TMB and RAT Status Report. Jay Hauser University of California Los Angeles. TMB Hardware Since April Emu@OSU. Procured all FPGAs (Xilinx X2V4000) Got fixed Virtex-2 mezzanine layout from Kan I/O pads are grouped in pairs, each pair needs to use the same clock. - PowerPoint PPT Presentation
28
1 Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA TMB and RAT Status Report Jay Hauser Jay Hauser University of California Los Angeles University of California Los Angeles
Transcript
Page 1: TMB and RAT Status Report

1Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB and RAT Status Report

Jay HauserJay Hauser

University of California Los AngelesUniversity of California Los Angeles

Page 2: TMB and RAT Status Report

2Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB Hardware Since April Emu@OSU• Procured all FPGAs (Xilinx X2V4000)• Got fixed Virtex-2 mezzanine layout from Kan

• I/O pads are grouped in pairs, each pair needs to use the same clock.

• Made 40 X2V4000 mezzanine cards• 2 remaining mezzanine card problems (there were 3 simple fixes)

• Made 29 working sets (TMB-base, TMB-mezz, RAT)• 1 base board has a bad SCSI connector• 9 sets used for full-crate tests• No problems seen at FAST site

• Procured all parts for full production (520 sets)• Still waiting for some hex switches and front-panel parts (due soon)

• Full-crate tests done at OSU, no problems• May-June test beam problem found:

• ALCT inputs through RAT did not work at all.• RPC inputs through RAT seemed okay (minor problems).

Page 3: TMB and RAT Status Report

3Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

RAT-to-TMB TTL Data Xmission• RAT gets everything (power, gnd, control signals) from TMB• Currently no connections to the common backplane

TMB

RAT

Backplane

NC

Page 4: TMB and RAT Status Report

4Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

RAT2003A DetailTo TMBTo TMBGND only GND only

RPC connectorsRPC connectors

To TMB and 3.3v, To TMB and 3.3v, 1.8v power 1.8v power

ALCT ALCT LVDS-TTL LVDS-TTL convertersconverters

Spartan 2E Spartan 2E FPGA for FPGA for

RPCRPC

ALCT SCSI connectorsALCT SCSI connectors

Mechanical Only Mechanical Only

Page 5: TMB and RAT Status Report

5Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

RAT-to-TMB Ground Problem• May-June test beam:

• Only the bottom connector on backplane

• 110 single-ended 80 MHz TTL signals from RAT to TMB.

• Reference ground and current return on 6 pins.

• “Typical” design used for all other modules in peripheral crate:• 1 GND per row of 5 pins, i.e. 25 GNDs per 125-pin connector

• Ground reference close to every signal

• Grounded to the backplane

It is not a DC current problem, it is an RF problem • 40 MHz noise

• 80 MHz signals, edges with 1-2 ns rise times.

Page 6: TMB and RAT Status Report

6Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Ground Issues, cont.• RPC signals seemed to work at May-June t.b.

• They are buffered through FPGA close to connector

• May have slightly better RF characteristics (N.B. no CRC available).

• Also a problem: layout house for TMB used very thin ground and power planes• ½-oz thickness of copper

• Usual thickness is 1-oz or 2-oz

• Ground plane impedances therefore higher

• Bench tests show very significant ground plane noise

Page 7: TMB and RAT Status Report

7Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB Ground minus RAT Ground

100 kHz ALCT

600 mV P-P

1 MHz ALCT

700 mV P-P

No ALCT triggers

300 mV P-P• 40 MHz noise depends

on ALCT trigger rate:

Page 8: TMB and RAT Status Report

8Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB-RAT Ground Details

Page 9: TMB and RAT Status Report

9Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

RAT-to-TMB Ground Problem• Bench investigations using CRC error checking of

ALCT data:• Checks for any bit errors in ~800 bytes of data.

• Rate of errors also seen to increase with ALCT trigger rate– Errors start when ALCT readout and triggering overlap in time

– Reaches ~100% before 1 MHz.

• Checks signal integrity through 8-bit DAQ path (out of 50 ALCT signals), i.e. many signals not checked.

• UC FAST site investigations using CRC:• Typically 0.5-2.0% errors seen.

• “New and improved” short backplane– 11 GNDs added, but on a different connector than TTL signals

– No observed change in the rate of CRC errors.

Page 10: TMB and RAT Status Report

10Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Test Beam Study of TMB-RAT Interface

• CRC checks that every bit of ~800 bytes is transmitted correctly.

