TM0 componentsinventory and procurement schedule
In lab testing facility
29/11/2010A.Bartalesi
A.Bartalesi
Inventory layout RF system
Accelerating structure (x16) PETS structure (x8) RF network and loads
Vacuum system BI and Vacuum systems
BPM-DBQ chamber assembly Magnet system Cooling system Supporting system Pre-alignment system
29/11/2010
A.Bartalesi
Accelerating structureoverview
29/11/2010
MB Unit (Assembly)Flange (VS)Compact load (RS)
Intermodule interconnection (VS)Cooling tubes (RS)
Manifold (RS)
Waveguides (RS)
17/11/2010A. Bartalesi4
A.Bartalesi
RF systemAccelerating structure (1 of 4)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
WG type 3 CLIATLAS0034 32+4 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
WG type 4 CLIATLAS0033 32+4 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
WG type 5 CLIATLAS0040 32+4 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
WG type 7 CLIATLAS0036 32+4 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
CLIC experimental
flangeCLIAVACU018
464+8(+8 in PETS)
R
Firm selected,
prototypes are
manufactured
30/12/2010
CERN C. Garion
Ø 74Prototypes
to be manufactur
ed
26/11/2010
WG type 1 body
CLIATLAS0037 64+8 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
WG type 1 cover
CLIATLAS0038 64+8 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
WFM WG body CLIATLAS0031 64+8 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
WFM WG cover CLIATLAS0030 64+8 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
Manifold body CLIATLAS0029 64 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
AS bar type 1 CLIATLAS0028 12 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 24/11/2010
29/11/2010
A.Bartalesi
RF systemAccelerating structure (2 of 4)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
AS bar type 2 CLIATLAS0057 2 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 24/11/2010
AS bar type 3 CLIATLAS0073 2 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
AS cooling fitting adapter
CLIATLAS0053
128+32 R
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
Plug CLIATLAS0052
64+16 R
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
MB-MB interconnection
bellowCLIATLVS000
4 4 RReceived, under leak
testingDec 2010
COM-VAT C. Garion 26/11/201
0
Intermediate piece
CLIATLAS0075 2 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
Intermediate piece 2
CLIATLAS0056 2 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
HOM Load (5x5, L=40)
CLIATLAS0004 64 M
Price offer received
17/11/2010? M.P. A. French 17/11/201
0Manifold small
cover 1CLIATLAS006
2 32 MPrice inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
Manifold small cover 2
CLIATLAS0065 32 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
PIN CLIATLAS0063 32 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
29/11/2010
A.Bartalesi
RF systemAccelerating structure (3 of 4)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
MB AS small cover 3 insert
CLIATLAS0090 32 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
Manifold small cover 3
CLIATLAS0060 64 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
PINCommercial
3D: ST0290352
32 MPrice inquiry launched on
01/1112/11/20
10 (any) A. French1 cm long
metal wire
17/11/2010
UHV CF FIXED FLANGE Ø114-63-
60STDVFUHV009
216
(+8 in PETS)
ROrdered
27/10/10, to be machined
? CERN C. Garion 26/11/201
0
Vacuum tube CLIATLAS0068 16 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
Cover 2 CLIATLAS0067 16 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
MB interconnection
flange Ø155CLIATLVS000
6 4 RBeing
manufactured
Dec 2010
CERN C. Garion 26/11/201
0
Screw VacomMC-310 Commercial 96 R Vaco
m A. French 17/11/2010
12WDSDVG1.8_R05_SIC CORNER SUPPORT_002
CLIAAS120081 32+8 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
12WDSDVG1.8_R05_SIC CORNER SUPPORT_001
CLIAAS120080
64+16 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
Cover CLIATLAS0070 48 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
29/11/2010
A.Bartalesi
RF systemAccelerating structure (4 of 4)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Damping material 12
CLIATLAS0072
64 + 2 R
Price offer received
17/11/2010? M.P. A. French 17/11/201
0
Cooling tubetype 1
CLIATLAS0080 8 M
Fabrication to be
launched? CER
N A. French 17/11/2010
Cooling tubetype 2
CLIATLAS0079 16 M
Fabrication to be
launched? CER
N A. French 17/11/2010
Cooling tubetype 3
CLIATLAS0082 32 M
Fabrication to be
launched? CER
N A. French 17/11/2010
Cooling tubetype 4
CLIATLAS0081 32 M
Fabrication to be
launched? CER
N A. French 17/11/2010
MB intermodule interconn.
