Town Panchayath Jog-Kargal – 577421.
Public Disclosure Schedule
Manual on Public Disclosure Schedules
CMAK | 2
Content
Sl.no Particulars Page. no
1 Urban planning including town planning 5-6
2 Regulation of Land- use and Construction of Buildings 7-8
3 Planning for Economic and Social development 9
4 Roads and Bridges 10-11
5 Water Supply- Domestic, Industrial and Commercial 12-14
6 Public Health, Sanitation, Conservancy and SWM 15-23
8 Urban forestry, protection of environment and ecology 24-25
10 Slum Improvement & Up-gradation 26-27
11 Urban Poverty Alleviation 28
12 Provision of urban amenities and facilities- parks, gardens and
playgrounds 29-30
13 Promotion of cultural, educational, and aesthetic aspects 31
14 Burials and burial grounds, cremations, cremation grounds and
electric crematoriums 32
15 Cattle pounds, prevention of cruelty to animals 33
16 Vital Statistics including registration of births and deaths 34-35
17 Public amenities including street lighting, parking lots, bus stops and
public conveniences 36-37
18 Regulation of slaughter houses and tanneries 38
Manual on Public Disclosure Schedules
CMAK | 3
Formats for Disclosure
Manual on Public Disclosure Schedules
CMAK | 4
Functions under 12th Schedule
1. URBAN PLANNING INCLUDING TOWN PLANNING
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
1 Urban
Planning
including
town
Planning
1. Town
Planning
Authority
2. Urban
Development
Authority
(UDA)
3. Municipal
Planning
Authority
(i) Report and Maps of
Master Plans including
Zoning Regulations
N/A N/A N/A Table 1.1 N/A
(ii) Maps of Planning
Districts
N/A N/A N/A N/A
(iii) Details of
provisional and finally
approved layouts
(Survey No, name of
owner, Site details)
N/A N/A N/A Table.1.2 N/A
4. ULB (iv) Report and maps of
Comprehensive
Development Plan (CDP)
N/A N/A N/A N/A N/A
Manual on Public Disclosure Schedules
CMAK | 5
Table 1.1: Report and Maps of Master Plans including Zoning Regulations
(Please fill in following information)
Sl.
No
Name of the reports related to Master
Plan, Zoning Regulation and CDP
Enclosure in
Maps related to Master Plan, Zoning
Regulations, Planning District and
CDP
Enclosure in PDF
1 Enclosure Enclosure
2 Enclosure Enclosure
3 Enclosure Enclosure
Table 1.2: Number of provisional and final approved layouts
(Please fill in following information)
Years Number of provisional layouts Number of approved layouts Details of layout as enclosure
Current year No No Enclosure as per the format
Current year -1 No no Enclosure as per the format
Current year-2 No No Enclosure as per the format
Format:
Details of Provisional and final approved layouts
Sl. No Name of
Layout
Whether provisional/approved Number of sites in the approved layout Name of the
owner/developer of the
layout 30*40 40*60 Odd sites
N/A N/A N/A N/A N/A N/A N/A
Manual on Public Disclosure Schedules
CMAK | 6
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
2 Regulation of
Land- use and
Construction of
Buildings
UDA/ULB (i) Details of Building
Commencement &
Completion Certificate
(Total application
received, total
permission granted,
location details)
N/A TP, Jog-
Kargal
N/A Table 2.1 (a)
& Table.2.1
(b)
N/A
(ii) Details of Industries
and commercial
complexes approved
(Survey No., Type,
Name of the owner)
N/A TP, Jog-
Kargal
N/A Table 2.2 N/A
Manual on Public Disclosure Schedules
CMAK | 7
Table 2.1 (a): Details of Building Commencement & Completion Certificate
Total number of application received for building
plan approval from past three years
Total number of License granted from past three
years
Current FY
(2009-10)
Current FY – 1
(2010-11)
Current FY – 2
(2011-12)
Current FY
(2009-10)
Current FY – 1
(2010-11)
Current FY – 2
(2011-12)
7 9 - 7 9 -
Current FY year (year to be displayed
in numeric like 2011-12)
----
Current FY – 1 (year to be displayed in
numeric like 2010-11)
9
Current FY – 2(year to be displayed in
numeric like 2009-10)
7
Manual on Public Disclosure Schedules
CMAK | 8
Mention year 2009-10
Site area(Sq/feet) Built-up
area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number
40x60 10.00x9.7 Mtr
97.55 Sqmts
03 Main road, Kargal 2067 60
25.00x25.00 Mts 12.20*13.70 Mts 03 Mosque road, Kargal 766 -
4.40+4.60/2x38
Mts
10.51x441=46.8
4 Mtr
04 Bazar line Kargal 209 -
32.80x71.80Mtr 6.4Mx9.47M
5.37x6.72M
05 Contractor kaloni, Kargal 427+446 -
11.10M+11.53/2x
27
10.90x7.95=
86.65 Mtr
04 Bazar line Kargal 223 -
4.40+4.60/2x38 4.20x5.20Mtr 04 Bazar line Kargal 209 -
9.80x11.50Mtr 8.90x9.85 06 2nd
Bazar Kargal 564 -
Mention year 2009-10
Site area(Sq/feet) Built-up
area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number
40x60 10.00x9.7 Mtr
97.55 Sqmts
03 Main road, Kargal 2067 60
25.00x25.00 Mts 12.20*13.70 Mts 03 Mosque road, Kargal 766 -
4.40+4.60/2x38
Mts
10.51x441=46.8
4 Mtr
04 Bazar line Kargal 209 -
32.80x71.80Mtr 6.4Mx9.47M
5.37x6.72M
05 Contractor kaloni, Kargal 427+446 -
11.10M+11.53/2x
27
10.90x7.95=
86.65 Mtr
04 Bazar line Kargal 223 -
4.40+4.60/2x38 4.20x5.20Mtr 04 Bazar line Kargal 209 -
9.80x11.50Mtr 8.90x9.85 06 2nd
Bazar Kargal 564 -
Mention year 2010-11
Site area(Sq/feet) Built-up
area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number
14+9.40/2x99.00
Mtr
9.00x11.50Mtr 06 Watertank area, Kargal 577 60
4.40+5.50/2x33 4.40+5.50/2x33 04 Bazar line Kargal 215 -
8.30x14.50Mtr 7.40Mx12.00M 03 Watertank, Kargal 670 -
25x35 5.62x8.16M
RCC
08 Riservecamp Joga 2541 -
Manual on Public Disclosure Schedules
CMAK | 9
Table 2.1 (b): Details of the building plan approval for three years
Format for enclosure Ref Table 2.1.b
25x35 19x29 08 Riserve camp, Jog 2515 -
11.50x15.50 9.07x 9.30 06 Jog road, Kargal 508 -
Mention year 2011-12
40X30 35x29 04 Pyadi Field 2497 -
3.00+2.50/2X360
0 Mtr
18.00x1.5 6 Bazar Line, Kargal 515 -
60x50 60x33 4 Pyadi Field, Kargal 2116 -
Current FY year (year to be displayed
in numeric like 2011-12)
N/A
Current FY – 1 (year to be displayed in
numeric like 2010-11)
2
Current FY – 2(year to be displayed in
numeric like 2009-10)
N/A
Manual on Public Disclosure Schedules
CMAK | 10
Table 2.2: Details of approved Industries/Commercial Areas
Format reference to table 2.2
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/War
d)
Frequency
of
Disclosure
Referenc
e
Remark
s
3 Planning for
Economic and
Social
development
ULB List and brief of the Social and
Economic Development Schemes.-
eg; 18% scheme, Ashraya and such
other Govt. programs
Details of budget allocation and
expenditure of these schemes
Details of Beneficiaries
Previous three
financial years
including current
year
ULB Half year Table 3.1
Mention year 2011-12
Site area(Sq/feet) Built-up
area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number
20+25/2X82 115.00 Sqmts 06 Bazar Line, Kargal 519 -
15.80+5.30/2*36.