• May-June test beam:• TMB backplane fed GND to RAT with only 6 pins.

• ALCT data did not successfully go through at all.

• Sept-Oct test beam:• TMB backplane had additional connector with 11 more GND pins.

• ALCT errors were found only at high rates at the Sept-Oct test beam.

• General observation that CRC errors increase with rate agrees with bench tests.

Page 11: TMB and RAT Status Report

11Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Sept. 2004 Test Beam Study

0.00E+00

5.00E-08

1.00E-07

1.50E-07

2.00E-07

2.50E-07

3.00E-07

0 100 200 300 400 500 600 700 800

Rate (KHz)

ALCT

CRC

Erro

r Frac

tion

• High-rate CRC error test:• Went up to 3.4 million muons

per spill before radiation alarms went off (ahem)

• Otherwise, ALCT-RAT-TMB worked fine

74.5 Million ALCTs

15 CRC errors

Page 12: TMB and RAT Status Report

12Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Conclusions on RAT-TMB Data Transmission Tests

• Ground noise is quite large• Level of success of tests varies dramatically:

• Absolutely no success at May-June beam test

• Errors reproduced and understood with bench tests

• Small rate of errors observed at UC FAST site

• Very very small rate of errors observed at Sept beam test

• Variable level of success not really surprising for a noise problem• Sitting on the edge of a serious problem

• This situation is unacceptable for long-term CMS operation, we would like to eliminate this problem entirely

Page 13: TMB and RAT Status Report

13Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Remedy

• Make the grounding for RAT like any other board in the peripheral crate:• Add one ground pin on every row of RAT pins

• Add backplane ground connections

• Requires more total pins:• Replace 55-pin X3 and 125-pin X18 connectors by two 110-

pin Type-A connectors

• 40 more pins, all “C” column pins used for grounding

• Also more robust alignment pins (noticed RAT alignment pins already broken before Sept beam test)

Page 14: TMB and RAT Status Report

14Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Implications• Backplane layout needs modification

• ~3 months, according to Alex

• TMB and RAT board layouts need modification• Also ~3 months, according to our estimate

– Includes thickening up the 1/2-oz ground and power planes and necessary changes to details of vias, thermal reliefs, etc.

– Includes “cleaning up” the data pathway from RAT to TMB.

• Revised “loop-back” backplane used for self-testing– will add proper RAT connection for production testing (previously RAT-TMB

connectors inserted by hand, subject to bent pins)

• More type-A connectors and backplane shrouds need to be ordered• Backplane pins have long lead-time, should be ordered immediately

Page 15: TMB and RAT Status Report

15Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB/RAT Production Schedule• Mezzanine card production can begin next week

• No problems seen with Virtex-II mezzanine card

• Re-layout of RAT and TMB:• RAT: 2 weeks• TMB: ~10 weeks• Testing loop-back backplane: 1 week

• Quick prototype cycle in February.• Production immediately after that.• Testing goes quickly, more than 4 boards per working day.• Deliveries of working TMB and RAT pairs:

• 25% by April 30 (130 of 520 boards, including 10% spares)• 50% by June 30 (260 of 520 boards)• 75% by August 31 (390 of 520 boards)• 100% by October 31 (all 520 boards)

• Boards will be shipped as soon as they are tested and acceptable space (not boxes) exists for them at CERN

Page 16: TMB and RAT Status Report

16Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Happier Matters• Active pulsing of CFEB front ends• Active pulsing of test strips• DAQ error checking by CRC technique• New TMB counters

Page 17: TMB and RAT Status Report

17Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

DAQ Error Checking by CRC• CRC = Cyclic Redundancy Check• Special “checksum” (22 bits) added to end of data

block to represent pattern of 1’s and 0’s sent• This checksum can be re-calculated from the 1’s and

0’s sent, then compared to the checksum received.• ALCT and TMB both create CRCs for their data.• TMB also checks ALCT CRC on the fly

• TMB adds CRC-error bit to last ALCT trailer word.• TMB counts & stores in VME register the number of CRC errors from

ALCT.• DDU now separates CRC errors coming from ALCT, CLCT/TMB.

• CRC bench test:• Special ALCT firmware creates dummy buffer of 400 words and responds

to external trigger• CRC can be checked at arbitrary rate with pulse generator

Page 18: TMB and RAT Status Report

18Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB Counters• VME registers recently added for real-time

counts of 23 various interesting things:• ALCTs

• CLCTs

• Matched LCTs

• L1 Accepts

• ALCT readout

• CLCT readout

• MPC accepts (muon 0, muon 1)

• ALCT CRC errors

• Etc. etc.

