+ All Categories
Home > Documents > TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr...

TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr...

Date post: 05-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
56
NYS Department of Transportation D / M / WBE Utilization Plans 2/19/2018 CONTRACT #: D037640 DESCRIPTION: BR. INV., 2018-2019 BIENNIAL AND INTERIM BRIDGE INSPECTIONS, REGION 5, ALL COUNTIES PIN #: 5B18.02 AWARD DATE: 1/16/2018 12:00:00AM CONTRACT COMPLETION DATE: CONTRACT AMOUNT: 8,600,000.00 IS CONTRACTOR D/M/WBE? No CONTRACTOR NAME & ADDRESS: GREENMAN-PEDERSEN, INC. D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT 325 WEST MAIN STREET BABYLON, NY 11702 DBE 586,222.00 POPLI, ARCHITECTURE + ENGINE 555 PENBROOKE DRIVE PENFIELD, NY 14526 TOTAL: 586,222.00
Transcript
Page 1: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D037640 DESCRIPTION: BR. INV., 2018-2019 BIENNIAL AND INTERIM BRIDGE

INSPECTIONS, REGION 5, ALL COUNTIES

PIN #: 5B18.02

AWARD DATE: 1/16/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 8,600,000.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

GREENMAN-PEDERSEN, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

325 WEST MAIN STREET

BABYLON, NY 11702

DBE 586,222.00POPLI, ARCHITECTURE + ENGINEERING AND L.S., P.C.

555 PENBROOKE DRIVE

PENFIELD, NY 14526

TOTAL: 586,222.00

Page 2: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D037647 DESCRIPTION: BR. INV., 2018 - 2019 BIENNIAL & INTERIM (SPECIAL) BRIDGE

INSPECTION OF THE WILLIAMSBURG BRIDGE, NEW YORK & KINGS COUNTIES.

PIN #: X764.19

AWARD DATE: 12/20/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,630,000.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

HNTB NEW YORK ENGINEERING AND ARCHITECTURE PC

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

5 PENN PLAZA 6TH FLOOR

NEW YORK, NY 10001

DBE 213,147.00AMERICAN STRUCTURAL ENGINEERING, P.C.

86 KEY PLACE

TAPPAN, NY 10983

TOTAL: 213,147.00

Page 3: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263386 DESCRIPTION: REHABILITATION & DECK REPLACEMENT OF THREE BRIDGES

ON ROUTE 209 OVER THE ESOPUS CREEK S.H 60-6 & 61-9 IN THE TOWN OF

PIN #: 881282

AWARD DATE: 12/15/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 11,867,676.76

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

HARRISON & BURROWES BRIDGE CNSTS

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

PO BOX 335

GLENMONT, NY 12077

DBE CONSTRUCTION 59,595.54DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE CONSTRUCTION 531,327.15EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 282,870.00LONGHOUSE CONSTRUCTION GROUP. LLC

409B BROOKFIELD ROAD

SYRACUSE, NY 13211

DBE TRUCKING 30,000.00PERFECT CUT LANDSCAPING, INC. D/B/A HUDSON VALLEY TRUCKING

10A MCNAMARA LANE

GOSHEN, NY 10924

DBE CONSTRUCTION 35,532.79STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

DBE CONSTRUCTION 69,410.00SY KIM LAND SURVEYOR, P.C.

260 OSBORNE ROAD

ALBANY, NY 12211

DBE MATERIAL SUPPLIER 6,000.00TRAFFIC LANE CLOSURES, LLC

1214 ROUTE 52

CARMEL, NY 10512

TOTAL: 531,327.15

Page 4: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263505 DESCRIPTION: SCHENECTADY RAIL STATION BUILDING PROJECT IN THE CITY

OF SCHENECTADY

PIN #: 182286

AWARD DATE: 12/27/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 10,425,900.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

MURNANE BUILDING CONTRACTORS INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

15 WOODS RD

WHITESBORO, NY 13492

DBE 15,000.00ACTION WASTE SERVICES, LLC

3396 RIVER ROAD

RENSSELAER, NY 12144

DBE CONSTRUCTION 101,300.00ARROW SHEET METAL WORKS INC

75 THIELMAN DR

BUFFALO, NY 14206

DBE 54,400.00C. LANCELOT SCHEDULING SERVICES, INC.

2 EAST VIEW ROAD

LATHAM, NY 12110

DBE CONSTRUCTION 148,500.00CC PAVING & EXCAVATING

2610 S. SALINA STREET (2C)

SYRACUSE, NY 13205

DBE CONSTRUCTION 133,203.00COLLINS CONCRETE CONST. INC.

PO BOX 914

COBLESKILL, NY 12043

DBE MATERIAL SUPPLIER 240,000.00HIGHWOODS ELECTRIC, INC., DBA HWE SUPPLY

973 GLASCO TURNPIKE

SAUGERTIES, NY 12477

DBE MATERIAL SUPPLIER 66,000.00JOHN W. FRANCISCO, INC./DBA FRANCISCO EQUIPMENT

P.O. BOX 279

RAVENA, NY 12143

DBE CONSTRUCTION 76,612.00LONGHOUSE CONSTRUCTION GROUP. LLC

409B BROOKFIELD ROAD

SYRACUSE, NY 13211

DBE 60,000.00MAC EQUIPMENT, LLC

120 WATERVLIET AVE

ALBANY, NY 12206

DBE CONSTRUCTION 8,608.00ROMMEL FENCE, LLC

Page 5: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

17 RAILROAD STREET

POLAND, NY 13431

DBE 12,752.00SUSAN M. ANACKER, PROFESSIONAL LAND SURVEYOR, PLLC

11082 DAVIS ROAD EAST

UTICA, NY 13502

TOTAL: 240,000.00

Page 6: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263525 DESCRIPTION: ROUTE 327 OVER ENFIELD CREEK BRIDGE REPLACEMENT BIN

1045920 IN THE TOWN OF ENFIELD.

PIN #: 319304

AWARD DATE: 2/6/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,426,464.20

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

ECONOMY PAVING CO., INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

1819 NY RTE. 13

CORTLAND, NY 13045

DBE CONSTRUCTION 3,600.00APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

DBE CONSTRUCTION 43,137.00LONGHOUSE CONSTRUCTION GROUP. LLC

409B BROOKFIELD ROAD

SYRACUSE, NY 13211

DBE TRUCKING,CONSTRUCTION 58,574.00MILLER'S LANDSCAPING, LLC

6741 HAPPY VALLEY ROAD

VERONA, NY 13478

DBE CONSTRUCTION 37,380.50PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

TOTAL: 58,574.00

Page 7: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263526 DESCRIPTION: WHERE AND WHEN EMERGENCY REPAIRS THROUGHOUT NEW

YORK CITY.