Damping Mat.CLIATLAS008
6 4 RPrice offer received 17/11/201
0? M.P. A. French 17/11/201
0
Connector hokeCommercial 4LMFS4BR TD
8mm112 R Swagel
ok A. French 17/11/2010
Connector hokeCommercial
4COSBR TD 8mm
16 R Swagelok A. French 17/11/201
0
Screw Vacom MFA-412 Commercial 16 R Vaco
m A. French 17/11/2010
Target sphere 0.5” Commercial 64 R ? ?
Leica Hubb
sH. Mainaud-
Durand02/11/201
0
Alignment sphere holding
magnet? 64 R ? ? ? H. Mainaud-
Durand02/11/201
0
29/11/2010
A.Bartalesi
PETS structureoverview
29/11/2010
DRIVE BEAM – PETS ASSEMBLY
Interconnection Flanges (Fixed) (VS)
PETS On-Off (Coupler)(RS)
PETS Mock-Up (RS)Interconnection Flanges (Fixed) (VS)
Cooling tubes (RS)Cooling fittings adapter (RS)
Cooling adapter (RS)PETS Minitanks(RS)
17/11/2010A. Bartalesi10
A.Bartalesi
RF systemPETS structure (1 of 3)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
ON-OFF half 1 CLIATLPE0033 8 M Fab. to be
launched15/01/201
1CER
N A. FrenchS.A.
reference person
29/11/2010
ON-OFF half 2 CLIATLPE0034 8 M Fab. to be
launched15/01/201
1 CER
N A. FrenchS.A.
reference person
29/11/2010
ON-OFF main body
CLIATLPE0029 8 M Fab. to be
launched15/01/201
1CER
N A. FrenchS.A.
reference person
29/11/2010
CLIC experimental
flangeCLIAVACU018
48
(+72 in AS)
R
Firm selected,
prototypes are
manufactured
30/12/2010
CERN C. Garion
Ø 74Prototypes
to be manufactur
ed
26/11/2010
ON-OFF piston mock-up CLATLPE0028 8 M
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
ON-OFF plug CLIATLPE0027 8 M
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
Parallel pin 5x20
CLIATLPE0049 32 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
UHV CV fixed flange Ø202
CLIATLPE0017 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
PETS adapter disk 3
CLIATLPE0048 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
PETS adapter disk 2
CLIATLPE0020 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
PETS adapter disk 1
CLIATLPE0015 8 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
29/11/2010
A.Bartalesi
RF systemPETS structure (2 of 3)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
PETS beam pipe
CLIATLPE0021 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
DN 63 - UHV CF fixed flange
CLIATLPE0022 4 R To be
machinedDec 2010
CERN C. Garion Ø 114 26/11/201
0
PETS cooling adapter
CLIATLPE0030 16 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
Plug Ø14 CLIATLPE0043 16 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
PETS mock up bars
CLIATLPE0002 8 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
PETS damping block
CLIATLPE0007 64 M
Price offer received
17/11/2010? M.P. A. French 17/11/201
0
Pin CLIATLPE0004 128 M
Price inquiry launched
28/10/201005/11/20
10 B-S A. French 17/11/2010
Holder plate CLIATLPE0003 64 M
Price inquiry launched
28/10/201005/11/20
10 B-S A. French 17/11/2010
VACOM MF-308 screw Commercial 128 R Vaco
m A. French 17/11/2010
Minitank tube CLIATLPE0009 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
Minitank tube (short)
CLIATLPE0051 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/201029/11/2010
A.Bartalesi
RF systemPETS structure (3 of 3)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Minitank flange CLIATLPE0010 16 R
Fabrication to be
launched05/11/20
10CER
N A. FrenchØ 120-124 J.M.G.
reference person
17/11/2010
Tube CLIATLPE0011 8 R
Fabrication to be
launched05/11/20
10CER
N A. FrenchJ.M.G.
