5
Message From: Marc Watterson [[email protected]] Sent: 07/02/2013 17:29:56 To: Alun Dawson [[email protected]] CC: [email protected]; [email protected]; Bruce Sounes [[email protected]] Subject: RE: Grenfell Tower Alun Just to keep you informed, I have spoken to the LPA and explained, in an appropriate manner, than we wish to pause the application while we consider the details of the scheme. He will get back to us if there are any problems with this. Kind Regards Marc Watterson Principal Town Planner IBI ' DDI Tel Fax click below for office addresses Manchester Liverpool London Leeds [email protected] www.tavlorvoung.co.uk IBI TaylorYoung is part of the IBI Group. please consider the environment before printing this e-mail: thank you. legal notice From: Alun Dawson [mailto:[email protected]] Sent: 05 February 2013 15:31 To: Marc Watterson; [email protected] Cc: [email protected]; [email protected] Subject: RE: Grenfell Tower Marc - thanks for your input. The TMO agrees with your advice that we should defer the submission for now until we know a bit more as to where we are with Leadbitter - there is another meeting scheduled with them for next Tuesday to review costs, but if you could sensitively manage the expectations of the Planning Officer concerned in the interim please and we'll be in touch. Kind regards Alun APPLE YARDS Alun DaWSOn BSc (Hons) MCIOB MAPM Associate Director OWHJVE. AHTtLdA. SEA00007331 0001 SEA00007331/1
Transcript
Page 1: To: CC: Subject: RE... · To: Alun Dawson [alun.dawson@appleyards.co.uk] CC: pdunkerton@kctmo.org.uk; pmaddlson@kctmo.org.uk; Bruce Sounes [bruce@studloe.co.uk] Subject: RE: Grenfell

Message

From: M a r c W a t t e r s o n [ m a r c . w a t t e r s o n @ t a y l o r y o u n g . c o . u k ]

Sent: 0 7 / 0 2 / 2 0 1 3 17:29:56

To: A lun Dawson [a lun .dawson@app leya rds .co .uk ]

CC: p d u n k e r t o n @ k c t m o . o r g . u k ; p m a d d l s o n @ k c t m o . o r g . u k ; Bruce Sounes [b ruce@stud loe .co .uk ]

Subject: RE: Grenfe l l T o w e r

Alun

Just to keep you informed, I have spoken to the LPA and explained, in an appropriate manner, than we wish to pause the application while we consider the details of the scheme.

He will get back to us if there are any problems with this.

Kind Regards

Marc Watterson Principal Town Planner

IBI ' DDI Tel Fax

cl ick be low for off ice addresses

Manchester Liverpool London Leeds

marc .wat te rson@tay loryoung.co .uk www. tav lo rvoung.co .uk

IBI Tay lo rYoung is part of the IBI Group.

please cons ider the env i ronment before print ing this e-mai l : thank you .

legal not ice

From: Alun Dawson [mailto:[email protected]] Sent: 05 February 2013 15:31 To: Marc Watterson; [email protected] Cc: [email protected]; [email protected] Subject: RE: Grenfell Tower

Marc - thanks for your input.

The TMO agrees with your advice that we should defer the submission for now until we know a bit more as to where we are with Leadbitter - there is another meeting scheduled with them for next Tuesday to review costs, but if you could sensitively manage the expectations of the Planning Officer concerned in the interim please and we'll be in touch.

Kind regards

Alun

APPLE YARDS A l u n D a W S O n BSc (Hons) MCIOB MAPM Associate Director

OWHJVE. AHTtLdA.

SEA00007331 0001

SEA00007331/1

Page 2: To: CC: Subject: RE... · To: Alun Dawson [alun.dawson@appleyards.co.uk] CC: pdunkerton@kctmo.org.uk; pmaddlson@kctmo.org.uk; Bruce Sounes [bruce@studloe.co.uk] Subject: RE: Grenfell

High Ho lbor r^Hous^^2-54 HioyHolborr^Ujnclon • WC1VSRL • United Kingdom

Tel : " 1 1 * Mob: | | www.applevards.co.uk Appleyards: now part ofArtelia International: same team, enhanced expertise

This message and any a t tachments (the "message" ) is intended solely f o r t h e addressees and is conf ident ia l . If you receive th is message in error, p lease delete it and immedia te ly notify the sender. A n y use not in accord wi th its purpose, any d isseminat ion or d isclosure, ei ther who le or partial, is prohibi ted except formal approva l . The internet can not guarantee the integrity of th is message . A R T E L I A (and its subsid iar ies) shall (will) not therefore be liable for the message if modi f ied.

