Timeline and Product Development
Aug-Oct 2007 Recovery Plan completed and adopted
2007-2008 Recovery Plan Adaptive Management Framework developed and adopted
Nov 2008-Dec 2009 RTT Analysis Workshop planning
Jan 12-13, 2010 RTT Analysis Workshop
Jan-Oct 2010 RTT deliberations, draft Synthesis Paper Development
July-Sept 2010 Feedback loop with Watershed Action Teams, UCSRB
Oct-Nov 2010 Finalize Synthesis Paper, presentations for Nov 16
Syn
thes
is
Pap
er
RTT Analysis Workshop Synthesis Paper
• Purpose: To summarize the science workshop and communicate the deliberations and recommendations from the RTT to the UCSRB, WATs, and other interested parties.
• Challenges: – Needed to capture and communicate scientific information for
multiple audiences (technical and non-technical)– How to answer Key Management Questions with less than
perfect information– Time: There’s never enough time to deliberate, wordsmith,
format, etc.
RTT Analysis Workshop Synthesis Paper
Five chapters/sessions:1) Species status and trend2) Implementation, limiting factors, threats
3) Habitat status and trend4) Habitat action effectiveness5) Data gaps / information needs
Key Management Questions----App Q of Recovery Plan
RTT Analysis Workshop Synthesis Paper
Five sessions:1) Species status and trend (6 KMQ)2) Implementation, limiting factors, threats (8 KMQ)
3) Habitat status and trend (7 KMQ)4) Habitat action effectiveness (5 KMQ)5) Data gaps / information needs (1 KMQ)
Key Management Questions (KMQ)
Total KMQ = 27