+ All Categories
Home > Documents > TRAFFIC STUDY AND ENVIRONMENTAL EVALUATION · 1209 Adam Smith Ave., Caldwell June 27 Happy Day...

TRAFFIC STUDY AND ENVIRONMENTAL EVALUATION · 1209 Adam Smith Ave., Caldwell June 27 Happy Day...

Date post: 17-May-2020
Category:
Upload: others
View: 6 times
Download: 0 times
Share this document with a friend
2
MIDLAND BLVD LINDEN ST S. 10 TH AVE CENTENNIAL WAY SIMPLOT BLVD CLEVELAND BLVD USTICK RD N CALDWELL ONTARIO NAMPA MAP NOT TO SCALE MIDDLETON RD ITD.IDAHO.GOV/D3 E: [email protected] P: 208.334.8002 44 19 26 20 MIDDLETON EXIT 25 WILDER/HOMEDALE EXIT 27 CITY CENTER/10 TH AVE EXIT 28 NOTUS/PARMA EXIT 26 FRANKLIN RD EXIT 29 KARCHER RD EXIT 33 he Idaho Transportation Department is conducting a traffic study and environmental analysis for Interstate 84 between Caldwell and the Karcher Interchange in Nampa. This project is a part of long-range plans to improve safety and mobility on I-84 in the Treasure Valley. At a minimum, ITD anticipates the plans will include additional lanes on I-84 and potential improvements to existing interchanges. T TRAFFIC STUDY A detailed traffic study will help ITD confirm today’s traffic volumes and project future traffic on I-84 between Caldwell and the Karcher Interchange in Nampa. The results will help ITD identify needed improvements and will help ITD determine how far west into Caldwell improvements need to be made. ENVIRONMENTAL EVALUATION ITD will evaluate a range of potential improvements to I-84 between Caldwell and the Karcher Interchange in Nampa. The environmental analysis will help ITD determine alternatives that will improve long-term mobility while minimizing impacts to the human and natural environment. As a part of the environmental evaluation, ITD will consider potential impacts to adjacent properties, minority populations, noise, floodplains, wetlands, air quality and many other factors. The project will include surveying and mapping, environmental research and reports, geotechnical investigation, drainage and hydraulic analysis, and public involvement. SCHEDULE The traffic study and environmental evaluation are underway. ITD anticipates this process will be complete in approximately 18 months. Once the traffic study and environmental evaluation is approved, ITD will begin design, right-of-way plans and construction for funded projects. ITD is looking at all available strategies to expedite the environmental analysis and design process, and advance construction. FUNDING ITD has allocated $193 million to study, design and construct improvements to I-84 between Caldwell and the Karcher Interchange in Nampa. The extent of the improvements will be determined by the traffic study and environmental analysis. COMMUNITY INPUT Community input will play an important role in shaping the future of the I-84 corridor in Canyon County. Please watch for invitations to provide input. COMMUNITY OPEN HOUSES YOU'RE INVITED June 26 Thomas Jefferson Charter School 1209 Adam Smith Ave., Caldwell June 27 Happy Day Transit Center 5907 Cleveland Blvd., Caldwell June 28 Hampton Inn 5750 E. Franklin Road, Nampa JUNE 2018 CALDWELL KARCHER TRAFFIC STUDY AND ENVIRONMENTAL EVALUATION
Transcript
Page 1: TRAFFIC STUDY AND ENVIRONMENTAL EVALUATION · 1209 Adam Smith Ave., Caldwell June 27 Happy Day Transit Center 5907 Cleveland Blvd., Caldwell June 28 Hampton Inn 5750 E. Franklin Road,

MID

LAND

BLV

D

LINDEN ST

S. 10

TH AVECE

NTE

NNIA

L WAY

SIMPLOT BLVD

CLEVELAND BLVD

USTICK RD

N

CALDWELL

ONTARIO

NAMPA

MAP NOT TO SCALE

MID

DLE

TON R

D

I T D . I D A H O . G O V/ D 3E: [email protected] P: 208.334.8002

44

19

2620

MIDDLETONEXIT 25

WILDER/HOMEDALEEXIT 27 CITY CENTER/10TH AVE

EXIT 28

NOTUS/PARMAEXIT 26

FRANKLIN RDEXIT 29

KARCHER RDEXIT 33

he Idaho Transportation Department is conducting a traffic study and environmental analysis for Interstate 84 between Caldwell and the Karcher Interchange in Nampa.

This project is a part of long-range plans to improve safety and mobility on I-84 in the Treasure Valley. At a minimum, ITD anticipates the plans will include additional lanes on I-84 and potential improvements to existing interchanges.

T

TRAFFIC STUDYA detailed traffic study will help ITD confirm today’s traffic volumes and project future traffic on I-84 between Caldwell and the Karcher Interchange in Nampa. The results will help ITD identify needed improvements and will help ITD determine how far west into Caldwell improvements need to be made.

ENVIRONMENTAL EVALUATIONITD will evaluate a range of potential improvements to I-84 between Caldwell and the Karcher Interchange in Nampa. The environmental analysis will help ITD determine alternatives that will improve long-term mobility while minimizing impacts to the human and natural environment.

As a part of the environmental evaluation, ITD will consider potential impacts to adjacent properties, minority populations, noise, floodplains, wetlands, air quality and many other factors. The project will include surveying and mapping, environmental research and reports, geotechnical investigation, drainage and hydraulic analysis, and public involvement.

