+ All Categories
Home > Documents > Traditional “stick built” house under construction.

Traditional “stick built” house under construction.

Date post: 31-Dec-2015
Category:
Upload: jasper-henry
View: 34 times
Download: 1 times
Share this document with a friend
Description:
Traditional “stick built” house under construction. Modular house “boxes” that are ready to be set on the foundation. Crane getting ready to pick up one of the modular house “boxes”. Crane setting one of the modular house “boxes” on the foundation. - PowerPoint PPT Presentation
10
Traditional “stick built” house under construction. Modular house “boxes” that are ready to be set on the foundation.
Transcript
Page 1: Traditional “stick built” house under construction.

Traditional “stick built” house under construction.

Modular house “boxes” that are ready to be set on the foundation.

Page 2: Traditional “stick built” house under construction.

Crane getting ready to pick up one of the modular house “boxes”.

Page 3: Traditional “stick built” house under construction.

Crane setting one of the modular house “boxes”

on the foundation.

Page 4: Traditional “stick built” house under construction.

Crane sets the final modular house “box”. Next step is

to raise the roof.

Page 5: Traditional “stick built” house under construction.

The modular house “boxes” are set, and the roof starts to get raised.

Page 6: Traditional “stick built” house under construction.

The roof is raised.

Page 7: Traditional “stick built” house under construction.

The modular house is completely set with the roof

raised – all in one day.

Page 8: Traditional “stick built” house under construction.

Next step is to complete the siding installation and then move on to the interior work.

Page 9: Traditional “stick built” house under construction.

Kitchen was completed in the factory, and is ready for the appliances to be put in.

Page 10: Traditional “stick built” house under construction.

Flooring to be installed on-site that was shipped from the factory.

This modular home will be finished and ready to move into in a few short weeks.

Remember the “stick built” house from the first slide? It will most likely be

several months before it is completed.


Recommended