PIN #: XM1820

AWARD DATE: 1/25/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 9,223,600.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

BOVE INDUSTRIES, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

16 HULSE ROAD

EAST SETAUKET, NY 11733

WBE CONSTRUCTION 1.00BOHEMIA GARDEN CENTER, INC.

608 JOHNSON AVENUE - SUITE #1

BOHEMIA, NY 11716

MBE CONSTRUCTION 1.00GCCOM CONSTRUCTION COMPANY, INC.

129-06 18TH AVE

COLLEGE POINT, NY 11356

WBE CONSTRUCTION 1.00ISLAND PAVEMENT CUTTING CO.

84 KEAN STREET

WEST BABYLON, NY 11704

WBE MATERIAL SUPPLIER 0.60MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

WBE CONSTRUCTION 1.00YABOO FENCE CO., INC.

95 WEST NYACK WAY

WEST NYACK, NY 10994

TOTAL: 1.00

Page 8: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263536 DESCRIPTION: GUIDERAIL UPGRADES ON THE GRAND CENTRAL PARKWAY

(907M).

PIN #: X05167

AWARD DATE: 2/12/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 6,645,608.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

CONSTAR, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

81 BRIGHTSIDE AVE

CENTRAL ISLIP, NY 11722

DBE MATERIAL SUPPLIER 381,713.40MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

TOTAL: 381,713.40

Page 9: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263542 DESCRIPTION: GUIDE RAIL REHABILITATION ON SOUTHERN STATE PARKWAY

(RTE 908 M) IN THE TOWNS OF HEMPSTEAD, OYSTER BAY, BABYLON & ISLIP.

PIN #: 080954

AWARD DATE: 1/30/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 4,654,321.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

CONSTAR, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

81 BRIGHTSIDE AVE

CENTRAL ISLIP, NY 11722

MBE CONSTRUCTION 600,667.53BLINK CONTRACTORS LLC

54 RALPH AVE

BRENTWOOD, NY 11717

WBE 111,000.00HIGHWAY SAFETY PROTECTION CORP.

15-11 130TH STREET

COLLEGE POINT, NY 11356

WBE MATERIAL SUPPLIER 60,000.00INFINITE ENERGY CORP

575 LEXINGTON AV

NEW YORK, NY 10022

MBE CONSTRUCTION 40,000.00KC ENGINEERING AND LAND SURVEYING, P.C.

7 PENN PLAZA, SUITE 1604

NEW YORK, NY 10001

WBE MATERIAL SUPPLIER 219,077.85METROFAB PIPE INC

15 FAIRCHILD COURT

PLAINVIEW, NY 11803

WBE MATERIAL SUPPLIER 290,991.00MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

TOTAL: 600,667.53

Page 10: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263543 DESCRIPTION: ROUTE 31F BRIDGE REPLACEMENT OVER THOMAS CREEK,

TOWN OF PERINTON

PIN #: 4031F1

AWARD DATE: 1/19/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,041,407.75

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

SLATE HILL CONSTRUCTORS, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

6573 HERMAN ROAD

WARNERS, NY 13164

DBE CONSTRUCTION 6,352.00APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

DBE CONSTRUCTION 3,000.00AROLD CONSTRUCTION CO., INC.

51 POWDER MILL BRIDGE ROAD

KINGSTON, NY 12401

DBE CONSTRUCTION 2,347.45G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

DBE CONSTRUCTION 52,945.40PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

DBE MATERIAL SUPPLIER 1,147.97UPSTATE REBAR, LLC

4605 WALDEN AVENUE

LANCASTER, NY 14086

DBE CONSTRUCTION 9,757.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

DBE CONSTRUCTION 7,839.55ZEHR'S FLOWERS AND LANDSCAPING, LLC

8484 VANAMBER ROAD

CASTORLAND, NY 13620

TOTAL: 52,945.40

Page 11: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263549 DESCRIPTION: REHABILITATION OF THE ROUTE 42 BRIDGE OVER THE

SCHOHARIE CREEK, DECK & BEARING REPLACEMENT & STEEL REPAIRS IN

PIN #: 101311

AWARD DATE: 1/24/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,555,515.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

ECONOMY PAVING CO., INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

1819 NY RTE. 13

CORTLAND, NY 13045

DBE CONSTRUCTION 8,100.00COLLINS CONCRETE CONST. INC.

PO BOX 914

COBLESKILL, NY 12043

DBE CONSTRUCTION, 40,911.35DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE CONSTRUCTION 60,671.80INTERSTATE REINFORCING, INC.

127 BLIND ROAD

MEXICO, NY 13114

DBE CONSTRUCTION 5,105.00MILLER'S LANDSCAPING, LLC

6741 HAPPY VALLEY ROAD

VERONA, NY 13478

DBE CONSTRUCTION 7,838.74STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

DBE CONSTRUCTION 11,219.00SY KIM LAND SURVEYOR, P.C.

260 OSBORNE ROAD

ALBANY, NY 12211

TOTAL: 60,671.80

Page 12: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263550 DESCRIPTION: DURABLE PAVEMENT MARKINGS CONTRACT.

PIN #: 080972

AWARD DATE: 2/6/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 6,905,393.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

DENVILLE LINE PAINTING, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

2 GREEN POND ROAD

ROCKAWAY, NJ 07866

DBE MATERIAL SUPPLIER 207,162.00CERTIFIED SAFETY PRODUCTS, NY

ROUTE 417

ANDOVER, NY 14806

TOTAL: 207,162.00

Page 13: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263553 DESCRIPTION: JOB ORDER CONTRACT - CULVERTS.

PIN #: 780497

AWARD DATE: 12/15/2017 12:00:00AM

CONTRACT COMPLETION DATE: 12/15/2018 12:00:0

CONTRACT AMOUNT: 1,008,900.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

BARRETT PAVING MATERIALS INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

4530 WETZEL ROAD

LIVERPOOL, NY 13090

WBE CONSTRUCTION 1.00A & K SLIPFORMING, INC.