00 Mtrs
(14.00x4.30)X3 04 B.H. Road, Kargal 225 -
Manual on Public Disclosure Schedules
CMAK | 11
Table 3.1
List and brief of the social and economic Development Schemes for three years
Current FY 1 (2009-10)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
01 22.75% 5348296 4016100
¥ÉÃzÀÄæ ¥sÀ£ÁðArøï
PÉÆ¥Áà¼ÀAiÀÄå
£ÀAdAiÀÄå
CAUÀtÚ
¥ÉÆ£ÀÄ߸Áé«Ä
¸Á§eÁ£ï
£ÁUÀAiÀÄå
SÁzÀgï ¸Á¨ï
ªÀÄtÂ
JA.gÁdÄ
wªÀÄä£ÁAiÀÄÌ
dUÀ£ÁßxÀ
gÀAUÀ ¸Áé«Ä
gÁdÄ
C§Äݯï
sÁ¸ÀÌgï
ªÀiÁ®PÉÆAqÀAiÀÄå
Manual on Public Disclosure Schedules
CMAK | 12
ªÀÄAd¥Àà
sÁ¸ÀÌgï
UÉæøÀªÀÄä
ªÀÄÄvÀÛAiÀÄå
C§Äݯï SÁzÀgï
SÁ¹A ¸Á¨ï
C¥Àà¥ÀÆeÁj
£ÁgÀAiÀÄt £ÁAiÀÄgï
ªÀÄAd¥ÀàeÉÊ£ï
£ÀAd¥Àà ªÉÆzÀ°AiÀiÁgï
gÁªÀÄAiÀÄå
gÁªÀÄ
Current FY-1 (2010-11)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
01 Urban Vajpeye vasathi
Yojane & Namma
mane
375000 75000
02 22.75% 5704623 4791800 ªÀÄAd.JAªÀÄAd.JAªÀÄAd.JAªÀÄAd.JA
£ÁgÁAiÀÄt.PÉ.£ÁgÁAiÀÄt.PÉ.£ÁgÁAiÀÄt.PÉ.£ÁgÁAiÀÄt.PÉ.
UÀt¥ÀwUÀt¥ÀwUÀt¥ÀwUÀt¥Àw
¥ÀÄlÖzÁ À¥ÀÄlÖzÁ À¥ÀÄlÖzÁ À¥ÀÄlÖzÁ À
ÀÄgÉñÀ.«ÀÄgÉñÀ.«ÀÄgÉñÀ.«ÀÄgÉñÀ.«
CuÁÚzÉÆgÉCuÁÚzÉÆgÉCuÁÚzÉÆgÉCuÁÚzÉÆgÉ
ÀĤvÀÀĤvÀÀĤvÀÀĤvÀ
ªÀĺÁzÉêÀªÀÄäªÀĺÁzÉêÀªÀÄäªÀĺÁzÉêÀªÀÄäªÀĺÁzÉêÀªÀÄä
Manual on Public Disclosure Schedules
CMAK | 13
ªÉAPÀmÉñÀ.JªÉAPÀmÉñÀ.JªÉAPÀmÉñÀ.JªÉAPÀmÉñÀ.J
AiÀÄĪÀgÁeïAiÀÄĪÀgÁeïAiÀÄĪÀgÁeïAiÀÄĪÀgÁeï
PÉ. ÀħæªÀÄtÂPÉ. ÀħæªÀÄtÂPÉ. ÀħæªÀÄtÂPÉ. ÀħæªÀÄtÂ
PÀĪÀiÁgÀPÀĪÀiÁgÀPÀĪÀiÁgÀPÀĪÀiÁgÀ
gÀvÀßgÀvÀßgÀvÀßgÀvÀß
¥À¼À¤¥À¼À¤¥À¼À¤¥À¼À¤
Dgï.zsÀ£À®QëöäÃDgï.zsÀ£À®QëöäÃDgï.zsÀ£À®QëöäÃDgï.zsÀ£À®QëöäÃ
VÃvÁVÃvÁVÃvÁVÃvÁ
£ÁUÀgÀvÀߣÁUÀgÀvÀߣÁUÀgÀvÀߣÁUÀgÀvÀß
±ÉÃRgÀ±ÉÃRgÀ±ÉÃRgÀ±ÉÃRgÀ
§ ÀªÀgÁdħ ÀªÀgÁdħ ÀªÀgÁdħ ÀªÀgÁdÄ
ÀAvÉÆõïÀAvÉÆõïÀAvÉÆõïÀAvÉÆõï
¥À¼À¤ ¸Áé«Ä¥À¼À¤ ¸Áé«Ä¥À¼À¤ ¸Áé«Ä¥À¼À¤ ¸Áé«Ä
JA.ZÀAzÀæ¥ÀàJA.ZÀAzÀæ¥ÀàJA.ZÀAzÀæ¥ÀàJA.ZÀAzÀæ¥Àà
Dgï. ÀÄgÉñÀDgï. ÀÄgÉñÀDgï. ÀÄgÉñÀDgï. ÀÄgÉñÀ
«Ä£ÁQë«Ä£ÁQë«Ä£ÁQë«Ä£ÁQë
ÀÄgÉñÀÀÄgÉñÀÀÄgÉñÀÀÄgÉñÀ
gÁeÉñÀgÁeÉñÀgÁeÉñÀgÁeÉñÀ
£ÁUÀ sÀƵÀuï.f.£ÁUÀ sÀƵÀuï.f.£ÁUÀ sÀƵÀuï.f.£ÁUÀ sÀƵÀuï.f.