reference person
17/11/2010
UHV CF FIXED FLANGE Ø114-63-
60STDVFUHV009
28 (+16 in AS) R To be
machinedDec 2010
CERN C. Garion 26/11/201
0
PETS U-cooling tube
CLIATLPE0032 4 R
Fabrication to be
launched05/11/20
10CER
N A. French 17/11/2010
HOKE male connector
Commercial6CMS6BR 16 R Swagel
ok A. French 17/11/2010
29/11/2010
A.Bartalesi
RF network and loadsoverview
29/11/2010
TYPE 1 TYPE 2
Hybrid (RS)Splitter (RS)
AS Connection WG (RF)
PETS Connection WG (RS)
Choke Mode Flange (RS)
RF Load (RS)
RF Load (RS)
A.Bartalesi
RF systemRF network and loads
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
RF network system None 2 Both Under
drafting14/11/20
10Multipl
e A. French3D
mockup study
ongoing
15/11/2010
Compact load None 40 BothFinalizing design and drawings
? Multiple A. French 15/11/201
0
29/11/2010
A.Bartalesi
Vacuum systemoverview
29/11/2010
Tube network
Connectionto central tank
Bellows
A.Bartalesi
Vacuum system (1 of 2)Name Drawing #
Quantity (2
TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Vacuum tank To be assigned 2 R Under
design03/12/20
10CERN C. Garion 26/11/201
0
Ion pumpCommercial
(Vaclon-plus75)
2 R On stock C. Garion 26/11/2010
Cartridge pumpCommercial(SAES GP 500
MK5)4 R Received C. Garion 26/11/201
0
AS connection bellows
To be assigned 16 R Under
design03/12/20
10CERN C. Garion Welded
on tank26/11/201
0PETS
connection bellows
To be assigned 8 R Under
design ASAP CERN C. Garion Welded
on tank26/11/201
0
UHV CF FLANGE Ø114-63-60 (rotating)
STDVFUHV0092 24 R
Received, to be
machinedDec 2010
CERN C. Garion 26/11/201
0
Gasket for Ø114 Flange 24 R Received CER
N C. Garion 26/11/2010
CLIC UHV RF gasket
CLIATLVS0005 80 R Ordered Jan
2010GARL-OCK C. Garion
To be moved in RF
section, Ø 74
26/11/2010
“Helicoflex” Commercial 3 R Ordered Jan 2010
GARL-OCK C. Garion 26/11/201
0Blank flanges at the outside of 2 modules?
?2 MB + 2 DB
M? ? ? ? C. Garion 26/11/2010
Vacuum network
assemblyCLIATLVS001
6-29 8 R Under control
03/12/2010
CERN C. Garion 26/11/201
0
29/11/2010
A.Bartalesi
Vacuum system (2 of 2)Name Drawing #
Quantity (2
TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Rack commercial? ? ? ? ? C. Garion 26/11/2010
Acquisition commercial? ? ? ? ? C. Garion 26/11/2010
Cabling commercial? ? ? ? ? C. Garion 26/11/2010
29/11/2010
A.Bartalesi
BI systemoverview
29/11/2010
Vacuum chamber
RF finger
Rotating flange
CeramicFeed-through
A.Bartalesi
BI System (1 of 3)(BPM-DBQ assembly)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
RF-FINGER FLANGE 1 CLIATLBI0003 8 R Production 30/12/20
10CERN C. Garion 26/11/201
0RF-FINGER INTERFACE
RINGCLIATLBI0004 8 R Production 30/12/20
10CERN C. Garion 26/11/201
0
RF-FINGER(SM DESIGN) CLIATLBI0005 8 R? Drawings
released ? CERN C. Garion 26/11/201
0
UHV ROTATING FLANGE 114/63
insertCLIATLVS000
2 4 R
Raw ordered
(27/10/10), to be
machined
Dec 2010
CERN C. Garion 26/11/201
0
UHV flange ring 114/63
STDVFUHV0008 4 R Received ? CER
N C. Garion 26/11/2010
UHV ROTATING FLANGE
202/150 insertCLIATLVS000
1 4 R
Raw ordered
(27/10/10), to be
machined
Dec 2010
CERN C. Garion 26/11/201
0
UHV flange ring 202/150
CLIATLVS0003 4 R Received ? CER
N C. Garion 26/11/2010
Bellow interface flange CLIATLBI0016 4 R Drawings
released ? CERN C. Garion
Done by the bellows
manufacturer
26/11/2010
Welding fitting CLIATLBI0015 4 R Drawings released ? CER
N C. GarionDone by
the bellows
manufacturer
26/11/2010
BellowNO DWG!