PO BOX 250

COBLESKILL, NY 12043

WBE CONSTRUCTION 1.00ALL SEASONS LANDSCAPING & GARDEN CENTER, LLC

7474 STATE RT 12

LOWVILLE, NY 13367

WBE CONSTRUCTION 1.00ALPINE SEEDING LLC

2030 OLD MARKET ROAD

WINTHROP, NY 13697

WBE CONSTRUCTION 1.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS

522 BRADLEY STREET

WATERTOWN, NY 13601

WBE CONSTRUCTION 1.00BRADY FENCE COMPANY, INC

637 STATE ROUTE 8

COLD BROOK, NY 13324

WBE CONSTRUCTION 1.00COLLINS CONCRETE CONST. INC.

PO BOX 914

COBLESKILL, NY 12043

WBE 1.00DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

WBE CONSTRUCTION 1.00EASTWOOD INDUSTRIES, INC

P O BOX 305

NORTH BOSTON, NY 14110

WBE CONSTRUCTION 1.00J & L PROFILING LLC

6856 STATE ROUTE 31

DURHAMVILLE, NY 13054

WBE MATERIAL SUPPLIER 0.60JC SMITH, INC.

Page 14: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

345 PEAT STREET

SYRACUSE, NY 13210

MBE MATERIAL SUPPLIER 0.60JHP INDUSTRIAL SUPPLY CO.

321 WEST TAYLOR STREET

SYRACUSE, NY 13202

WBE MATERIAL SUPPLIER 0.60MARIE TURNER, INC.

6178 KINGSLEY ROAD

KINGSLEY, PA 18826

WBE MATERIAL SUPPLIER 0.60MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

WBE CONSTRUCTION 1.00T. J. CLEMENT CONSTRUCTION CO., INC.

PO BOX 201

WATERTOWN, NY 13601

WBE CONSTRUCTION 1.00ZEHR'S FLOWERS AND LANDSCAPING, LLC

8484 VANAMBER ROAD

CASTORLAND, NY 13620

TOTAL: 1.00

Page 15: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263556 DESCRIPTION: BRIDGE REPLACEMENT PROJECT ON ROUTE 907W OVER

HUTCHINSON RIVER IN THE CITY OF MOUNT VERNON.

PIN #: 8BOW27

AWARD DATE: 11/24/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 6,050,506.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

E. E. CRUZ & COMPANY, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

32 AVENUE OF THE AMERICAS 13TH

NEW YORK, NY 10013

DBE CONSTRUCTION 225,940.00GRANITEWORKS, INC.

415 BROOK AVE.

DEER PARK, NY 11729

DBE CONSTRUCTION 81,150.00ISLAND PAVEMENT CUTTING CO.

84 KEAN STREET

WEST BABYLON, NY 11704

DBE CONSTRUCTION 114,362.20MCCAREY LANDSCAPING, INC.

80 TOWER DRIVE

MIDDLETOWN, NY 10941

DBE CONSTRUCTION 91,425.08NEW YORK GEOMATICS, INC.

4601 39TH AVENUE

SUNNYSIDE, NY 11104

DBE MATERIAL SUPPLIER 21,103.20TRAFFIC LANE CLOSURES, LLC

1214 ROUTE 52

CARMEL, NY 10512

TOTAL: 225,940.00

Page 16: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263558 DESCRIPTION: PREVENTIVE MAINTENANCE OF PAVEMENT - FILLING AND

SEALING CRACKS AND JOINTS IN NEW YORK CITY.

PIN #: XM1730

AWARD DATE: 1/30/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,337,792.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

CONSTAR, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

81 BRIGHTSIDE AVE

CENTRAL ISLIP, NY 11722

DBE MATERIAL SUPPLIER 43,200.00MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

TOTAL: 43,200.00

Page 17: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263560 DESCRIPTION: PAVEMENT RESURFACING ON THE LAKE ONTARIO STATE

PARKWAY IN THE TOWNS OF HAMLIN AND KENDALL.

PIN #: 494731

AWARD DATE: 1/4/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 5,219,770.40

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

KEELER CONSTRUCTION CO., INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

13519 WEST LEE ROAD

ALBION, NY 14411

DBE CONSTRUCTION 27,360.00AL SLAWSON, INC

3 PRINCETON PLACE

PITTSFORD, NY 14534

DBE TRUCKING 174,325.00BILL'S TOPSOIL SAND & GRAVEL

3 CARRIAGE HOUSE LANE

ROCHESTER, NY 14624

DBE MATERIAL SUPPLIER 9,580.20BUFFALO CONCRETE ACCESSORIES

250 GRIDER ST

BUFFALO, NY 14215

DBE CONSTRUCTION 6,630.00CERTIFIED SAFETY PRODUCTS, NY

ROUTE 417

ANDOVER, NY 14806

DBE CONSTRUCTION 4,800.00EASTWOOD INDUSTRIES, INC

P O BOX 305

NORTH BOSTON, NY 14110

DBE TRUCKING 174,505.00M.J. DREHER TRUCKING, INC.

50 OWENS ROAD

BROCKPORT, NY 14420

DBE CONSTRUCTION 7,700.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 174,505.00

Page 18: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263569 DESCRIPTION: REPLACEMENT OF ROUTE 96 BRIDGE BIN 1035140 OVER MUD

CREEK S.H 335 IN THE TOWN OF VICTOR.

PIN #: 409657

AWARD DATE: 12/22/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,171,511.11

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

VECTOR CONSTRUCTION CORP

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

6364 ISLAND ROAD

CICERO, NY 13039

DBE CONSTRUCTION 1,242.00APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

DBE CONSTRUCTION 45,233.48G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

DBE CONSTRUCTION 78,081.93PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

DBE CONSTRUCTION 9,288.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 78,081.93

Page 19: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263570 DESCRIPTION: PAINTING OF BIN(S) 1027080 RTE 55 OVER RONDOUT CREEK,

5502571 TACONIC STATE PARKWAY (SB) & 5502572 (NB) OVER COUNTY ROAD

PIN #: 881291

AWARD DATE: 12/22/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,559,000.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

AMSTAR OF WESTERN NY, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

825 REIN ROAD

BUFFALO, NY 14225

DBE CONSTRUCTION 42,000.00DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE MATERIAL SUPPLIER 9,000.00NAUGHTON ENERGY CORP.