©.ªÀiÁºÉñÀ©.ªÀiÁºÉñÀ©.ªÀiÁºÉñÀ©.ªÀiÁºÉñÀ
JA.J¸ï.®Qëöä ªÀÄtÂJA.J¸ï.®Qëöä ªÀÄtÂJA.J¸ï.®Qëöä ªÀÄtÂJA.J¸ï.®Qëöä ªÀÄtÂ
sÀªÁ¤ ÀĨÁæAiÀÄsÀªÁ¤ ÀĨÁæAiÀÄsÀªÁ¤ ÀĨÁæAiÀÄsÀªÁ¤ ÀĨÁæAiÀÄ
AiÀıÀªÀAvÀ£ÀªÀ¯ÉAiÀıÀªÀAvÀ£ÀªÀ¯ÉAiÀıÀªÀAvÀ£ÀªÀ¯ÉAiÀıÀªÀAvÀ£ÀªÀ¯É
ªÀiÁzÉñÀªÀiÁzÉñÀªÀiÁzÉñÀªÀiÁzÉñÀ
ªÀÄAdÄ£ÁxÀ.J¯ïªÀÄAdÄ£ÁxÀ.J¯ïªÀÄAdÄ£ÁxÀ.J¯ïªÀÄAdÄ£ÁxÀ.J¯ï
Manual on Public Disclosure Schedules
CMAK | 14
dAiÀÄ ÀÄUÀA¢dAiÀÄ ÀÄUÀA¢dAiÀÄ ÀÄUÀA¢dAiÀÄ ÀÄUÀA¢
sÀgÀvïPÀĪÀiÁgïsÀgÀvïPÀĪÀiÁgïsÀgÀvïPÀĪÀiÁgïsÀgÀvïPÀĪÀiÁgï
gÁzsÀgÁzsÀgÁzsÀgÁzsÀ
£ÁUÀgÁeï£ÁUÀgÁeï£ÁUÀgÁeï£ÁUÀgÁeï
gÁdªÀÄägÁdªÀÄägÁdªÀÄägÁdªÀÄä
F±ÀéjF±ÀéjF±ÀéjF±Àéj
®°vÀ®°vÀ®°vÀ®°vÀ
gÀÄQäÃtÂgÀÄQäÃtÂgÀÄQäÃtÂgÀÄQäÃtÂ
eÉÆåÃw®QëöäeÉÆåÃw®QëöäeÉÆåÃw®QëöäeÉÆåÃw®Qëöä
£ÁUÉÃAzÀæ.Dgï£ÁUÉÃAzÀæ.Dgï£ÁUÉÃAzÀæ.Dgï£ÁUÉÃAzÀæ.Dgï
²æäªÁ À²æäªÁ À²æäªÁ À²æäªÁ À
PÀĪÀiÁgÀPÀĪÀiÁgÀPÀĪÀiÁgÀPÀĪÀiÁgÀ
GªÀiÁGªÀiÁGªÀiÁGªÀiÁ
gÀªÉÄñïgÀªÉÄñïgÀªÉÄñïgÀªÉÄñï
ªÀÄĤ¸Áé«ÄªÀÄĤ¸Áé«ÄªÀÄĤ¸Áé«ÄªÀÄĤ¸Áé«Ä
PÉ.gÁdÄPÉ.gÁdÄPÉ.gÁdÄPÉ.gÁdÄ
sÁUÀå ®QëöäsÁUÀå ®QëöäsÁUÀå ®QëöäsÁUÀå ®Qëöä
®QëöäzÉë®QëöäzÉë®QëöäzÉë®QëöäzÉë
«Ä£ÁQëëģÁQëëģÁQëëģÁQëÃ
±ÁgÀzÀ±ÁgÀzÀ±ÁgÀzÀ±ÁgÀzÀ
±ÀPÀÄAvÀ¯Á±ÀPÀÄAvÀ¯Á±ÀPÀÄAvÀ¯Á±ÀPÀÄAvÀ¯Á
ªÀÄAdÄ£ÁxÀªÀÄAdÄ£ÁxÀªÀÄAdÄ£ÁxÀªÀÄAdÄ£ÁxÀ
gÁeÉñÀéjgÁeÉñÀéjgÁeÉñÀéjgÁeÉñÀéj
ÀIJïÁÀIJïÁÀIJïÁÀIJïÁ
ªÀÄAdÄ£ÁxÀªÀÄAdÄ£ÁxÀªÀÄAdÄ£ÁxÀªÀÄAdÄ£ÁxÀ
Manual on Public Disclosure Schedules
CMAK | 15
²ªÀPÀĪÀiÁgÀ²ªÀPÀĪÀiÁgÀ²ªÀPÀĪÀiÁgÀ²ªÀPÀĪÀiÁgÀ
gÀÄPÀätÂgÀÄPÀätÂgÀÄPÀätÂgÀÄPÀätÂ
EAzÁætÂEAzÁætÂEAzÁætÂEAzÁætÂ
¥ÀgÀªÉÄñÀégÀ¥ÀgÀªÉÄñÀégÀ¥ÀgÀªÉÄñÀégÀ¥ÀgÀªÉÄñÀégÀ
gÁªÀÄZÀAzÀægÁªÀÄZÀAzÀægÁªÀÄZÀAzÀægÁªÀÄZÀAzÀæ
ZÀAzÀæªÀÄäZÀAzÀæªÀÄäZÀAzÀæªÀÄäZÀAzÀæªÀÄä
«.f.¥ÀĵÀà«.f.¥ÀĵÀà«.f.¥ÀĵÀà«.f.¥ÀĵÀà
¥ÁªÀðw¥ÁªÀðw¥ÁªÀðw¥ÁªÀðw
®vÁ.PÉ.®vÁ.PÉ.®vÁ.PÉ.®vÁ.PÉ.
ÀgÉÆÃdÀgÉÆÃdÀgÉÆÃdÀgÉÆÃd
À«vÀÀ«vÀÀ«vÀÀ«vÀ
UËjUËjUËjUËj
É®égÁeïÉ®égÁeïÉ®égÁeïÉ®égÁeï
£ÁUÀ¥Àà£ÁUÀ¥Àà£ÁUÀ¥Àà£ÁUÀ¥Àà
ªÀÄAdļÁªÀÄAdļÁªÀÄAdļÁªÀÄAdļÁ
J£ï.ºÀÄZÀÑPÉA¥ÀAiÀÄåJ£ï.ºÀÄZÀÑPÉA¥ÀAiÀÄåJ£ï.ºÀÄZÀÑPÉA¥ÀAiÀÄåJ£ï.ºÀÄZÀÑPÉA¥ÀAiÀÄå
©.JªÀiï.¹zÀÝAiÀÄå©.JªÀiï.¹zÀÝAiÀÄå©.JªÀiï.¹zÀÝAiÀÄå©.JªÀiï.¹zÀÝAiÀÄå
Dgï.ªÀÄAdÄ£ÁxÀDgï.ªÀÄAdÄ£ÁxÀDgï.ªÀÄAdÄ£ÁxÀDgï.ªÀÄAdÄ£ÁxÀ
ÀgÉÆÃdªÀÄäÀgÉÆÃdªÀÄäÀgÉÆÃdªÀÄäÀgÉÆÃdªÀÄä
vÀAUÀgÁdÄvÀAUÀgÁdÄvÀAUÀgÁdÄvÀAUÀgÁdÄ
¨Á§Ä¨Á§Ä¨Á§Ä¨Á§Ä
£ÀlgÁeï£ÀlgÁeï£ÀlgÁeï£ÀlgÁeï
dAiÀÄ®QëöädAiÀÄ®QëöädAiÀÄ®QëöädAiÀÄ®Qëöä
¤AUÀ¥Àà¤AUÀ¥Àà¤AUÀ¥Àà¤AUÀ¥Àà
£ÁUÀgÀvÀߣÁUÀgÀvÀߣÁUÀgÀvÀߣÁUÀgÀvÀß
Manual on Public Disclosure Schedules
CMAK | 16
zÀ£À®QëöäzÀ£À®QëöäzÀ£À®QëöäzÀ£À®Qëöä
zÉêÉAzÀæzÉêÉAzÀæzÉêÉAzÀæzÉêÉAzÀæ
gÁeÉñÀéjgÁeÉñÀéjgÁeÉñÀéjgÁeÉñÀéj
ªÀÄÄgÀÄUÉñªÀÄÄgÀÄUÉñªÀÄÄgÀÄUÉñªÀÄÄgÀÄUÉñïïïï
£ÀAdÄAqÀ£ÀAdÄAqÀ£ÀAdÄAqÀ£ÀAdÄAqÀ
±ÉÃRgï±ÉÃRgï±ÉÃRgï±ÉÃRgï
¦.ªÀ£ÀgÁeï¦.ªÀ£ÀgÁeï¦.ªÀ£ÀgÁeï¦.ªÀ£ÀgÁeï
PÉ.PÀȵÀÚ¥ÀàPÉ.PÀȵÀÚ¥ÀàPÉ.PÀȵÀÚ¥ÀàPÉ.PÀȵÀÚ¥Àà
¥À«vÀæ .J£ï.¥À«vÀæ .J£ï.¥À«vÀæ .J£ï.¥À«vÀæ .J£ï.