SCHEDULEThe traffic study and environmental evaluation are underway. ITD anticipates this process will be complete in approximately 18 months. Once the traffic study and environmental evaluation is approved, ITD will begin design, right-of-way plans and construction for funded projects. ITD is looking at all available strategies to expedite the environmental analysis and design process, and advance construction.

FUNDING ITD has allocated $193 million to study, design and construct improvements to I-84 between Caldwell and the Karcher Interchange in Nampa. The extent of the improvements will be determined by the traffic study and environmental analysis.

COMMUNITY INPUTCommunity input will play an important role in shaping the future of the I-84 corridor in Canyon County. Please watch for invitations to provide input.

COMMUNITY OPEN HOUSESYOU'RE INVITEDJune 26 Thomas Jefferson Charter School1209 Adam Smith Ave., Caldwell

June 27Happy Day Transit Center5907 Cleveland Blvd., Caldwell

June 28Hampton Inn 5750 E. Franklin Road, Nampa

JUNE 2018

C A L DW E L L KA R C H E RT R A F F I C S T U D Y A N D E N V I R O N M E N TA L E VA L UAT I O N

Page 2: TRAFFIC STUDY AND ENVIRONMENTAL EVALUATION · 1209 Adam Smith Ave., Caldwell June 27 Happy Day Transit Center 5907 Cleveland Blvd., Caldwell June 28 Hampton Inn 5750 E. Franklin Road,

MID

LAND

BLV

D

LINDEN ST

S. 10

TH AVECE

NTEN

NIAL

WAY

SIMPLOT BLVD

CLEVELAND BLVD

USTICK RD

N

CALDWELL

ONTARIO

NAMPA

EL MAPA NO TIENE CORRECTOS

DIMENSIONES

MID

DLE

TON R

D

I T D . I D A H O . G O V/ D 3E: [email protected] P: 208.334.8002

44

19

2620

MIDDLETONEXIT 25

WILDER/HOMEDALEEXIT 27 CITY CENTER/10TH AVE

EXIT 28

NOTUS/PARMAEXIT 26

FRANKLIN RDEXIT 29

KARCHER RDEXIT 33

l Departamento de Transportación de Idaho (ITD) está realizando un estudio de tránsito y un análisis ambiental para el Interestatal 84 (I-84) entre el cruce de Caldwell y de Karcher en Nampa. Este proyecto es un parte de un gran plan para mejorar la seguridad y la movilidad por I-84 en el Treasure Valley. A lo mínimo, ITD espera que los planes incluyan los carriles adicionales por I-84 y los mejoramientos potenciales a los cruces que existen hoy en día.

E

EL ESTUDIO DE TRÁNSITO Un estudio detallado de tránsito ayudará a ITD para confirmar el volumen de tránsito hoy en día y predecir el tránsito en el futuro por el I-84 entre el cruce de Caldwell y de Karcher en Nampa. Los resultados ayudarán a ITD para identificar los mejoramientos necesarios y ayudará a ITD determinar la distancia al oeste de Caldwell para los mejoramientos.

LA EVALUACION AMBIENTALITD evaluará los opciones para los mejoramientos potenciales por I-84 entre el cruce de Caldwell y de Karcher en Nampa. El análisis ambiental ayudará a ITD para determinar los alternativos que mejorarán la movilidad en el futuro mientras minimizando los impactos al ambiente natural y a los humanos.

Como parte de la evaluación ambiental, ITD considerará los posibles impactos a propiedades adyacentes, poblaciones minoritarias, ruido, planicies de inundación, humedales, calidad del aire y muchos otros factores. El proyecto incluirá topografía y mapeo, investigación e informes ambientales, investigaciones geotécnicas, análisis de drenaje e hidráulica, y participación pública.

EL HORARIOITD anticipa que el estudio de tránsito y la evaluación ambiental podrían durar por dos años para terminar. Cuando la evaluación ambiental está aprobado, ITD va a empezar los planes para el diseño, derecho de vía y la construcción por los proyectos fundados. ITD está mirando a todos los estrategias para acelerar el análisis ambiental y el proceso del diseño y para avanzar la construcción.

FINANCIAMIENTO ITD ha asignado $193 millones para estudiar, diseñar y construir los mejoramientos por el I-84 en Nampa entre el intercambio de Caldwell y de Karcher en Nampa. Los mejoramientos serán determinados por el estudio de tránsito y el análisis ambiental.

LAS CONTRIBUCIONES DE LA COMUNIDADLas contribuciones de la comunidad tienen un papel muy importante para formar el futuro del corredor de I-84 en Canyon County. Por favor busque las invitaciones para dar sus opiniones.

UN JORNADA DE PUERTA ABIERTAS PARA LA COMUNIDADESTÁN INVITADOSEl 26 de junio La escuela de Thomas Jefferson1209 Adam Smith Ave., Caldwell

El 27 de junio Happy Day Transit Center5907 Cleveland Blvd., Caldwell

El 28 de junio Hampton Inn 5750 E. Franklin Road, Nampa

C A L DW E L L KA R C H E RU N E S T U D I O D E T R Á N S I T O Y U N A E VA L UA C I Ó N A M B I E N TA L


Recommended