1898 ROUTE 940

POCONO PINES, PA 18350

TOTAL: 42,000.00

Page 20: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263572 DESCRIPTION: HIGHWAY RECONSTRUCTION ON ROUTE 5S (1 MILE). WORK

INCLUDES REALIGNMENT, ROUNDABOUT, SIDEWALKS & SIGNALS IN THE CITY

PIN #: 280532

AWARD DATE: 2/6/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 16,515,000.67

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

SEALAND CONTRACTORS CORP.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

85 HIGH TECH DRIVE

RUSH, NY 14543

DBE CONSTRUCTION 987,798.00A & K SLIPFORMING, INC.

PO BOX 250

COBLESKILL, NY 12043

DBE TRUCKING 724,658.12LEITZ TRUCKING CORP.

162 MCINTYRE ROAD

FRANKFORT, NY 13340

DBE CONSTRUCTION 180,235.60ZEHR'S FLOWERS AND LANDSCAPING, LLC

8484 VANAMBER ROAD

CASTORLAND, NY 13620

TOTAL: 987,798.00

Page 21: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263575 DESCRIPTION: ROUTE 17B/ROUTE 55 INTERSECTION IMPROVEMENT IN THE

TOWN OF BETHEL

PIN #: 903625

AWARD DATE: 2/2/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 2,487,962.30

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

BOTHAR CONSTRUCTION LLC

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

170 EAST SERVICE ROAD

BINGHAMTON, NY 13901

DBE CONSTRUCTION 5,094.00AROLD CONSTRUCTION CO., INC.

51 POWDER MILL BRIDGE ROAD

KINGSTON, NY 12401

DBE CONSTRUCTION 7,425.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS

522 BRADLEY STREET

WATERTOWN, NY 13601

DBE CONSTRUCTION 44,577.25MCCAREY LANDSCAPING, INC.

80 TOWER DRIVE

MIDDLETOWN, NY 10941

DBE CONSTRUCTION 127,236.80MEXCON INC

PO BOX 34

CENTRAL VALLEY, NY 10917

DBE CONSTRUCTION 58,043.21STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

TOTAL: 127,236.80

Page 22: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263576 DESCRIPTION: GENERAL BRIDGE REPAIRS IN THE CITY OF BUFFALO &

NIAGARA FALLS, TOWNS OF CHEEKTOWAGA, MARILLA, AND TONAWANDA.

PIN #: 581258

AWARD DATE: 2/6/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 3,063,811.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

HUNTING VALLEY CONSTRUCTION, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

P.O. BOX 26

BOWMANSVILLE, NY 14026

DBE MATERIAL SUPPLIER 52,202.16BUFFALO CONCRETE ACCESSORIES

250 GRIDER ST

BUFFALO, NY 14215

DBE CONSTRUCTION 9,600.00EASTWOOD INDUSTRIES, INC

P O BOX 305

NORTH BOSTON, NY 14110

DBE CONSTRUCTION 10,805.00NATURAL RESTORATIONS BY LINDA J & CO., INC.,

P.O. BOX 177

WILLIAMSVILLE, NY 14231

DBE CONSTRUCTION 110,762.33ONEIDA SALES AND SERVICE INC

155 COMMERCE DRIVE

LACKAWANNA, NY 14218

DBE MANUFACTURING 7,013.46UPSTATE STEEL, INC.

1800 DALE ROAD

BUFFALO, NY 14225

DBE CONSTRUCTION, 104,295.60US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 110,762.33

Page 23: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263578 DESCRIPTION: BRIDGE PAINTING - CORPORATE WOODS BLVD OVER I-90,

I-90/RTE 9 RAMPS AND WASHINGTON AVE OVER I-90

PIN #: 181075

AWARD DATE: 12/22/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 2,267,000.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

AMSTAR OF WESTERN NY, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

825 REIN ROAD

BUFFALO, NY 14225

DBE CONSTRUCTION 80,000.00DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE MATERIAL SUPPLIER 12,000.00NAUGHTON ENERGY CORP.

1898 ROUTE 940

POCONO PINES, PA 18350

TOTAL: 80,000.00

Page 24: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263579 DESCRIPTION: ROUTE 961G OVER CANACADEA CREEK BRIDGE

REPLACEMENT IN THE TOWN OF ALFRED.

PIN #: 607901

AWARD DATE: 1/12/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 2,012,546.10

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

THE LC WHITFORD CO.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

P.O. BOX 663

WELLSVILLE, NY 14895

DBE CONSTRUCTION 42,812.50A & K SLIPFORMING, INC.

PO BOX 250

COBLESKILL, NY 12043

DBE CONSTRUCTION 14,571.00CERTIFIED SAFETY PRODUCTS, NY

ROUTE 417

ANDOVER, NY 14806

DBE CONSTRUCTION 6,400.00EASTWOOD INDUSTRIES, INC

P O BOX 305

NORTH BOSTON, NY 14110

DBE CONSTRUCTION 53,976.32G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

DBE CONSTRUCTION 28,245.28PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

DBE CONSTRUCTION 2,518.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 53,976.32

Page 25: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263580 DESCRIPTION: PEDESTRIAN & SAFETY IMPROVEMENTS ON US ROUTE 20,

ASPHALT CONCRETE MILLING & RESURFACING, SIDEWALKS & CURB RAMP

PIN #: 211133

AWARD DATE: 1/11/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,152,372.99

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

HANSON AGGREGATES NEW YORK LLC

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

PO BOX 513

JAMESVILLE, NY 13078

DBE CONSTRUCTION 41,392.94MILLER'S LANDSCAPING, LLC

6741 HAPPY VALLEY ROAD

VERONA, NY 13478

DBE CONSTRUCTION 51,721.14STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

TOTAL: 51,721.14

Page 26: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263581 DESCRIPTION: STRUCTURES WHERE AND WHEN CONTRACT, VARIOUS

LOCATIONS

PIN #: 881305

AWARD DATE: 1/23/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,914,100.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

HARRISON & BURROWES BRIDGE CNSTS

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

PO BOX 335

GLENMONT, NY 12077

WBE CONSTRUCTION 1.00ALLBAR STEEL, INC.