sÁgÀwsÁgÀwsÁgÀwsÁgÀw
gÁeÉñÀéjgÁeÉñÀéjgÁeÉñÀéjgÁeÉñÀéj
«zÁå«zÁå«zÁå«zÁå
²ªÀPÀĪÀiÁgÀ²ªÀPÀĪÀiÁgÀ²ªÀPÀĪÀiÁgÀ²ªÀPÀĪÀiÁgÀ
¦.±À²PÀ®¦.±À²PÀ®¦.±À²PÀ®¦.±À²PÀ®
¦.¥ÀĵÀà®vÁ¦.¥ÀĵÀà®vÁ¦.¥ÀĵÀà®vÁ¦.¥ÀĵÀà®vÁ
±ÀÈw.J¸ï.±ÀÈw.J¸ï.±ÀÈw.J¸ï.±ÀÈw.J¸ï.
PÉ.ªÀrªÉîÄPÉ.ªÀrªÉîÄPÉ.ªÀrªÉîÄPÉ.ªÀrªÉîÄ
±ÀÈw.J£ï.±ÀÈw.J£ï.±ÀÈw.J£ï.±ÀÈw.J£ï.
ªÀiÁjªÀÄÄvÀÄÛªÀiÁjªÀÄÄvÀÄÛªÀiÁjªÀÄÄvÀÄÛªÀiÁjªÀÄÄvÀÄÛ
©.ªÀiÁzÉñÀ©.ªÀiÁzÉñÀ©.ªÀiÁzÉñÀ©.ªÀiÁzÉñÀ
±É±É±É±ÉÆèÁ.JA.ÆèÁ.JA.ÆèÁ.JA.ÆèÁ.JA.
gÀ«ZÀAzÀægÀ«ZÀAzÀægÀ«ZÀAzÀægÀ«ZÀAzÀæ
ªÉAPÀlgÀªÀÄtªÀÄäªÉAPÀlgÀªÀÄtªÀÄäªÉAPÀlgÀªÀÄtªÀÄäªÉAPÀlgÀªÀÄtªÀÄä
UÀÄt ±ÉÃRgÀUÀÄt ±ÉÃRgÀUÀÄt ±ÉÃRgÀUÀÄt ±ÉÃRgÀ
¥ÉAZÁ®ªÀÄä¥ÉAZÁ®ªÀÄä¥ÉAZÁ®ªÀÄä¥ÉAZÁ®ªÀÄä
Manual on Public Disclosure Schedules
CMAK | 17
ªÀĺÀzÉêÀªÀĺÀzÉêÀªÀĺÀzÉêÀªÀĺÀzÉêÀ
VÃvÁ £ÁUÀgÁdVÃvÁ £ÁUÀgÁdVÃvÁ £ÁUÀgÁdVÃvÁ £ÁUÀgÁd
vÁgÀªÀÄävÁgÀªÀÄävÁgÀªÀÄävÁgÀªÀÄä
ÀIJîÀIJîÀIJîÀIJî
¹.JZï.¥ÉAZÀ®AiÀÄå¹.JZï.¥ÉAZÀ®AiÀÄå¹.JZï.¥ÉAZÀ®AiÀÄå¹.JZï.¥ÉAZÀ®AiÀÄå
D£ÀAzÀD£ÀAzÀD£ÀAzÀD£ÀAzÀ
C£ÀAvÀ.r.JZï.C£ÀAvÀ.r.JZï.C£ÀAvÀ.r.JZï.C£ÀAvÀ.r.JZï.
ZÉÃvÀ£ïPÀĪÀiÁgï.f.ZÉÃvÀ£ïPÀĪÀiÁgï.f.ZÉÃvÀ£ïPÀĪÀiÁgï.f.ZÉÃvÀ£ïPÀĪÀiÁgï.f.
C«ÄvïPÀĪÀiÁgïC«ÄvïPÀĪÀiÁgïC«ÄvïPÀĪÀiÁgïC«ÄvïPÀĪÀiÁgï
µÀtÄäRµÀtÄäRµÀtÄäRµÀtÄäR
JJJJ¸ï.©. ÀAdAiÀĸï.©. ÀAdAiÀĸï.©. ÀAdAiÀĸï.©. ÀAdAiÀÄ
¦.«. ÀÄgÉñÀ¦.«. ÀÄgÉñÀ¦.«. ÀÄgÉñÀ¦.«. ÀÄgÉñÀ
J¸ï. ÀÄgÉñÀJ¸ï. ÀÄgÉñÀJ¸ï. ÀÄgÉñÀJ¸ï. ÀÄgÉñÀ
£À«Ã£À.r.£À«Ã£À.r.£À«Ã£À.r.£À«Ã£À.r.
ªÀĺÁzÉêÀ.JAªÀĺÁzÉêÀ.JAªÀĺÁzÉêÀ.JAªÀĺÁzÉêÀ.JA
¢Ã¥ÀPï.«¢Ã¥ÀPï.«¢Ã¥ÀPï.«¢Ã¥ÀPï.«
C¤vÀ.«.C¤vÀ.«.C¤vÀ.«.C¤vÀ.«.
¥Àæ±ÁAvÀ¥Àæ±ÁAvÀ¥Àæ±ÁAvÀ¥Àæ±ÁAvÀ
CtÚ¥ÀàCtÚ¥ÀàCtÚ¥ÀàCtÚ¥Àà
ªÀÄAdÄ£ÁxÀ.J¸ï.©ªÀÄAdÄ£ÁxÀ.J¸ï.©ªÀÄAdÄ£ÁxÀ.J¸ï.©ªÀÄAdÄ£ÁxÀ.J¸ï.©
¥ÀæPÁ±À.r.¥ÀæPÁ±À.r.¥ÀæPÁ±À.r.¥ÀæPÁ±À.r.
£À½£À.JA.¹.£À½£À.JA.¹.£À½£À.JA.¹.£À½£À.JA.¹.
¸Ë sÁUÀå.J¸ï.Dgï.¸Ë sÁUÀå.J¸ï.Dgï.¸Ë sÁUÀå.J¸ï.Dgï.¸Ë sÁUÀå.J¸ï.Dgï.
