1 CORRIDOR CITIES TRANSITWAY AAC Operations Presentation
Transcript
Page 1: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

1

CORRIDOR CITIES TRANSITWAY

AAC Operations Presentation

Page 2: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Agenda

• Operations Planning Process• Operations Related CCT Premium Elements• Safety and Security Elements

2

Page 3: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning Process• Ridership Forecasting

– Daily and hourly ridership forecasts– Boardings and alightings by station

• Operations Planning– Required buses per hour– Bus fleet size

3

Page 4: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Ridership Forecasting(Regional Model)

• Ridership - key input into operations planning process– Sufficient service to comfortably accommodate estimated

riders• Customized version of Metropolitan Washington

Council of Governments Regional TransportationModel– Model of regional transportation network– Model purposes:

• Air quality conformity analysis– EPA Certification

• Project planning– Results calibrated against actual data

4

Page 5: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Ridership Forecasting(Project Specific Model)

• Regional model further customized– Accurately reflect walk distances and access to transit– Accurately reflect how people choose modes– Accurately reflect non-work trips

• All results validated against actual real-world data• Purple Line variant of the regional model

– Certified by the Federal Transit Administration• CCT model – customized version of Purple Line

Model5

Page 6: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning• Step 1 – Final Policy Guidelines

– Vehicle type• 60’ articulated vehicle with 60 seats• Diesel-Electric Hybrid

– Acceptable maximum passenger load• 60 seated/30 standing passengers per vehicle (industry standard)

– Services utilizing transitway• Only CCT branded vehicles

– Two route patterns – CCT Direct and CCT via USG– No proposed changes to RideOn, WMATA, or local shuttle

Networks• Ongoing co-ordination with agencies

– Elements impacting CCT operations• Fare collection approach• Transit Signal Priority• Vehicle configuration

6

Page 7: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Los Angeles Metro - Orange Line7

Page 8: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Lane Transit District (Eugene, Oregon) – Emerald Express (EmX) Green Line

8

Page 9: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning (cont.)

• Step 2 – Calculate required # of buses perhour– Ridership forecast - determine maximum

passenger load location and hour• AM Peak• Mid-Day

– Maximum load will dictate the required number ofbuses per hour

9

Page 10: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning (cont.)

10

861 893

585

499418

231 243194

139 97 65

0

100

200

300

400

500

600

700

800

900

1000

2020 CCT AM Peak Hour Northbound - Passenger Loads by Station-to-Station Link

AM Peak NB Passenger Load

Page 11: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning (cont.)

11

237 265 283

458 477 450 442406

543 515460

0

100

200

300

400

500

600

700

800

900

1000

2020 CCT AM Peak Hour Southbound - Passenger Loads by Station-to-Station Link

AM Peak SB Passenger Load

Page 12: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning (cont.)• Step 2 – cont.

– Maximum Load – 893• Northbound between East Gaither and West Gaither

– Required # of Bus Arrivals• 893/90 passengers (allowable load) = 9.92 = 10 buses

on CCT Direct required per hour to meet demand– Frequency = 60/10 = a bus every 6 minutes

12

Page 13: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning• Step 3 – Required Service Frequency – All Times –

Opening Year

Time of Day

CCT DirectBus ArrivalFrequency

CCT via USGBus ArrivalFrequency

Monday - Thursday4:30 AM - 6:00 AM 12 306:00 AM - 9:00 AM 6 159:00 AM - 3:00 PM 12 153:00 PM - 7:00 PM 6 157:00 PM - 1:00 AM 12 30Friday4:30 AM - 6:00 AM 12 306:00 AM - 9:00 AM 6 159:00 AM - 3:00 PM 12 153:00 PM - 7:00 PM 6 157:00 PM - 3:00 AM 12 30Saturday6:30 AM - 3:00 AM 12 30Sunday6:30 AM - 1:00 AM 12 30 13

Page 14: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations Planning• Step 4 – Calculate Opening Year Vehicle

Requirements– CCT via USG – 7 vehicles– CCT Direct – 15 vehicles– Total Service Requirement = 22 vehicles– Spare Vehicle Requirement = 5 vehicles– 27 vehicles in fleet

• Full fleet estimate in 2035 – 39 vehicles

14

Page 15: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Operations RelatedCCT Premium Elements

• Dedicated transitway– Improved travel times and reliability

• Separated from general traffic• Allows bus to bypass congestion

• High frequency service• Simple and direct route patterns• Branded service• Premium vehicles• Minimize time spent at stations

– Off-board fare collection– Multiple doors on vehicle

• Passenger Information15

Page 16: tion ta s Presen ation C Oper AAPlanning (cont.) ations Oper 11 237 265 283 458 477 450 442 406 543 515 460 0 100 200 300 400 500 600 700 800 900 1000 ion- at er Loads by St asseng

Safety and Security Elements• Vehicle

– Voice annunciators– Closed Circuit TV– Silent Alarm– Voice Monitoring– Announcement signs– Driver public address system

• Stations– Emergency phones– Closed Circuit TV