301 E. SEARSVILLLE RD.

MONTGOMERY, NY 12549

WBE CONSTRUCTION 1.00EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

WBE MATERIAL SUPPLIER 0.60JC SMITH, INC.

345 PEAT STREET

SYRACUSE, NY 13210

WBE CONSTRUCTION 1.00L.M. SESSLER EXCAVATING & WRECKING, INC.

1257 ROUTE 96 N.

WATERLOO, NY 13165

WBE TRUCKING 1.00MCCAREY LANDSCAPING, INC.

80 TOWER DRIVE

MIDDLETOWN, NY 10941

WBE CONSTRUCTION 1.00MOHEGAN ASSOCIATES INC

130 OLD RT 6

CARMEL, NY 10512

MBE TRUCKING 1.00PERFECT CUT LANDSCAPING, INC. D/B/A HUDSON VALLEY TRUCKING

10A MCNAMARA LANE

GOSHEN, NY 10924

WBE CONSTRUCTION 1.00ROMMEL FENCE, LLC

17 RAILROAD STREET

POLAND, NY 13431

WBE CONSTRUCTION 1.00STILSING ELECTRIC, INC

PO BOX 27

RENSSELAER, NY 12144

MBE CONSTRUCTION 1.00SY KIM LAND SURVEYOR, P.C.

Page 27: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

260 OSBORNE ROAD

ALBANY, NY 12211

TOTAL: 1.00

Page 28: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263582 DESCRIPTION: REPLACEMENT OF NYS ROUTE 7 BRIDGE BIN 1003810 OVER

KELSEY BROOK IN THE VILLAGE OF AFTON, S.H 8075.

PIN #: 930716

AWARD DATE: 2/1/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,907,581.75

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

TIOGA CONSTRUCTION COMPANY, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

333 GROS BLVD.

HERKIMER, NY 13350

DBE CONSTRUCTION 12,451.05APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

DBE CONSTRUCTION 112,110.55EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 56,310.03LONGHOUSE CONSTRUCTION GROUP. LLC

409B BROOKFIELD ROAD

SYRACUSE, NY 13211

DBE CONSTRUCTION 5,982.23MILLER'S LANDSCAPING, LLC

6741 HAPPY VALLEY ROAD

VERONA, NY 13478

TOTAL: 112,110.55

Page 29: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263585 DESCRIPTION: NY ROUTE 33 AND HUMBOLDT PARKWAY RAILING

REHABILITATION PROJECT. AESTHETIC CONCRETE BARRIER, CURB RAMPS,

PIN #: 551254

AWARD DATE: 2/1/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 2,987,442.90

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

UNION CONCRETE AND CONSTRUCTION CORP.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

P.O. BOX 410

WEST SENECA, NY 14224

DBE CONSTRUCTION 8,310.00CERTIFIED SAFETY PRODUCTS, NY

ROUTE 417

ANDOVER, NY 14806

DBE CONSTRUCTION 164,147.96G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

DBE CONSTRUCTION 52,257.50NATURAL RESTORATIONS BY LINDA J & CO., INC.,

P.O. BOX 177

WILLIAMSVILLE, NY 14231

TOTAL: 164,147.96

Page 30: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263586 DESCRIPTION: WHERE AND WHEN REPAIRS AND DEGRADATION PREVENTION

THROUGHOUT REGION 2.

PIN #: 280592

AWARD DATE: 12/11/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,408,900.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

SLATE HILL CONSTRUCTORS, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

6573 HERMAN ROAD

WARNERS, NY 13164

WBE CONSTRUCTION 0.01A & K SLIPFORMING, INC.

PO BOX 250

COBLESKILL, NY 12043

WBE CONSTRUCTION 0.01APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

WBE CONSTRUCTION 0.01EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

WBE CONSTRUCTION 0.01LONGHOUSE CONSTRUCTION GROUP. LLC

409B BROOKFIELD ROAD

SYRACUSE, NY 13211

MBE CONSTRUCTION 0.01PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

WBE CONSTRUCTION 0.01ROMMEL FENCE, LLC

17 RAILROAD STREET

POLAND, NY 13431

TOTAL: 0.01

Page 31: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263587 DESCRIPTION: CRACK SEALING PROJECT

PIN #: 280593

AWARD DATE: 12/26/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 889,859.52

IS CONTRACTOR D/M/WBE? Yes (DBE)

CONTRACTOR NAME & ADDRESS:

ANNSEAL, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

P.O. BOX 615

BIBLE SCHOOL PK, NY 13737

DBE CONSTRUCTION 889,859.52ANNSEAL, INC.

P.O. BOX 615

BIBLE SCHOOL PK, NY 13737

TOTAL: 889,859.52

Page 32: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263594 DESCRIPTION: ROUTE 11 BRIDGE REPLACEMENT (COMPOSITE GIRDER) OVER

CSX RAILROAD, TOWN OF DEKALB.

PIN #: 714332

AWARD DATE: 1/29/2018 12:00:00AM

CONTRACT COMPLETION DATE: 12/30/2019 12:00:0

CONTRACT AMOUNT: 8,147,250.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

RIFENBURG CONSTRUCTION, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

159 BRICK CHURCH ROAD

TROY, NY 12180

DBE CONSTRUCTION 37,165.40APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

DBE CONSTRUCTION 3,000.00AROLD CONSTRUCTION CO., INC.

51 POWDER MILL BRIDGE ROAD

KINGSTON, NY 12401

DBE CONSTRUCTION 61,486.84DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE CONSTRUCTION 222,860.55EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 313,970.53INTERSTATE REINFORCING, INC.

127 BLIND ROAD

MEXICO, NY 13114

DBE CONSTRUCTION 16,687.50ROMMEL FENCE, LLC

17 RAILROAD STREET

POLAND, NY 13431

DBE CONSTRUCTION 78,452.58ZEHR'S FLOWERS AND LANDSCAPING, LLC

8484 VANAMBER ROAD

CASTORLAND, NY 13620

TOTAL: 313,970.53

Page 33: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263596 DESCRIPTION: BRIDGE REHABILITATION OF D & H RAILROAD OVER I-87 IN THE

TOWN OF PLATTSBURGH.