JA.ZÀAzÀæPÀ¯ÁJA.ZÀAzÀæPÀ¯ÁJA.ZÀAzÀæPÀ¯ÁJA.ZÀAzÀæPÀ¯Á
gÁzsÁUÀÄAfÃPÀgÀgÁzsÁUÀÄAfÃPÀgÀgÁzsÁUÀÄAfÃPÀgÀgÁzsÁUÀÄAfÃPÀgÀ
Manual on Public Disclosure Schedules
CMAK | 18
dAiÀÄ®PÀëöäªÀÄädAiÀÄ®PÀëöäªÀÄädAiÀÄ®PÀëöäªÀÄädAiÀÄ®PÀëöäªÀÄä
EA¢gÁ ªÀÄ£ÉÆúÀgÀ ¥ÁnïïEA¢gÁ ªÀÄ£ÉÆúÀgÀ ¥ÁnïïEA¢gÁ ªÀÄ£ÉÆúÀgÀ ¥ÁnïïEA¢gÁ ªÀÄ£ÉÆúÀgÀ ¥Ánïï
PÁ¼Àå £ÁAiÀÄÌPÁ¼Àå £ÁAiÀÄÌPÁ¼Àå £ÁAiÀÄÌPÁ¼Àå £ÁAiÀÄÌ
ÉÆÃPÉñï.JAÉÆÃPÉñï.JAÉÆÃPÉñï.JAÉÆÃPÉñï.JA
«dAiÀÄ ¤ªÀÄð®.©«dAiÀÄ ¤ªÀÄð®.©«dAiÀÄ ¤ªÀÄð®.©«dAiÀÄ ¤ªÀÄð®.©
ÀAVÃvÀ.JZï.PÉ.ÀAVÃvÀ.JZï.PÉ.ÀAVÃvÀ.JZï.PÉ.ÀAVÃvÀ.JZï.PÉ.
gÁªÀÄgÁªÀÄgÁªÀÄgÁªÀÄ
ªÀÄÄgÀÄUÉñïªÀÄÄgÀÄUÉñïªÀÄÄgÀÄUÉñïªÀÄÄgÀÄUÉñï
®PÀëöäªÀÄä®PÀëöäªÀÄä®PÀëöäªÀÄä®PÀëöäªÀÄä
Current FY-2 (2011-12)
Sl. No Name of the Scheme Targetd Achivement List of beneficiaries to be enclosed
02 22.75% 6250826 -
4. ROADS & BRIDGES
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
4 Roads and
Bridges
ULBs & UDA (i) Total Road Length
(type of road, its length
and width)
Current status ULB/Ward Half year Table 4.1 MIS
(ii) Details of Roads
proposed & executed for
carpeting/ re-carpeting.
Current year ULB Half year Table 4.2
(a) and 4.2
(b)
N/A
(iii) Percentage of
footpath to the total road
current status ULB Half year Table 4.3 N/A
Manual on Public Disclosure Schedules
CMAK | 19
length of main roads
Table 4.1: Road types
Total existing road length in kms
Water bound macadam
(WBM)
Bituminous Cement Concrete (CC) Mud road Total
20.00 15.00 7.00 16.00 58.00
Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in current Financial year (year to be
mentioned numeric like 2010-11)
Type of road Total Road length approved and
tendered for carpeting in kms
Total Road length
approved and tendered for
re-carpeting in km
Water bound macadam (WBM) N/A N/A
Bituminous N/A N/A
Cement Concrete (CC) N/A N/A
Mud road N/A N/A
Total Automatic sum Automatic sum
Manual on Public Disclosure Schedules
CMAK | 20
Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in current financial year (year to
be mentioned numeric like 2010-11)
Format for enclosure reference table 4.2.b
Road length Approved and tendered for carpeting, WBM,
Bituminous and CC road (newly surfacing of the roads)
Road length Approved and Tendered for re-
carpeting, WBM, Bituminous and CC road
Type of
road
Ward Number Street Name Length of road in Kms Type of
Road
Ward
Number
Street Name Length of road
in Kms
N/A N/A N/A N/A N/A N/A N/A N/A
Table 4.3: Footpath coverage to main roads
Type of road Total Road length
approved and tendered for
carpeting in kms
Total Road length approved and
tendered for re-carpeting in km
Water bound macadam (WBM) Enclosure as per the format given below
Enclosure as per the format given below
Bituminous Enclosure as per the format given below
Enclosure as per the format given below
Cement Concrete (CC) Enclosure as per the format given below
Enclosure as per the format given below
Mud road Enclosure as per the format given below
Enclosure as per the format given below
Manual on Public Disclosure Schedules
CMAK | 21
Total length of the main roads in ULB Jurisdiction: 6.00 kms
Total length of the footpath built against main road: N/A kms
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
5 Water Supply-
Domestic,
Industrial and
Commercial
Water Board/
ULB
(i) Percentage of total
water supply (Surfaced,
Underground and external
source)
0.87mid 0.87mld Half yearly Table 5.1 SLB1
(ii)Total number of
connection & percentage
of Coverage (Household/
public stand posts/
Commercial and
Industrial Connection),
quantity of w/s
526 526 Half yearly Table 5.2 SLB
(iii) Frequency and
Timing for Water Supply.
7 days 7 days Half yearly Table 5.3 SLB
(iv) Quality of Water
Supply (percentage of
samples complied with
the Water Act norms)
6 times/6 months 6 times/6
months
Half yearly Table 5.4 SLB
(v) Cost Recovery in
Water Supply Services
(Revenue Generated per
KL of water/Cost incurred
55 Rs/months 55 Rs/months Annually Table 5.5 SLB
1 Service Level benchmarking by DMA, GoK
Manual on Public Disclosure Schedules
CMAK | 22
per KL of Water
Supplied)
(vi) Water tariff Rs.55/domestic
Rs.110/commersi
al
Rs.55/domesti
c
Rs.110/comm
ersial
Annually Table 5.6
Format 5.1 -Per capita production of water
Water supplied through Surface Source 0.87 in MLD
Water Supplied through Underground Source N/A in MLD
Water supplied through external source N/A in MLD
Format 5.2- Water Supply Coverage
Total Number of Households 526 .in numbers
Number of house holds with direct water supply connections N/A in numbers
Total number of Public Stand Posts …25…… in numbers
Total number of industrial connections…N/A……in numbers
Format 5.3- frequency & Timings of water supply
Frequency and Timing for Water Supply
Manual on Public Disclosure Schedules
CMAK | 23
Number of days of water supply per week in
Normal season
Number of hours of water supply on any supplied day (Normal
season)
7day 30 min/day
Format 5.4- Quality of water supply
Total number of water samples collected at the consumer end….. 6….in Numbers/6 months
Number of water samples that meet potable water standards--6---in Numbers/6 months
Format 5.5- Cost recovery in water supply (same as in SLB)
Expenditure
1 Total contractual (if outsourced) cost for Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/
Jack well/ Intake well, valves, replacement of distribution
network, supplying of spare materials, salaries of Contract
labours, vehicles etc)
Current
Year
(2009-10)
150000
Current
FY-1
(2009-10)
480000
Current
FY -2
(2011-12)
157950
2 Total expenditure borne by ULB on Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/
Jack well/ Intake well, valves, replacement of distribution
network, supplying of spare materials, vehicles etc
460950 N/A 56870
3 Salaries of employees under water supply (Permanent and Daily
wages 120830 142992 43650
4 Purchase of items (for water treatment, for pumping machinery
and spare parts if any 100000 84923 457560
5 Electricity Bill for water supply (Surface source and Ground
water)
106956 736847 607794
Revenue
1 Amount collected out of current year demand 359040 367605 51115
Manual on Public Disclosure Schedules
CMAK | 24
Format 5.6- Water Tariff
Water Tariff
Present water charges (which ever is applicable)
Flat rate ( mention the rate)
slab Rate (Mention the slab)
Enclosure
Enclosure
Enclosure
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT
Sl.
