TIMELINE While the timing on projects is rarely exactly the same, here's where propane would typically fit into your overall build schedule.
Noles (1) Regardless or its size. any ASME container filled on site must be located so that the filling connection and fixed maximum liquid level gauge are at least 10 ft from any external source ol ignition (e.g., open flame, window AC, compressor), intake to direct-vented gas appliance, or intake to a mechanical ventilation system. Reier lo 6.3.4.4 (2) Reier lo 6.3.4.3 (3) This distance can be reduced to no less than 10 fl lor a single container of 1200 gal (4.5 m3) waler capacity or less. provided such container is al least 25 fl from any other LP-Gas container of more than 125 gal (0.5 m3) waler capacity_ Refer to 6.3.1.3
Aboveground ASME*
/ 10flmin) 2:::��:':;r (Nole 1) (Note 2) window, or eidlaust fan (sourceof1gnrt1on) ,----.: :l NOfl(min) _,,,,/ : ¾gaf ·--. (Note 2�_,.......-· •�Of'.i<J!}!J ___ �--c) _........-_........-
./ _........-,.......--- ��:r��neofadjoining property that can be
For SI units. 1 fl= 0.3048 m Noles (1) The relief valve, filling connection, and fixed maximum liquid level gauge vent connection al the container must be al least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Reier lo 6.3.4.4 (2) No part of an underground container can be less than 10 fl from an important building or line of adjoining property that can be built upon. Reier lo 6.3.2.3
Underground ASME*
compressor (source of ignition) For SI units. 1 fl= 0.3048 m
Notes:
Crawl space opening, windows,or exhaust fan
(1) 5 fl minimum from relief valve in any direction away from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to Table 6.3.4.3. (2) If the cylinder is filled on site at the point of use from a bulk truck, the filling connection and vent valve must be at least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to6.3.4.4. (3) Refer to 6.3.4.3.
Cylinders*
-g "',::, . ""� 0. u ,-.o, � oi ��
"vi 0 ..::,t_"<J C <C "' u
t- .2
8 L L"" - ��:::, "'"L C
t-w
E " 0..
I Vl z
0 _J
::J co
z CJ vi w 0
I I
I I
Contact us for a free onsite consultation of:
• Propane System Design• Mechanicals Coordination• Underground/Aboveground
Tank Installations• Temporary Construction Heat• Community or Metered Systems• High Efficiency Appliances
800.523.5237 www.eastern.com
TIMELINE While the timing on projects is rarely exactly the same, here's where propane would typically fit into your overall build schedule.
Noles (1) Regardless ol its size. any ASME container filled on site must be localed so that the filling connection and fixed maximum liquid level gauge are al least 10 fl from any external source ol ignition (e.g., open flame, window AC, compressor), intake lo direct-vented gas appliance, or intake lo a mechanical ventilation system. Reier lo 6.3.4.4 (2)Reler lo6.3.4.3 (3) This distance can be reduced to no less than 10 fl lor a single container of 1200 gal (4.5 m3) waler capacity or less. provided such container is al least 25 fl from any other LP-Gas container of more than 125 gal (0.5 m3) waler capacity_ Refer to 6.3.1.3
Aboveground ASME*
For SI units. 1 fl= 0.3048 m Noles
./ _/ __ Nearestlineofadjoining propertythatcanbe / bu11tupon
(1) The relief valve, filling connection, and fixed maximum liquid level gauge vent connection al the container must be al least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Reier lo 6.3.4.4 (2) No part of an underground container can be less than 10 fl from an important building or line of adjoining property that can be built upon. Reier lo 6.3.2.3
Underground ASME*
compressor (source of ignition) For SI units. 1 fl= 0.3048 m
Notes:
Crawl space opening, windows,or exhaust fan
(1) 5 fl minimum from relief valve in any direction away from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to Table 6.3.4.3. (2) If the cylinder is filled on site at the point of use from a bulk truck, the filling connection and vent valve must be at least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to6.3.4.4. (3) Refer to 6.3.4.3.
Cylinders*
C >-sQ L� "'u L � OL a.� E :<' �8
8 L L"" - ��:::, "',::, L C
t-w
E " 0..
I Vl z
0 _J
::J co
z CJ vi w 0
We're In Your Neighborhood We're In Your Neighborhood
Ho
le D
ime
nsio
ns *
* **T
ou
ch
up
an
y s
cra
tch
es o
r m
ark
s o
n t
an
ks o
r lif
tin
g lu
gs w
ith
pro
pe
r co
atin
g m
ate
ria
ls b
efo
re b
ack-f
illin
g.
Ta
nk S
ize
Ta
nk D
ime
nsio
ns
We
igh
t (a
pp
rox.)
Be
low
th
e T
an
k-a
ll siz
es
Be
su
reto
ke
ep
atle
asth
alf
ofrise
r(d
om
e)
ab
ove
gro
un
dM
ark
ing
the
ha
lfw
ay
po
intb
efo
reb
ack-f
illin
gis
he
lpfu
le
sp
ecia
llyif
fin
ish
ing
with
top
so
ilF
illin
g
Pro
pe
r e
xca
va
tio
n is t
he
esse
ntia
l firs
t ste
p in
th
e p
rop
er
insta
llatio
n o
f a
n u
nd
erg
rou
nd
ta
nk.
Imp
rop
er
exca
va
tio
n c
an
je
op
ard
ize
th
e in
sta
llatio
n a
nd
ca
n p
ote
ntia
lly le
ad
to
a h
aza
rdo
us g
as le
ak.
