Title 40/CCA LSS Initiative Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08
Transcript
Page 1: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

Title 40/CCA LSS InitiativeTitle 40/CCA LSS Initiative

Working Team Meeting Updates 23 Sep 08

Page 2: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

2

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

9/23/08 Working Team AGENDA9/23/08 Working Team AGENDA

Time Topic Details Facilitator

5 min Review Work Progress from 9/16 Team Workshop Tomatra

5 min Action Items & Homework

(1) Homework: Sub-team creation & composition, Sub-team roles & responsibilities.

(2) NOTE: Everyone should come to the meeting prepared to volunteer for sub-teams & be ready to identify organizations/entities/components that should be included on the sub-teams.

Tomatra / Ed / Rick

20 min Report Out Overview of functional areas with Ed Zick (GIG/ISP).

Ed Zick

50 min Sub-Team Creation Introduction to LSS Waste categories. Complete Sub-teams focused around the CCA elements (team member determination and identifying key factors/metrics for sub-teams.)

Tomatra / Rob Pratt

25 min Metrics Creation Identify key performance indicators, refine data collection questions and finalize metrics.

Tomatra

10 min Project Timeline Discussion

Agree to a project timeline with key milestone dates.

Tomatra / Ed

5 min Wrap-up Next Steps & Action Item Review Tomatra

Page 3: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

3

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Projects LaunchedProject Selection

Working Group prioritizes project candidates

Report Findings to Working GroupSub-team Fact Finding

Data Collection Methods

Information Sharing

Building Our Pyramid of Project SuccessBuilding Our Pyramid of Project Success

Page 4: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

4

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

CCA/40 Process Flow – Layer 0

Perform

CCA Compliance

Analysis

Perform

CCA Compliance

Administration

Component CIO CCA

Certification

Memo

Perform

Milestone

Review

Submit CCA

Milestone

Compliance

Documents CCA

Documents (Version)

&

Review ( MS A, MSB or

FRPDR) memo

A1.0

A2.0

Resolve CCA

Compliance

Issues

Non-Compliance Issue (s)

Fail

1. Resolve all compliance issues

2. Repeat until completed

CCA

Compliant

Milestone A

Milestone B

FRPDR

Pass

ACT IAMACT IAM

ACT IACACT IAC

Perform Milestone

Review

Perform Milestone

Review

Acquisition Decision

Memorandumw/ DoD CIO Cert Memo

Acquisition Decision

Memorandumw/ DoD CIO Cert Memo

DoD CIO CCA

Certification

Memo

Note: The activity “Perform Milestone Review” is out of scope of this process flow

Validate Component

CCA Certification

Validate Component

CCA Certification

A3.0

CCA Certification Process FlowCCA Certification Process Flow

(For MAIS and MAIS-MDAP Programs Only)(For MAIS and MAIS-MDAP Programs Only)

D1D1

D1D1

ACAT IAM or

ACAT IAC

Page 5: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

5

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

CCA/40 Process Flow – Layer 0

Perform

CCA Compliance

Analysis

Perform

CCA Compliance

Administration

Component CIO CCA

Confirmation

Memo

Perform

Milestone

Review

Submit CCA

Milestone

Compliance

Documents CCA

Documents (Version)

&

Review ( MS A, MSB or

FRPDR) memo

A1.0

A2.0

Resolve CCA

Compliance

Issues

Non-Compliance Issue (s)

Fail

1. Resolve all compliance issues

2. Repeat until completed

CCA

Compliant

Milestone A

Milestone B

FRPDR

Pass

DoD CIO CCA

Confirmation

Memo

Note: The activity “Perform Milestone Review” is out of scope of this process flow

Validate Component

CCA Confirmation

Validate Component

CCA Confirmation

A3.0

CCA Confirmation Process FlowCCA Confirmation Process Flow

(For MDAP Programs)(For MDAP Programs)

D1D1

Page 6: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

6

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

General Rules of Project Sub-team Responsibility

• What is the project sub-team responsible for? – Understanding the work to be completed – Planning assigned activities

• In increasing detail as needed

– Completing assigned work • Within scope, quality, and time expectations

– Keeping the project sponsors (Title 40/CCA Working Group) informed • Of scope changes, risk and quality issues

– Proactively communicating status • And managing expectations

Page 7: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

7

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Title 40/CCA Requirements Sub-Team Roles & Responsibilities

• Each sub-team will be composed of a Team Lead and Team Members.

• Team Leader: Responsible for leading the team to examine the requirement function across the product life cycle. The Team Lead is responsible for ensuring the sub-team addresses the checklist items and reports the findings back to the Title 40/CCA Working Group.

• Team Members: Responsible for helping the Team Lead to address the checklist by identifying potential problem areas within Title 40/CCA requirements across the product life cycle. Also responsible for reporting their findings back to the Title 40/CCA Working Group.

• Title 40/CCA Working Group: Responsible for reviewing the information & data provided by the sub-teams. Also responsible for identifying, prioritizing and selecting DMAIC/Quick Win & Rapid Improvement Event projects to be completed.

