+ All Categories
Home > Documents > Total Cost of project is with reference to the Civil, .MEP and allied works required to be completed...

Total Cost of project is with reference to the Civil, .MEP and allied works required to be completed...

Date post: 29-Sep-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
3
Transcript
Page 1: Total Cost of project is with reference to the Civil, .MEP and allied works required to be completed for obtaining occupation certificate/ completion certificate for the building(s)
Page 2: Total Cost of project is with reference to the Civil, .MEP and allied works required to be completed for obtaining occupation certificate/ completion certificate for the building(s)
Page 3: Total Cost of project is with reference to the Civil, .MEP and allied works required to be completed for obtaining occupation certificate/ completion certificate for the building(s)

Recommended