N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
6 Public Health,
Sanitation,
Conservancy and
SWM
ULBs/ Water
Board/ UDA
(i) Street Sweeping
(road wise street
sweeping schedule)
N/A Town
Panchayath,
N/A Table
6.(a).1 &
6.(a).2
SWM
Action
Plan
(ii) General statistics on
Solid Waste Management
(Generation quantity,
Details of the Secondary
Collection Points, landfill
location, user fee)
3.65 tone
Survey num.28,
Govt land,
Iduvani.
Town
Panchayath,
Jog-karagl
N/A Table
6.(a).3.1&
6.(a).3.2
SWM MIB
(iii) Percentage of HH
covered under Door-to-
Door Collection
N/A N/A N/A Table
6.(a).4
SLB and
MIB
2
Amount collected for providing new connection
166400
18790
11700
Manual on Public Disclosure Schedules
CMAK | 25
(iv) Percentage of
households participating
in segregation
N/A N/A N/A Table
6.(a).5
(v) Extent of Scientific
treated and Disposal of
MSW (%)
N/A N/A N/A Table
6.(a).5
SLB and
MIB
(vi) Cost recovery under
SWM (Revenue
generated per ton of SW/
Expenditure per ton of
SWM (in Rs.))
N/A N/A N/A Table
6.(a).6
SLB
Sewerage & Drainage:
(vii) Percentage of
coverage of UGD
N/A N/A N/A Table
6.(b).1
SLB
(viii) Percentage of Waste
Water Treated
N/A N/A N/A Table
6.(b).2
SLB
(ix) Percentage of extent
of reuse and recycle of
treated waste water
N/A N/A N/A Table
6.(b).3
SLB
(x) Cost recovery under
UGD (Revenue generated
under UGD/ Expenditure
under UGD (in Rs.))
N/A N/A N/A Table
6.(b).4
SLB
Storm Water Drains
(xi) Statistics of storm
Water Drains ( location,
length and its cleaning
frequency)
N/A N/A N/A Table
6.(c).1
N/A
Manual on Public Disclosure Schedules
CMAK | 26
(xii) % age roadside
drains to road length (
Paved and unpaved)
N/A N/A N/A Table
6.(c).2
SLB
(xiii) Incidences of
Water Logging and
Flooding (No.s of cases
per year/ total number of
identified points)
N/A N/A N/A Table
6.(c).3
SLB
Public Health (if applicable)
(xiv) No of Municipal
Hospitals and its location
details
N/A N/A N/A Table
6.(d).1.1
And 1.2
N/A
(xv) Facilities available &
OPD Timings
N/A N/A N/A N/A
(xvi) Number of cases of
vector Born Diseases per
1000 population
N/A N/A N/A Table
6.(d).2
N/A
(xvii) Number of cases of
Water Born Diseases per
1000 population
N/A N/A N/A N/A
Table 6(a).1 Private sector participation details for SWM
Package Number Scope of work Name of the
contractor
Contract period (dd/mm/yyyy to
dd/mm/yyyy)
Contract value in
Rs. In lakhs
N/A Sanitation & supplying
lsbour
Tender
submited for
approval
1-6-2010 to 31-5-2011 0.56
Manual on Public Disclosure Schedules
CMAK | 27
Table 6(a).2
Street Sweeping Schedule
Package
number
ward number Road ID
if
avaliable
Road name Road length in
Kms
Sun Mon Tue Wed Thu Fri Sat
A* type N/A N/A N/A N/A N/A N/A N/A N/A
..
…
04+06+08+09 A type 5.00km √ √ √ √ √ √ √
..
…
05+07+09+02+03 B type 12km N/A N/A √ N/A N/A √ N/A
..
…
1+10+11+12+13 C type 9.20km N/A N/A N/A √ N/A N/A N/A
..
…
D type N/A N/A N/A N/A N/A N/A N/A N/A
..
…
Source: SWM Action Plan
Table 6(a).3.1
Details Handled by SHG
(No.s)
Handled by Service Provider, if
applicable (No.s)
Handled by ULB
(No.s)
Handled by
RWA/NGO (No.s)
Manual on Public Disclosure Schedules
CMAK | 28
Non slum Household’s 2709 N/A N/A N/A
Slum Household’s 536 N/A N/A N/A
commercial establishments 102 N/A N/A N/A
Bulk generators 3347 N/A N/A N/A
Expected User fee generation (demand) N/A N/A N/A N/A
Table.6 (a) 3.2
General statistics on Solid Waste Management
Total Quantity of waste
generated in the city per
day(TPD)
Total Quantity of waste
Collected (TPD)
User fee Slab details
enclosed
Resolution date
passed from
Council
Land fill location Number of
secondary
transportation
vehicles under
SWM
3.65 2.75 N/A N/A Survey num.28,
Iduvani,
Sagara(T), Govt.
Land
1
Secondary storage
containers Location Map
Enclosure
Source: SWM Action Plan
Table 6(a).4
Number of Households participating in segregation N/A
Table 6(a).5 Scientific Disposal of MSW
Manual on Public Disclosure Schedules
CMAK | 29
Total waste collected & transported to disposal sites……..in tones/day
Total waste processed in scientific manner…………in tones/day
Table 6(a).6 Cost recovery under SWM in Rs Lakhs
Expenditure
1. Salary of the employees under SWM
4,45,900=00
2 Total Contractual cost if outsourced under
MSWM for hiring services, vehicles or
equipments, O& M of vehicles, fuel cost, labour
cost etc.
6,72,000=00
3 Total expenditure borne by ULB on SWM for O
&M of vehicles, purchase of tools and
equipments, insurance cost for vehicles, landfill
management cost like tipping fee etc.
18,000=00
Revenue
1 Total Revenue generated under SWM
N/A
Manual on Public Disclosure Schedules
CMAK | 30
Sewerage
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections….in Numbers
Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant……in MLD
Quantity of waste water treated…………….in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water……..in MLD (when mouse is moved on MLD then it
should show “million Liters per day”)
Table.6 (b) 4 Cost recovery under UGD (Input screen)
Expenditure
1. Electricity bill for sewage treatment plant Nil
2 Total salaries of ULB employees working in STP & UGD system Nil
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items,
repair and replacement of spares, labour cost etc.)
Nil
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and
replacement of spares etc.)