Page 8: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

8

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Sub-Team Composition List

Title 40/CCA Requirement Project Team Members

Core Priority Function Determination

Outcome-based Performance Measures (MOEs) & Post Implementation Review (PIR)

Len Sadauskas & Amelia Grazioso

Business Process Redesign (BPR) Tom Hickok

Outsourcing Determination  

Analysis of Alternatives (AOA)  Bill May, Ed Wingfield

Economic Analysis (EA)  Bill May, Ed Wingfield

Acquisition Performance Measures

Global Information Grid (GIG) (Information Support Plan (ISP)

Ed Zick, Paul Szabados

Information Assurance (IA) strategy  Art King, Dominic Cussatt

Modular contracting

DoD IT Registry Ed Wingfield, Kevin Garrison

Page 9: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

9

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

U D O T W I M P

LSS: 8 Categories of Waste

• Under Utilized People

• Defects• Over Production• Transportation• Waiting• Inventory (excess)• Motion (excess)• Processing (over)

Watching a machine run Rework Sorting inventory Moving parts long

distances Machine Breakdown Make more than is sold Looking for tools Redundant inspections

Manufacturing ExamplesManufacturing Examples ??? ??? ??? ??? ??? ??? ??? ???

CCA ExamplesCCA Examples

Page 10: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

10

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Value Added vs. Non-Value Added

= RED (Waste) = YELLOW (Required Waste)= YELLOW (Required Waste) = GREEN (Value)

• Value is added any time we physically change our product towards what the Customer is buying

• If we are not adding value, we are adding cost or waste• Lean drives the systematic elimination of waste

KEY QUESTION – Are my Customers willing to pay for this????KEY QUESTION – Are my Customers willing to pay for this????

Value Added Time : MinutesTime in “Plant” : Weeks or Months

REQUEST COST

Note: Here the term “Plant” refers to the particular work-stream/operation where the process is conducted; the plant works.

Note: Here the term “Plant” refers to the particular work-stream/operation where the process is conducted; the plant works.

Page 11: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

11

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Path Delay Factors and Optimizing Cycle Time

1. Delay - Time spent waiting for information, approvals, etc. It can even factor in voice or email message response times, etc.

2. Review - Inspection of completed or partially completed work to check for errors or omissions (confirming conformance to policy, regulation, statutes or best practices). It may include review work of people new to the process or new employees (interns) or newly assigned responsible for various aspects of CCA (draft, approval, etc)

3. Mistakes - Redoing work because of errors or omissions identified internally (e.g. correcting data entry errors) or noticed by external stakeholders (e.g. resending CCA documentation to ameliorate errors fixed on previous versions - documentation management and control issues).

4. Duplication - Activities that are done elsewhere in the system (e.g. acquisition, PPBE, requirements or even service component versus DoD component) or that can be done more easily by another part of the system (e.g. writing data onto a form prior to computer entry or making hard copies of a form that is saved electronically).

Page 12: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

12

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Path Delay Factors and Optimizing Cycle Time

5. Movement - Physical transport of information, personnel or equipment (e.g. traveling to attend meetings or mailing/sending reports to customers/stakeholders).

6. Processing inefficiency - Performing a task in an ineffective manner (e.g. reinventing the wheel, every time a report is generated it is seen as unique and there is always a learning curve due to inexperienced people, processes, structures).

7. Resource inefficiency - Ineffective management of personnel, equipment, materials, or capital (e.g. idle workers or using workers for tasks not requiring their skills or expertise).

Page 13: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

13

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Metrics: Attributes

• Metrics are generally defined as:– “specific measures that communicate information about quality,

processes, technology, products, and resources.” (DAU LOG 204 Course material)

• An optimum metric would have the following attributes:– Tells how well organizational goals are being met thought processes

and tasks;– Represents cause-effect relationship;– Is simple, understandable, logical, repeatable;– Shows a trend (measures change, progress);– Is unambiguously defined;– Uses data that is cost effective to collect;– Allows for timely collection, analysis, and reporting of information; and– Provides insight that drives appropriate action

Page 14: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

14

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

Checklist for Title 40/CCA Requirements Sub-teams

• Who are the customers? What are their requirements? Are they measurable? How were the customer requirements determined?

• What are the key success factors for requirement being achieved? What is a requirements defect (what can go wrong)?

• What is the impact of requirement on the program, customer, and its relationship to acquisition process?

• What is the process/work flow to determine compliance?• Who are the key stakeholders? How will they be involved in the project?

Who should be on the team?• What have been the key lessons learned to date (if any)? What kinds of

barriers/obstacles will need assistance to be removed?DATA• What are the top 3 issues experienced by those completing the requirement

across the product life cycle? How often does the issue occur?• What entity/agency causes the issue? How often does the entity cause the

same issue?• What effect does the issue have on the work being conducted (how is the

issue felt?) • How long does it take to correct the issue?

Page 15: Title 40/CCA LSS Initiative Working Team Meeting Updates 23 Sep 08.

15

UNCLASSIFIED

Title 40/CCA Core Team A CIMD

15

Next StepsNext Steps

• Next Meeting:– 30 September (every Tuesday: 9 AM – 11 AM, CS4 - Room 310)

• Homework: TBD

• Action Item: TBD

• Focus:– Metrics Identified

– Data Collections Questions Completed

– Getting the Sub-teams started and underway

• Working to meet the “Deliverables” date as posted in the Milestone Calendar provided to Senior Executives


Recommended