App leyards Limi ted: Registered No. 3935522 England. Vat Reg. No. 232 2357 94 Dobson Wh i te Boulcott Limited trading as Appleyards: Registered No. 5086063 England. Vat Reg. No. 539 0912 36 Registered Off ice: Tubs Hill House, London Road, Sevenoaks , Kent, T N 1 3 1BL

From: Marc Watterson Fmailto:marc.watterson(g)tayloryounq.co.uk1 Sent: 05 February 2013 13:18 To: Alun Dawson; [email protected] Cc: [email protected]; [email protected] Subject: RE: Grenfell Tower

Alun / Bruce

As the LPA are not happy with the current proposals in any event (hence the forthcoming submission) and as we are just finalising our current redesign, it may seem more prudent to wait to agree the details properly that are affordable before we undertake the resubmission process.

This of course means that achieving planning permission is also delayed so Leadbitter will not be getting started on site for the scheme, which is the downside.

If we submit our current proposals now and then go back for an amendment, there is a risk that it will be deemed so different from the approved scheme that the LPA will require a new application, with all the associated submission (and consultants) fees to the LPA which are £5.5k. The benefit is that Leadbitter can get started on the site. However, I think that we may all look rather foolish - not least the TMO as we will have to write to tenants a fourth time to tell them that a further application has been submitted.

I know that the LPA are not supporters of render, proved through other schemes, and I would be surprised if they felt any differently on this scheme. They have expressed a clear preference for metal cladding (not trespa) on Grenfell. It could certainly be a time consuming negotiation.

Considering the above, my recommendation would be to seek with the LPA to put the application on hold while we establish what we can afford then submit the revised details.

Kind Regards

Marc Watterson Principal Town Planner

IB I ' DDI Tel Fax

cl ick be low for off ice addresses

Manchester Liverpool London Leeds

marc .wat te rson@tay loryoung.co .uk www. tav lo rvounq.co .uk

SEA00007331 0002

SEA00007331/2

Page 3: To: CC: Subject: RE... · To: Alun Dawson [alun.dawson@appleyards.co.uk] CC: pdunkerton@kctmo.org.uk; pmaddlson@kctmo.org.uk; Bruce Sounes [bruce@studloe.co.uk] Subject: RE: Grenfell

IBI Tay lo rYoung is part of the IBI Group.

please cons ider the env i ronment before print ing this e-mai l : thank you .

legal not ice

From: Alun Dawson [mailto:alun.dawson(a)appleyards.co.uk] Sent: 05 February 2013 11:35 To: [email protected]; Marc Watterson Cc: [email protected]; [email protected] Subject: RE: Grenfell Tower

Bruce/Marc

Based on the comments below, how much scope do we have to go back with something fairly radical ie. including sto render or other cost effective solutions...?

Please treat this information sensitively at this stage as we need to manage the process sensitively, but we have a significant cost discrepancy with Leadbitter, not least of which is on the cladding, and so have to do some work with them first to ascertain the real gap and any VE options (they have indicated a £300k saving to switch from zinc to aluminium).

I understand from Paul that you were going for formal resubmission today....? Is this the right strategy given the above or would we be better submitting as planned today and deal with any subsequent changes retrospectively...?

Your thoughts welcome, regards

Alun

A l u n D a W S O n BSc (Hons) MCIOB MAPM ^ — A s s o c i a t e Director

A P P L E VARDS High Holborn House • 52-54 H i g ^ o l b o r r ^ ^ n d o n • WC1V 6RL • United Kingdom A H T L L I ^ Tel : B I* Mob: - | | www.applevards.co.uk

Appleyards: now part ofArtelia International: same team, enhanced expertise

This message and any a t tachments (the "message" ) is intended solely f o r t h e addressees and is conf ident ia l . If you receive th is message in error, p lease delete it and immedia te ly notify the sender. A n y use not in accord wi th its purpose, any d isseminat ion or d isclosure, ei ther who le or partial, is prohibi ted except formal approva l . The internet can not guarantee the integrity of th is message . A R T E L I A (and its subsid iar ies) shall (will) not therefore be l iable for the message if modi f ied.