PIN #: 772096

AWARD DATE: 12/26/2017 12:00:00AM

CONTRACT COMPLETION DATE: 12/31/2018 12:00:0

CONTRACT AMOUNT: 1,859,141.60

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

LUCK BROS, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

73 TRADE ROAD

PLATTSBURGH, NY 12901

DBE CONSTRUCTION 7,482.50AROLD CONSTRUCTION CO., INC.

51 POWDER MILL BRIDGE ROAD

KINGSTON, NY 12401

DBE CONSTRUCTION, 80,819.48DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE CONSTRUCTION 29,514.75EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 13,669.75INTERSTATE REINFORCING, INC.

127 BLIND ROAD

MEXICO, NY 13114

TOTAL: 80,819.48

Page 34: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263597 DESCRIPTION: ASPHALT CONCRETE MILLING & RESURFACING, SIDEWALK,&

TRAFFIC SIGNAL WORK ON NY ROUTE 14 IN THE VILLAGE OF WATKINS GLEN,

PIN #: 610858

AWARD DATE: 2/16/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 7,210,000.33

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

SEALAND CONTRACTORS CORP.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

85 HIGH TECH DRIVE

RUSH, NY 14543

DBE CONSTRUCTION 180,000.00DECCA PAVING INC.

1007 CHILI AVENUE

ROCHESTER, NY 14611

DBE CONSTRUCTION 105,743.10PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

DBE CONSTRUCTION 148,600.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 180,000.00

Page 35: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263598 DESCRIPTION: ROUTE 9 AND TACONIC STATE PARKWAY; RUSTIC GUIDE RAIL

AND CULVERT RAIL REPLACEMENT (16.6 MILES).

PIN #: 881149

AWARD DATE: 1/12/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 2,150,533.40

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

ELDERLEE, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

729 CROSS ROAD

OAKS CORNERS, NY 14518

DBE CONSTRUCTION 59,820.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS

522 BRADLEY STREET

WATERTOWN, NY 13601

DBE CONSTRUCTION 32,022.40MCCAREY LANDSCAPING, INC.

80 TOWER DRIVE

MIDDLETOWN, NY 10941

TOTAL: 59,820.00

Page 36: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263599 DESCRIPTION: SMALL CULVERT REPLACEMENTS AT 2 LOCATIONS IN THE

TOWNS OF CHARLOTTE AND VILLENOVA.

PIN #: 581225

AWARD DATE: 2/8/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 298,267.50

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

UNION CONCRETE AND CONSTRUCTION CORP.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

P.O. BOX 410

WEST SENECA, NY 14224

DBE CONSTRUCTION 19,317.00PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

TOTAL: 19,317.00

Page 37: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263600 DESCRIPTION: JOB ORDER CONTRACT: CULVERT MAINTENANCE

PIN #: 6JOC17

AWARD DATE: 1/22/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 475,461.97

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

C.P. WARD INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

100 RIVER ROAD

SCOTTSVILLE, NY 14546

WBE CONSTRUCTION 1.00AROLD CONSTRUCTION CO., INC.

51 POWDER MILL BRIDGE ROAD

KINGSTON, NY 12401

WBE MATERIAL SUPPLIER 0.60BUFFALO CONCRETE ACCESSORIES

250 GRIDER ST

BUFFALO, NY 14215

WBE CONSTRUCTION 1.00CERTIFIED SAFETY PRODUCTS, NY

ROUTE 417

ANDOVER, NY 14806

MBE CONSTRUCTION 1.00G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

WBE TRUCKING 1.00M.J. DREHER TRUCKING, INC.

50 OWENS ROAD

BROCKPORT, NY 14420

WBE MATERIAL SUPPLIER 0.60MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

MBE CONSTRUCTION 1.00PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

TOTAL: 1.00

Page 38: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263602 DESCRIPTION: PAINTING 4 BRIDGES ON I-81 & I-481 IN THE TOWNS OF DEWITT

& SALINA

PIN #: 380738

AWARD DATE: 12/22/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,535,000.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

AMSTAR OF WESTERN NY, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

825 REIN ROAD

BUFFALO, NY 14225

MBE 20,000.00MB ENVIRONMENTAL CONSULTING, INC.

13362 IRVING STREET

ALDEN, NY 14004

WBE MATERIAL SUPPLIER, 61,600.00MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

MBE MATERIAL SUPPLIER 72,000.00NAUGHTON ENERGY CORP.

1898 ROUTE 940

POCONO PINES, PA 18350

TOTAL: 72,000.00

Page 39: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263608 DESCRIPTION: REPLACEMENT OF EAST AVENUE BRIDGE (COMPOSITE

GIRDER) OVER I-86 IN THE CITY OF ELMIRA

PIN #: 606704

AWARD DATE: 1/23/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,930,607.70

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

ECONOMY PAVING CO., INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

1819 NY RTE. 13

CORTLAND, NY 13045

DBE CONSTRUCTION 33,378.00A & K SLIPFORMING, INC.

PO BOX 250

COBLESKILL, NY 12043

DBE CONSTRUCTION 1,560.00APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

DBE CONSTRUCTION 102,864.60G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

DBE CONSTRUCTION 11,911.40MILLER'S LANDSCAPING, LLC

6741 HAPPY VALLEY ROAD

VERONA, NY 13478

TOTAL: 102,864.60

Page 40: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263616 DESCRIPTION: AMERICANS WITH DISABILITIES ACT ACCESSIBILITY BLOCK

(REPLACE CURBS AND SIDEWALKS, INSTALL DETECTABLE WARNING

PIN #: 9ADA18

AWARD DATE: 2/2/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,425,964.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

MILLENIUM CONSTRUCTION INC

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

248 N BRIER ROAD

BUFFALO, NY 14228

DBE CONSTRUCTION, 44,750.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 44,750.00

Page 41: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263617 DESCRIPTION: JOB ORDER CONTRACT FOR COMBINED HIGHWAY & CULVERT

MAINTENANCE AT VARIOUS LOCATIONS.

PIN #: 6DRN17

AWARD DATE: 1/23/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 855,832.99

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

C.P. WARD INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

100 RIVER ROAD

SCOTTSVILLE, NY 14546

WBE CONSTRUCTION 1.00AROLD CONSTRUCTION CO., INC.