3D: ST0293101
4 RPrice
Inquiry to be launched
03/12/2010 C. Garion 26/11/201
0
29/11/2010
A.Bartalesi
BI System (2 of 3) (BPM-DBQ assembly)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
DBQ chamber CLIATLBI0001 4 M Drawings released ? ? L. Soby 26/11/201
0
DB BPM body CLIATLBI0002 4 M Drawings released ? ? L. Soby 26/11/201
0Ceramic based feed-through CLIATLBI0012 16 M Drawings
released ? ? L. Soby 26/11/2010
DB BPM alignment
frameCLIATLBI0008 4 M Drawings
released ? ? L. Soby 26/11/2010
DB BPM load insert CLIATLBI0011 32 M Drawings
released ? ? L. Soby 26/11/2010
DB BPM half ring load CLIATLBI0010 16 M Drawings
released ? ? L. Soby 26/11/2010
DB BPM damping ring CLIATLBI0014 4 M Drawings
released ? ? L. Soby 26/11/2010
PIN D4X10 CLIATLBI0013 4 M Drawings released ? ? L. Soby 26/11/201
0Vented screw
VACOM MC-310 Commercial 32 R ? ? ? C. Garion 12/11/2010
Spring washer M3 DIN 137
type ACommercial 32 R ? ? ? C. Garion 12/11/201
0
HEX SKT HD CAP Screw
M4x8
Commercial(VIS
CHC_M4x8)12 M ? ? ? L. Soby 26/11/201
029/11/2010
A.Bartalesi
BI System (3 of 3) (BPM-DBQ assembly)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
HUBBS .5 SM 10mm-8mm Commercial 12 R? ? ?
Leica Hubb
sH. Mainaud-
Durand (Sphere)
Sphere holder? ? 12 R? ? ?Leica Hubb
s?H. Mainaud-
Durand
It appears
in 2D but is not
named
29/11/2010
A.Bartalesi
Magnet systemoverview
29/11/2010
DBQ mock-up
A.Bartalesi
Magnet systemName Drawing #
Quantity (2
TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
DB quad mock-up
To be assigned 4+1 M
Procurement
launched15/01/20
11CERN A. Bartalesi 12/11/201
0
Supporting Plate (DB-
Quad)_ver. CCLIATLSS000
9 4+1 M
2D drawings
done, waiting
approval
05/11/2010
CERN N. Gazis 29/10/201
0
29/11/2010
A.Bartalesi
Cooling systemName Drawing #
Quantity (2
TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Cooling system None 2 3D design done ? Multipl
e A. French 29/10/2010
Rack commercial? ? ? ? ? A. French 01/11/2010
Acquisition commercial? ? ? ? ? A. French 01/11/2010
Cabling commercial? ? ? ? ? A. French 01/11/2010
29/11/2010
A.Bartalesi
Supporting systemoverview
29/11/2010
DB(boostec)
MB(microcontrol
e)
A.Bartalesi
Supporting systemName Drawing #
Quantity (2
TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
DB girder withV-supports
CLIATLSS0005 2 R Being
delivered30/11/20
10Boost
ec N. Gazis
Few days delay due to modif.
26/11/2010
DB cradle system ? 3 R
2D drawings
done, waiting
approval
15/11/2010
CERN N. Chritin 26/11/201
0
MB girder CLIATLSS0006 2 R Being
delivered3/12/201
0Micro-control
eN. Gazis 26/11/201
0
MB V-support CLIATLSS0006 10 R Being
delivered3/12/201
0Micro-control
eN. Gazis 26/11/201
0
MB cradle system
CLIATLSS0006 3 R Being
delivered3/12/201
0Micro-control
eN. Gazis
N. Gazis is responsible
for the complete
supporting system
concept of Micro-
controle for CLIC Module
Type 0
26/11/2010
Central vacuum tank support ? 4 R
Making the 2D
drawings06/12/20
10CERN N. Gazis 26/11/201
0
U-clamps forV-support
CLIATLSS0011 44 R
Finalizing the 2D
drawings06/12/20
10CERN N. Gazis
Modification on fixation
pin26/11/201
029/11/2010
A.Bartalesi
Pre-alignment systemDB components only (1 of 2)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
cWPS with 3D interface Commercial 5 R
Received, under
validation tests
15/12/2010 F.N. H. Mainaud-
DurandNeeded
for 01/12/201
0
25/11/2010
cWPS interfaces Commercial 8 R Ordered 30/11/20
10M.S.N.