App leyards Limi ted: Regis tered No. 3935522 England. Vat Reg. No. 232 2357 94 Dobson Wh i te Boulcott Limited trading as Appleyards: Registered No. 5086063 England. Vat Reg. No. 539 0912 36 Registered Off ice: Tubs Hill House, London Road, Sevenoaks , Kent, TN13 I B L

From: [email protected] [mailto:[email protected]] Sent: 04 February 2013 17:31 To: [email protected] Cc: [email protected]: [email protected]: [email protected]: Alun Dawson; [email protected] Subject: RE: Grenfell Tower

Bruce,

Thank you for the note. That is where we are. Though I would say that the AAP didn't say use bright colours in their notes. It read:

SEA00007331 0003

SEA00007331/3

Page 4: To: CC: Subject: RE... · To: Alun Dawson [alun.dawson@appleyards.co.uk] CC: pdunkerton@kctmo.org.uk; pmaddlson@kctmo.org.uk; Bruce Sounes [bruce@studloe.co.uk] Subject: RE: Grenfell

• despite a good budget and the use of expensive materials the current choice of cladding finish is dull and lifeless, offering little visual improvement compared to the existing profiled and textured concrete finish. Alternative designs and materials or mix of materials should be explored that would be more visually stimulating and would foster a more heartening identity (e.g., copper or enamelled steel).

As i said to you, we would welcome exploring the use of metal finishes (eg bronze or copper), which is about colour, but also could be about texture.

Kind regards,

Richard

From: Bruce Sounes [mailto:[email protected] Thst Sent: 01 February 2013 18:35 To: Craig, Richard: PC-Plan Cc: George, Edward: PC-Plan; Marc Watterson; Paul Dunkerton; Alun Dawson; Grenfell Subject: Grenfell Tower

D e a r R i c h a r d ,

I'm writing to confirm the content of our telephone conversation earlier.

The green and yellow elevations we discussed on Wednesday were presented to you Executive Director who expressed the following opinions:

• The colours need to be calmer and more muted, more reflective of RBKC and the buildings in the area. This is contrary to the steer we were given by the AAP.

• The preference is for natural colours, greys or blacks. Accent colours would be acceptable, at entrances for instance.

• Trespa to be avoided because of its plastic appearance. The preference is for metallic, textured or materials with some surface interest. (We will retain the zinc.)

No comments were made as the form of the proposal. We will prepare colour options early next week and you will provide feedback as soon as possible.

Regards

Bruce Sounes

For and on behalf of

STUDIO E LLP Palace Whar f , Rainvi l le Road, London W 6 9HN

| www.s tud ioe .co .uk

ton I N I I K M W . . S i - . MVtlOMMNr

Q u e e n ' s A w a r d for E n t e r p r i s e : S u s t a i n a b l e Deve lopment 2010

SEA00007331 0004

SEA00007331/4

Page 5: To: CC: Subject: RE... · To: Alun Dawson [alun.dawson@appleyards.co.uk] CC: pdunkerton@kctmo.org.uk; pmaddlson@kctmo.org.uk; Bruce Sounes [bruce@studloe.co.uk] Subject: RE: Grenfell

BCSE Award Schoo l Archi tect of the Year 2008 & 2010 BCSE Award Inspir ing Design Pr imary Schoo l 2008 & A c a d e m y 2010 BSF Award Excel lence in Student Engagement 2009 Susta inable City Award 2009

Please consider the environment before printing this email.

E L E C T R O N I C INFORMATION T R A N S F E R DISCLAIMER This email and any files transmitted with it are sent for and on behalf of Studio E and are intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error please notify the sender. All attached files are copyright and may only be used for the purpose stated in the drawing status box In the event that the files are altered in anyway, it is a condition of use that the Studio E name and logo be removed f rom the modified file, unless prior written agreement has been obtained. Studio E will assume no responsibility for tne accuraoy, adequacy, and integrity of the files, and recommends that the files be thoroughly screened for viruses prior to ins:allation. Opinions, conclusions and other nforniation expressed ir this message are rot given cr endorsed by Srudio E LLP unless otherwise indicated by an authorised representative independent of this message.

The Royal Borough of Kensington and Chelsea. This e-mail may contain information which is confidential, legally privileged and/or copyright protected. This e-mail is intended for the addressee only. I f you receive this in error, please contact the sender and delete the material from your computer.

SEA00007331/5


Recommended