• Very useful diagnostics at test beam

Page 19: TMB and RAT Status Report

19Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Additional Slides Follow

Page 20: TMB and RAT Status Report

20Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Active Pulsing of CFEB Front Ends• How it’s done:

• All channels have capacitors with 4 levels of charge that can be preset (0,1,2,3) within Buckeye ASIC

• “left half-strip” puts strip charges at ….,0,0,0,2,3,1,0,0,0…• “right half-strip” puts strip charges at …,0,0,0,1,3,2,0,0,0…• Single VME command to DMB pulses all channels simultaneously• Patterns give e.g. 6-layer CLCTs• First vary 40 MHz clock phase from TMB to comparators until

patterns correctly found• Then patterns can be swept across entire chamber and checked

• Advantages:• Finds optimum phase of 40 MHz clock to comparators• Checks all Buckeye, comparator, and CFEB-TMB Skewclear

cable channels• Test takes a few minutes• No gas, HV, etc. needed

Page 21: TMB and RAT Status Report

21Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Active Pulsing of Test Strips• How it’s done:

• CCB provides 500ns gate to make the ALCT test strip pulses• Capacitive coupling between test strips and anode wire groups

gives pulses on leading and trailing edges of 500ns pulse• All channels fire on leading edge• Hot wire mask on ALCT board ALCT patterns• Like CFEB, vary 40 MHz receive and send phases until optimum

data transmission from TMB to and from ALCT• Find optimum in 2D matrix of receive/send clock phases• Scan patterns across chamber to find bad AFEB/ALCT channels

Advantages:• Set up phases of 80 MHz clock TMB to and from ALCT with high

reliability without HV, gas, or cosmic ray data• Check all AFEB, ALCT, and Skewclear channels through the

system• What previously took days now takes minutes

Page 22: TMB and RAT Status Report

22Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

More on TMB and RAT Power

Page 23: TMB and RAT Status Report

23Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB Ground minus RAT Ground

100 kHz ALCT

600 mV P-P

1 MHz ALCT

700 mV P-P

No ALCT triggers

300 mV P-P• 40 MHz noise depends

on ALCT trigger rate:

Page 24: TMB and RAT Status Report

24Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Other Noise Measurements• RAT GND versus

RAT +3.3v (okay) 100 mV/division

GND vs +3.3v

Clock off

GND vs +3.3v

Clock ON

GND vs +3.3v

Clock ON

ALCT 1 MHz

Page 25: TMB and RAT Status Report

25Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Other Noise Measurements• TMB GND versus

TMB +3.3v (okay) 100 mV/division

GND vs +3.3v

Clock off

GND vs +3.3v

Clock ON

GND vs +3.3v

Clock ON

ALCT 1 MHz

Page 26: TMB and RAT Status Report

26Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

Other Noise Measurements• TMB “logic 1” signal as seen at

RAT, 2v per division

• Big noise seen, as expected from GND(TMB) – GND(RAT) measurements

Logic 1

Clock off

Logic 1

Clock ON

Logic 1

Clock ON &

ALCT 1 MHz

!

Page 27: TMB and RAT Status Report

27Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

LVTTL (from +3.3v) Logic Levels• Typical outputs 0.4v low, 2.4v high, transition ~1.5v• Worst case output supposed to be 0.8v low, 2.0v high• Measurements show violation of that

Page 28: TMB and RAT Status Report

28Endcap Muon meeting: FNAL, Oct. 29-30, 2004 J. Hauser UCLA

TMB, RAT Power Supply Filtering Capacitor Design

• TMB base board• Power sources for +3.3v and +1.8v: 2x100uF, 4x4.7uF, 1x1uF, 1x0.1uF

• Power destinations: hundreds of 0.1 uF capacitors across board, typically several for each driver

• Power sources for +3.3v and +1.5v for RAT: 1x100uF, 1x4.7uF, 1x1uF, 1x0.1uF

• RAT board• 3x4.7uF, 12x0.1uF

• Many 0.1 uF capacitors distributed across board, several for each driver

• Virtex-II mezzanine board• 2x330uF, 10x47uF, ~20x0.1uF, ~40x0.022uF distributed according to

Xilinx spec.

• Connections to TMB base board with 56 ground pins, 19 +1.5v pins, 17 +3.3v pins

• Comment: looks OK