H. Mainaud-Durand
Needed for
08/11/2010
25/11/2010
oWPS Commercial 3 RReady(CER
N and SLAC)
OSI H. Mainaud-Durand
25/11/2010
oWPS interfaces Commercial 3 R
50% Received
50% Ordered
30/11/2010 ? H. Mainaud-
DurandNeeded
for 08/11/201
0
25/11/2010
Inclinometer 1 axis Commercial 3 R
Delivered (being tested)
15/11/2010
Althen
H. Mainaud-Durand
Needed for
01/12/2010
25/11/2010
Temperature sensor
Commercial (PT100) 3 R Ready H. Mainaud-
Durand25/11/201
0
Linear actuator Commercial 9 R Ordered 06/12/2010 ZTS H. Mainaud-
DurandNeeded
for 15/11/201
0
25/11/2010
Prism support Commercial ? R Delivered H.M. H. Mainaud-Durand
Needed for
08/11/2010
25/11/2010
Base settlement interface
? 3 R Ordered 30/11/2010
CERN
H. Mainaud-Durand
Needed for
01/12/2010
25/11/2010
Sensor plate ? 2 R Design in progress
30/11/2010
CERN
H. Mainaud-Durand
Needed for
31/10/2010
25/11/2010
Wire stretcher LHCGIWPS0189 2 R Ordered 15/12/20
10CERN
H. Mainaud-Durand
Needed for
01/12/2010
25/11/2010
29/11/2010
A.Bartalesi
Pre-alignment systemDB components only (2 of 2)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Rack None 1 R Ordered 30/11/2010
CERN catalog
H. Mainaud-Durand
Needed for
01/12/2010
25/11/2010
Acquisition (SAS) None 1 R Ready CER
NH. Mainaud-
DurandNeeded
for 01/12/201
0
25/11/2010
MCA8 cable None 13 R Ordered 30/11/2010
CERN
H. Mainaud-Durand
Needed for
01/12/2010
25/11/2010
Linear actuators cable None 5 R Given to
ZTS30/11/20
10CERN
H. Mainaud-Durand
25/11/2010
PC None 1 R Ready 15/11/2010
CERN catalog
H. Mainaud-Durand
Needed for
01/12/2010
25/11/2010
29/11/2010
A.Bartalesi
Pre-alignment systemMB components only (1 of 2)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
cWPS with 3D interface Commercial 4 R
Received, under
validation tests
15/12/2010 F.N. H. Mainaud-
DurandNeeded
15/12/2010
25/11/2010
cWPS interfaces Commercial 7 R Ordered 30/11/20
10M.S.N.
H. Mainaud-Durand
Needed08/11/20
1025/11/201
0
oWPS Commercial 3 RReady(CER
N and SLAC)
OSI H. Mainaud-Durand
25/11/2010
oWPS interfaces Commercial 3 R
50% Received
50% Ordered
30/11/2010 ? H. Mainaud-
DurandNeeded
08/11/2010
25/11/2010
Inclinometer 1 axis Commercial 3 R Ordered 15/11/20
10Althe
nH. Mainaud-
DurandNeeded
15/12/2010
25/11/2010
Temperature sensor
Commercial (PT100) 3 R Ready H. Mainaud-
Durand25/11/201
0Sensor
interface with girder
CERN 4 RDesigned,
to be ordered
15/11/2010
CERN
H. Mainaud-Durand
Needed01/12/20
1025/11/201
0
Prism support Commercial ? R Ordered H.M. H. Mainaud-Durand
Needed08/11/20
1025/11/201
0
Base settlement interface
CERN 3 R Ordered 30/11/2010
CERN
H. Mainaud-Durand
Needed01/12/20
1025/11/201
0
Sensor plate CERN 2 R Ordered 30/11/2010
CERN
H. Mainaud-Durand
Needed31/10/20
1025/11/201
0
Wire stretcher LHCGIWPS0189 2 R Ordered 15/12/20
10CERN
H. Mainaud-Durand
Needed15/12/20
1025/11/201
0
29/11/2010
A.Bartalesi
Pre-alignment systemMB components only (2 of 2)
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Rack None 1 R Ordered 30/11/2010
CERN catalog
H. Mainaud-Durand
Needed15/12/20
1025/11/201
0
Acquisition (SAS) None 1 R Ready CER
NH. Mainaud-
DurandNeeded
15/12/2010
25/11/2010
MCA8 cable None 13 R Ordered 30/11/2010
CERN
H. Mainaud-Durand
Needed15/12/20
1025/11/201
0
29/11/2010
A.Bartalesi 29/11/2010
Thanks for you interest-and-
Thanks to all the procurement responsible people for their
precious help!
Introduction to priority levels
Priority level 0
Priority level 1Priority level 1
Priority level 2
A “priority level” has been assigned to parts basing on their “indent level” in the project structure. Example:
The higher the priority level, the sooner we will need the part during assembly phase, if we are going to follow the assembling sequence defined by the drawings.If some changes in the mounting order are required for some few components, we can modify their priority level and keep the rest as is.