Nil
Revenue
1 Total revenue collected from UGD Nil
Manual on Public Disclosure Schedules
CMAK | 31
Storm Water Drains
Table.6(c).1
Statistics of storm water drains
Name of major storm water drains Length in kms Cleaning frequency per annum
N/A N/A N/A
Table.6 (c) 2
Length of road side drains
N/A
Table.6 (c) 3
Number of water logging and flooding cases per year……in numbers N/A
Total number of identified points….in Numbers N/A
Public Health to be filled by the ULBs if they are managing this function
Table 6 (d).1.1
Public Health
Name of the Municipal
hospitals
Location details Detail of facilities
Number of
beds
Number of
staff
OPD2
Timings of
the OPD
Lab Facility
(yes/No)
Others if any
N/A N/A N/A N/A N/A N/A N/A
2 Out Patient department
Manual on Public Disclosure Schedules
CMAK | 32
Table 6(d). 1.2
Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
N/A N/A
Function 7 is not managed by ULB in Karnataka State hence the details are not mentioned 8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for
which
information
has to be
disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
8 Urban
forestry,
protection of
environment
and ecology
ULB Trees (if applicable) --------------------------
(i) Number of tree cut/uprooted
to the number of existing trees
N/A N/A N/A Table 8.1 N/A
(ii) Number of sapling planted
to the number of trees
cut/uprooted to the number of
existing trees
N/A N/A N/A N/A
Water bodies (if applicable)
(iii) Existing number, New
Proposals for Revival of water
bodies, budget and expenditure
N/A N/A N/A Table 8.2 N/A
Table.8.1 (To be filled by the ULBs if they are managing this function)
Urban forestry
Manual on Public Disclosure Schedules
CMAK | 33
Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted
N/A N/A N/A
Table.8.2
Protection of Environment and Ecology
Sl. No Name existing water bodies
like lake, tanks, pond etc.
Proposed for revival in Yes/No=no N/A N/A
Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned
10. SLUM IMPROVEMENT & UP-GRADATION
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
10 Slum
Improvement &
Up-gradation
ULB/UDA (i) Details on declared
and undeclared slums
(numbers, location,
number of households,
population, area)
Declared
slums=06
Undeclared
slums=02
TP, Jog,kargal Table 10.1 N/A
(ii) Details of slum
improvement schemes
(schemes, slums
benefited, budget and
expenditure)
N/A N/A N/A Table 10.2. N/A
(iii) Beneficiary list under
each scheme
N/A N/A N/A Table 10.2 N/A
Manual on Public Disclosure Schedules
CMAK | 34
(iv) Status of Basic
Services in Slums
(a) No of connections -
Water Supply &
sanitation (% coverage)
(b) Length of Roads and
drains (paved and
unpaved)
(c) No and % of houses
(pacca and katcha houses)
N/A N/A N/A Table 10.3 N/A
Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same) Details of declared slums Malabar Camp Jog
Chavvali Camp Kargal
Joga Rasthe Kargal
I.H.P Camp Jog
Water Tank Area Kargal
Jink Shed & Lorry Shed Jog
Details of un declared slums Ambedkar Colony Kargal
Fathimapura Jog
Format for enclosure as mentioned in table 10.1
Details of declared and undeclared slums
Name of the slum Declared/ Undeclared Extent in Sq. mt Population Number of Households
Malabar Camp Jog
Chavvali Camp Kargal
Joga Rasthe Kargal
I.H.P Camp Jog
Water Tank Area Kargal
Jink Shed & Lorry Shed Jog
Declared 4.200000
3.010000
3.270000
5.000000
5.000000
3.090000
282
208
398
377
427
118
57
49
86
90
100
33
Manual on Public Disclosure Schedules
CMAK | 35
Ambedkar Colony Kargal
Fathimapura Jog
Non Declared 3.000000
3.000000
195
317
50
71
Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)
Current Year Name of the slum
Improvement Schemes Total Number of Budget and under
each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure Slums Beneficiaries
N/A N/A N/A N/A enclosure Current Year - 1
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries N/A N/A N/A N/A enclosure Current Year - 2
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries N/A N/A N/A N/A enclosure
Table 10.3 Basic Service status in Slums
Status of Basic services in Slums
Total number of
households with
direct water
supply
connections
(numeric)
Total number
of public
taps/mini
water cisterns
(numeric)
Total length
of roads
paved and
unpaved in
Kms
Total
households
connected to
UGD
(numeric)
Total
length of
road
side
drains in
Kms
Total
number of
HH with
individual
toilets
(numeric)
Number of
Functional
Community
Toilets
(numeric)
Total number of
pacca/kaccha
houses
(numeric)
Manual on Public Disclosure Schedules
CMAK | 36
N/A N/A N/A N/A N/A N/A N/A N/A
Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
11. URBAN POVERTY ALLEVIATION
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
11 Urban Poverty
Alleviation
ULBs
/DMA/UDA
(i) Details of the Urban
Poverty Alleviation
Schemes (eg.
Components of SJSRY )
Current status ULB Annually Table 11.1
Table 11.1 Details of Urban Poverty Alleviation
Name of Schemes
under urban
poverty alleviation
(multiple entries)
Budget for
the schemes
Expenditure
met for the
scheme
Number of beneficiaries
under the scheme
list of the beneficiaries to be
enclosed
Usep 2011-12 0.00 0 ( Enclosure)
Gwsep 0.00 0
Rf 0.00 0
Step up 0.00 0
Manual on Public Disclosure Schedules
CMAK | 37
ucdm 0.00 0
Uwep 0.00 0
All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
12 Provision of
urban amenities
and facilities-
parks, gardens
and playgrounds
ULBs/UDAs Playground/ Parks/Gardens
------------------
(i) Percentage of area
under parks and gardens
to the total ULB area
N/A N/A N/A Table 12.1
(ii) Percentage of
developed parks and
gardens (%)
N/A N/A N/A Table 12.1
(iii) Number, Location,
Area, Amenities, details
of the maintaining agency
N/A N/A N/A Table 12.2
(a) and 12.2
(b)
Table.12.1. Area reserved under Parks & Gardens
1. Total ULB area----------in Sq.kms
2. Area reserved under Parks & Gardens------ in Sq.meters
3. Area of developed parks and gardens ------in sq. mts
Manual on Public Disclosure Schedules
CMAK | 38
Table.12.2 (a) Amenities under parks & Gardens
Locations of
the park
-------
Park Area in
sq. mt
--------
Amenities available under each park (yes/no)
----------------------
Contact details of the
Maintaining Agency
------------
Children
play area
Seating
facility
Track for
walking/joggin
g
Facility for
exercise
Name Contact
number(n
umeric)
(multiple
entries)
N/A N/A N/A N/A N/A N/A
Table 12.3.(b) Play ground details Locations of the
playgrounds
playground Area in sq. mt Contact details of the Maintaining
Agency
N/A N/A N/A N/A
Manual on Public Disclosure Schedules
CMAK | 39
13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
13 Promotion of
cultural,
educational, and
aesthetic aspects
ULBs (i) Details of Community
halls, Cultural Centers,
marriage halls, municipal
educational institutes
2011-12 ULB N/A Table 13.1
(a) and 13.1.
(b)
(ii) Details of
advertisement hoardings,
rates, revenue generated
2011-12 ULB N/A Table 13.2.1
and 13.2.2
Table 13.1.a Details of cultural Centers
Community halls/Auditorium Details
Name Address Booking
office
address
and contact
details
SJSRY 1) Town Panchyath, Jog-Kargal.