51 POWDER MILL BRIDGE ROAD

KINGSTON, NY 12401

WBE MATERIAL SUPPLIER 0.60BUFFALO CONCRETE ACCESSORIES

250 GRIDER ST

BUFFALO, NY 14215

WBE CONSTRUCTION 1.00CERTIFIED SAFETY PRODUCTS, NY

ROUTE 417

ANDOVER, NY 14806

MBE CONSTRUCTION 1.00G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

WBE TRUCKING 1.00M.J. DREHER TRUCKING, INC.

50 OWENS ROAD

BROCKPORT, NY 14420

WBE MATERIAL SUPPLIER 0.60MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

MBE CONSTRUCTION 1.00PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

TOTAL: 1.00

Page 42: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263627 DESCRIPTION: ROUTE 5S OVER TERWILLEGER CREEK BRIDGE

REHABILITATION (BIN 1002970) IN THE TOWN OF FLORIDA.

PIN #: 202953

AWARD DATE: 1/22/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,680,539.40

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

TIOGA CONSTRUCTION COMPANY, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

333 GROS BLVD.

HERKIMER, NY 13350

DBE CONSTRUCTION 14,944.00A & K SLIPFORMING, INC.

PO BOX 250

COBLESKILL, NY 12043

DBE CONSTRUCTION 10,103.92DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE CONSTRUCTION 50,783.75EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 18,472.00INTERSTATE REINFORCING, INC.

127 BLIND ROAD

MEXICO, NY 13114

DBE CONSTRUCTION 67,511.00KAL HARBOUR/DBA: HARBOUR ROADS

PO BOX 4087

ALBANY, NY 12204

DBE CONSTRUCTION 1,774.99MILLER'S LANDSCAPING, LLC

6741 HAPPY VALLEY ROAD

VERONA, NY 13478

DBE CONSTRUCTION 9,842.00STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

TOTAL: 67,511.00

Page 43: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263632 DESCRIPTION: 0.6 MILES OF ASPHALT CONCRETE RESURFACING ON MAIN

STREET IN THE CITY OF HORNELL

PIN #: 675493

AWARD DATE: 2/7/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 880,360.08

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

DALRYMPLE GRAVEL & CONTRACTING CO., INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

2105 SOUTH BROADWAY

PINE CITY, NY 14871

DBE CONSTRUCTION 3,943.00CERTIFIED SAFETY PRODUCTS, NY

ROUTE 417

ANDOVER, NY 14806

TOTAL: 3,943.00

Page 44: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263635 DESCRIPTION: RECONSTRUCTION OF ROUTE 481 / ROUTE 45 INTERSECTION

IN THE TOWNS OF VOLNEY & SCRIBA

PIN #: 310712

AWARD DATE: 1/23/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,898,545.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

BARRETT PAVING MATERIALS INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

4530 WETZEL ROAD

LIVERPOOL, NY 13090

DBE CONSTRUCTION 57,275.00APEX STRIPING, INC.

6500 NEW VENTURE GEAR DRIVE

EAST SYRACUSE, NY 13057

DBE CONSTRUCTION 30,930.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS

522 BRADLEY STREET

WATERTOWN, NY 13601

DBE CONSTRUCTION 19,845.00EASTCOM UTILITY CONTRACTORS

1092 COUNTY ROUTE 37

CENTRAL SQUARE, NY 13036

DBE CONSTRUCTION 118,081.80US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 118,081.80

Page 45: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263639 DESCRIPTION: 8.9 MILES OF ASPHALT CONCRETE MILLING & RESURFACING

ON I-81 IN THE TOWNS OF LAFAYETTE AND TULLY

PIN #: 350175

AWARD DATE: 2/5/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 8,224,111.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

SUIT-KOTE CORPORATION

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

1911 LORINGS CROSSINGS RD.

CORTLAND, NY 13045

DBE CONSTRUCTION 44,000.00AROLD CONSTRUCTION CO., INC.

51 POWDER MILL BRIDGE ROAD

KINGSTON, NY 12401

DBE CONSTRUCTION 241,756.98EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 339,313.30STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

TOTAL: 339,313.30

Page 46: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263640 DESCRIPTION: I-86 MAINTENANCE BY CONTRACT (7 MILES, PAVEMENT

RESURFACING, SIDEWALKS, BRIDGE REHAB), TOWNS OF BIG FLATS AND

PIN #: 606718

AWARD DATE: 2/14/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 7,273,873.14

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

DOLOMITE PRODUCTS CO. INC./DBA: A.L. BLADES

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

7610 COUNTY ROUTE 65

HORNELL, NY 14843

DBE MATERIAL SUPPLIER 32,940.00ANNSEAL, INC.

P.O. BOX 615

BIBLE SCHOOL PK, NY 13737

DBE MATERIAL SUPPLIER 4,704.78BUFFALO CONCRETE ACCESSORIES

250 GRIDER ST

BUFFALO, NY 14215

DBE MATERIAL SUPPLIER, 49,735.62MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

DBE CONSTRUCTION 314,732.40PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

DBE CONSTRUCTION 11,214.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 314,732.40

Page 47: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263642 DESCRIPTION: SAFETY IMPROVEMENT PROJECT IN THE TOWN OF HAMBURG.

PIN #: 511194

AWARD DATE: 2/15/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 1,596,961.60

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

KELEMAN-BAUER CONSTRUCTION

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

2790 CLINTON STREET

BUFFALO, NY 14224

DBE TRUCKING 74,040.00DIG IT OF NEW YORK, LLC

3529 BROADWAY

BUFFALO, NY 14227

DBE CONSTRUCTION 5,964.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 74,040.00

Page 48: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263646 DESCRIPTION: MILLING AND PAVING ALONG NY RTE. 28 IN THE TOWN OF

INDIAN LAKE.

PIN #: 211804

AWARD DATE: 2/6/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 6,769,769.69

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

KUBRICKY CONSTRUCTION CORP.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

269 BALLARD ROAD

GANSEVOORT, NY 12831

DBE CONSTRUCTION, 178,633.34DONNELLY CONSTRUCTION, INC.

PO BOX 150

MECHANICVILLE, NY 12118

DBE CONSTRUCTION 589,487.75EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 177,664.75STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

TOTAL: 589,487.75

Page 49: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263647 DESCRIPTION: REPLACEMENT OF BRIDGE DECKS ON I-390 OVER RTE 90 &

RTE 248 OVER BENNETT'S CREEK W/ 4.45 MILES OF RESURFACING ON I390 IN

PIN #: 621826

AWARD DATE: 2/12/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 7,067,629.97

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

RAMSEY CONSTRUCTORS, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

5711 GATEWAY PARK

LAKEVILLE, NY 14480

DBE CONSTRUCTION 74,614.65G & J CONTRACTING, INC.

