

Aug-Oct 2007 Recovery Plan completed and adopted

2007-2008 Recovery Plan Adaptive Management Framework developed and adopted

Nov 2008-Dec 2009 RTT Analysis Workshop planning

Jan 12-13, 2010 RTT Analysis Workshop

Jan-Oct 2010 RTT deliberations, draft Synthesis Paper Development

July-Sept 2010 Feedback loop with Watershed Action Teams, UCSRB

Oct-Nov 2010 Finalize Synthesis Paper, presentations for Nov 16

Page 3: Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted 2007-2008Recovery Plan Adaptive Management Framework developed and adopted.
Page 4: Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted 2007-2008Recovery Plan Adaptive Management Framework developed and adopted.

Syn

thes

is

Pap

er

Page 5: Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted 2007-2008Recovery Plan Adaptive Management Framework developed and adopted.

RTT Analysis Workshop Synthesis Paper

• Purpose: To summarize the science workshop and communicate the deliberations and recommendations from the RTT to the UCSRB, WATs, and other interested parties.

• Challenges: – Needed to capture and communicate scientific information for

multiple audiences (technical and non-technical)– How to answer Key Management Questions with less than

perfect information– Time: There’s never enough time to deliberate, wordsmith,

format, etc.

Page 6: Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted 2007-2008Recovery Plan Adaptive Management Framework developed and adopted.

RTT Analysis Workshop Synthesis Paper

Five chapters/sessions:1) Species status and trend2) Implementation, limiting factors, threats

3) Habitat status and trend4) Habitat action effectiveness5) Data gaps / information needs

Key Management Questions----App Q of Recovery Plan

Page 7: Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted 2007-2008Recovery Plan Adaptive Management Framework developed and adopted.

RTT Analysis Workshop Synthesis Paper

Five sessions:1) Species status and trend (6 KMQ)2) Implementation, limiting factors, threats (8 KMQ)

3) Habitat status and trend (7 KMQ)4) Habitat action effectiveness (5 KMQ)5) Data gaps / information needs (1 KMQ)

Key Management Questions (KMQ)

Total KMQ = 27