+ All Categories
Home > Documents > Traders Point Gateway Project Phase 2 Planted October 24, 2009.

Traders Point Gateway Project Phase 2 Planted October 24, 2009.

Date post: 18-Jan-2018
Category:
Upload: melinda-singleton
View: 213 times
Download: 0 times
Share this document with a friend

If you can't read please download the document

Transcript

Traders Point Gateway Project Phase 2 Planted October 24, 2009 Thanks to Keep Indianapolis Beautiful, Inc., and a dedicated group representing five Traders Point neighborhoods, the greenspace surrounding the INDOT salt barn was planted with additional trees and shrubs on Saturday, October 24. These latest embellishments to the landscape were phase 2 of a beautification effort launched in November 2007, when Traders Point neighbors, Butler and IUPUI students, and KIB volunteers planted 100 native trees and shrubs and spread 100 cubic yards of mulch on newly established planting beds around the INDOT maintenance unit near the 71st Street/I-65 interchange. The aim of the landscaping was to blend the facility into the surrounding woodland, selectively masking unsightly views and creating a fitting entrance to the historic Traders Point neighborhoods and Eagle Creek Park. Phase 2 aimed for a thicker planting of shrubs in the beds to shade the soil and keep weeds from sprouting. New mulch was also be spread to maintain a neat appearance. Phase 2 Plant List Red chokeberry Brilliantissima Red-twig dogwood Virginia sweetspire 'Henry's Garnet Eastern red cedar Bayberry Ninebark Diabolo Potentilla Goldfinger Fragrant sumac (species) Fragrant sumac Gro-Low Staghorn sumac Tiger Eye Arrowwood viburnum Blue Muffin Nannyberry American cranberry Wentworth Bald cypress Hawthorn Winter King 1000 daffodils Thanks to our volunteers and supporters 9010 Michigan Road Starbucks, 56 th & Lafayette Road Starbucks, Intech Commons Drive


Recommended