14
' L
x 5
' W
x 4
' 6
" D
eep
20
' L
x 5
' 6
" W
x 4
' 6
" D
eep
Six
in
ch
es o
f sa
nd
in
th
e b
ott
om
of
the
ho
le .
On
e 1
7 lb
. A
no
de
ba
g c
on
nte
cte
d t
o t
an
k.
Pla
ce
at
lea
st
2' a
wa
y f
rom
ta
nk a
nd
lo
w in
th
e h
ole
. P
ou
r 1
ga
llon
of
wa
ter
on
ba
g a
nd
im
me
dia
tely
co
ve
r w
ith
sa
nd
.
Sa
me
pro
ce
du
re -
usin
g 2
An
od
e b
ag
s.
320 G
al.
9' 6
" L x
4' W
x 4
4"
Deep
13
' L
x 4
' 6"
W x
52
" D
eep
Wa
rnin
g:
Th
e in
sta
llatio
n o
f u
nd
erg
rou
nd
LP
ga
s t
an
ks is g
ove
rne
d b
y t
he
LP
Ga
s C
od
e (
NF
PA
58
) a
nd
mu
st
alw
ays b
e d
on
e b
y a
qu
alif
ied
pro
fessio
na
l.
Insta
llatio
n o
f ta
nks b
y u
nq
ua
lifie
d p
ers
on
s c
an
po
ten
tia
lly le
ad
to
a h
aza
rdo
us g
as le
ak.
Be
su
re t
o c
all
Dig
sa
fe b
efo
re d
igg
ing
: 8
88
-DIG
-SA
FE
(3
34
-72
33
).
500 G
al.
10
' x 3
8"
dia
me
ter
16
' x 4
1"
dia
me
ter
120 G
al.
17
31
lb
.
On
ce
ta
nk is p
lace
an
d in
sp
ecte
d b
y t
he
lo
ca
l A
HJ,
if r
eq
uire
d,
ba
ck-f
ill t
he
en
tire
ho
le w
ith
sa
nd
. G
rad
e d
ow
nw
ard
an
d a
wa
y f
rom
h
ou
sin
g d
om
e.
Th
is p
reve
nts
wa
ter
fro
m c
olle
ctin
g a
nd
ru
nn
ing
in
to o
r sta
nd
ing
aro
un
d t
he
ho
usin
g d
om
e.
Ba
ck-f
ill *
*
If a
co
ncre
te p
ad
is r
equired, depth
of hole
must be 6
" deeper
to a
ccom
modate
a 6
" concre
te p
ad in the d
imensio
ns o
f th
e tank w
ith 4
anchor
eye b
olts (
one in e
ach c
orn
er
of th
e p
ad).
Attach s
tain
less s
teel or
sim
ilar
str
appin
g fro
m lifitin
g lugs d
ow
n to e
ye b
olts. M
ultip
le u
nder
grou
nd ta
nks
need
to b
e se
para
ted
by a
min
imum
of 3
feet
. Mea
surin
g fr
om th
e ta
nk s
urfa
ce.
1000 G
al.
5' 6
" x 2
4"
dia
me
ter
9' x
32
" d
iam
ete
r
Prio
r to
Ba
ck-f
illin
g
.bl
12
9.
bl 8
85
.bl
25
2
Ga
s L
ine
Tre
nc
h S
pe
cif
ica
tio
ns
: T
he tre
nch
fo
r buried c
oate
d c
opper
tubin
g o
r poly
eth
yle
ne p
ipe a
nd tubin
g s
hall
be insta
lled w
ith
a m
inim
um
12 in. o
f cle
an fill
or
sand. D
o n
ot backfill
until in
specte
d b
y the local A
HJ, if r
equired. T
he m
inim
um
cover
shall
be incre
ased to 1
8 in
. if
exte
rnal dam
age to
the p
ipe o
r
tubin
g fro
m v
ehic
les is lik
ely
to r
esult. T
race
r w
ire
(re
quired fo
r P
E p
ipe &
tubin
g o
nly
) alo
ng w
ith y
ello
w c
aution tape (
Caution G
as L
ine B
uried B
elo
w)
shall
be
pro
perl
y in
sta
lled b
y a
qualif
ied s
erv
ice
technic
ian.
Be
sure
tokeep
atle
asthalf
of
riser
(dom
e)
above
gro
und.
Mark
ing
the
halfw
ay
poin
tbefo
reback-f
illin
gis
help
ful ,
especia
llyif
finis
hin
gw
ith
top
soil .
Fill
ing
in m
ore
than h
alfw
ay c
an c
ause f
utu
re w
ate
r/fr
eezin
g p
roble
ms a
nd m
ust be a
void
ed.
Tan
k D
om
e -
Half o
f th
e d
om
e m
ust be a
bove t
he g
round.
G
rade d
ow
nw
ard
and a
way f
rom
dom
e.
28"
hig
h d
om
eM
ulti-valv
e &
re
gula
tor
insid
e d
om
e
A 6
-inch b
ase o
f sand in r
equir
ed o
n a
ll underg
round t
ank insta
llations.
fig
. A
. D
eta
il o
f dom
e
Copyright©
202
0, E
aste
rn P
ropane G
as, In
c.
Fin
ish G
rade
28"
Excavati
on
Gu
ide
lin
es
for U
nd
erg
rou
nd
Pro
pan
e T
an
ks
10”
9”
8”
7”
6”
5”
4”
3”
2”
1”
Pro
pan
e &
Oil
Since
1932
Mul
tiple
und
ergr
ound
tank
s ne
ed to
be
sepa
rate
d by
a m
inim
um o
f 3 fe
et. M
easu
ring
from
the
tank
sur
face
.
i
020