P.O. BOX 255

HEMLOCK, NY 14466

DBE CONSTRUCTION 33,084.80NATURAL RESTORATIONS BY LINDA J & CO., INC.,

P.O. BOX 177

WILLIAMSVILLE, NY 14231

DBE CONSTRUCTION 505,003.50PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

TOTAL: 505,003.50

Page 50: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: D263650 DESCRIPTION: I-86 MBC PAVING - HORNELL TO ANGELICA

PIN #: 606724

AWARD DATE: 2/16/2018 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 9,476,972.51

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

DOLOMITE PRODUCTS CO. INC./DBA: A.L. BLADES

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

7610 COUNTY ROUTE 65

HORNELL, NY 14843

DBE MATERIAL SUPPLIER 32,952.00ANNSEAL, INC.

P.O. BOX 615

BIBLE SCHOOL PK, NY 13737

DBE 49,140.00MS UNLIMITED, INC.

PO BOX 577

SYRACUSE, NY 13206

DBE TRUCKING 196,500.00TRACEY TRUCKING, INC.

7292 ROUTE 98

ARCADE, NY 14009

DBE CONSTRUCTION 11,028.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 196,500.00

Page 51: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: LD034721 DESCRIPTION: BRIDGE REHABILITATION OF OAK STREET OVER AMTRAK/CSX

AND SWEETHILL CREEK IN THE CITY OF SCHENECTADY

PIN #: 1755.33

AWARD DATE: 1/22/2018 12:00:00AM

CONTRACT COMPLETION DATE: 6/15/2018 12:00:00

CONTRACT AMOUNT: 1,750,906.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

BETTE & CRING, LLC

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

22 CENTURY HILL DRIVE

LATHAM, NY 12110

DBE CONSTRUCTION 1,800.00EMI GUIDE RAIL LLC

693 RIVER ROAD

SCHENECTADY, NY 12306

DBE CONSTRUCTION 3,916.00STRAIGHTLINE INDUSTRIES INC

5 ARROWHEAD LANE

COHOES, NY 12047

DBE CONSTRUCTION 2,500.00SY KIM LAND SURVEYOR, P.C.

260 OSBORNE ROAD

ALBANY, NY 12211

TOTAL: 3,916.00

Page 52: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: LD035349 DESCRIPTION: RESURFACING VARIOUS COUNTY ROADS - PHASE 43

PIN #: 0760.53

AWARD DATE: 12/5/2017 12:00:00AM

CONTRACT COMPLETION DATE: 9/3/2018 12:00:00A

CONTRACT AMOUNT: 8,912,513.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

POSILLICO CIVIL, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

1750 NEW HIGHWAY

FARMINGDALE, NY 11735

DBE CONSTRUCTION 455,175.00DIVAD CONCRETE INC

PO BOX 1179

RONKONKOMA, NY 11779

DBE CONSTRUCTION 412,511.75ISLAND PAVEMENT CUTTING CO.

84 KEAN STREET

WEST BABYLON, NY 11704

TOTAL: 455,175.00

Page 53: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: LD035635 DESCRIPTION: WEST HOWARD AVE/CROOKED BROOK CREEK, CULVERT

REPLACEMENT

PIN #: 5762.21

AWARD DATE: 12/7/2017 12:00:00AM

CONTRACT COMPLETION DATE: 7/1/2018 12:00:00A

CONTRACT AMOUNT: 602,929.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

H&K SERVICES, INC.

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

6585 TOWN HILL ROAD

CONEWANGO VALLEY, NY 14726

MBE TRUCKING 11,356.00IROQUOIS BAR CORP. DBA: ONEIDA TRUCKING

155 COMMERCE DRIVE

LACKAWANNA, NY 14218

WBE TRUCKING 11,356.00M.O. TRUCKING

5617 ROUTE 380

SINCLAIRVILLE, NY 14782

MBE CONSTRUCTION 25,650.00PAVILION DRAINAGE SUPPLY

PO BOX 219

PAVILION, NY 14525

MBE 3,569.00RAVI ENGINEERING & L.S., P.C.

2110 SOUTH CLINTON AVENUE

ROCHESTER, NY 14618

WBE 500.00UPSTATE STEEL, INC.

1800 DALE ROAD

BUFFALO, NY 14225

WBE 2,523.00US TRAFFIC CONTROL, INC.

100 FIRE TOWER DRIVE

TONAWANDA, NY 14150

TOTAL: 25,650.00

Page 54: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: LD035815_C1 DESCRIPTION: IRVINGTON MAIN STREET AND STATION STREET PEDESTRIAN

IMPROVEMENTS

PIN #: 8761.87

AWARD DATE: 12/18/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 183,919.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

CREIGHTON MANNING ENGINEERING

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

17 COMPUTER DRIVE WEST

ALBANY, NY 12205

DBE 13,271.00KC ENGINEERING AND LAND SURVEYING, P.C.

7 PENN PLAZA, SUITE 1604

NEW YORK, NY 10001

TOTAL: 13,271.00

Page 55: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018

CONTRACT #: LD035817_C1 DESCRIPTION: VILLAGE OF IRVINGTON MAIN STREET PEDESTRIAN

IMPROVEMENTS

PIN #: 8761.72

AWARD DATE: 12/18/2017 12:00:00AM

CONTRACT COMPLETION DATE:

CONTRACT AMOUNT: 32,000.00

IS CONTRACTOR D/M/WBE? No

CONTRACTOR NAME & ADDRESS:

CREIGHTON MANNING ENGINEERING

D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT

17 COMPUTER DRIVE WEST

ALBANY, NY 12205

DBE 17,570.00KC ENGINEERING AND LAND SURVEYING, P.C.

7 PENN PLAZA, SUITE 1604

NEW YORK, NY 10001

TOTAL: 17,570.00

Page 56: TOTAL · 2/19/2018  · arrow sheet metal works inc dbe construction 101,300.00 75 thielman dr buffalo, ny 14206 c. lancelot scheduling services, inc. dbe 54,400.00 2 east view road

NYS Department of Transportation

D / M / WBE Utilization Plans

2/19/2018


Recommended