+ All Categories
Home > Documents > TO A SUCCESSFUL INTEGRATION OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

TO A SUCCESSFUL INTEGRATION OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

Date post: 20-Jan-2016
Category:
Upload: ohio
View: 34 times
Download: 0 times
Share this document with a friend
Description:
TO A SUCCESSFUL INTEGRATION OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE). Joaquim Cavalheiro AMTP Executive Board President. Contents. Portugal and the Metropolitan Area of Oporto Municipalities in the Metropolitan Area of Oporto - PowerPoint PPT Presentation
Popular Tags:
20
TO A SUCCESSFUL INTEGRATION OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE) 16/9/2013 AMTP 1 Joaquim Cavalheiro AMTP Executive Board President
Transcript
Page 1: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

TO A SUCCESSFUL INTEGRATION OF PUBLIC TRANSPORT OPERATORS

AND ROAD OPERATORS

(THE AMTP CASE)

16/9/2013 AMTP 1

Joaquim CavalheiroAMTP Executive Board President

Page 2: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

Contents

1. Portugal and the Metropolitan Area of Oporto

2. Municipalities in the Metropolitan Area of Oporto

3. Metropolitan Transport Authority of Oporto

4. Public Transport Offer

5. Near Future and Challenges

16/9/2013 AMTP 2

Page 3: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

1. Portugal and theMetropolitan Area of Oporto

Key figures PortugalMetropolitan

Area of Oporto (AMP)

%

Population (2011) 10.562.178 1.672.670 16

Area(Km2) 92.212 1.883 2

Municipalities 308 16 5

Fonte: http://www.pordata.pt

16/9/2013 AMTP 3

Page 4: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

2. Municipalities in the Metropolitan Area of Oporto

Municipalities Population in 2011 Area Km2

Arouca 22.359 329

Espinho 31.786 21Gondomar 168.027 132Maia 135.306 83Matosinhos 175.478 62Oliveira de Azeméis 68.611 161Porto 237.591 41Póvoa do Varzim 63.408 82Santa Maria da Feira 139.312 216Santo Tirso 71.530 137São João da Madeira 21.713 8Trofa 38.999 72Vale de Cambra 22.864 147Valongo 93.858 75Vila do Conde 79.533 149Vila Nova de Gaia 302.295 168Total 1.672.670 1.883

Data Source: http://www.pordata.pt/Municipios

16/9/2013 AMTP 4

Data Source: http://www.amtp.pt/ficheiros/mapas/mapaAMP.php

Page 5: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

3.1. Metropolitan Transport Authority of Oporto (AMTP)

16/9/2013 AMTP 5

Page 6: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

3.2. AMTP Governance Structure

16/9/2013 AMTP 6

* Municipalities, consumers, supervising entities, infrastructure managers, companies, unions, supervisory bodies of road safety

Page 7: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

3.3. Human resources*

DivisionsDivision

Head

Senior Technical

Staff

Administrative Assistants

Total

Central Services 1  2  3 6

Planning  1 7 8

Regulation  1 8   9

Communication  1 7   8

Total 4 24 3 31

16/9/2013 AMTP 7

* 2013 – Actual universe of 17 colaborators 2014 – Authorization granted to strenghen the staff up to 23 colaborators

Page 8: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

4. Public Transport Offer

16/9/2013 AMTP 8

* Intermodal Transport Ticket

Page 9: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

4. ANDANTE

16/9/2013 AMTP 9

Metropolitan Area of Oporto Intermodal Transport Ticket

Created in December 2002

Managed by TIP – Transportes Intermodais do Porto, ACE (a complementary group of companies composed by the three public owned operators)

SHAREHOLDERS %

Comboios de Portugal, EPE (Heavy Rail Operator)

33,33

Metro do Porto, S.A. (Light Rail Operator)

33,33

STCP, SA(Road Operator)

33,33

Page 10: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

4. Public Transport Offer

16/9/2013 AMTP 10

Page 11: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

4. Public Transport Offer

16/9/2013 AMTP 11

Page 12: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

4. Public Transport Offer

16/9/2013 AMTP 12

Page 13: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

5. Near Future and Challenges

16/9/2013 AMTP 13

INTEGRATIONINTEGRATION

Co-ModalityCo-Modality

Economic EfficiencyEconomic Efficiency

Environmental SustainabilityEnvironmental Sustainability Social EquitySocial Equity

Page 14: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

5. Near Future and Challenges

– Establish a network of Interfaces

(3 Levels)

– Improve planning in Parking and Public

Transport

– Promote dedicated Lanes

16/9/2013 AMTP 14

5.1 Infrastructure Integration

Page 15: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

5. Near Future and Challenges

16/9/2013

5.2 Tariff Integration

AMTP 15

Page 16: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

5. Near Future and Challenges

– Expand ANDANTE to all operators in the AMP

– Expand tariff Zonning to all municipalities in the AMP

16/9/2013

5.2 Tariff Integration

AMTP 16

Page 17: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

5. Near Future and Challenges

– Improve the knowledge of the demand and its

evolution

– Improve the quality and quantity of the

information provided to citizens

– Promote the utilization of Support Systems to

Management and Control to all operators16/9/2013 AMTP 17

5.3 Logic Integration

Page 18: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

5. Near Future and Challenges

National Regulator established by Law on the 28 August 2013

AMTP 1816/9/2013

Redesign of the organizational model of public transport in progress

5.4 Institutional Integration

Metropolitan Area of Lisbon

Metropolitan Area of Oporto

Page 19: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

5. Near Future and Challenges

– New institutional competences alignment

– To make Urbanism and Transportation Politics compatible

16/9/2013 AMTP 19

5.4 Institutional Integration

Page 20: TO A SUCCESSFUL INTEGRATION  OF PUBLIC TRANSPORT OPERATORS AND ROAD OPERATORS (THE AMTP CASE)

Thank You For Your Kind Attention

www.amtp.pt

[email protected] - R. Campo Alegre, 1459 1º Dto. 4150-181 Porto Portugal

16/9/2013 AMTP 20


Recommended