Addressing traffic congestion on city streets is a priority for Elk Grove. This fact sheet is intended to summarize completed actions, ongoing activities, as well as proposed future solutions that City staff is actively working on to help alleviate traffic. For additional information or questions, please contact our Public Works Department at (916)478-2256.
• Sheldon/Waterman Roundabout. • Traffic Management Center (TMC) relocated to City Hall to allow staff to better monitor and address congestion in real time.• Connected all 148 Traffic Signals to TMC so that signal timing can be remotely changed based on observations.• Signal upgrades to controllers and additional traffic monitoring cameras though ITS IV.
• Bradshaw/Sheldon Roundabout.
• Extended westbound left turn pocket at Laguna Boulevard and Franklin Boulevard.
• Extended westbound left turn pocket on Laguna Boulevard at Laguna Park Drive (east intersection).
• Bilby Road extension (Bruceville Road to Big Horn Boulevard extension).
• New traffic signal coordination plans are being developed for Laguna Boulevard, Bond Road and Elk Grove Boulevards to reduce congestion. • Traffic signal timing is reviewed and adjusted on an ongoing basis • Staff conducts travel time studies along Elk Grove Boulevard, Laguna Boulevard and Bond Road. Coordination plans are modified based on findings.• Implement flashing yellow arrow (FYA) pilot program.
TRAFFIC CONGESTION
Completed Actions
Ongoing Activities
Proposed Mid Term Solutions (within next 5 years)• Evaluate allowing permissive left turns on flashing yellow arrow.• Grant Line Road Widening from Waterman Road to Bradshaw Road. • Install traffic signal on Grant Line Road at Mosher Road. • Install traffic Signal on Grant Line Road at Bradshaw Road. • Install traffic signal on Bruceville Road at Quail Run Lane/Poppy Ridge Road. • Install a traffic signal on Whitelock Parkway at Cape Verde Way. • Big Horn Boulevard extension (Whitelock Parkway to Bilby Road Extension). • I-5 HOV Lanes.• Franklin Blvd Cycle Track.
Proposed Long Term Solutions (beyond 5 years)• Kammerer Road – Reconstruct existing roadway and extension of 2 lanes to Interstate 5. • New Highway 99/Whitelock interchange • Traffic Signal Communications fiber optic network. • Hwy 99 Auxiliary Lanes.
See Map on Back
MAY 2019
CITY
OF
SAC
RA
MEN
TOO
F EL
KCI
TYG
ROVE
Whi
telo
ck P
kwy
Shel
don
Rd
Elk Grove Florin Rd
Grant Line Rd
Lagu
na B
lvd
Bruceville Rd
Franklin Blvd
Elk
Grov
e Bl
vd
Bradshaw Rd
Wilto
n Rd
Calv
ine
Rd Bond
Rd
Waterman Rd
Excelsior Rd
Bilb
y Rd
Willa rd Pkwy
Hood
Fran
klin
Rd
Lotz
Pkwy
E Stockton Blvd
Kam
mer
er R
d
Mos
her R
d
Bader Rd
Elk
Grov
e Bl
vd
Harbo ur Point Dr
Shel
don
Rd
BigHorn BlvdPo w
erIn
n Rd
12
13
1
2
3
4
5
6
7
8
9
1011
15
16
14
Elk
Grov
e Ci
ty Li
mits
Cong
estio
n Lo
catio
ns a
nd P
lann
ed P
roje
cts
G:\
PR
OJE
CT
S\T
RA
FF
IC\T
RA
FF
IC_
VO
LU
ME
S\L
ayo
uts
\Co
ng
est
ion
_Lo
cati
on
s_P
lan
ned
_P
roje
cts.
mxd
5/2
/20
19
01
0.5
Mile
s
Map
Pro
duce
d by
Elk
Gro
ve G
IS, 2
019
May
.
Plan
ned
Proj
ects
Proj
ect N
umbe
r and
Des
crip
tion
1- L
eft T
urn
Pock
et E
xten
sion
EB L
agun
a Bl
vd a
t Fra
nklin
Blv
d(C
ompl
ete)
2- C
oord
inat
ion
Impr
ovem
ents
EG
Blvd
(Fra
nklin
Blv
d to
Hw
y 99
)3
- Coo
rdin
atio
n Im
prov
emen
ts La
guna
Blv
d/Bo
nd R
d (F
rank
lin B
lvd
to E
G Fl
orin
Rd)
4- B
ond
Rd M
edia
n Im
prov
emen
ts a
nd R
esur
facin
g5
- Old
Tow
n Ar
ea S
tree
tsca
pe P
hase
26
- Whi
telo
ck P
kwy/
Stat
e Ro
ute
99 In
terc
hang
e Pr
ojec
t7
- Kam
mer
er R
d Ex
tens
ion
and
Wid
enin
g8
- Bra
dsha
w R
d/Sh
eldo
n Rd
Rou
ndab
out
(Com
plet
e)9
- Gra
nt Li
ne R
d/Br
adsh
aw R
d In
ters
ectio
n, G
rant
Line
Rd/
Mos
her R
d In
ters
ectio
n,Gr
ant L
ine
Rd W
iden
ing
10- T
raffi
c Sig
nal,
Bruc
evill
e Rd
/Pop
py R
idge
Rd
(In C
onst
ruct
ion)
11- B
ig H
orn
Blvd
and
Bilb
y Rd
Ext
ensio
ns(C
ompl
ete)
12- I
nter
stat
e 5
HOV
Lane
s13
- Fra
nklin
Cyc
le T
rack
14- S
tate
Rou
te 9
9 Au
xilia
ry La
nes
15- L
agun
a Bl
vd/W
. Sto
ckto
n Bl
vd R
ight
Tur
n La
ne16
- She
ldon
Rd
Left
Turn
Lane
s
Cong
estio
n Th
resh
old
Appr
oach
es P
erfo
rman
ce T
arge
tDo
es N
ot M
eet P
erfo
rman
ce T
arge
t
CO
NG
ESTI
ON
LO
CA
TIO
NS
AN
D P
LAN
NED
PR
OJE
CTS