Towards New Milestones In CFB Boiler Technology – CFB 800MW e / New 460 MW e super critical plant with CFB boiler in Lagisza - First experience update Arto Hotta, Timo Jäntti, Kari Kauppinen, Ari Kettunen Foster Wheeler Energia Oy, Finland
Transcript
Page 1: Towards New Milestones In CFB Boiler Technology – CFB ...

Towards New Milestones In CFB Boiler Technology – CFB 800MWe / New 460 MWe super

critical plant with CFB boiler in Lagisza - First experience update

Arto Hotta, Timo Jäntti, Kari Kauppinen, Ari KettunenFoster Wheeler Energia Oy, Finland

Page 2: Towards New Milestones In CFB Boiler Technology – CFB ...

Presentation Outline

• CFB Technology Status & Key Design Features of the Foster Wheeler Once-through (OTU) CFB

• Łagisza 460 MWe Project– Project Summary– Boiler Design– Operation Experience

• CFB Technology up to 800MWe

Page 3: Towards New Milestones In CFB Boiler Technology – CFB ...

Key Advantages of CFB & CFB Technology Status

• Fuel flexibility is a special advantage– Wide range for design coals– Opportunity fuels (biomass etc)– Hard-to-Burn fuels (petcoke etc)

• Excellent emission performance– No DeSOx / DeNOx –plants required

• Technology Status > CFB has reached the large utility scale

– Drum based units in scale 330 MWe in operation– 460 MWe supercritical CFB in commercial operation– Readiness to offer the 800 MWe supercritical CFB now!

Page 4: Towards New Milestones In CFB Boiler Technology – CFB ...

Foster Wheeler Once-through (OTU) CFB Key Design Features

• Proven and Efficient CFB Process• High Plant Efficiency

– Supercritical Steam Parameters

• BENSON Vertical Tube Technology– Sliding Pressure Operation– Low Pressure Drop– Simple support System

• Integrated Steam Cooled Solids Separators

– Minimum Amount of Refractory– Minimum Expansion Joints– Most Compact Design

• INTREX™ Fluidized Bed Heat Exchangers

• Regenerative Air Heaters

Page 5: Towards New Milestones In CFB Boiler Technology – CFB ...

World’s Largest CFB and World’s First CFB with Supercritical Steam Parameters

Łagisza 460 MWe - Project

Page 6: Towards New Milestones In CFB Boiler Technology – CFB ...

Łagisza 460 MWe CFB – Project

Re-powering of the Łagisza powerplant in Poland

• Customer: Południowy Koncern Energetyczny SA (PKE)

• 460 MWe supercritical OTU – CFB– World’s largest Single CFB unit– World’s first supercritical CFB

• Start of Project Execution (NTP): December 2005

• Start-up: 36 Months after NTP

• Foster Wheeler providing boiler island supply and erection with foundations

PKE -Lagizsa

Page 7: Towards New Milestones In CFB Boiler Technology – CFB ...

SH / RH• Steam flow kg/s 361 / 306• SH pressure bar 275 / 55• SH temperature °C 560 / 580• Feed water temperature °C 290

Plant Design Parameters

Gross / Net• Electrical Output MW 460 / 439• Plant efficiency % 45.3 / 43.3

Page 8: Towards New Milestones In CFB Boiler Technology – CFB ...

FUELS (as received) Coal

SulfurAshMoistureLHV

% wt

MJ/kg

1.2231220

% wt% wt

Performance Range0.6 - 1.410 - 256 - 2318 - 23

Coal Slurry(max. 30 %)

Range0.6 - 1.628 - 6527 - 457 - 17

Fuel Flexi-bility

EMISSION (6 % O2, dry) (follows EU’s LCP directive)SO2 mg/Nm3 200NOx (as NO2) mg/Nm3 200CO mg/Nm3 200Dust mg/Nm3 30

Low Emissions

Łagisza 460 MWe CFBHigh Fuel Flexibility & Emissions without DeSOx, DeNOx

Page 9: Towards New Milestones In CFB Boiler Technology – CFB ...

Łagisza 460 MWe - Boiler Design

Page 10: Towards New Milestones In CFB Boiler Technology – CFB ...

Boiler Layout & Furnace Design

Furnace10.6 m * 27.6 mHeight 48 m

Integratedseparators

INTREX™superheaters

BENSON Vertical Tube Technology

Boiler Inline Arrangement

Page 11: Towards New Milestones In CFB Boiler Technology – CFB ...