Priority level 2
Supplementary
information
A.Bartalesi
RF systemAccelerating structure (1 of 4)
29/11/2010
Name Drawing # Priority level
WG type 3 CLIATLAS0034 5
WG type 4 CLIATLAS0033 5
WG type 5 CLIATLAS0040 6
WG type 7 CLIATLAS0036 6
CLIC experimental
flangeCLIAVACU018
4 7
WG type 1 body
CLIATLAS0037 8
WG type 1 cover
CLIATLAS0038 8
WFM WG body CLIATLAS0031 6
WFM WG cover CLIATLAS0030 6
Manifold body CLIATLAS0029 5
AS bar type 1 CLIATLAS0028 4
Name Drawing # Priority level
AS bar type 2 CLIATLAS0057 4
AS bar type 3 CLIATLAS0073 4
AS cooling fitting adapter
CLIATLAS0053 4
Plug CLIATLAS0052 4
MB-MB interconnection
bellowCLIATLVS000
4 3
Intermediate piece
CLIATLAS0075 3
Intermediate piece 2
CLIATLAS0056 3
HOM Load (5x5, L=40)
CLIATLAS0004 3
Manifold small cover 1
CLIATLAS0062 3 and 2
Manifold small cover 2
CLIATLAS0065 3 and 2
PIN CLIATLAS0063 3
Supplementary
information
A.Bartalesi
RF systemAccelerating structure (2 of 2)
29/11/2010
Name Drawing # Priority level
Damping material 12
CLIATLAS0072 2
Cooling tubetype 1
CLIATLAS0080 1
Cooling tubetype 2
CLIATLAS0079 1
Cooling tubetype 3
CLIATLAS0082 1
Cooling tubetype 4
CLIATLAS0081 1
MB intermodule interconn.
Damping Mat.CLIATLAS008
6 1
Connector hokeCommercial 4LMFS4BR TD
8mm1
Connector hokeCommercial
4COSBR TD 8mm
1
Screw Vacom MFA-412 Commercial 1
Target sphere 0.5” Commercial 1
Alignment sphere holding
magnet? 1
Name Drawing # Priority level
MB AS small cover 3 insert
CLIATLAS0090
4 and 3
Manifold small cover 3
CLIATLAS0060
4 and 3
PINCommercial
3D: ST0290352
3
UHV CF FIXED FLANGE Ø114-63-
60STDVFUHV009
2 3
Vacuum tube CLIATLAS0068 3
Cover 2 CLIATLAS0067 3
MB interconnection
flange Ø155CLIATLVS000
6 2
Screw VacomMC-310 Commercial 2
12WDSDVG1.8_R05_SIC CORNER SUPPORT_002
CLIAAS120081 2
12WDSDVG1.8_R05_SIC CORNER SUPPORT_001
CLIAAS120080 2
Cover CLIATLAS0070 2
Supplementary
information
A.Bartalesi
RF systemPETS structure
29/11/2010
Name Drawing # Priority level
ON-OFF half 1 CLIATLPE0033 5
ON-OFF half 2 CLIATLPE0034 5
ON-OFF main body
CLIATLPE0029 3
CLIC experimental
flangeCLIAVACU018
4 3
ON-OFF piston mock-up CLATLPE0028 4
ON-OFF plug CLIATLPE0027 4
Parallel pin 5x20
CLIATLPE0049 3
UHV CV fixed flange Ø202
CLIATLPE0017 2
PETS adapter disk 3
CLIATLPE0048 2
PETS adapter disk 2
CLIATLPE0020 2
PETS adapter disk 1
CLIATLPE0015 2
Name Drawing # Priority level
PETS beam pipe
CLIATLPE0021 2
DN 63 - UHV CF fixed flange
CLIATLPE0022 2
PETS cooling adapter
CLIATLPE0030 2
Plug Ø14 CLIATLPE0043 2
PETS mock up bars
CLIATLPE0002 2
PETS damping block
CLIATLPE0007 2
Pin CLIATLPE0004 2
Holder plate CLIATLPE0003 2
VACOM MF-308 screw Commercial 2
Minitank tube CLIATLPE0009 2
Minitank tube (short)
CLIATLPE0051 2
Name Drawing # Priority level
Minitank flange CLIATLPE0010 2
Tube CLIATLPE0011 2
UHV CF FIXED FLANGE Ø114-63-
60STDVFUHV009
2 2
PETS U-cooling tube
CLIATLPE0032 1
HOKE male connector
Commercial6CMS6BR 1
Supplementary