2) Marikamba Temple
3) Yedehalli Eshwara temple
4) Yelamanguda Temple
5) Malbar Camp
6) Linganmakki, Chowdeshwari
temple.
Town
Panchyath,
Jog-Kargal.
Manual on Public Disclosure Schedules
CMAK | 40
Table 13.1 (b) Details of educational institutes (only if applicable)
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement
(As Enclosure)
Advertisement tax demand
for the current year in Rs. in
lakhs
Advertisement tax collected
in the current year in Rs. in
lakhs
1 Rs.2/- per Square meters 0.20 0.002
Name of the Municipal Educational Institutes Number of teachers in each
municipal Educational Institutes(in
numbers)
Name Address Numbers
N/A N/A N/A
Manual on Public Disclosure Schedules
CMAK | 41
14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
14 Burials and
burial grounds,
cremations,
cremation
grounds and
electric
crematoriums
ULBs (i) Numbers, type,
Location of burial
grounds and cremation
facilities available, fee
charged if any
N/A N/A N/A Table 14.1
(a). and
14.1(b)
(ii) Details of facility of
“Herse/ Corpse
Vehicles”(number and
contact details)
N/A N/A N/A Table 14.2
Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums
Details of Burial grounds, cremation grounds & electric crematoriums
Name of the
Community burial
ground with
locations
Name and
location of
the
Crematorium
s/Burial
ground
Facilities available in the Crematoriums ( Yes / No)
Electric Burning Burial Availabili
ty of
wood
Water
facility
Cleaning
facility
Others
if any
Maintaining agency
Name Contact
details
Multiple (entries) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Manual on Public Disclosure Schedules
CMAK | 42
Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Enclosure
N/A N/A
Table 14.2: Details of Hearse Vehicles
Hearse/Corpse vehicle details
Number of hearse vehicles
available
Fee details for the vehicle(
in Rs)
Contact details
to hire the
vehicle
Maintaining agency
Contact Number Name Contact
Number
N/A N/A N/A N/A N/A
Manual on Public Disclosure Schedules
CMAK | 43
15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
15 Cattle ponds,
prevention of
cruelty to
animals
ULBs (i) Numbers of stray
animals, vaccinated
N/A N/A N/A Table 15.1
(a) and 15.1
(b)
N/A
(ii) List of ‘Kanji House’
(care centers for stray
animals).
N/A N/A N/A Table 15.1
(a)
N/A
Table.15.1.1 Details of stray animals (input & output screen are same)
Number of stray animals Number of stray dogs
vaccinated
Location of Kanji House
(care centers for Stray
animals) if applicable Dogs Cows Pig Others if applicable
300 1000 N/A N/A N/A N/A
Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals Kargal
List of Animal Welfare Association (if available) N/A
Name and location of NGOs working for animal
welfare( if available)
N/A
Manual on Public Disclosure Schedules
CMAK | 44
16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
16 Vital Statistics
including
registration of
births and deaths
ULBs (i) General information
pertaining to city
(population, area,
households etc.)
N/A N/A N/A Table 16.1 City
website
(ii) List of citizen service
centers with location
N/A N/A N/A Table 16.2 N/A
(iii) Total Births and
Deaths recorded along
with Birth and Death
rates.
Registered N/A Birth=79
Death=50
Table 16.3 N/A
(iv) Citizen Charter to be
published
2011-12 ULB N/A Table 16.4 N/A
Table 16.1: City General information as per recent census details (should be added in their respective ULB website
City General information
Present
population
Present area in
sq.km
Total number
of households
Population
density
Total male
population
Total female
population
Total SC/ST
Population
Total Slum
population
Literacy rate
10840 44.43 3245 N/A 5378 5462 - 2322 8540
Table 16.2: List of Citizen Service centers
Sl. No Address of the Citizen Service centers if applicable
enclosure
Manual on Public Disclosure Schedules
CMAK | 45
Table 16.3: Details of Birth & Death
Total births recorded Total deaths recorded
79 50
N/A N/A
Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below format Service Details Period of catering the
service
Procedure to
Apply
Officer incharge
Designation Contact Number
Birth Certificate 7 days By application CO, TP, Jog-
Kargal
9481915838
Death certificate 7 days By application CO, TP, Jog-
Kargal
9481915838
Property Tax Application 7 days By application CO, TP, Jog-
Kargal
9481915838
Khatha Certificate 7 days By application CO, TP, Jog-
Kargal
9481915838
others 30 By application CO, TP, Jog-
Kargal
9481915838
Enclosure if already citizen
charter being maintained
enclosure
Manual on Public Disclosure Schedules
CMAK | 46
17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
17 Public amenities
including street
lighting, parking
lots, bus stops
and public
conveniences
ULBs (i) number of street lights 598 Tp, Jog-
Kargal
N/A Table 17.1 SLB
(ii) No. of Street Lights/
Km of Road Length
(No.s)
40 Tp, Jog-
Kargal
N/A Table 17.1 SLB
(iv) Details of agency
maintaining street lights
(name and contact details)
N/A N/A N/A Table 17.2 N/A
(v) List of Authorized
Parking Areas along with
parking capacities and fee
N/A N/A N/A Table 17.3 N/A
(vi) Number and locations
of bus stops and public
toilets (Community and
commercial) with its user
charge.
N/A N/A N/A Table 17.4 N/A
Table.17.1: Details of streetlights
Total number of streetlights Types of streetlights with number
Tube light High Mast Incandescent Mercury vapor Sodium vapor
598 520 4 N/A N/A 74
Manual on Public Disclosure Schedules
CMAK | 47
Table 17.2: Details of Agency Maintaining Streetlight
Package Number Wards Covered details of the agency Maintaining the streetlights
Name Phone Number
------ 13 Suhash electricals, Kargal 9448944100
Table.17.3: Details of Parking Lots
Details of parking lots=-------
N/A
Format
Parking lot location Parking Capacity Fee Slab
Two
wheeler
Four
wheeler
Two
wheeler
Four
wheeler
N/A N/A N/A N/A N/A
Table.17.4 Details of toilets
Table17.5: Details of Bus stop
Public toilets Community Toilets
Location Fee slab Location Fee slab
Kargal Free N/A N/A
Location of Bus stop( As Enclosure)
Kargal, Main Road, Kargal
Manual on Public Disclosure Schedules
CMAK | 48
18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
18 Regulation of
slaughter houses
and tanneries
ULBs (i) Number, Location of
Slaughter House /
Tanneries along with
facilities available and
capacity
N/A N/A N/A Table
18.1(a) and
(b)
N/A
Table.18.1(a): list of Slaughter houses
Location of Public toilets User charges for Pay and Use toilets in Rs.
Pay and use toilets Community based
Toilets
Pay and use toilets Community based Toilets
No No No No
Number of Slaughter Houses
Functional
Number of slaughter houses
Non functional
N/A
N/A
Manual on Public Disclosure Schedules
CMAK | 49
Table 18.1 (b): Details of Slaughter House
Location of
the
slaughter
House
Whether the
Slaughter
house is been
regulated by
KSCB
(Yes/No)
Capacity Number of
animals
slaughtered
per week
Facilities
Washing Medical
Examin
ation
Remo
val of
Waste
Others
if any
N/A N/A N/A N/A N/A N/A N/A N/A