Steam Cycle

INTREX-chambers

Furnace

Economizer

2nd passwalls

Hanger tubes

SH III Solids separators

SH II SH IVINTREX

HP- bypass

To turbine

Feed water pump

Furnaceroof

To flash tank

Water/Steam separators

SH I

HP-heatersFrom feed tank

From turbineRH I

RH IIINTREX To turbine

Page 12: Towards New Milestones In CFB Boiler Technology – CFB ...

Plant Layout – Front View

Boiler Building Dimensions:

-Length 86 m-Width 41 m-Height 78 m

Page 13: Towards New Milestones In CFB Boiler Technology – CFB ...

Łagisza 460 MWe –Start-up & Initial Operation Experience

2006 2009

Page 14: Towards New Milestones In CFB Boiler Technology – CFB ...

Łagisza 460 MWe CFB Start-up Schedule

• Erection completed July, 2008• First firing, Acid cleaning, Steam blowings based on schedule• First steam to turbine > beginning of Feb, 2009• Turbine Synchronization > Middle of Feb, 2009• 720h Trial Run > 12th May, 2009• Plant hand-over > 27th June, 2009

Page 15: Towards New Milestones In CFB Boiler Technology – CFB ...

Łagisza 460 MWe CFB & Project StatusStable Process Behaviour over the Whole load Range

40 %MCR 65 %MCR 80 %MCR 100 %MCR

Main steam flow kg/s 144 235 287 361

Main steam pressure Bar 131 186 231 271

Main steam temperature °C 560 560 560 560

Reheat temperature °C 550 572 580 580

Bed temperature °C 753 835 853 889

Flue gas exit temperature °C 80 81 86 88

SO2 emission* mg/m3n 143 197 140 < 200 **

NO2 emission* mg/m3n 167 154 188 < 200 **

CO emission* mg/m3n 45 48 48 22*@ 6 % O2, dry

** Demonstrated to be met

Page 16: Towards New Milestones In CFB Boiler Technology – CFB ...

Łagisza 460 MWe CFB in Commercial OperationGenerator Output

Page 17: Towards New Milestones In CFB Boiler Technology – CFB ...

Conclusions from the operating performance of Łagisza 460 MWe CFB

The first Year operating experiences from Łagisza 460 MWe CFB prove:

• Good and stable operation of the CFB combustion process in large scale• Successful integration of the BENSON vertical tube technology with the CFB process• Performance of the boiler is very close to the design. The CFB process models and

design tools have proven to simulate and predict the actual operation of a large scale furnace.

• Good dynamic behaviour of the large scale OTU CFB meets the requirements of the grid

• Successful design of the mechanical features and challenges of a large furnace and cyclones

Łagisza has validated our utility CFB design platform providing know-how for designing larger units

Page 18: Towards New Milestones In CFB Boiler Technology – CFB ...

• CFB Technology up to 800MWe

Page 19: Towards New Milestones In CFB Boiler Technology – CFB ...

Foster Wheeler Technology base ready to propose the supercritical CFB up to 800MWe now!

Page 20: Towards New Milestones In CFB Boiler Technology – CFB ...

SH / RH• Steam flow kg/s 598 / 518• SH pressure bar 300 / 45• SH temperature °C 600 / 620• Feed water temperature °C 290

Plant Design Parameters

Gross / Net• Electrical Output MW 853 / 800• Plant efficiency % 47.2 / 44.8 (LHV)

– Cooling water temperature °C 18

Page 21: Towards New Milestones In CFB Boiler Technology – CFB ...

CFB 800 – Boiler Design

Main Characteristics:• Single pass evaporator• Low mass flux BENSON

technology; vertical tubes • Single fluidization grid• Steam cooled solids

separators• Staged INTREX

Superheaters• Regenerative Air Heaters

The similar design features validated in Łagisza will be used

Page 22: Towards New Milestones In CFB Boiler Technology – CFB ...

Summary

• Foster Wheeler is Leading the CFB Technology in the World

• Modern CFB Design with Integrated Water/Steam Cooled Solid Separators

– High fuel flexibility– Excellent emissions performance

• Foster Wheeler OTU CFB Concept demonstrated in Łagisza 460 MWe

– Performance meets the Design over the whole load range

• Foster Wheeler Technology base ready to propose the supercritical CFB up to 800MWenow!

Page 23: Towards New Milestones In CFB Boiler Technology – CFB ...

Thank You for Your Attention !